CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Petersen Brothers, Inc.
Vendor Number: 33561
JD Edwards Number
Contract Number: iq-d( -j-Q(o 1
This is assigned by City Clerk's Office
Project Name: Guardrail repair @ 277th
Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract
❑ Other:
Contract Effective Date: 1/31/2013 Termination Date: 3/1/2013
Contract Renewal Notice (Days): N/A
Number of days required notice for termination or renewal or amendment
Contract Manager: Tom Rusbuldt Department: PWO- Street Signs &
Markings
Detail: (i.e. address, location, parcel number, tax id, etc. :
Public Works Agreement
S Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08
1
KENT
WASHINGTON
PUBLIC WORKS AGREEMENT
between City of Kent and
Petersen Brothers, Inc.
THIS AGREEMENT is made by and between the City of Kent, a Washington municipal
corporation (hereinafter the "City"), and Petersen Brothers, Inc. organized under the laws of the
State of Washington, located and doing business at 2008 East Valley Highway Sumner, WA
98390 (hereinafter the "Contractor").
AGREEMENT
The parties agree as follows:
I. DESCRIPTION OF WORK.
Contractor shall perform the following services for the City in accordance with the
following described plans and/or specifications:
The Contractor shall repair approximately 100 lineal feet of damaged guardrail on SE
277th westbound lane at the east end of the Don E Wickstrom bridge. All
replacements parts shall be new as noted on the Contractor's bid. For a copy of the
Contractor's bid see the attached Exhibit A which is incorporated by this reference.
Contractor further represents that the services furnished under this Agreement will be
performed in accordance with generally accepted professional practices within the Puget Sound
region in effect at the time such services are performed.
II. TIME OF COMPLETION. The parties agree that work will begin on the tasks
described in Section I above immediately upon execution of this Agreement. Upon the effective
date of this Agreement, Contractor shall complete the work described in Section I within 30
days.
III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed
$7388.55. Applicable Washington State Retail Sales Tax on this contract shall be governed by
WAC 458-20-171 and its related rules for the work contemplated in this Agreement. The
Contractor shall invoice the City monthly. The City will pay for the portion of the work described
in the invoice that has been completed by the Contractor and approved by the City. The City's
payment shall not constitute a waiver of the City's right to final inspection and acceptance of the
project.
PUBLIC WORKS AGREEMENT - 1
(Roadway/Pedestrian Path - Under$1OK and Performance Bond)
A. Payment and Performance Bond. Pursuant to Chapter 39.08 RCW, the
Contractor, shall provide the City a payment and performance bond for the
full contract amount.
B. Retainaae. The City shall hold back a retainage in the amount of five percent
(5%) of any and all payments made to contractor for a period of sixty (60)
days after the date of final acceptance, or until receipt of all necessary
releases from the State Department of Revenue, the State Department of
Labor & Industries, and the State Employment Security Department, and
until settlement of any liens filed under Chapter 60.28 RCW, whichever is
later. The amount retained shall be placed in a fund by the City pursuant to
RCW 60.28.011(4)(a), unless otherwise instructed by the Contractor within
fourteen (14) calendar days of Contractor's signature on the Agreement.
C. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work. Defective
or unauthorized work includes, without limitation: work and materials that
do not conform to the requirements of this Agreement; and extra work and
materials furnished without the City's written approval. If Contractor is
unable, for any reason, to satisfactorily complete any portion of the work, the
City may complete the work by contract or otherwise, and Contractor shall be
liable to the City for any additional costs incurred by the City. "Additional
costs" shall mean all reasonable costs, including legal costs and attorney
fees, incurred by the City beyond the maximum Contract price specified
above. The City further reserves its right to deduct the cost to complete the
Contract work, including any Additional Costs, from any and all amounts due
or to become due the Contractor.
D. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF
FINAL PAYMENT SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS,
EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY
CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND
ACCEPTED.
IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent
Contractor-Employer Relationship will be created by this Agreement. By their execution of this
Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following
representations:
A. The Contractor has the ability to control and direct the performance and
details of its work, the City being interested only in the results obtained
under this Agreement.
B. The Contractor maintains and pays for its own place of business from which
Contractor's services under this Agreement will be performed.
C. The Contractor has an established and independent business that is eligible
for a business deduction for federal income tax purposes that existed before
the City retained Contractor's services and is a service other than that
furnished by the City, or the Contractor is engaged in an independently
established trade, occupation, profession, or business of the same nature as
that involved under this Agreement.
PUBLIC WORKS AGREEMENT - 2
(Roadway/Pedestrian Path - Under$10K and Performance Bond)
D. The Contractor is responsible for filing as they become due all necessary tax
documents with appropriate federal and state agencies, including the Internal
Revenue Service and the state Department of Revenue.
E. The Contractor has registered its business and established an account with
the state Department of Revenue and other state agencies as may be
required by Contractor's business, and has obtained a Unified Business
Identifier (UBI) number from the State of Washington.
F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW
or an electrical contractor license pursuant to Ch. 19.28 RCW.
G. The Contractor maintains a set of books dedicated to the expenses and
earnings of its business.
V. TERMINATION. The City may terminate this Agreement for good cause. 'Good
cause" shall include, without limitation, any one or more of the following events:
A. The Contractor's refusal or failure to supply a sufficient number of properly
skilled workers or proper materials for completion of the Contract work.
B. The Contractor's failure to complete the work within the time specified in this
Agreement.
C. The Contractor's failure to make full and prompt payment to subcontractors
or for material or labor.
D. The Contractor's persistent disregard of federal, state or local laws, rules or
regulations.
E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt.
F. The Contractor's breach of any portion of this Agreement.
If the City terminates this Agreement for good cause, the Contractor shall not receive any
further money due under this Agreement until the Contract work is completed. After
termination, the City may take possession of all records and data within the Contractor's
possession pertaining to this project which may be used by the City without restriction.
VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay
Prevailing Wages," with the State of Washington Department of Labor & Industries prior to
commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the
bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code
of Washington, as well as any other applicable prevailing wage rate provisions. The latest
prevailing wage rate revision issued by the Department of Labor and Industries is attached.
VII. CHANGES. The City may issue a written change order for any change in the
Contract work during the performance of this Agreement. If the Contractor determines, for any
reason, that a change order is necessary, Contractor must submit a written change order
request to the person listed in the notice provision section of this Agreement, section XV(D),
within fourteen (14) calendar days of the date Contractor knew or should have known of the
PUBLIC WORKS AGREEMENT - 3
(Roadway/Pedestrian Path - Under$10K and Performance Bond)
facts and events giving rise to the requested change. If the City determines that the change
increases or decreases the Contractor's costs or time for performance, the City will make an
equitable adjustment. The City will attempt, in good faith, to reach agreement with the
Contractor on all equitable adjustments. However, if the parties are unable to agree, the City
will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed
with the change order work upon receiving either a written change order from the City or an oral
order from the City before actually receiving the written change order. If the Contractor fails to
require a change order within the time specified in this paragraph, the Contractor waives its
right to make any claim or submit subsequent change order requests for that portion of the
contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must
complete the change order work; however, the Contractor may elect to protest the adjustment
as provided in subsections A through E of Section VIII, Claims, below.
The Contractor accepts all requirements of a change order by: (1) endorsing it, (2)
writing a separate acceptance, or (3) not protesting in the way this section provides. A change
order that is accepted by Contractor as provided in this section shall constitute full payment and
final settlement of all claims for contract time and for direct, indirect and consequential costs,
including costs of delays related to any work, either covered or affected by the change.
VIII. CLAIMS. If the Contractor disagrees with anything required by a change order,
another written order, or an oral order from the City, including any direction, instruction,
interpretation, or determination by the City, the Contractor may file a claim as provided in this
section. The Contractor shall give written notice to the City of all claims within fourteen (14)
calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14)
calendar days of the date the Contractor knew or should have known of the facts or events
giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for
any reason, or extension of time, whether under this Agreement or otherwise, shall be
conclusively deemed to have been waived by the Contractor unless a timely written claim is
made in strict accordance with the applicable provisions of this Agreement.
At a minimum, a Contractor's written claim shall include the information set forth in
subsections A, items 1 through 5 below.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY
CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS
SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY.
A. Notice of Claim. Provide a signed written notice of claim that provides the following
information:
1. The date of the Contractor's claim;
2. The nature and circumstances that caused the claim;
3. The provisions in this Agreement that support the claim;
4. The estimated dollar cost, if any, of the claimed work and how that
estimate was determined; and
5. An analysis of the progress schedule showing the schedule change or
disruption if the Contractor is asserting a schedule change or
disruption.
PUBLIC WORKS AGREEMENT - 4
(Roadway/Pedestrian Path - Under$I OK and Performance Bond)
B. Records. The Contractor shall keep complete records of extra costs and time
incurred as a result of the asserted events giving rise to the claim. The City shall
have access to any of the Contractor's records needed for evaluating the protest.
The City will evaluate all claims, provided the procedures in this section are
followed. If the City determines that a claim is valid, the City will adjust payment
for work or time by an equitable adjustment. No adjustment will be made for an
invalid protest.
C. Contractor's Duty to Complete Protested Work. In spite of any claim, the
Contractor shall proceed promptly to provide the goods, materials and services
required by the City under this Agreement.
D. Failure to Protest Constitutes Waiver. By not protesting as this section provides,
the Contractor also waives any additional entitlement and accepts from the City any
written or oral order (including directions, instructions, interpretations, and
determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures
of this section, the Contractor completely waives any claims for protested work and
accepts from the City any written or oral order (including directions, instructions,
interpretations, and determination).
IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY
LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR
DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO
FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY
APPLICABLE STATUTORY LIMITATIONS PERIOD.
X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the
City a one-year warranty bond in a form and amount acceptable to the City. The Contractor
shall correct all defects in workmanship and materials within one (1) year from the date of the
City's acceptance of the Contract work. In the event any parts are repaired or replaced, only
original replacement parts shall be used—rebuilt or used parts will not be acceptable. When
defects are corrected, the warranty for that portion of the work shall extend for one (1) year
from the date such correction is completed and accepted by the City. The Contractor shall begin
to correct any defects within seven (7) calendar days of its receipt of notice from the City of the
defect. If the Contractor does not accomplish the corrections within a reasonable time as
determined by the City, the City may complete the corrections and the Contractor shall pay all
costs incurred by the City in order to accomplish the correction.
XI. DISCRIMINATION. In the hiring of employees for the performance of work under
this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on
behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age,
sexual orientationr national origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform the work to which the
employment relates.
Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy
Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract
work, file the attached Compliance Statement.
PUBLIC WORKS AGREEMENT - 5
(Roadway/Pedestrian Path - Under$1OK and Performance Bond)
XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officers, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits, including all legal costs and attorney fees, arising out of or in
connection with the Contractor's performance of this Agreement, except for that portion of the
injuries and damages caused by the City's negligence.
The City's inspection or acceptance of any of Contractor's work when completed shall not
be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor
and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability
hereunder shall be only to the extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF
IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF
THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER.
In the event Contractor refuses tender of defense in any suit or any claim, if that tender
was made pursuant to this indemnification clause, and if that refusal is subsequently determined
by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the
Contractor's part, then Contractor shall pay all the City's costs for defense, including all
reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and
fees incurred because there was a wrongful refusal on the Contractor's part.
The provisions of this section shall survive the expiration or termination of this
Agreement.
XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the
Agreement, insurance of the types and in the amounts described in Exhibit B attached and
incorporated by this reference.
XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all
necessary precautions and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of the contract work and shall utilize all protection necessary
for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be
responsible for any loss of or damage to materials, tools, or other articles used or held for use in
connection with the work.
XV. MISCELLANEOUS PROVISIONS.
A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City
requires its contractors and consultants to use recycled and recyclable products whenever
practicable. A price preference may be available for any designated recycled product.
B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of
any of the covenants and agreements contained in this Agreement, or to exercise any option
conferred by this Agreement in one or more instances shall not be construed to be a waiver or
PUBLIC WORKS AGREEMENT - 6
(Roadway/Pedestrian Path - Under$10K and Performance Bond)
relinquishment of those covenants, agreements or options, and the same shall be and remain in
full force and effect.
C. Resolution of Disputes and Governing Law. This Agreement shall be governed by
and construed in accordance with the laws of the State of Washington. If the parties are unable
to settle any dispute, difference or claim arising from the parties' performance of this
Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by
filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court,
King County, Washington, unless the parties agree in writing to an alternative dispute resolution
process. In any claim or lawsuit for damages arising from the parties' performance of this
Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or
bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award
provided by law; provided, however, nothing in this paragraph shall be construed to limit the
City's right to indemnification under Section XII of this Agreement.
D. Written Notice. All communications regarding this Agreement shall be sent to the
parties at the addresses listed on the signature page of the Agreement, unless notified to the
contrary. Any written notice hereunder shall become effective three (3) business days after the
date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to
the addressee at the address stated in this Agreement or such other address as may be
hereafter specified in writing.
E. Assignment. Any assignment of this Agreement by either party without the written
consent of the non-assigning party shall be void. If the non-assigning party gives its consent to
any assignment, the terms of this Agreement shall continue to full force and effect and no
further assignment shall be made without additional written consent.
F. Modification. No waiver, alteration, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative of
the City and Contractor.
G. Entire Agreement. The written provisions and terms of this Agreement, together
with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or
other representative of the City, and such statements shall not be effective or be construed as
entering into or forming a part of or altering in any manner this Agreement. All of the above
documents are hereby made a part of this Agreement. However, should any language in any of
the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms
of this Agreement shall prevail
H. Comeliance with Laws. The Contractor agrees to comply with all federal, state, and
municipal laws, rules, and regulations that are now effective or in the future become applicable
to Contractor's business, equipment, and personnel engaged in operations covered by this
Agreement or accruing out of the performance of those operations.
PUBLIC WORKS AGREEMENT- 7
(Roadway/Pedestrian Path - Under$10K and Performance Bond)
I. Counterparts. This Agreement may be executed in any number of counterparts,
each of which shall constitute an original, and all of which will together constitute this one
Agreement.
IN WITNESS, the parties below execute this Agreement, which shall become
effective on the last date entered below.
CONTRACTOR:: Petersen Brothers, Inc. CITY OF KENT:
By: to�/` By:
a�� a, A'Q'-
(signature) (sign )
Print Name: Ronald G. Petersen, President Print Name: Bradley Lake
Its: President Its: Operations Manager
DATE: 1-16-13 (title) DATE: t
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
CONTRACTOR: CITY OF KENT:
Tom Rusbuldt
Petersen Brothers, Inc. City of Kent
2008 East Valley Highway 220 Fourth Avenue South
Sumner, WA 98390 Kent, WA 98032
253-833-2544 (telephone) (253) 856-5600 (telephone)
253-863-5951 (facsimile) (253) 856-6600 (facsimile)
PUBLIC WORKS AGREEMENT - 8
(Roadway/Pedestrian Path - Under$10K and Performance Bond)
DECLARATION
CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY
The City of Kent is committed to conform to Federal and State laws regarding equal opportunity.
As such all contractors, subcontractors and suppliers who perform work with relation to this
Agreement shall comply with the regulations of the City's equal employment opportunity
policies.
