Loading...
HomeMy WebLinkAboutPW13-061 - Original - Petersen Brothers, Inc. - Guardrail Repair at 277th - 01/31/2013 Records M rOf 9 ement) WAIHINOTOHDocument w �n` CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Petersen Brothers, Inc. Vendor Number: 33561 JD Edwards Number Contract Number: iq-d( -j-Q(o 1 This is assigned by City Clerk's Office Project Name: Guardrail repair @ 277th Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 1/31/2013 Termination Date: 3/1/2013 Contract Renewal Notice (Days): N/A Number of days required notice for termination or renewal or amendment Contract Manager: Tom Rusbuldt Department: PWO- Street Signs & Markings Detail: (i.e. address, location, parcel number, tax id, etc. : Public Works Agreement S Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08 1 KENT WASHINGTON PUBLIC WORKS AGREEMENT between City of Kent and Petersen Brothers, Inc. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Petersen Brothers, Inc. organized under the laws of the State of Washington, located and doing business at 2008 East Valley Highway Sumner, WA 98390 (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall repair approximately 100 lineal feet of damaged guardrail on SE 277th westbound lane at the east end of the Don E Wickstrom bridge. All replacements parts shall be new as noted on the Contractor's bid. For a copy of the Contractor's bid see the attached Exhibit A which is incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within 30 days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed $7388.55. Applicable Washington State Retail Sales Tax on this contract shall be governed by WAC 458-20-171 and its related rules for the work contemplated in this Agreement. The Contractor shall invoice the City monthly. The City will pay for the portion of the work described in the invoice that has been completed by the Contractor and approved by the City. The City's payment shall not constitute a waiver of the City's right to final inspection and acceptance of the project. PUBLIC WORKS AGREEMENT - 1 (Roadway/Pedestrian Path - Under$1OK and Performance Bond) A. Payment and Performance Bond. Pursuant to Chapter 39.08 RCW, the Contractor, shall provide the City a payment and performance bond for the full contract amount. B. Retainaae. The City shall hold back a retainage in the amount of five percent (5%) of any and all payments made to contractor for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. The amount retained shall be placed in a fund by the City pursuant to RCW 60.28.011(4)(a), unless otherwise instructed by the Contractor within fourteen (14) calendar days of Contractor's signature on the Agreement. C. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. D. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. PUBLIC WORKS AGREEMENT - 2 (Roadway/Pedestrian Path - Under$10K and Performance Bond) D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. 'Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the PUBLIC WORKS AGREEMENT - 3 (Roadway/Pedestrian Path - Under$10K and Performance Bond) facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. PUBLIC WORKS AGREEMENT - 4 (Roadway/Pedestrian Path - Under$I OK and Performance Bond) B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientationr national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. PUBLIC WORKS AGREEMENT - 5 (Roadway/Pedestrian Path - Under$1OK and Performance Bond) XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or PUBLIC WORKS AGREEMENT - 6 (Roadway/Pedestrian Path - Under$10K and Performance Bond) relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue to full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail H. Comeliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. PUBLIC WORKS AGREEMENT- 7 (Roadway/Pedestrian Path - Under$10K and Performance Bond) I. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR:: Petersen Brothers, Inc. CITY OF KENT: By: to�/` By: a�� a, A'Q'- (signature) (sign ) Print Name: Ronald G. Petersen, President Print Name: Bradley Lake Its: President Its: Operations Manager DATE: 1-16-13 (title) DATE: t NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Tom Rusbuldt Petersen Brothers, Inc. City of Kent 2008 East Valley Highway 220 Fourth Avenue South Sumner, WA 98390 Kent, WA 98032 253-833-2544 (telephone) (253) 856-5600 (telephone) 253-863-5951 (facsimile) (253) 856-6600 (facsimile) PUBLIC WORKS AGREEMENT - 8 (Roadway/Pedestrian Path - Under$10K and Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. Dated this 16th day of January , 2013 By: 0110L ona eters m, President For: Petersen Brothers, Inc. Title: President Date: 1-16-13 EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Petersen Brothers, Inc. Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as SE 277th St. Repair that was entered into on the 1-16-13 (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this 16th day of January 20 13 B y ona e ersen, President For: Petersen Brothers, Inc. Title: President Date: 1-16-13 EEO COMPLIANCE DOCUMENTS - 3 Petersen Brothers, Inc. 2008 EAST VALLEY HIGHWAY SUMNER,WASHINGTON 98390 (253)833-2544 (253)863-8136 FAX(253)863-5951 Contractors# CC-01 PETERBI187NZ SE 2771H WBEASI END OF GREEN RIVER Project Name: BRIDGE DID DATE- IV27112 - Item PQ�Y DESCRIPTION TOTAL GUARDRAIL BEHIN D DAMAGED RAIL 1 1 00 EA 6X8X6'CRT WOOD POST $ 3000 $ 3000 1 QO EA 6X8X6'W000 POSTS $ 2315 S 23 15 12 50 _= W-BEAM GUARCRAIL TYPE 1 ANCHOR PLATE $ 905 S 11313 MAINLINE DAMAGED RAIL 1 D0 EA 8X8X22"WOOD BLOCK $ 1020 $ 1020 2001 EA 6X8X22'WOOD BLOCK $ 915 $ 1830 2 ODi EA 6XEX7 WOOD POSTS $ 2560 $ 51 20 11 0D EA 6X8X6'WOOD POSTS S 23 15 $ 25465 1 00 EA 6XBX6'CRT 1N001)POSTS $ 3000 $ 3000 1 00 EA 6XBX3'-6"WOOD POSTS $ 1650 S 1650 6250 LF W-BEAM GUARDRAIL $ 7 55 $ 471 88 1 00 EA BEAM GUARDRAIL B TRANSITION PLATE $ 18500 $ 185 DO 2500 LF ITHRIE BEAM GUARDRAIL $ 1345 $ 33625 1100 EA 6X8X14"WOOD BLOCKS $ 525 $ 5775 1500 EA 518XI B"MASTER BO-TS S 270 S 4050 200 EA 5/8XIO"MASTER BOLTS $ 1 90 $ 380 7600 EA 5/8X1-1/4'SPLICE BOLTS $ 065 1$ 4940 200 EA 5/8X20 MASTERBOLTS $ 290 $ 580 1900 EA 5/8"WASHERS $ 020 $ 3 80 95 00 EA 518"NUTS $ 055 $ 5225 1000 HRS CREW TIME LABOR $ 49500 $ 4 950 00 1 00 LS PROJECT TEMP TRAFFIC CONTROL $ 68500 $ 68500 TOM-CITY OF KENT 253-856-5673 EMAIL trusbuldtk kentwa gov TOTAL $ 7,388 55 "'Price does not include traffic control unless specified —Prices include material&installation,bond and insurance Beam Guardrail is available in 12 5'and 6.25'lengths. "Prices are good if contract is received within 30 days after award of job,after 30 days prices must be renegotiated IF ACCEPTED PLEASE SIGN AND FAX BACK TO 253-863-5951 NO WORK WILL BE PERFORMED WITHOUT PROPER AUTHORIZATION By Date Title Company Name Phone Address Fax 3 EXHIBIT B INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Commercial General Liabilitv insurance shall be written on ISO occurrence form CG 00 01 or its equivalent, with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. The Commercial General Liability insurance shall be endorsed to provide the Aggregate per