The following questions specifically identify the requirements the City deems necessary for any
contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative
response is required on all of the following questions for this Agreement to be valid and binding.
If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the
directives outlines, it will be considered a breach of contract and it will be at the City's sole
determination regarding suspension or termination for all or part of the Agreement;
The questions are as follows:
1. I have read the attached City of Kent administrative policy number 1.2.
2. During the time of this Agreement I will not discriminate in employment on the basis of
sex, race, color, national origin, age, or the presence of all sensory, mental or physical
disability.
3. During the time of this Agreement the prime contractor will provide a written statement to
all new employees and subcontractors indicating commitment as an equal opportunity
employer.
4. During the time of the Agreement I, the prime contractor, will actively consider hiring and
promotion of women and minorities.
5. Before acceptance of this Agreement, an adherence statement will be signed by me, the
Prime Contractor, that the Prime Contractor complied with the requirements as set forth
above.
By signing below, I agree to fulfill the five requirements referenced above.
Dated this 16th day of January , 2013
By:
0110L
ona eters m, President
For: Petersen Brothers, Inc.
Title: President
Date: 1-16-13
EEO COMPLIANCE DOCUMENTS - 1
CITY OF KENT
ADMINISTRATIVE POLICY
NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998
SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996
CONTRACTORS APPROVED BY Jim White, Mayor
POLICY:
Equal employment opportunity requirements for the City of Kent will conform to federal and
state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee
equal employment opportunity within their organization and, if holding Agreements with the City
amounting to $10,000 or more within any given year, must take the following affirmative steps:
1. Provide a written statement to all new employees and subcontractors indicating
commitment as an equal opportunity employer.
2. Actively consider for promotion and advancement available minorities and women.
Any contractor, subcontractor, consultant or supplier who willfully disregards the City's
nondiscrimination and equal opportunity requirements shall be considered in breach of contract
and subject to suspension or termination for all or part of the Agreement.
Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public
Works Departments to assume the following duties for their respective departments.
1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these
regulations are familiar with the regulations and the City's equal employment opportunity
policy.
2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines.
EEO COMPLIANCE DOCUMENTS - 2
CITY OF KENT
EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT
This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the
Agreement.
I, the undersigned, a duly represented agent of Petersen Brothers, Inc.
Company, hereby acknowledge and declare that the before-mentioned company was the prime
contractor for the Agreement known as SE 277th St. Repair that was entered into on
the 1-16-13 (date), between the firm I represent and the City of
Kent.
I declare that I complied fully with all of the requirements and obligations as outlined in the City
of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity
Policy that was part of the before-mentioned Agreement.
Dated this 16th day of January 20 13
B
y ona e ersen, President
For: Petersen Brothers, Inc.
Title: President
Date: 1-16-13
EEO COMPLIANCE DOCUMENTS - 3
Petersen Brothers, Inc.
2008 EAST VALLEY HIGHWAY
SUMNER,WASHINGTON 98390
(253)833-2544 (253)863-8136
FAX(253)863-5951
Contractors# CC-01 PETERBI187NZ
SE 2771H WBEASI END OF GREEN RIVER
Project Name: BRIDGE DID DATE- IV27112 -
Item PQ�Y DESCRIPTION TOTAL
GUARDRAIL BEHIN D DAMAGED RAIL
1 1 00 EA 6X8X6'CRT WOOD POST $ 3000 $ 3000
1 QO EA 6X8X6'W000 POSTS $ 2315 S 23 15
12 50 _= W-BEAM GUARCRAIL TYPE 1 ANCHOR PLATE $ 905 S 11313
MAINLINE DAMAGED RAIL
1 D0 EA 8X8X22"WOOD BLOCK $ 1020 $ 1020
2001 EA 6X8X22'WOOD BLOCK $ 915 $ 1830
2 ODi EA 6XEX7 WOOD POSTS $ 2560 $ 51 20
11 0D EA 6X8X6'WOOD POSTS S 23 15 $ 25465
1 00 EA 6XBX6'CRT 1N001)POSTS $ 3000 $ 3000
1 00 EA 6XBX3'-6"WOOD POSTS $ 1650 S 1650
6250 LF W-BEAM GUARDRAIL $ 7 55 $ 471 88
1 00 EA BEAM GUARDRAIL B TRANSITION PLATE $ 18500 $ 185 DO
2500 LF ITHRIE BEAM GUARDRAIL $ 1345 $ 33625
1100 EA 6X8X14"WOOD BLOCKS $ 525 $ 5775
1500 EA 518XI B"MASTER BO-TS S 270 S 4050
200 EA 5/8XIO"MASTER BOLTS $ 1 90 $ 380
7600 EA 5/8X1-1/4'SPLICE BOLTS $ 065 1$ 4940
200 EA 5/8X20 MASTERBOLTS $ 290 $ 580
1900 EA 5/8"WASHERS $ 020 $ 3 80
95 00 EA 518"NUTS $ 055 $ 5225
1000 HRS CREW TIME LABOR $ 49500 $ 4 950 00
1 00 LS PROJECT TEMP TRAFFIC CONTROL $ 68500 $ 68500
TOM-CITY OF KENT
253-856-5673
EMAIL trusbuldtk kentwa gov
TOTAL $ 7,388 55
"'Price does not include traffic control unless specified
—Prices include material&installation,bond and insurance Beam Guardrail is available in 12 5'and 6.25'lengths.
"Prices are good if contract is received within 30 days after award of job,after 30 days prices must be renegotiated
IF ACCEPTED PLEASE SIGN AND FAX BACK TO 253-863-5951
NO WORK WILL BE PERFORMED WITHOUT PROPER AUTHORIZATION
By Date
Title
Company Name Phone
Address Fax
3
EXHIBIT B
INSURANCE REQUIREMENTS FOR
CONSTRUCTION PROJECTS
Insurance
The Contractor shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which may
arise from or in connection with the performance of the work hereunder by the
Contractor, their agents, representatives, employees or subcontractors.
A. Minimum Scope of Insurance
Contractor shall obtain insurance of the types described below:
1. Commercial General Liabilitv insurance shall be written on ISO
occurrence form CG 00 01 or its equivalent, with minimum limits of
$3,000,000 per occurrence and in the aggregate for each 1 year
policy period. This coverage may be any combination of primary,
umbrella or excess liability coverage affording total liability limits of
not less than $3,000,000 per occurrence and in the aggregate.
Products and Completed Operations coverage shall be provided for
a period of 3 years following Substantial Completion of the work.
The Commercial General Liability insurance shall be endorsed to
provide the Aggregate per Project Endorsement ISO form CG 25 03
11 85. The City shall be named as an Additional Insured
under the Contactor's Commercial General Liability
insurance policy with respect to the work performed for the
City. All endorsements adding Additional Insureds shall be
issued on form CG 20 10 11 85 or a form deemed equivalent,
providing the Additional Insureds with all policies and
endorsements set forth in this section.
2. Automobile Liabilitv insurance covering all owned, non-owned,
hired and leased vehicles. Coverage shall be written on Insurance
Services Office (ISO) form CA 00 01 or a substitute form providing
equivalent liability coverage. If necessary, the policy shall be
endorsed to provide contractual liability coverage.
3. Workers' Compensation coverage as required by the Industrial
Insurance laws of the State of Washington.
B. Minimum Amounts of Insurance
Contractor shall maintain the following insurance limits:
1. Commercial General Liability insurance shall be written with
minimum limits of $3,000,000 per occurrence and in the aggregate
for each 1 year policy period. This coverage may be any
EXHIBIT B (Continued)
combination of primary, umbrella or excess liability coverage
affording total liability limits of not less than $3,000,000 per
occurrence and in the aggregate. Products and Completed
Operations coverage shall be provided for a period of 3 years
following Substantial Completion of the work.
2. Automobile Liability insurance with a minimum combined single
limit for bodily injury and property damage of $1,000,000 per
accident.
C. Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following
provisions for Automobile Liability and Commercial General Liability:
1. The Contractor's insurance coverage shall be primary insurance as
respect the City. Any insurance, self-insurance, or insurance pool
coverage maintained by the City shall be excess of the Contractor's
insurance and shall not contribute with it.
2. The Contractor's insurance shall be endorsed to state that coverage
shall not be cancelled by either party, except after thirty (30) days
prior written notice by certified mail, return receipt requested, has
been given to the City.
3. The City of Kent shall be named as an additional insured on all
policies (except Professional Liability) as respects work performed
by or on behalf of the contractor and a copy of the endorsement
naming the City as additional insured shall be attached to the Ji
Certificate of Insurance. The City reserves the right to receive a
certified copy of all required insurance policies. The Contractor's
Commercial General Liability insurance shall also contain a clause
stating that coverage shall apply separately to each insured against
whom claim is made or suit is brought, except with respects to the
limits of the insurer's liability.
D. Contractor's Insurance for Other Losses
The Contractor shall assume full responsibility for all loss or damage from any
cause whatsoever to any tools, Contractor's employee owned tools, machinery,
equipment, or motor vehicles owned or rented by the Contractor, or the
Contractor's agents, suppliers or contractors as well as to any temporary
structures, scaffolding and protective fences.
i
i
EXHIBIT B (Continued)
E. Waiver of Subrogation
The Contractor and the City waive all rights against each other any of their
Subcontractors, Sub-subcontractors, agents and employees, each of the other, for
damages caused by fire or other perils to the extend covered by Builders Risk
insurance or other property insurance obtained pursuant to the Insurance
Requirements Section of this Contract or other property insurance applicable to the
work. The policies shall provide such waivers by endorsement or otherwise.
F. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not less
than ANII.
G. Verification of Coverage
Contractor shall furnish the City with original certificates and a copy of the
amendatory endorsements, including but not necessarily limited to the additional
insured endorsement, evidencing the Automobile Liability and Commercial General
Liability insurance of the Contractor before commencement of the work.
H. Subcontractors
Contractor shall include all subcontractors as insureds under its policies or shall
furnish separate certificates and endorsements for each subcontractor. All
coverages for subcontractors shall be subject to all of the same insurance
requirements as stated herein for the Contractor.
1
Page 1 of 18
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate
of fringe benefits. On public works projects, worker's wage and benefit rates must add to
not less than this total. A brief description of overtime calculation requirements are
provided on the Benefit Code Key.
Journey Level Prevailing Wage Rates for the Effective Date:
1/11/2013
County Trade Job Classification Wage HolidayOvertime Note
King Asbestos Abatement Workers Journey Level $40.83 5D 1 H
IKing Boilermakers Journey Level $60.24 5N 1C
King Brick Mason Brick And Block Finisher $42.21 5A 1M
King Brick Mason Journey Level $49.07 5A 1M
King Brick Mason Pointer-Caulker-Cleaner $49.07 5A 1M
,King Building Service Employees Janitor $19.98 5S 2F
IKing Building Service Employees Traveling Waxer/shampooer $20.39 5S 2F
King Building Sernce Employees Window Cleaner (Scaffold) $24.52 5S 2F
King Building Service Employees Window Cleaner(non-scaffold) $23.66 5S 2F ,
King Cabinet Makers In Shop1 Journey Level $22.74 1
King Carpenters Acoustical Worker $49.57 5D 1M
King Carpenters Bridge, Dock And Wharf $49.57 5D 1M
Carpenters
-King Carpenters Carpenter $49.57 5D 1M
King Carpenters Carpenters on Stationary Tools $49.70 5D 1M
1King Carpenters Creosoted Material $49.67 5D 1M r
King Carpenters Floor Finisher $49.57 5D 1M
King Carpenters Floor Layer $49.57 5D 1M
King Carpenters Scaffold Erector $49.57 5D 1M
King Cement Masons Journey Level $50.13 7A 1M
=King Divers Et Tenders Diver $100.28 5D 1M 8A
IKing Divers 8 Tenders Diver On Standby $56 68 5D 1M
King Divers Et Tenders Diver Tender $52.23 5D 1M
,King Divers £t Tenders Surface Rcv 8 Rov Operator $52.23 5D 1M
,King Divers Et Tenders Surface Rcv & Rov Operator $48.67 5A 1B
Tender
King Dredge Workers Assistant Engineer $49.57 5D 1T 8L
King Dredge Workers Assistant Mate(deckhand) $49.06 5D 1T 8L
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013
Page 2 of 18
King Dredge Workers Engineer Welder $49.62 5D 1T 8L
King Dredge Workers Leverman, Hydraulic $51.19 5D 1T 8L
King Dredge Workers Maintenance $49.06 5D 1T 8L
.King Dredge Workers Mates And Boatmen $49.57 5D 1T 8L
King Dredge Workers Oiler $49.19 5D 1T 8L
King Drywall Applicator Journey Level $49.74 5D 1 H
King Drywall Tapers Journey Level $49.79 5P 1 E
King Electrical Fixture Maintenance Journey Level $25.08 5L 1 E
Workers
King Electricians - Inside Cable Splicer $62.74 7C 2W
King Electricians - Inside Cable Splicer (tunnel) $67.451 7C 2W
King Electricians - Inside Certified Welder $60.61 7C 2W
King Electricians - Inside Certified Welder (tunnel) $65.10 7C 2W
King Electricians - Inside Construction Stock Person $33.69 7C 2W
King Electricians - Inside Journey Level $58.47 7C 2W
King Electricians - Inside Journey Level (tunnel) $62.74 7C 2W
King Electricians - Motor Shop Craftsman $15.37 1
King Electricians - Motor Shop Journey Level $14.69 1
King Electricians - Powerline Cable Splicer $64.95 5A 4A
Construction
King Electricians - Powerline Certified Line Welder $59.37 5A 4A
Construction
King Electricians - Powerline Groundperson $42.16 5A 4A
Construction
;King Electricians - Powerline Head Groundperson $44.50 5A 4A
Construction
King Electricians - Powerline Heavy Line Equipment $59.37 5A 4A I
Construction Operator
King Electricians - Powerline Jackhammer Operator $44.50 5A 4A
Construction
King Electricians - Powerline Journey Level Lineperson $59.37 5A 4A {
Construction
I King Electricians - Powerline Line Equipment Operator $49.95 5A 4A
Construction
;King Electricians - Powerline Pole Sprayer $59.37 5A 4A
Construction
King Electricians - Powerline Powderperson $44.50 5A 4A
Construction
King Electronic Technicians Journey Level $31.00 1 I
King Elevator Constructors Mechanic $75.24 7D 4A
King Elevator Constructors Mechanic In Charge $82.00 7D 4A
King Fabricated Precast Concrete All Classifications - In-Factory $14.15 5B 2K
Products Work Only
;King Fence Erectors Fence Erector $15.18 1 l
(King Fla¢gers Journey Level $34.61 7A 2Y i
King Glaziers Journey Level $52.76 7L 1Y
King Heat Et Frost Insulators And Journeyman $56.93 5J 15
3
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013
Page 3 of 18
Asbestos Workers
King Heating Equipment Mechanics Journey Level $68.52 7F 1 E
King Hod Carriers 8 Mason Tenders Journey Level $42.11 7A 2Y
King Industrial Engine And Machine Journey Level $15.65 1
Mechanics
King Industrial Power Vacuum Journey Level $9.24 1
Cleaner
;King Inland Boatmen Boat Operator $52.32 5B 1K
;King Inland Boatmen Cook $48.89 5B 1K
!King Inland Boatmen Deckhand $48.96 5B 1K
King Inland Boatmen Deckhand Engineer $49.95 5B 1K
King Inland Boatmen Launch Operator $51.16 5B 1K
King Inland Boatmen Mate $51.16 5B 1K
King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1
Sewer &Water Systems By Operator
Remote Control
King Inspection/Cleaning/Sealing Of Grout Truck Operator $11.48 1
Sewer li Water Systems By
Remote Control
rKing Inspection/Cleaning/Sealing Of Head Operator $24.91 1
Sewer Et Water Systems By
Remote Control
King Inspection/Cleaning/Sealing Of Technician $19.33 1
Sewer 8t Water Systems By
l Remote Control
King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1
Sewer Et Water Systems By
Remote Control
King Insulation Applicators Journey Level $49.57 5D 1M
King Ironworkers Journeyman $59.02 7N 10
King Laborers Air, Gas Or Electric Vibrating $40 83 7A 2Y
Screed
King Laborers Airtrac Drill Operator $42.11 7A 2Y
lKing Laborers Ballast Regular Machine $40.83 7A 2Y
King Laborers Batch Weighman $34.61 7A 2Y
King Laborers Brick Pavers $40 83 7A 2Y
'King Laborers Brush Cutter $40.83 7A 2Y
King Laborers Brush Hog Feeder $40 83 7A 2Y
;King Laborers Burner $40.831 7A I 2Y
King Laborers Caisson Worker $42.11 7A 2Y
King Laborers Carpenter Tender $40.83 7A 2Y
King Laborers Caulker $40.83 7A 2Y ?
King Laborers Cement Dumper-paving $41.59 7A 2Y
King Laborers Cement Finisher Tender $40.83 7A 2Y
King Laborers Change House Or Dry Shack $40.83 7A 2Y
King Laborers Chipping Gun (under 30 Lbs.) $40 83 7A 2Y
King Laborers Chipping Gun(30 Lbs. And $41.59 7A 2Y
i
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 j
Page 4 of 18
Over)
King Laborers Choker Setter $40.83 7A 2Y
King Laborers Chuck Tender $40.83 7A 2Y
King Laborers Clary Power Spreader $41.59 7A 2Y
King Laborers Clean-up Laborer $40.83 7A 2Y
King Laborers Concrete Dumper/chute $41.59 7A 2Y
Operator
(King Laborers Concrete Form Stripper $40.83 7A 2Y
King Laborers Concrete Placement Crew $41.591 7A 2Y
King Laborers Concrete Saw Operator/core $41.59 7A 2Y
Driller
;King Laborers Crusher Feeder $34.61 7A 2Y
King Laborers Curing Laborer $40.83 7A 2Y
King Laborers Demolition: Wrecking Er Moving $40.83 7A 2Y
(incl. Charred Material)
King Laborers Ditch Digger $40.83 7A 2Y
King Laborers Diver $42.11 7A 2Y
King Laborers Drill Operator $41.59 7A 2Y
(hydraulic,diamond)
King Laborers Dry Stack Walls $40.83 7A 2Y
King Laborers Dump Person $40.831 7A 2Y
eKing Laborers Epoxy Technician $40.83 7A 2Y
King Laborers Erosion Control Worker $40.83 7A 2Y
King Laborers Faller Et Bucker Chain Saw $41.59 7A 2Y
King Laborers Fine Graders $40.83 7A 2Y g
King Laborers Firewatch $34.61 7A 2Y
King Laborers Form Setter $40.83 7A 2Y
King Laborers Gabian Basket Builders $40.83 7A 2Y x
King Laborers General Laborer $40.83 7A 2Y
King Laborers Grade Checker Et Transit $42.11 7A 2Y
Person
King Laborers Grinders $40.831 7A 2Y
King Laborers Grout Machine Tender $40.83 7A 2Y
King Laborers Groutmen (pressure)including $41.59 7A 2Y
Post Tension Beams !
pKing Laborers Guardrail Erector $40.83 7A 2Y
King Laborers Hazardous Waste Worker (level $42.11 7A 2Y
A)
King Laborers Hazardous Waste Worker (level $41.59 7A 2Y
B) l
King Laborers Hazardous Waste Worker (level $40.83 7A 2Y ;
C)
King Laborers High Scaler $42.11 7A 2Y
:King Laborers Jackhammer $41.59 7A 2Y
;King Laborers Laserbeam Operator $41.59 7A 2Y
`King Laborers Maintenance Person $40.83 7A 2Y
z
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013
Page 5 of 18
King Laborers Manhole Builder-mudman $41.591 7A 2Y
(King Laborers Material Yard Person $40.83 7A 2Y
King Laborers Motorman-dinky Locomotive $41.59 7A 2Y
King Laborers Nozzleman (concrete Pump, $41.59 7A 2Y
Green Cutter When Using
Combination Of High Pressure
Air Et Water On Concrete Et
Rock, Sandblast, Gumte,
Shotcrete, Water Bla
King Laborers Pavement Breaker $41.59 7A 2Y
King Laborers Pilot Car $34 61 7A 2Y
King Laborers Pipe Layer Lead $42.11 7A 2Y ,
King Laborers Pipe Layer/tailor $41.59 7A 2Y
King Laborers Pipe Pot Tender $41.591 7A 2Y
King Laborers Pipe Reliner $41.591 7A 2Y
King Laborers Pipe Wrapper $41.59 7A 2Y
King Laborers Pot Tender $40.83 7A 2Y ;
`King Laborers Powderman $42.11 7A 2Y
King Laborers Powderman's Helper $40.83 7A 2Y
King Laborers Power Jacks $41.59 7A 2Y
King Laborers Railroad Spike Puller- Power $41.59 7A 2Y
King Laborers Raker - Asphalt $42.11 7A 2Y
King Laborers Re-timberman $42.11 7A 2Y
!King Laborers Remote Equipment Operator $41.59 7A 2Y
King Laborers Rigger/signal Person $41.59 7A 2Y
King Laborers Rip Rap Person $40.83 7A 2Y
King Laborers Rivet Buster $41.59 7A 2Y
gKing Laborers Rodder $41.59 7A 2Y
King Laborers Scaffold Erector $40.83 7A 2Y
King Laborers Scale Person $40.83 7A 2Y
King Laborers Sloper (over 20") $41.591 7A 2Y
King Laborers SloperSprayer $40.831 7A 2Y
King Laborers Spreader (concrete) $41.59 7A 2Y
King Laborers Stake Hopper $40.83 7A 2Y
King Laborers Stock Piler $40.83 7A 2Y
King Laborers Tamper Et Similar Electric, Air $41.59 7A 2Y
Et Gas Operated Tools
King Laborers Tamper (multiple Et Self- $41.59 7A 2Y
propelled)
King Laborers Timber Person - Sewer (Lagger, $41.59 7A 2Y
Shorer Et Cribber)
King Laborers Toolroom Person (at Jobsite) $40.83 7A 2Y
sKing Laborers Topper $40.83 7A 2Y
iKing Laborers Track Laborer $40.83 7A 2Y
(King Laborers ITrack Liner (power) $41.591 7A I 2Y
;King Laborers ITraffic Control Laborer $37.011 7A 2Y 8R
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013
Page 6 of 18
(King Laborers Traffic Control Supervisor $37.011 7A 2Y 8R
King Laborers Truck Spotter $40.83 7A 2Y
!King Laborers Tugger Operator $41.59 7A 2Y
King Laborers Tunnel Work-Compressed Air $55.89 7A 2Y 8D ,
Worker 0-30 psi
King Laborers Tunnel Work-Compressed Air $60.92 7A 2Y 8D
? Worker 30.01-44.00 psi i
King Laborers Tunnel Work-Compressed Air $64.60 7A 2Y 8D
Worker 44.01-54.00 psi
King Laborers Tunnel Work-Compressed Air $70.30 7A 2Y 8
Worker 54.01-60.00 psi
°King Laborers Tunnel Work-Compressed Air $72.42 7A 2Y
Worker 60.01-64.00 psi
King Laborers Tunnel Work-Compressed Air $77.52 7A 2Y y
Worker 64.01-68.00 psi
;King Laborers Tunnel Work-Compressed Air $79.42 7A 2Y 8D
{ Worker 68.01-70.00 psi
King Laborers Tunnel Work-Compressed Air $81.42 7A 1H 8�
Worker 70.01-72.00 psi
King Laborers Tunnel Work-Compressed Air $83.42 7A 1H 8D
Worker 72.01-74.00 psi
King Laborers Tunnel Work-Guage and Lock $42.21 7A 2Y 8D ;
Tender
King Laborers Tunnel Work-Miner $42.21 7A r2Y
8D '_
King Laborers Vibrator $41.59 7AKing Laborers Vinyl Seamer $40.83 7AKing Laborers Watchman $31.46 7AKing Laborers Welder $41.59 7A
King Laborers Well Point Laborer $41.59 7A 2Y
King Laborers Window Washer/cleaner $31.46 7A 2Y
King Laborers - Underground Sewer General Laborer Ft Topman $40.83 7A 2Y
Et Water
King Laborers - Underground Sewer Pipe Layer $41.59 7A 2Y
i3 Water
King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1
Installers
King Landscape Construction Landscape Equipment $28.17 1
Operators Or Truck Drivers
King Landscape Construction Landscaping or Planting $17.87 1 ;
Laborers
King Lathers Journey Level $49.74 5D 1H
King Marble Setters Journey Level $49.07 5A 1M i
King Metal Fabrication (In Shop) Fitter $15.86 1
King Metal Fabrication In Shop) Laborer $9.78 1
King Metal Fabrication (In Shop) Machine Operator $13.04 1
'King Metal Fabrication (In Shop) Painter $11.10 1
King Metal Fabrication (In Shop) Welder $15.48 1
King Millwright Journey Level $50.67 5D 1M
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013
Page 7 of 18
King Modular Buildings Cabinet Assembly $11.56 1
King Modular Buildings Electrician $11.56 1
;King Modular Buildings Equipment Maintenance $11.56 1
King Modular Buildings Plumber $11.56 1
King Modular Buildings Production Worker $9.40 1
King Modular Buildings Tool Maintenance $11.56 1
King Modular Buildings Utility Person $11.56 1
King Modular Buildings Welder $11.56 1
King Painters Journey Level $37.51 6Z 2B
King Pile Driver Journey Level $49.82 5D 1M
King Plasterers Journey Level $48.23 7Q 1R
King Playground Et Park Equipment Journey Level $9.19 1
Installers
lKing Plumbers £t Pipefitters Journey Level $70.84 6Z 1G
King Power Equipment Operators Asphalt Plant Operators $51.89 7A 3C 8P
IKing Power Eauipment Operators Assistant Engineer $48 62 7A 3C 8P
RKing Power Equipment Operators Barrier Machine (zipper) $51.40 7A 3C 8P
;King Power Equipment Operators Batch Plant Operator, $51.40 7A 3C 8P
x Concrete
,King Power Eauipment Operators Bobcat $48.62 7A 3C 8P
King Power Eauipment Operators Brokk - Remote Demolition $48.62 7A 3C 8P
E Equipment
lKing Power Eauipment Operators Brooms $48.62 7A 3C 8P
(King Power Eauipment Operators Bump Cutter $51 40 7A 3C 8P
King Power Eauipment Operators Cableways $51.89 7A 3C 8P
King Power Equipment Operators Chipper $51.40 7A 3C 8P
King Power Equipment Operators Compressor $48.62 7A 3C 8P
King Power Equipment Operators Concrete Pump: Truck Mount $51.89 7A 3C 8P
With Boom Attachment Over 42
M
King Power Eauipment Operators Concrete Finish Machine -laser $48.62 7A 3C 8P
Screed
King Power Equipment Operators Concrete Pump - Mounted Or $50.98 7A 3C 81
Trailer High Pressure Line
Pump, Pump High Pressure.
'King Power Eauipment Operators Concrete Pump: Truck Mount $51.40 7A 3C 8P '
With Boom Attachment Up To
42m
King Power Equipment Operators Conveyors $50.98 7A 3C 8P
King Power Eauipment Operators Cranes: 20 Tons Through 44 $51.40 7A 3C 8P
Tons With Attachments
King Power Eauipment Operators Cranes: 20 Tons Through 44 $51.40 7A 3C 8P
Tons With Attachments
Overhead, Bridge Type Crane:
20 Tons Through 44 Tons
;'King Power Eauipment Operators Cranes: 100 Tons Through 199 $52.44 7A 3C 8P ,
Tons, Or 150' Of Boom
(including Jib With
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013
Page 8 of 18
King Power Equipment Operators Cranes: 100 Tons Through 199 $52.44 7A 3C 8P
Tons, or 150' of boom
(including jib with
attachments); Overhead,
bridge type, 100 tons and over;
Tower crane up to 175' in
height, base to boom.
King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $53.01 7A 3C 8P
Or 250' Of Boom (including Jib
With Attachments)
King Power Equipment Operators Cranes: 45 Tons Through 99 $51.89 7A 3C 8P
Tons, Under 150' Of Boom
(including Jib With
Attachments)
'King Power Equipment Operators Cranes: A-frame - 10 Tons And $48.62 7A 3C 8P
Under
King Power Equipment Operators Cranes: Friction 100 Tons $53.01 7A 3C 8P
Through 199 Tons
King Power Equipment Operators Cranes: Friction Over 200 Tons $53.57 7A 3C 8P ,
King Power Equipment Operators Cranes: Over 300 Tons Or 300' $53.57 7A 3C 8P
Of Boom (including Jib With
Attachments)
King Power Equipment Operators Cranes. Through 19 Tons With $50.98 7A 3C 8P
Attachments A-frame Over 10
Tons 3
King Power Equipment Operators Crusher $51.40 7A 3C 8P i
King Power Equipment Operators Deck Engineer/deck Winches $51.40 7A 3C 8P
(power)
King Power Equipment Operators Derricks, On Building Work $51.89 7A 3C 813
King Power Equipment Operators Dozer Quad 9, HD 41, D10 and $51.89 7A 3C 8P
Over
King Power Equipment Operators Dozers D-9 8t Under $50.98 7A 3C 8P
'King Power Equipment Operators Drill Oilers: Auger Type, Truck $50.98 7A 3C 8P
Or Crane Mount
King Power Equipment Operators Drilling Machine $51.40 7A 1C 8P
King Power Equipment Operators Elevator And Man-lift: $48.62 7A 3C 8P
Permanent And Shaft Type
King Power Equipment Operators Finishing Machine, Bidwell And $51.40 7A 3C 8P
Gamaco 8t Similar Equipment §
King Power Equipment Operators Forklift: 3000 Lbs And Over $50.98 7A 3C 8P
With Attachments
King Power Equipment Operators Forklifts: Under 3000 Lbs With $48 62 7A 3C 8P
Attachments
King Power Equipment Operators Grade Engineer: Using Blue $51.40 7A 3C 8P
l Prints, Cut Sheets, Etc
King Power Equipment Operators Gradechecker/stakeman $48.62 7A 3C 8P
King Power Equipment Operators Guardrail Punch $51.40 7A 3C 8P
King Power Equipment Operators Guardrail Punch/Auger $51.40 7A 3C 8P
King Power Equipment Operators Hard Tail End Dump $51.89 7A 3C 8P
Articulating Off- Road
https://fortress.wa.gov/In1/wagelookup/prvWagelookup.aspx 1/11/2013
Page 9of18
Equipment 45 Yards. £t Over
King Power Equipment Operators Hard Tail End Dump $51.40 7A 3C 8P
i Articulating Off-road
Equipment Under 45 Yards
King Power Equipment Operators Horizontal/directional Drill $50.98 7A 3C 8P i
Locator
King Power Equipment Operators Horizontal/directional Drill $51.40 7A 3C 8P
Operator
'King Power Equipment Operators Hydralifts/boom Trucks Over $50.98 7A 3C 8P
10 Tons
King Power Equipment Operators Hydralifts/boom Trucks, 10 $48.62 7A 3C 8P
Tons And Under
:King Power Equipment Operators Loader, Overhead 8 Yards. £t $52.44 7A 3C 8P
Over
King Power Equipment Operators Loader, Overhead, 6 Yards. But $51.89 7A 3C 8P
Not Including 8 Yards
King Power Equipment Operators Loaders, Overhead Under 6 $51 40 7A 3C 8P
Yards
King Power Equipment Operators Loaders, Plant Feed $51.40 7A 3C 8P
;King Power Equipment Operators Loaders: Elevating Type Belt $50.98 7A 3C 8E
King Power Equipment Operators Locomotives, All $51.40 7A 3C 8P
King Power Equipment Operators Material Transfer Device $51.40 7A 3C 8P
King Power Equipment Operators Mechanics, All (leadmen - $52.44 7A 3C 8P
$0.50 Per Hour Over Mechanic)
King Power Equipment Operators Mixers* Asphalt Plant $51.40 7A 3C 8P i
King Power Equipment Operators Motor Patrol Grader - Non- $50.98 7A 3C 8P
finishing
King Power Equipment Operators Motor Patrol Graders, Finishing $51.89 7A 3C 8P 3
t King Power Equipment Operators Mucking Machine, Mole, Tunnel $51.89 7A 3C 8P
Drill, Boring, Road Header
And/or Shield
King Power Equipment Operators Oil Distributors, Blower $48.62 7A 3C 8P
I Distribution Et Mulch Seeding
Operator
lKing Power Equipment Operators Outside Hoists (elevators And $50.98 7A 3C 8P °
Manhfts), Air Tuggers,strato
King Power Equipment Operators Overhead, Bridge Type Crane: $51.40 7A 3C 8P
20 Tons Through 44 Tons
King Power Equipment Operators Overhead, Bridge Type: 100 $52.44 7A 3C 8P
Tons And Over
King Power Equipment Operators Overhead, Bridge Type: 45 $51.89 7A 3C 8P
Tons Through 99 Tons
King Power Equipment Operators Pavement Breaker $48.62 7A 3C 8P
King Power Equipment Operators Pile Driver (other Than Crane $51.40 7A 3C 8P ,
Mount)
`King Power Equipment Operators Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P
King Power Equipment Operators Posthole Digger, Mechanical $48.62 7A 3C 8P
King Power Equi affitaL Operators Power Plant $48.62 7A 3C 8P
tKing Power Equipment Operators Pumps Water $48.62 7A 3C 8P ,
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013
Page 10of18
King Power Equipment Operators Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P
'King Power Equipment Operators Quick Tower - No Cab, Under $48.62 7A 3C 8P
100 Feet In Height Based To
Boom
King Power Equipment Operators Remote Control Operator On $51.89 7A 3C 8P
Rubber Tired Earth Moving
Equipment
King Power Equipment Operators Rigger And Bellman $48.62 7A 3C 8P
King Power Equipment Operators Rollagon $51.89 7A 3C 8P
King Power Equipment Operators Roller, Other Than Plant Mix $48.62 7A 3C 8P
King Power Equipment Operators Roller, Plant Mix Or Multi-lift $50.98 7A 3C 8P
Materials
King Power Equipment Operators Roto-milt, Roto-grinder $51.40 7A 3C 8P
King Power Equipment Operators Saws - Concrete $50.98 7A 3C 8P
King Power Equipment Operators Scraper, Self Propelled Under $51.40 7A 3C 8P l
45 Yards
King Power Equipment Operators Scrapers - Concrete ft Carry All $50.98 7A 3C 8P
King Power Equipment Operators Scrapers, Self-propelled: 45 $51.89 7A 3C 8P
Yards And Over
King Power Equipment Operators Service Engineers - Equipment $50.98 7A 3C 8P
King Power Equipment Operators Shotcrete/gumte Equipment $48 62 7A 3C 8P
King Power Equipment Operators Shovel , Excavator, Backhoe, $50.98 7A 3C 8P
Tractors Under 15 Metric Tons. x
IKing Power Equipment Operators Shovel, Excavator, Backhoe: $51.89 7A 3C 8P
Over 30 Metric Tons To 50
Metric Tons
King Power Equipment Operators Shovel, Excavator, Backhoes, $51.40 7A 3C 8P
Tractors. 15 To 30 Metric Tons
<King Power Equipment Operators Shovel, Excavator, Backhoes: $52 44 7A 3C 8P
Over 50 Metric Tons To 90
Metric Tons
King Power Equipment Operators Shovel, Excavator, Backhoes: $53.01 7A 3C 8P
Over 90 Metric Tons
King Power Equipment operators Stipform Pavers $51.89 7A 3C 8P ,
King Power Equipment Operators Spreader, Topsider Et $51.89 7A 3C 8P
Screedman
King Power Equipment Operators Subgrader Trimmer $51.40 7A 3C 8P
King Power Equipment Operators Tower Bucket Elevators $50.98 7A 3C 8P
King Power Equipment Operators Tower Crane Over 175'in $53.01 7A 3C 8P
Height, Base To Boom
King Power Equipment Operators Tower Crane Up To 175' In $52.44 7A 3C 8P r
Height Base To Boom
King Power Equipment Operators Transporters, All Track Or $51.89 7A 3C 8P
Truck Type
lKing Power Equipment Operators Trenching Machines $50.98 7A 3C 8P
King Power Equipment Operators Truck Crane Oiler/driver - 100 $51.40 7A 3C 8P
Tons And Over
,King Power Equipment Operators Truck Crane Oiler/driver Under $50.98 7A 3C 8P
100 Tons
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013
Page 11of18
King Power Equipment Operators Truck Mount Portable Conveyor $51.401 7A 3C 8P
King Power Equipment Operators Welder $51.89 7A 3C 8P
King Power Equipment Operators Wheel Tractors, Farmall Type $48.62 7A 3C 8P
King Power Equipment Operators Yo Yo Pay Dozer $51.40 7A 3C 8P
King Power Equipment Operators- Asphalt Plant Operators $51.89 7A 3C 8P
Underground Sewer £t Water
3King Power Equipment Operators- Assistant Engineer $48.62 7A 3C 8P
Underground Sewer Et Water
;King Power Equipment Operators- Barrier Machine (zipper) $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Batch Plant Operator, $51.40 7A 3C 8P
Underground Sewer Et Water Concrete
King Power Equipment Operators- Bobcat $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Brokk - Remote Demolition $48.62 7A 3C 8P
Underground Sewer Et Water Equipment
King Power Equipment Operators- Brooms $48.62 7A 3C 8P B
Underground Sewer Et Water
I King Power Equipment Operators- Bump Cutter $51.40 7A 3C 8P
Underground Sewer Et Water
?King Power Equipment Operators- Cableways $51.89 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Chipper $51.40 7A 3C 8P
Underground Sewer Et Water
'King Power Equipment Operators- Compressor $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Concrete Pump: Truck Mount $51.89 7A 3C 8P
Underground Sewer Et Water With Boom Attachment Over 42
M
King Power Equipment Operators- Concrete Finish Machine -laser $48.62 7A 3C 8P
Underground Sewer Et Water Screed
King Power Equipment Operators- Concrete Pump - Mounted Or $50.98 7A 3C 8P
Underground Sewer 8 Water Trailer High Pressure Line
Pump, Pump High Pressure.
King Power Equipment Operators- Concrete Pump: Truck Mount $51.40 7A 3C 8P
Underground Sewer Et Water With Boom Attachment Up To
42m
King Power Equipment Operators- Conveyors $50.98 7A 3C 8P
Underground Sewer Et Water
iKing Power Equipment Operators- Cranes: 20 Tons Through 44 $51.40 7A 3C 8P
Underground Sewer Et Water Tons With Attachments
King Power Equipment Operators- Cranes: 20 Tons Through 44 $51.40 7A 3C 8P
r Underground Sewer Et Water Tons With Attachments
a Overhead, Bridge Type Crane:
20 Tons Through 44 Tons
King Power Equipment Operators- Cranes: 100 Tons Through 199 $52.44 7A 3C 8P
Underground Sewer Et Water Tons, Or 150' Of Boom
(including Jib With
King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $53.01 7A 3C 8P
Underground Sewer Et Water Or 250' Of Boom (including Jib
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013
Page 12 of 18
With Attachments)
King Power Equipment Operators- Cranes: 45 Tons Through 99 $51 89 7A 3C 8P
Underground Sewer Et Water Tons, Under 150' Of Boom
i (including Jib With
Attachments)
King Power Equipment Operators- Cranes- A-frame - 10 Tons And $48.62 7A 3C 8P
Underground Sewer Et Water Under
King Power Equipment Operators- Cranes: Friction 100 Tons $53.01 7A 3C 8P
Underground Sewer Et Water Through 199 Tons
'King Power Equipment Operators- Cranes: Friction Over 200 Tons $53.57 7A 3C 8P ,
Underground Sewer Et Water
King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $53.57 7A 3C 8P
Underground Sewer Et Water Of Boom (including Jib With
Attachments)
,King Power Equipment Operators- Cranes: Through 19 Tons With $50 98 7A 3C 8P
Underground Sewer Et Water Attachments A-frame Over 10
Tons
King Power Equipment Operators Crusher $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Deck Engineer/deck Winches $51.40 7A 3C 8P
Underground Sewer Et Water (power)
King Power Equipment Operators- Derricks, On Building Work $51.89 7A 3C 8P
Underground Sewer Et Water
t
King Power Equipment Operators- Dozer Quad 9, HD 41, D10 and $51.89 7A 3C 8P
Underground Sewer Et Water Over
King Power Equipment Operators- Dozers D-9 Et Under $50.98 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Drill Oilers: Auger Type, Truck $50.98 7A 3C 8P b
Underground Sewer Et Water Or Crane Mount
King Power Equipment Operators- Drilling Machine $51.40 7A 3C 2P
D
Underground Sewer Et Water
King Power Equipment Operators- Elevator And Man-lift: $48.62 7A 3C 8P
Underground Sewer Et Water Permanent And Shaft Type
4King Power Equipment Operators- Finishing Machine, Bidwell And $51.40 7A 3C 8P
r Underground Sewer Et Water Gamaco Et Similar Equipment s
King Power Equipment Operators- Forklift: 3000 Lbs And Over $50.98 7A 3C 8P
Underground Sewer Et Water With Attachments
King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $48.62 7A 3C 8P
Underground Sewer Et Water Attachments
King Power Equipment operators- Grade Engineer: Using Blue $51.40 7A 3C 8P
Underground Sewer Et Water Prints, Cut Sheets, Etc
King Power Equipment Operators- Gradechecker/stakeman $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Guardrail Punch $51.40 7A 3C 8P
Underground Sewer Et Water
`King Power Equipment Operators- Guardrail Punch/Auger $51.40 7A 3C 8P
Underground Sewer Et Water
-King Power Equipment Operators- Hard Tail End Dump $51.89 7A 3C 8P
Underground Sewer Et Water Articulating Off- Road
Equipment 45 Yards Et Over
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013
Page 13 of 18
King Power Equipment Operators- Hard Tail End Dump $51.40 7A 3C 8P
Underground Sewer Et Water Articulating Off-road
! Equipment Under 45 Yards
`King Power Equipment Operators- Horizontal/directional Drill $50.98 7A 3C 8P i
Underground Sewer Et Water Locator
`King Power Equipment Operators- Horizontal/directional Drill $51.40 7A 3C 8P °
Underground Sewer Et Water Operator
King Power Equipment Operators- Hydrahfts/boom Trucks Over $50.98 7A 3C 8P
Underground Sewer Et Water 10 Tons
King Power Equipment Operators- Hydralifts/boom Trucks, 10 $48.62 7A 3C 8P
Underground Sewer 8 Water Tons And Under
King Power Equipment Operators- Loader, Overhead 8 Yards. Et $52.44 7A 3C 8P
Underground Sewer Et Water Over
King Power Equipment Operators- Loader, Overhead, 6 Yards. But $51.89 7A 3C 8P
Underground Sewer Et Water Not Including 8 Yards
King Power Equipment Operators- Loaders, Overhead Under 6 $51.40 7A 3C 8P
Underground Sewer Et Water Yards
King Power Equipment Operators- Loaders, Plant Feed $51.40 7A 3C 8P
Underground Sewer Et Water
EKing Power Equipment Operators- Loaders: Elevating Type Belt $50.98 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Locomotives, All $51.40 7A 3C 8P
Underground Sewer Et Water
'King Power Equipment Operators- Material Transfer Device $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Mechanics, All (leadmen - $52.44 7A 3C 8P
Underground Sewer Et Water $0.50 Per Hour Over Mechanic)
King Power Equipment Operators- Mixers: Asphalt Plant $51.40 7A 3C 8P ?
Underground Sewer Et Water
King Power Equipment Operators- Motor Patrol Grader - Non- $50.98 7A 3C 8P
Underground Sewer Et Water finishing
King Power Equipment Operators- Motor Patrol Graders, Finishing $51.89 7A 3C 8P
Underground Sewer 8 Water
,King Power Equipment Operators- Mucking Machine, Mole, Tunnel $51.89 7A 3C 8P
Underground Sewer Et Water Drill, Boring, Road Header
And/or Shield
King Power Equipment Operators- Oil Distributors, Blower $48.62 7A 3C 8P
Underground Sewer Et Water Distribution Et Mulch Seeding
Operator
King Power Equipment Operators- Outside Hoists (elevators And $50.98 7A 3C 8P
Underground Sewer Et Water Manhfts), Air Tuggers,strato
King Power Equipment Operators- Overhead, Bridge Type Crane $51.40 7A 3C 8P
Underground Sewer Et Water 20 Tons Through 44 Tons
King Power Equipment Operators- Overhead, Bridge Type: 100 $52.44 7A 3C 8P
Underground Sewer Et Water Tons And Over
King Power Equipment Operators- Overhead, Bridge Type: 45 $51.89 7A 3C 8P
Underground Sewer Et Water Tons Through 99 Tons
King Power Equipment Operators- Pavement Breaker $48.62 7A 3C 8P
Underground Sewer Et Water
!King Power Equipment Operators- Pile Driver (other Than Crane $51.40 7A 3C 8P }
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013
Page 14 of 18
Underground Sewer Et Water Mount)
King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators. Posthole Digger, Mechanical $48.62 7A 3C 8P ,
Underground Sewer Et Water
King Power Equipment Operators- Power Plant $48 62 7A 3C 8P ,
Underground Sewer Et Water
King Power Equipment Operators- Pumps - Water $48 62 7A 3C 8P
Underground Sewer Et Water
;King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P "
Underground Sewer Et Water
King Power Equipment Operators- Quick Tower - No Cab, Under $48.62 7A 3C 8P
Underground Sewer Et Water 100 Feet In Height Based To
Boom
King Power Equipment Operators- Remote Control Operator On $51.89 7A 3C 8P `
Underground Sewer Et Water Rubber Tired Earth Moving
Equipment
King Power Equipment Operators- Rigger And Bellman $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Rollagon $51.89 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Roller, Other Than Plant Mix $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $50.98 7A 3C 8P
Underground Sewer Et Water Materials
King Power Equipment Operators- Roto-mill, Roto-grinder $51.40 7A 3C 8P '
Underground Sewer Et Water
°King Power Equipment Operators- Saws - Concrete $50.98 7A 3C 8P
Underground Sewer Et Water
,King Power Equipment Operators- Scraper, Self Propelled Under $51.40 7A 3C 8P
Underground Sewer Et Water 45 Yards
King Power Equipment Operators- Scrapers - Concrete Et Carry All $50.98 7A 3C SP
i
Underground Sewer Et Water
King Power Equipment Operators- Scrapers, Self-propelled: 45 $51.89 7A 3C 8P
Underground Sewer Et Water Yards And Over
King Power Equipment Operators- Service Engineers - Equipment $50.98 7A 3C 8P
Underground Sewer Et Water 1
King Power Equipment Operators- Shotcrete/gunite Equipment $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Shovel , Excavator, Backhoe, $50.98 7A 3C 8P v
Underground Sewer Et Water Tractors Under 15 Metric Tons.
King Power Equipment Operators- Shovel, Excavator, Backhoe: $51.89 7A 3C 8P
Underground Sewer Et Water Over 30 Metric Tons To 50
Metric Tons
€King Power Equipment Operators- Shovel, Excavator, Backhoes, $51.40 7A 3C 8P
I Underground Sewer Et Water Tractors: 15 To 30 Metric Tons
King Power Equipment Operators- Shovel, Excavator, Backhoes: $52.44 7A 3C 8P
Underground Sewer Et Water Over 50 Metric Tons To 90
Metric Tons
King Power Equipment Operators- Shovel, Excavator, Backhoes: $53.01 7A 3C 8P
i
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013
Page 15 of 18
Underground Sewer Et Water Over 90 Metric Tons
!King Power Equipment Operators- Slipform Pavers $51.89 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Spreader, Topsider Et $51.89 7A 3C 8P
Underground Sewer Et Water Screedman
King Power Equipment Operators- Subgrader Trimmer $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Tower Bucket Elevators $50.98 7A 3C 8P
Underground Sewer Et Water
King Power Equipment operators- Tower Crane Over 175'in $53.01 7A 3C 8P
Underground Sewer Et Water Height, Base To Boom
King Power Equipment Operators- Tower Crane Up To 175' In $52.44 7A 3C 8P
Underground Sewer Et Water Height Base To Boom
King Power Equipment Operators- Transporters, All Track Or $51.89 7A 3C 8P =
Underground Sewer Et Water Truck Type £
King Power Equipment Operators- Trenching Machines $50.98 7A X 8P i
Underground Sewer Et Water s
King Power Equipment Operators- Truck Crane Oiler/driver - 100 $51.40 7A 3C 8P
Underground Sewer Et Water Tons And Over ;
;King Power Equipment Operators- Truck Crane Oiler/driver Under $50 98 7A 3C 8P
i Underground Sewer Et Water 100 Tons
King Power Equipment Operators- Truck Mount Portable Conveyor $51.40 7A X 8P
Undereround Sewer Et Water
King Power Equipment Operators- Welder $51.89 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Wheel Tractors, Farmall Type $48.62 7A 3C 8P i
a Underground Sewer Et Water
%ng Power Equipment Operators- Yo Yo Pay Dozer $51.40 7A 3C 8P
9
Underground Sewer Et Water
„King Power Line Clearance Tree Journey Level In Charge $42.91 5A 4A
Trimmers
King Power Line Clearance Tree Spray Person $40.73 5A 4A
Trimmers
King Power Line Clearance Tree Tree Equipment Operator $41.29 5A 4A
Trimmers
!King Power Line Clearance Tree Tree Trimmer $38.38 5A 4A
Trimmers
King Power Line Clearance Tree Tree Trimmer Groundperson $28.95 5A 4A
Trimmers
;King Refrigeration Et Air Journey Level $69.96 6Z 1G
Conditioning Mechanics
;King Residential Brick Mason Journey Level $49.07 5A 1M
King Residential Carpenters Journey Level $28.20 1
King Residential Cement Masons Journey Level $22.64 1
King Residential Drywall Applicators Journey Level $38.081 5D 1M
King Residential Drywall Tapers Journey Level $49.79 5P 1 E
iKing Residential Electricians JOURNEY LEVEL $30.44 1
King Residential Glaziers Journey Level $34.60 7L 1 H
iKing Residential Insulation Journey Level $26.28 1
t
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013
Page 16 of 18
Applicators
'King Residential Laborers Journey Level $23.03 1
:King Residential Marble Setters Journey Level $24.09 1
King Residential Painters Journey Level $24.46 1
King Residential Plumbers Et Journey Level $34.69 1
Pipefitters
°King Residential Refrigeration Et Air Journey Level $69.96 6Z 1G
Conditioning Mechanics
King Residential Sheet Metal Journey Level (Field or Shop) $41.30 7F 111
Workers
King Residential Soft Floor Lavers Journey Level $41.78 5A 3D
King Residential Sprinkler Fitters Journey Level $41.31 5C 211
(Fire Protection)
iKing Residential Stone Masons Journey Level $49.07 5A 1M
,King Residential Terrazzo Workers Journey Level $45.43 5A 1M
King Residential Terrazzo/Tile Journey Level $21.46 1
Finishers
King Residential Tile Setters Journey Level $25.17 1
,King Roofers Journey Level $43.90 5A 111
,King Roofers Using Irritable Bituminous $46 90 5A 1R
Materials
King Sheet Metal Workers Journey Level (Field or Shop) $68.52 7F 1 E
;King Shipbuilding Et Ship Repair Boilermaker $35.831 7M 1H
King Shipbuilding Et Ship Repair Carpenter $38 24 70 3B
King Shipbuilding Et Ship Repair Electrician $37.85 70 3B
King Shipbuilding Et Ship Repair Heat Et Frost Insulator $56.93 5J 15
King Shipbuilding Et Ship Repair Laborer $36.81 70 3B
King Shipbuilding Et Ship Repair Machinist $37.81 70 36 I
King Shipbuilding Et Ship Repair Operator $40.20 70 3B
King Shipbuilding Et Ship Repair Painter $37.81 70 3B
King Shipbuilding Et Ship Repair Pipefitter $37.79 70 3B
King Shipbuilding Et Ship Repair Rigger $37.78 70 313 i
King Shipbuilding Et Ship Repair Sandblaster $36 81 70 3B 3
King Shipbuilding Et Ship Repair Sheet Metal $37.77 70 36
King Shipbuilding Et Ship Repair Shipfitter $37.78 70 3B
King Shipbuilding Et Ship Repair Trucker $37.63 70 3B
;King Shipbuilding £t Ship Repair Warehouse $37.68 70 313
King Shipbuilding Et Ship Repair Welder/Burner $37.781 7O 3B
King Sign Makers Et Installers Sign Installer $22.92 1
(Electrical)
i
t
King Sign Makers Et Installers Sign Maker $21.36 1
IElectricaU
King Sign Makers Et Installers (Non- Sign Installer $27.28 1
Electrical
King Sign Makers Et Installers (Non- Sign Maker $33.25 1
Electrical
t
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013
Page 17of18
King Soft Floor Lavers Journey Level $41.78 5A 3D
King Solar Controls For Windows Journey Level $12.44 1
King Sprinkler Fitters (Fire Journey Level $69.44 5C 1X
i Protectionl
'King Stage Rigging Mechanics (Non Journey Level $13.23 1
Structural)
,King Stone Masons Journey Level $49.07 5A 1M
King Street And Parking Lot Journey Level $19.09 1
Sweeper Workers
EKing Surveyors Assistant Construction Site $50.98 7A 3C 8P
Surveyor
)King Surveyors Chainman $50.46 7A 3C 8P
King Surveyors Construction Site Surveyor $51.89 7A 3C 8P '
King Telecommunication Journey Level $22.76 1
Technicians
King Telephone Line Construction - Cable Splicer $35.09 5A 2B
1 Outside
King Telephone Line Construction - Hole Digger/Ground Person $19 22 5A 2B
Outside
King Telephone Line Construction - Installer (Repairer) $33.63 5A 2B
Outside
King Telephone Line Construction - Special Aparatus Installer 1 $35.09 5A 2B
Outside
King Telephone Line Construction - Special Apparatus Installer II $34.37 5A 2B
I Outside
King Telephone Line Construction - Telephone Equipment Operator $35.09 5A 2B
Outside (Heavy)
King Telephone Line Construction - Telephone Equipment Operator $32.62 5A 2B
Outside (Light)
King Telephone Line Construction - Telephone Lineperson $32.62 5A 2B
Outside
lKing Telephone Line Construction - Television Groundperson $18.65 5A 2B
l Outside
;King Telephone Line Construction - Television Lineperson/Installer $24.66 5A 2B
Outside
King Telephone Line Construction - Television System Technician $29.42 5A 2B
Outside
King Telephone Line Construction - Television Technician $26.43 5A 2B
Outside
King Telephone Line Construction - Tree Trimmer $32.95 5A 2B
Outside
King Terrazzo Workers Journey Level $45.43 5A 1M
King Tile Setters Journey Level $21.65 1
lKing Tile, Marble Et Terrazzo Finisher $37.76 5A 16
Finishers
King Traffic Control Stripers Journey Level $41.27 7A 1K
King Truck Drivers Asphalt Mix Over 16 Yards (W. $47.91 5D 3A 8L
WA-Joint Council 28)
'King Truck Drivers Asphalt Mix To 16 Yards (W. $47.07 5D 3A 81
l [
i
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013
Page 18 of 18
WA-Joint Council 28)
King Truck Drivers Dump Truck Ft Trailer $47.91 5D 3A 8L
King Truck Drivers Dump Truck (W. WA-Joint $47.07 5D 3A 8L
Council 28)
King Truck Drivers Other Trucks (W. WA-Joint $47.91 5D 3A 8L
Council 28)
King Truck Drivers Transit Mixer $43.23 1
King Well Drillers Ft IrriQation Pump Irrigation Pump Installer $17.71 1
Installers
King Well Drillers Ft Irrigation Puma Oiler $12.97 1
Installers
King Well Drillers Ft Irrigation Pump Well Driller $18.00 1
Installers
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013
Benefit Code Key-Effective 08-31-2012 thru 03-02-2013
Overtime Codes
Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly rate
must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the
worker
1 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES TI IE HOURLY RATE OF WAGE
B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage
C. The first two (2) hours after eight(8) regular hours Monday through Friday and the first ten (10)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All other overtime hours and all hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage
D. The first two (2)hours before or after a five - eight (8)hour workweek day or a four-ten (10)hour workweek day
and the first eight (8) hours worked the next day after either workweek shall be paid at one and one-half times the
hourly rate of wage All additional hours worked and all worked on Sundays and holidays shall be paid at double the
hourly rate of wage.
E The first two (2)hours after eight (8)regular hours Monday through Friday and the first eight(8) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage
F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All other overtime hours worked, except Labor Day,
shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the
hourly rate of wage
G The first ten(10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four
- ten hour schedule, shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of
ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage
H All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions or equipment
breakdown) shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through
Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate
of wage
I All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage
J The first two(2)hours after eight(8) regular hours Monday through Friday and the first ten (10) hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All hours worked over ten (10) hours Monday
through Saturday,Sundays and holidays shalt be paid at double the hourly rate of wage
K All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All
hours worked on holidays shall be paid at double the hourly rate of wage
M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be
paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage
N All hours worked on Saturdays(except makeup days)shall be paid at one and one-half times the hourly rate of wage.
All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage
1. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All
hours worked on Sundays, holidays and after twelve(12)hours,Monday through Friday and after ten (10)hours on
Saturday shall be paid at double the hourly rate of wage
Benefit Code Key—Effective 08-31-2012 thru 03-03-2013
P All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and
one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage
Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on
Saturdays shall be paid at one and one-half times the hourly rate of wage All horns worked in excess of ten (10)
hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day) shall
be paid at double the hourly rate of wage All hours worked on Christmas day shall be paid at two and one-half times
the hourly rate of wage
R All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage
S The first two(2) hours after eight(8) regular hours Monday through Friday and the first eight(8)hours on Saturday
shall be paid atone and one-half times the hourly rate of wage All hours worked on holidays and all other overtime
hours worked, except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day
shall be paid at three times the hourly rate of wage
T. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the noimal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate Hours
worked over twelve hours (12) in a single shift and all work performed after 6 00 pm Saturday to 6 00 am Monday
and holidays shall be paid at double the straight time rate of pay The employer shall have the sole discietion to
assign overtime work to employees Primary consideration for overtime work shall be given to employees regularly
assigned to the work to be performed on overtime situations After an employee has worked eight(8) hours at an
applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee
has had a break of eight(8)hours or more.
U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on
Sundays and holidays (except Labor Day)shall be paid at two times the hourly rate of wage All hours worked on
Labor Day shall be paid at three tunes the hourly rate of wage
V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at
one and one-half times the hourly rate of wage All hours worked on Thanksgiving Day and Christmas day shall be
paid at double the hourly rate of wage
W All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the
employer)) shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be
paid at double the hourly rate of wage
X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on
Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve(12) hours
Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage When holiday falls
on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday,Monday, shall be considered the
holiday and all work performed shall be paid at double the hourly rate of wage
Y. All hours worked outside the hours of 5 00 am and 5 00 pm (or such other hours as may be agreed upon by any
employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10
workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half tunes the hourly rate
of wage (except for employees who are absent from work without prior approval on a scheduled workday during the
workweek shall be paid at the straight-time rate until they have worked 8 hours in a day(10 in a 4 x 10 workweek)or
40 hours during that workweek) All hours worked Monday through Saturday over twelve (12) hours and all hours
worked on Sundays and Labor Day shall be paid at double the hourly rate of wage
1. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All
hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay
2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage.
—2 —
Benefit Code Key—Effective 08-31-2012 thru 03-03-2013
2. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on
holidays shall be paid at two times the hourly rate of wage
F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday
pay All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly i ate of wage
G All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on paid holidays
shall be paid at two and one-half times the hourly rate of wage including holiday pay
H. All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on holidays shall
be paid at one and one-half times the hourly rate of wage
K. All hours worked on holidays shall be paid at two times the hourly rate of wage in addition to the holiday pay.
O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage
R. All hours worked on Sundays and holidays and all hours worked over sixty(60) in one week shall be paid at double
the hourly rate of wage
U All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked
over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage
W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage On a four-day.ten-
hom weekly schedule,either Monday thou Thursday or Tuesday thru Friday schedule,all hours worked after ten shall
be paid at double the hourly rate of wage The first eight(8)hours worked on the fifth day shall be paid at one and
one-half times the hourly rate of wage All other hours worked on the fifth, sixth, and seventh days and on holidays
shall be paid at double the hourly rate of wage
Y. All hours worked on Saturdays (except for make-up days) shall be paid at one and one-half times the hourly rate of
wage All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and
holidays shall be paid at double the hourly rate of wage
3 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
A Work performed in excess of eight(8)hours of straight time per day, or ten (10)hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate Hours
worked over twelve hours (12) in a single shift and all work performed after 6 00 pm Saturday to 6 00 am Monday
and holidays shall be paid at double the straight time rate of pay Any shift starting between the hours of 6 00 pm and
midnight shall receive an additional one dollar($1 00)per hour for all hours worked that shift
The employer shall have the sole discretion to assign overtime work to employees Primary consideration for
overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations
After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the
applicable overtime rate until such time as the employee has had a break of eight(8)hours or more
B. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on
Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve (12)hours
Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of
wage
C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage
All work performed after 6 00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate
of wage After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at
the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more
—3—
Benefit Code Key—Effective 08-31-2012 thru 03-03-2013
3. D. All hours worked between 6 00 pm Monday through 6.00 am Saturday,shall be paid at an overtime rate of 15%over
the hourly rate of wage All other hours worked after 6 00 am on Saturdays,shall be paid at one and one-half times
the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
E All hours worked Sundays and holidays shall be paid at double the hourly rate of wage Each week,once 40 hours of
straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid
at double the hourly wage rate
4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
A All hours worked in excess of eight(8)hours per day or forty (40)hours per week shall be paid at double the hourly
rate of wage All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage
B. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be
paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve(12)
hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage
Holiday Codes
5. A Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day,and Christmas Day(7).
B Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day,the day before Chnstmas,and Christmas Day(8)
C. Holidays New Year's Day,Presidents' Day,Memorial Day,Independence Day, Labor Day, Thanksgiving Day,the
Friday after Thanksgiving Day,And Christmas Day(8)
D Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day,And Christmas Day (8)
H. Holidays New Year's Day,Memorial Day,Independence Day, Thanksgiving Day,the Day after Thanksgiving Day,
And Christmas(6)
I Holidays New Year's Day,Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
(6)
J. Holidays: New Year's Day,Memorial Day, Independence Day, Thanksgiving Day,Friday after Thanksgiving Day,
Christmas Eve Day,And Christmas Day(7)
K Holidays. New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
Friday After Thanksgiving Day, The Day Before Christmas,And Christmas Day(9)
L. Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8)
N. Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day,
Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9).
P. Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday
After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9) If A Holiday Falls On Sunday, The
Following Monday Shall Be Considered As A Holiday
R. Paid Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After
Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day (7 1l2)
—4—
Benefit Code Key—Effective 08-31-2012 thru 03-03-2013
5. S. Paid Holidays New Year's Day,Presidents' Day,Memorial Day,Independence Day, Labor Day, Thanksgiving
Day,And Christmas Day(7)
T. Paid Holidays- New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas
(9)
Z. Holidays New Year's Day. Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the
Friday after Thanksgiving Day,And Chi istmas Day(8)
Holiday Codes Continued
6. A. Paid Holidays-New Year's Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,
The Friday After Thanksgiving Day,And Christmas Day(8)
E Paid Holidays New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, Christmas Day, And A Half-Day
On Chistmas Eve Day (9 1/2)
G Paid Holidays New Year's Day,Martin Luther King Jr.Day,Presidents'Day,Memorial Day, Independence
Day,Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day, Christmas Day, And
Christmas Eve Day(11)
H. Paid Holidays New Year's Day,New Year's Eve Day,Memorial Day,Independence Day,Labor Day,Thanksgiving
Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(10)
L Paid Holidays New Year's Day,Memorial Day,Independence Day,Labor Day, Thanksgiving Day,Friday 1
After Thanksgiving Day.And Christmas Day(7)
Q Paid Holidays New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day,
Thanksgiving Day,The Day After Thanksgiving Day And Christmas Day(8) Unpaid Holiday_ Presidents'
Day
T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day,The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day,And
Christmas Day(9)
Z. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday after
Thanksgiving Day, And Christmas Day (7) If a holiday falls on Saturday, the preceding Friday shall be
considered as the holiday If a holiday falls on Sunday, the following Monday shall be considered as the
holiday
Holiday Codes Continued
7 A Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And
Saturday After Thanksgiving Day, And Christmas Day (8) Any Holiday Which Falls On A Sunday Shall Be
Observed As A Holiday On The Following Monday If any of the listed holidays falls on a Saturday, the preceding
Friday shall be a regular work day
B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as
a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the
preceding Friday
C. Holidays New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8) Any holiday which falls on a
Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday
�5�
Benefit Code Key—Effective 08-31-2012 thru 03-03-2013
7. D Paid Holidays New Year's Day, Memorial Day,Independence Day,Labor Day Veteran's Day.Thanksgiving Day,
the Friday after Thanksgiving Day, And Christmas Day (8) Unpaid Holidays President's Day Any paid holiday
which falls on a Sunday shall be observed as a holiday on the following Monday Any paid holiday which falls on a
Saturday shall be observed as a holiday on the preceding Friday
E. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day And Chnstmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday
F. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, the last working day before Christmas day and Christmas day (8) Any holiday which falls on a
Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday
G. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
(6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday
H. Holidays New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day,
Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas
Day(9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday
which falls on a Saturday shall be observed as a holiday on the preceding Friday
I Holidays New Year's Day, President's Day Independence Day, Memorial Day,Labor Day, Thanksgiving Day, The
Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day(9) Any holiday which falls on
a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday
J Holidays New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day
(6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday
which falls on a Saturday shall be observed as a holiday on the preceding Friday
K. Holidays New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after
Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday
L. Holidays New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day
before Christmas Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday
on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday
M Paid Holidays New Year's Day, The Day after or before New Year's Day. President's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day, And the Day
after or before Christmas Day 10) Any holiday which falls on a Sunday shall be observed as a holiday on the
following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday
N. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day Thanksgiving Day, the Friday after
Thanksgiving Day, And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday
i
O. Paid Holidays. New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, The Day
After Or Before Christmas Day, And The Employees Birthday 11) Any holiday which falls on a Sunday shall be
observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a
holiday on the preceding Friday
P. Holidays New Year's Day, Memorial Day. Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day, And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday
—6—
Benefit Code Key—Fffectne 08-31-2012 thru 03-03-2013
7. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(8) Any holiday which falls on
a Sunday shall be observed as a holiday on the following Monday If any of the listed holidays falls on a Saturday,
the preceding Friday shall be a regular work day
R. Paid Holidays New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day
after or before Christmas Day (10) If any of the listed holidays fall on Saturday. the preceding Friday shall be
observed as the holiday If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be
considered a holiday and compensated accordingly
Note Codes
S. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more-
Over 50' To 100'-$2 00 per Foot for Each Foot Over 50 Feet ;
Over 100'To 150'-$3 00 per Foot for Each Foot Over 100 Feet
Over 150'To 220'-$4 00 per Foot for Each Foot Over 150 Feet
Over 220'-S5 00 per Foot for Each Foot Over 220 Feet a
C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more-
Over 50' To 100'-$1 00 per Foot for Each Foot Over 50 Feet
Over 100'To 150'-$1 50 per Foot for Each Foot Over 100 Feet
Over 150'To 200'-S2 00 per Foot for Each Foot Over 150 Feet '
Over 200'-Divers May Name Their Own Price
D. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour
1
L. Workers on hazmat projects receive additional hourly premiums as follows - Level A $0 75, Level B $0 50, And
Level C $0 25
M. Workers on hazmat projects receive additional hourly premiums as follows Levels A & B $1 00, Levels C & D:
$0 50
N Workers on hazmat projects receive additional hourly premiums as follows -Level A. $1 00, Level B. $0 75, Level
C.$0 50,And Level D-$0 25
P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit $2 00,Class B Suit $1.50,
Class C Suit $1.00,And Class D Suit$0 50.
Q The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the
shift shall be used in determining the scale paid
R. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or
spotting or other traffic control labor is being utilized A Traffic Control Laborer performs the setup,maintenance and
removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and
pedestrian traffic during construction operations Flaggers and Spotters shall be posted where shown on approved
Traffic Control Plans or where directed by the Engineer All flaggers and spotters shall possess a current flagging
card issued by the State of Washington, Oregon, Montana, or Idaho These classifications are only effective on or
after August 31,2012
S Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or
spotting or other traffic control labor is being utilized Flaggers and Spotters shall be posted where shown on
approved Traffic Control Plans or where directed by the Engineer All flaggers and spotters shall possess a current
flagging card issued by the State of Washington, Oregon,Montana,or Idaho This classification is only effective on
or after August 31,2012
—7—
Benefit Code Key—Effective 08-31-2012 thru 03-0;-2013
8. T. Effective August 31,2012—A Traffic Control Laborer performs the setup.maintenance and removal of all temporary
traffic control devices and construction signs necessary to control vehicular, bicycle and pedestrian traffic during
construction operations Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or
where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of
Washington,Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012
—8—
Page 1 of 3
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Statement of Intent to Pay Prevailing Wage
Document Received Date: Intent ID: Affidavit ID: Status: Approved On
1/17/2013 552385 1/18/2013
Company Details
Company Name: PETERSEN BROTHERS INC
4
Address: 2008 E VALLEY HWY
SUMNER, WA, 98390
Contractor Registration No. PETER61187NZ
WA UBI Number 600072474
Phone Number 253-863-8136
Industrial Insurance Account ID 190,856-00
Email Address kim@petersenbrothers.com
Filed By Knox, Kim
Prime Contractor 1
Company Name PETERSEN BROTHERS INC
Contractor Registration No. PETERB1187NZ
WA UBI Number 600072474
Phone Number 253-863-8136
Project Information
Awarding Agency KENT, CITY OF
220 - 4TH AVE S KENT, WA - 98032-5895
Awarding Agency Contact Kristin Lykken
Awarding Agency Contact Phone Number 253-856-5650
Contract Number 13-004
Project Name 277th St SE Guardrail Repair
Contract Amount $77388.55
https://fortress.wa.gov/Ini/wagelookup/IntentDetaiIs.aspx 1/23/2013
Page 2of3
Bid due date 12/27/2012
Award Date 1/14/2013
Project Site Address or Directions
Payment Details
Check Number:
Transaction Id: 103790366
Intent Details
Expected project start date: (MM-DD-YYYY) 1/22/2013
In what county (or counties) will the work be King
performed?
In what city (or nearest city) will the work be Kent
performed?
What is the estimated contract amount? OR is this $7,388.55
a time and materials estimate?
Will this project utilize American Recovery and No
Reinvestment Act (ARRA) funds?
Specifically, will this project utilize any No
weatherization or energy efficiency upgrade
funds (ARRA or otherwise)?
Does your company intend to hire ANY No
subcontractors?
Does your company intend to hire subcontractors No
to perform ALL work?
Will your company have employees perform work Yes
on this project?
Do you intend to use any apprentices? No
(Apprentices are considered employees.)
How many owner/operators performing work on 0
the project own 30% or more of the company?
journey Level Wages
County Trade Occupation Wage Fringe # ��
Workers
King Laborers General Laborer $31.31 $9.52 2
King Power Equipment Operators Guardrail Punch/Auger $35 50 $15.90 1
King Power Equipment Operators Cranes: Through 19 Tons With $35.08 $15.90 1
https://fortress.wa.gov/Ini/wagelookup/IntentDetaiIs.aspx 1/23/2013
Page 3of3
Attachments A-frame Over 10
Tons
Y King Power Equipment Operators Hydratifts/boom Trucks Over $35.08 $15.90 1
10 Tons
King Power Equipment Operators Assistant Engineer $32.72 $15.90 1
Public Notes
s Show/Hide Existing, Notes
No note exists
https:Hfortress.wa.gov/lni/wagelookup/IntentDetails.aspx 1/23/2013
® K ANT PAYMENT AND PERFOP.MANCE BOND Bond No 105856985
W. k' °" TO CITY OF KENT
KNOW ALL MEN BY THESE PRESENTS:
That we, the undersigned, Petersen Brothers, Inc.
as Principal, and Travelers Casualty and Surety Company of America
a Corporation organized and existing under the laws of the State of Washington, as a
Surety Corporation, and qualified under the laws of the State of Washington to
become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are
jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of $
$7,388 55 , together with any adjustments, up or down, in the total contract
price because of changes in the contract work, for the payment of which sum on
demand we bind ourselves and our successors, heirs, administrators or personal
representatives, as the case may be.
This obligation is entered into in pursuance of the statutes of the State of
Washington, and the Codes and Ordinances of the CITY OF KENT.
Nevertheless, the conditions of the above obligation are such that:
WHEREAS, under and pursuant to a motion, duly made, seconded and passed
by the City Council of the City of Kent, King County, Washington, the Mayor of the City
of Kent has let or is about to let to the above bounden Principal, a certain contract, the
sald contract providing for construction of Repair Damaged Guardrail on SE 277th Street W/B Lane
(which contract is referred to herein and is made a part hereof as though attached
hereto), and
WHEREAS, the Principal has accepted, or is about to accept, the contract, and
undertake to perform the work therein provided for in the manner and within the time
set forth:
NOW, THEREFOR-Er for non-FHWA projects only, if the Principal shall faithfully
perform a€I the provisions of said contract in the manner and within the time herein
set forth, or within such extensions of time as may be granted under the said contract,
and shall pay all laborers, mechanics, subcontractors and material men, and all
persons who shalt supply the Principal or subcontractors with provisions and supplies
for the carrying on of said work and shall indemnify and hold the CITY OF KENT
harmless from any damage or expense by reason of failure of performance as
specified in said contract or from defects appearing or developing in the material or
workmanship provided or performed under said contract, then and In that event this
obligation shall be void; but otherwise it shall be and remain in full force and effect.
IN WITNESS WHEREOF, the above bounden parties have executed this
instrument under their separate seals. The name and corporate seal (if required by
PAYMENT AND PERFORMANCE BOND
Page 1 of 2
law) of each corporate party is hereto affixed and duly signed by Its undersigned
representatives pursuant to authority of its governing body.
V0 WITNESSES: Petersen Brothers, Inc
PRINCIPAL Can pr+n is name above)
V-0-'tiaa
br6 T. eYsCn TITLE: __ vSODC-t.Yt'
DATE: January 17, 2013 DATE: January 17, 2013
CORPORATE SEAL:
PRINT NAME
DATE: �r,�� � D�� Travelers Casualty and Surety Company of America
��=" SURETY
CORPORATE SEAL: BY: ry
D TE: January 17, 2013
TITLE: Karen J Smith, Attorney-In-Fact
ADDRESS: 621 Pacific Ave #400
Tacoma, WA 98402
CERTIFICATE AS TO CORPORATE SEAL
I hereby certify that I am the (Assistant)Secretary of the Corporation named as
Principal in the within Bond; that 'W-r=fPrci_n c:, - R§il LS�
Who signed the said band on behalf of the Principal . givsenl rii _sue
Of the said Corporation; that I know his signature thereto is genuine, and that said
Bond was duly signed, sealed, and attested for and in behalf of said Corporation by
authority of its governing body.
SECRETARY OR ASSISTA T SECRETARY
C r isi `c>, Pr--T&g-5C—t`3
P.1tiv4yamuSSaarzaV RaeueolFerh'muricv9onE dw i
PAYMENT AND PERFORMANCE BOND
Page 2 of 2
WARNING THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
POWER OF ATTORNEY
TRAVELERSJ� Farmington Casualty Company St.Paul Mercury Insurance Company
Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America
St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company
St.Paul Guardian Insurance Company
Attorney-In Fact No. 218993 Certificate No 004820220
KNOW ALL MEN BY THESE PRESENTS That St Paul Fire and Marine Insurance Company,St Paul Guardian Insurance Company and St Paul Mercury Insurance
Company are corporations duly organized under the laws of the State of Minnesota that Farmington Casualty Company,Travelers Casualty and Surety Company,and
Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut,that United States Fidelity and Guaranty
Company is a corporation duly organized under the laws of the State of Maryland,that Fidelity and Guaranty Insurance Company is a corporation duly organized under
the laws of the State of Iowa,and that Fidelity and Guaranty Insurance Underwtrters,Inc,is a corporation duly organized under the laws of the State of Wisconsin
(herein collectively called the `Companies"),and that the Companies do hereby make,constitute and appoint
Karen Ingram,Karen J Smith,Julie Craker,Thomas P Hentschell,Leslie A Parks,Brad Roberts,and Joanne Reinkensmeyer
of the City of Tacoma ,State of Washington ,their true and lawful Attomey(s)-m-Fact,
each in their separate capacity if more than one is named above,to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional undertakings and
other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of petsons,guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings iequued or permitted in any actions or proceedings allowed by law
23rd
IN WITNESS AYHEREOF,the Couparttels�iave caused this instrument to be signed and their corporate seals to be hereto affixed,this
day of AprilLUU
Farmington Casualty Company St.Paul Mercury Insurance Company
Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company
Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America
St.Paul Fire and Maine Insurance Company United States Fidelity and Guaranty Company
St.Paul Guardian Insurance Company
G q(� �F\RE64 \R% IpgG p�,NSUq J,,,FY RryA r�W�Dw�y�gR� Y
Z`�Go��qFf t,V�� aP�iy PO. y 9 LJ _4 q1 W P qL .S SE ! o
�-5 �n s dYCaVPa[4tEO �„ 'u� �ICOPPONq)Fy/ W LOPPORgT n� y 9i Q a0 TT
195 < �e SE ALa i ;tea SEAL :
fit' HAflTFOaJ,
CONN o
Caa1�' $
AN
at 'E'1886 �
State of Connecticut By
City of Hartford ss Georg L Thompson, error lice President
23rd April 2012
On this the day of , before me personally appeared George W Thompson, who acknowledged
himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwiners,
Inc, St Paul Fire and Mature Insurance Company, St Paul Guardian Insurance Company, St Paul Mercury Insurance Company, Travelers Casualty and Surety
Company,Tiavelers Casualty and Surety Company of Amerca,and United States Fidelity and Guaranty Company, and that be, as such,being authorized so to do,
executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer
W r In Witness Whereof,I hereunto se[my hand and official seal Taff C
My Commission expires the 30th day of June,2016 'OUBU� tM Mane C Teneanit,Notary Publi,
58440-6-11 Printed in U S A.
WARNING THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
'4� CERTIFICATE OF LIABILITY INSURANCE 1/17i 013
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the pollcy(ies)must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s)
PRODUCER CONE C Karen Smith
NAME
HENTSCHELL 6 ASSOC INC PHONE (253)272-1151 FAXJAJC P. Ed) IAIC Na (253)272-1225
One Pacific Building karens@hentschell.com
621 PacLflc Ave. , Sumte 400 INSURERS AFFORDING COVERAGE NAICX
Tacoma WA 98402 INSURERA The Travelers Indei Co.
INSURED INSURER The Travelers Indemnity Co.
Petersen Brothers, Inc. INSURERc Travelers Prop Cas Co Of Am
2008 East Valley Hwy INSURERD Great American Insurance Co
-INSURER E
Sumner WA 98390 INSURERF
COVERAGES CERTIFICATE NUMBER:2012 GL/Auto/Umb/Ex REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
INSR TYPE Of INSURANCE ADDL SUeR POLICY EFF POLICY EXP LIMITS
LTR POLICY NUMBER MMIDDfYYYY MMIDDJYYY
GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000
DAMAGEINIII
X COMMERCIAL GENERAL LIABILITY PREM SESOEa occurrence)
cwence $ 300,000
A CLAIMS-MADE X❑OCCUR X Y T-CO-526D9518-IND-12 1/1/2012 1/1/2013 MED EXP(Any one person) $ 10,000
PERSONAL B ADV INJURY $ 1,000,000
GENERAL AGGREGATE $ 2,000,000
GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $ 2,000,000
17
POLICY X P LOC $
RO
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT
Ea accident 1,000,000
A X ANY AUTO BODILY INJURY(Per person) $
AUTOALL ED SCHEDULED T-810-52W9518-M-12 1/1/2012 1/1/2013 BODILY INJURY(Per accident) $
l AUTOS
NON-OWNED PROPERTY DAMAGE
X HIRED AUTOS X AUTOS Per accident $
Medical paynnents $ 5,000
C X UMBRELLA LIAB X OCCUR TSM-CUP-526D9518-TIL-12 1/1/2012 1/1/2013 EACH OCCURRENCE $ 1,000,000
D X EXCESS LIAB CLAIMS-MADE AGGREGATE $ 1,000,000
DED I X RETENTION$ 10,ODO X Y UE0196241-02 (Excess) 1/1/2012 1/1/2013 Each Occurrence/Aggregate $ 5,000,000
A WORKERS COMPENSATION WCSTATU- OTH-
AND EMPLOYERS'LIABILITY YIN
ANY PROPRIETOR/PARTNEWEXECUTIVE EL EACH ACCIDENT $ 1,000,000
OFFICEWMEMBER EXCLUDED? NIA
(Mandatory In NH) T—CO-526D9518-11TD-12 1/1/2012 1/1/2013 EL DISEASE-EA EMPLOYEE $ 1,000,000
If yes,describe under DESCRIPTION OF OPERATIONS bli (WA-Stop Gap) EL DISEASE-POLICY LIMIT $ 2,000,000
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if morespace Is required)
RE: Repair Damaged Guardrail on BE 277th Street W/B Lane. Blanket Additional Insured - Pr3mary and
Non-Contributory basis as required by written contract or agreement per the attached Endorsement
#CGD246(8/05) . Blanket Waiver of Subrogation as required by written contract or agreement per the
attached Endorsement #CGD316(11/11) . (#13-004)
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
City of Kent ACCORDANCE WITH THE POLICY PROVISIONS
220 Fourth Avenue South Kent, WA 98032 AUTHORIZED REPRESENTATIVE
Thomas Hentschell/KJS
ACORD 26(2010105) (D1988-2010 ACORD CORPORATION. All rights reserved.
INS025(201005)01 The ACORD name and logo are registered marks of ACORD
Policy# DT-CO-526D9518-IND-12
COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY
BLANKET ADDITIONAL INSURED
(CONTRACTORS)
This endorsement modifies insurance provided under the following-
COMMERCIAL GENERAL LIABILITY COVERAGE PART
1. WHO IS AN INSURED —(Section il) is amended c) The insurance provided to the additional in-
to include any person or organization that you sured does not apply to "bodily injury" or
agree in a "written contract requiring insurance" "property damage" caused by "your work'
to include as an additional insured on this Cover- and included in the "products-completed op-
age Part, but erations hazard" unless the "written contract
a) Only with respect to liability for'bodily injury', requiring insurance" specifically requires you
"property damage"or"personal injury", and to provide such coverage for that additional
insured, and then the insurance provided to
b) If, and only to the extent that, the injury or the additional insured applies only to such
damage is caused by acts or omissions of 'bodily injury" or 'property damage" that oc-
you or your subcontractor in the performance curs before the end of the period of time for
of "your work" to which the 'written contract which the "written contract requiring insur-
requiring insurance" applies The person or ance" requires you to provide such coverage
organization does not qualify as an additional or the end of the policy period, whichever is
insured with respect to the independent acts earlier
or omissions of such person or organization 3. The insurance provided to the additional insured
2. The insurance provided to the additional insured by this endorsement is excess over any valid and
by this endorsement is limited as follows collectible 'other insurance", whether primary,
a) In the event that the Limits of Insurance of excess, contingent or on any other basis, that is
this Coverage Part shown in the Declarations available to the additional insured for a loss we
exceed the limits of liability required by the cover under this endorsement However, if the
"written contract requiring insurance", the in- 'written contract requiring insurance" specifically
surance provided to the additional insured requires that this insurance apply on a primary
shall be limited to the limits of liability re- basis or a primary and non-contributory basis,
quired by that "written contract requiring in- this insurance is primary to 'other insurance'
surance" This endorsement shall not in- available to the additional insured which covers
crease the limits of insurance described in that person or organization as a named insured
Section III—Limits Of Insurance for such loss, and we will not share with that
'other insurance" But the insurance provided to
b) The insurance provided to the additional in- the additional insured by this endorsement still is
sured does not apply to "bodily injury", 'prop- excess over any valid and collectible "other in-
erty damage" or "personal injury" arising out surance", whether primary, excess, contingent or
of the rendering of, or failure to render, any on any other basis, that is available to the addi-
professional architectural, engineering or sur- tional insured when that person or organization is
veying services, including an additional insured under such 'other insur-
1. The preparing, approving, or fading to ance'
prepare or approve, maps, shop draw- 4. As a condition of coverage provided to the
ings, opinions, reports, surveys, field or- additional insured by this endorsement
ders or change orders, or the preparing,
a The additional insured must give us written
approving, or failing to prepare or ap )
notice soon as practicable of 'occur-
prove,drawings and specifications, and o re
rence" or an offense which may result in a
II. Supervisory, inspection, architectural or claim To the extent possible, such notice
engineering activities should include
CG D2 46 08 05 0 2005 The St.Paul Travelers Companies, Inc Page 1 of 2
COMMERCIAL GENERAL LIABILITY
I. How, when and where the "occurrence" any provider of "other insurance'which would
or offense took place, cover the additional insured for a loss we
If. The names and addresses of any injured cover under this endorsement However, this
persons and witnesses, and condition does not affect whether the insur-
ance provided to the additional insured by
III. The nature and location of any injury or this endorsement is primary to 'other insur-
damage ansing out of the"occurrence"or ance" available to the additional insured
offense which covers that person or organization as a
b) If a claim is made or 'suit" is brought against named insured as described in paragraph 3.
the additional insured, the additional insured above
must 5. The following definition is added to SECTION V
I. Immediately record the specifics of the —DEFINITIONS
claim or"suit" and the date received, and "Written contract requiring insurance" means
If. Notify us as soon as practicable that part of any written contract or agreement
under which you are required to include a
The additional insured must see to it that we person or organization as an additional in-
receive written notice of the claim or"suit" as sured on this Coverage Part, provided that
soon as practicable the "bodily injury" and "property damage" oc-
c) The additional insured must immediately curs and the "personal injury" is caused by an
send us copies of all legal papers received in offense committed
connection with the claim or "suit", cooperate a. After the signing and execution of the
with us in the investigation or settlement of
the claim or defense against the "suit", and contract or agreement by you,
otherwise comply with all policy conditions b. While that part of the contract or
d) The additional insured must tender the de- agreement is in effect,and
fense and indemnity of any claim or "suit' to c. Before the end of the policy period
i'
Page 2 of 2 0 2005 The St.Paul Travelers Companies, Inc. CG 1146 08 05
DT-130-52609518-1ND-12
COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
CONTRACTORS XTEND ENDORSEMENT
This endorsement modifies insurance provided under the following
COMMERCIAL GENERAL LIABILITY COVERAGE PART
GENERAL DESCRIPTION OF COVERAGE—This endorsement broadens coverage_However,coverage for any
injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or
limited by another endorsement to this Coverage Part,and these coverage broadening provisions do not apply to
the extent that coverage is excluded or limited by such an endorsement The following listing is a general cover-
age description only Limitations and exclusions may apply to these coverages Read all the provisions of this en-
dorsement and the rest of your policy carefully to determine rights,duties, and what Is and is not covered
A. Aircraft Chartered With Pilot H. Blanket Additional Insured — Lessors Of Leased
B. Damage To Premises Rented To You Equipment
C. Increased Supplementary Payments 1. Blanket Additional Insured — States Or Political
Subdivisions—Permits
D. Incidental Medical Malpractice
E. J Knowledge And Notice Of Occurrence Or Offense
. Who Is An Insured— Newly Acquired Or Formed
Organizations K. Unintentional Omission
F. Who Is An Insured— Broadened Named Insured L. Blanket Waiver Of Subrogation
—Unnamed Subsidiaries M. Amended Bodily Injury Definition
G. Blanket Additional Insured — Owners, Managers N. Contractual Liability—Railroads
Or Lessors Of Premises
PROVISIONS INJURY AND PROPERTY DAMAGE ll
A. AIRCRAFT CHARTERED WITH PILOT ABILITY
The following is added to Exclusion g., Aircraft, Exclusions c.and g. through n. do not apply
Auto Or Watercraft, in Paragraph 2.of SECTION to "premises damage" Exclusion f.(1)(a)
I — COVERAGES - COVERAGE A BODILY IN- does not apply to"premises damage"caused
JURY AND PROPERTY DAMAGE LIABILITY by.
This exclusion does not apply to an aircraft that a. Fire;
is b. Explosion,
(a) Chartered with a pilot to any insured, c. Lightning,
(b) Not owned by any insured,and d. Smoke resulting from such fire,explosion,
(c) Not being used to carry any person or prop- or lightning,or
erty for a charge. e. Water,
B. DAMAGE TO PREMISES RENTED TO YOU unless Exclusion L of Sei I—Coverage A
1. The first paragraph of the exceptions in Ex- — Bodily Injury And Property Damage Liability
elusion j., Damage To Property, in Para- is replaced by another endorsement to this
graph 2. of SECTION I — COVERAGES — Coverage Part that has Exclusion—All Pollu-
COVERAGE A BODILY INJURY AND tion Injury Or Damage or Total Pollution Ex-
PROPERTY DAMAGE LIABILITY is deleted. elusion in its title.
2. The following replaces the last paragraph of A separate limit of insurance applies to
Paragraph 2., Exclusions, of SECTION I — "premises damage" as described in Para-
COVERAGES — COVERAGE A. BODILY graph 6. of SECTION III — LIMITS OF IN-
SURANCE
CG DS 1611 11 0 2011 The Travelers Indemnity Company An rights reserved Page 1 of 6
COMMERCIAL GENERAL LIABILITY
3. The following replaces Paragraph 6. of SEC- C. INCREASED SUPPLEMENTARY PAYMENTS
TION III—LIMITS OF INSURANCE I. The following replaces Paragraph 1.b. of
Subject to 5, above, the Damage To Prem- SUPPLEMENTARY PAYMENTS — COVER-
ises Rented To You Limit is the most we will AGES A AND B of SECTION I — COVER-
pay under Coverage A for damages because AGE:
of"premises damage" to any one premises. b. Up to $2,500 for the cost of bail bonds
The Damage To Premises Rented To You required because of accidents or traffic
Limit will apply to all "property damage" law violations arising out of the use of any
proximately caused by the same "occur- vehicle to which the Bodily Injury Liability
rence , whether such damage results from. Coverage applies We do not have to fur-
fire, explosion, lightning;smoke resulting from nish these bonds
such fire, explosion, or lightning, or water, or 2
any combination of any of these causes. The following replaces Paragraph 1.d. ofSUPPLEMENTARY PAYMENTS — COVER-
The Damage To Premises Rented To You AGES A AND B of SECTION I — COVER-
Limit will be AGES.
a. The amount shown for the Damage To d. All reasonable expenses incurred by the t
Premises Rented To You Limit on the insured at our request to assist us in the
Declarations of this Coverage Part, or investigation or defense of the claim or
b. $300,000 if no amount is shown for the "suit", including actual loss of earnings up
Damage To Premises Rented To You to $500 a day because of time off from
Limit on the Declarations of this Coverage work
Part D. INCIDENTAL MEDICAL MALPRACTICE
4. The following replaces Paragraph a. of the 1. The following is added to the definition of"oc-
definition of insured contract in the DEFINI- currence"in the DEFINITIONS Section.
TIONS Section: "Occurrence" also means an act or omission
a. A contract for a lease of premises How- committed in providing or fading to provide
ever, that portion of the contract for a "incidental medical services", first aid or
lease of premises that indemnities any "Good Samaritan services"to a person
person or organization for "premises damage"is not an"insured contract"' y The following is added t Paragraph 2.a(1)of
o INSURED
5. The following is added to the DEFINITIONS SECTION II—WHO IS to
Section Paragraph (1)(d) above does not apply to
"Premises damage" means dam- "bodily injury" arising out of providing or fail-
9 "property Ing to provide.
age"to (i) "Incidental medical services" by any of
a. Any premises while rented to you or tem- your "employees" who is a nurse practi-
porarily occupied by you with permission goner,registered nurse,licensed practical
of the owner,or nurse, nurse assistant, emergency medi-
b. The contents of any premises while such cal technician or paramedic;or
premises is rented to you,if you rent such (11) First aid or"Good Samaritan services"by
premises for a period of seven or fewer consecutive days. any of your "employees" or "volunteer
workers", other than an employed or vol-
6. The following replaces Paragraph 4.b.(1)(b) unteer doctor Any such "employees" or
of SECTION IV—COMMERCIAL GENERAL "volunteer workers" providing or failing to
LIABILITY CONDITIONS' provide first aid or "Good Samaritan ser-
(b) That is insurance for"premises damage"; vlces" during their work hours for you will
or be deemed to be acting within the scope
7. Paragraph 4.b.(1)(c) of SECTION IV — of their employment by you or performing
COMMERCIAL GENERAL LIABILITY CON- duties related to the conduct of your busi-
DITIONS is deleted. ness
Page 2 of 6 02011 The Travelers Indemnfty Company A6 rigits reserved CG D3 16 1111
COMMERCIAL GENERAL LIABILITY
3. The following is added to Paragraph 5. of 4. Any organization you newly acquire or form,
SECTION III—LIMITS OF INSURANCE other than a partnership, joint venture or lim-
For the purposes of determining the applica- tied liability company, of which you are the
ble Each Occurrence Limit, all related acts or sole owner or in which you maintain the ma-
omissions committed in providing or fading to jority ownership interest, will qualify as a
provide"incidental medical services", first aid Named Insured if there is no other insurance
or"Good Samaritan seances"to any one per- which provides similar coverage to that Or-
son will be deemed to be one"occurrence". ganization However:
4. The following exclusion Is added to Para- a. Coverage under this provision is afforded
graph 2., Exclusions, of SECTION I —COV- only
ERAGES—COVERAGE A BODILY INJURY (1) Until the 180th day after you acquire or
AND PROPERTY DAMAGE LIABILITY form the organization or the end of the
Sale Of Pharmaceuticals policy period, whichever is earlier, if you
"Bodily injury" or "property damage" arising do not report such organization in writing
out of the willful violation of a penal statute or to us within 180 days after you acquire or
ordinance relating to the sale of pharmaceuti- form if,or
cals committed by, or with the knowledge or (2) Until the end of the policy period, when
consent of,the insured that date is later than 180 days after you
6. The following is added to the DEFINITIONS acquire or form such organization, if you
Section report such organization in writing to us
"Incidental medical services"means: within 180 days after you acquire or form
a. Medical, surgical, dental, laboratory,x-ray it, and we agree in writing that it will con-
or nursing service or treatment, advice or tlnue to be a Named Insured until the end
instruction, or the related furnishing of of the policy period;
food or beverages,or b. Coverage A does not apply to "bodily injury"
b. The furnishing or dispensing of drugs or or "property damage" that occurred before
medical, dental, or surgical supplies or you acquired or formed the organization,and
appliances c. Coverage B does not apply to "personal in-
"Good Samaritan services" means any emer- jury" or "advertising injury" arising out of an
gency medical services for which no compen- offense committed before you acquired or
sation is demanded or received formed the organization
6. The following is added to Paragraph 4.b., Ex- F. WHO IS AN INSURED— BROADENED NAMED
cess Insurance, of SECTION IV — COM- INSURED—UNNAMED SUBSIDIARIES
MERCIAL GENERAL LIABILITY CONDI- The following is added to SECTION 11 —WHO IS
TIONS AN INSURED
The insurance is excess over any valid and
collectible other insurance available to the in- Any of your subsidiaries,other than a partnership,
sured,whether primary, excess,contingent or joint venture or limited liability Company, that is
on any other basis, that is available to any of not shown as a Named Insured in the Declara-
your "employees" or "volunteer workers" for bons is a Named Insured if you maintain an own-
"bodily injury" that arises out of providing or ership interest of more than 50% in such subsidi-
fading to provide "incidental medical ser- ary on the first day of the policy penod
vices", first aid or"Good Samaritan services" No such subsidiary is an insured for"bodily injury"
to any person to the extent not subject to or"property damage" that occurred, or "personal
Paragraph 2.a.(1) of Section It —Who Is An injury" or "advertising injury" caused by an of-
Insured fense committed after the date, if any, during the
E. WHO IS AN INSURED — NEWLY ACQUIRED policy period, that you no longer maintain an
OR FORMED ORGANIZATIONS ownership interest of more than 50% in such sub-
The following replaces Paragraph 4.of SECTION sidiary
11—WHO IS AN INSURED-
CO D3 16 11 11 c 2011 The Travelers IrWamnity,Company AA rights reserved Page 3 of 6
COMMERCIAL GENERAL LIABILITY
G. BLANKET ADDITIONAL INSURED—OWNERS, H. BLANKET ADDITIONAL INSURED—LESSORS
MANAGERS OR LESSORS OF PREMISES OF LEASED EQUIPMENT
The following is added to SECTION II —WHO 13 The following is added to SECTION II—WHO IS
AN INSURED. AN INSURED.
Any person or organization that Is a premises Any person or organtzation that Is an equipment
owner, manager or lessor and that you have lessor and that you have agreed in a wrden con-
agreed in a written contract or agreement to in- tract or agreement to include as an insured on
elude as an additional insured on this Coverage this Coverage Part is an insured,but only with re-
Part is an insured, but only with respect to liability t "bodily injury", "property dam-
„ sped to liability for bodrl m'u
for "bodily injury", property damage", personal age","personal injury"or"advertising injury"that,
injury"or"advertising injury' that
a. Is "bodily injury" or "property damage" that
o :a
a. "badly injury" "property damage" that occurs, or is "personal injury" or "advertising
occurs, is "personal injury" or "advertising injury" caused by an offense that is commit-
injury" caused by an offense that is commit- injury"
subsequent to the execution of that con-
ted, subsequent to the execution of that con-
tract or agreement, and tract or agreement, and a
b. Arises out of the ownership, maintenance or b. Is caused, in whole or in part, by your ads or
use of that part of any premises leased to omissions in the maintenance, operation oruse of equipment leased to you by such 9
YOU
equipment lessor
The insurance provided to such premises owner, The insurance provided to such equipment lessor
manager or lessor is subject to the following pro- is subject to the following 9 provisions:
visions
a. The limits of insurance provided to such
a. The limits of insurance provided to such equipment lessor will be the minimum limb
premises owner, manager or lessor will be which you agreed to provide in the written
the minimum limits which you agreed to pro- contract or agreement, or the limits shown on j
vide in the written contract or agreement, or the Declarations, whichever are less
the limits shown on the Declarations, which-
ever are less b. The insurance provided to such equipment
lessor does not apply to any"bodily injury"or
b. The insurance provided to such premises "property damage" that occurs, or "personal
owner,manager or lessor does not apply to injury"or"advertising injury"caused by an of-
(1) Any "bodily injury" or "property damage" fense that is committed, after the equipment
that occurs, or"personal injury"or"adver- lease expires,
tising injury"caused by an offense that is
committed,after you cease to be a tenant C. The Insurance provided to such equipment
lessor is excess over any valid and collectible
in that premises;or other insurance available to such equipment
(2) Structural alterations, new construction or lessor, whether primary, excess, contingent
demolition operations performed by or on or on any other basis, unless you have
behalf of such premises owner, lessor or agreed in the written contract or agreement
manager, that this insurance must be primary to, or
c. The insurance provided to such premises non-contnbulory with, such other insurance,
owner, manager or lessor is excess over any in which case this insurance will be primary
valid and collectible other Insurance available to, and non-contributory with, such other in-
to such premises owner, manager or lessor, surance
whether primary, excess, contingent or on 1. BLANKET ADDITIONAL INSURED — STATES
any other basis, unless you have agreed in OR POLITICAL SUBDIVISIONS—PERMITS
the written contract or agreement that this in-
surance must be primary to, or non- The following is added to SECTION 11—WHO IS
contributory with, such other insurance, in INSURED,
which case this insurance will be primary to, Any state or political subdivision that has issued a
and non-contributory with, such other insur- permit in connection with operations performed by
ance you or on your behalf and that you are required
Page 4 of 6 0 2011 The Travelers Indemnity Company AN rigtrts reserved CG D3 16 11 11
COMMERCIAL GENERAL LIABILITY
by any ordinance, law or building code to include (it) A manager of any limited liability
as an additional insured on this Coverage Part is company,or
an insured, but only with respect to liability for (tjj)An executive officer or director of
"bodily injury", "property damage", "personal In- any other organization;
jury"or"advertising injury"arising out of such op- that is your partner, joint venture
eratlons• member or manager,or
The insurance provided to such state or political (b) Any "employee" authorized by such
subdivision does not apply to partnership, joint venture, limited la
a. Any "bodily injury," "property damage," "per- ability company or other organization
sonal injury"or"advertising injury" arising out to give notice of an "occurrence" or
of operations performed for that state or po- offense.
litical subdivision,or (3) Notice to us of such"occurrence"or of an
b. Any "bodily injury" or "property damage" in- offense will be deemed to be given as
cluded in the"products-completed operations soon as practicable if it is given In good
hazard" faith as soon as practicable to your work-
J. KNOWLEDGE AND NOTICE OF OCCUR- ers' compensation insurer This applies
RENCE OR OFFENSE only if you subsequently give notice to us
The following Is added to Paragraph 2., Duties In of the"occurrence"or offense as soon as
The Event of Occurrence, Offense, Claim or practicable after any of the persons de-
Suit, of SECTION IV — COMMERCIAL GEN. scribed in Paragraphs e. (1) or(2) above
ERAL LIABILITY CONDITIONS, discovers that the"occurrence"or offense
may result in sums to which the insurance
e. The following provisions apply to Paragraph provided under this Coverage Part may
a. above, but only for the purposes of the in- apply
surance provided under this Coverage Part to
you or any insured listed in Paragraph 1.or 2. However, if this Coverage Part includes an en-
of Section II—Who Is An Insured dorsement that provides limited coverage for
"bodily injury" or "property damage" or pollution
(1) Notice to us of such "occurrence" or of- costs arising out of a discharge, release or es-
fense must be given as soon as practica- cape of"pollutants"which contains a requirement
ble only after the "occurrence" or offense that the discharge, release or escape of "pollut-
is known by you(if you are an individual), ants" must be reported to us vnthin a specific
any of your partners or members who is number of days after its abrupt commencement,
an individual (if you are a partnership or this Paragraph e. does not affect that require-
joint venture), any of your managers who ment
is an individual(if you are a limited liability K UNINTENTIONAL OMISSION
company), any of your "executive offi-
cers"or directors (if you are an organiza- The following is added to Paragraph 6., Repre-
tion other than a partnership,joint venture sentations, of SECTION IV — COMMERCIAL
or limited liability company) or any "am- GENERAL LIABILITY CONDITIONS-
played' authorized by you to give notice The unintentional omission of, or unintentional
of an"occurrence"or offense error In, any information provided by you which
(2) If you are a partnership, joint venture or we relied upon in issuing this policy will not preju-
limited liability company, and none of your dice your rights under ttus insurance However,
partners, joint venture members or man- this provision does not affect our right to collect
alters are individuals, notice to us of such additional premium or to exercise our rights of
"occurrence"or offense must be given as cancellation or nonrenewal In accordance with
soon as practicable only after the "occur- applicable insurance laws or regulations.
rence"or offense is known by L. BLANKET WAIVER OF SUBROGATION
(a) Any individual who is The following is added to Paragraph 8., Transfer
(i) A partner or member of any part- Of Rights Of Recovery Against Others To Us,
nership or joint venture, of SECTION IV —COMMERCIAL GENERAL LI-
ABILITY CONDITIONS
CG D316 111111 0 2011 The Travelers Irrderrcdty company All Aahts reserved Page 5 of a
COMMERCIAL GENERAL LIABILITY
If the insured has agreed in a contract or agree- 3. "Bodily injury" means bodily injury, mental
ment to waive that insured's right of recovery anguish, mental injury,shock,fright,disability,
against any person or organization,we waive our humiliation, sickness or disease sustained by
right of recovery against such person or organiza- a person, including death resulting From any
tion, but only for payments we make because of of these at any time
a. "Bodily injury' or"property damage" that oo- N. CONTRACTUAL LIABILITY—RAILROADS
curs, or 1. The following replaces Paragraph c. of the
b. "Personal injury" or "advertising injury" definition of'insured contract" in the DEFINI-
caused by an offense that is committed, TIONS Section;
subsequent to the execution of that contract or c. Any easement or license agreement,
agreement 2. Paragraph f.(1) of the definition of "insured
M. AMENDED BODILY INJURY DEFINITION contract" In the DEFINITIONS Sechon is de-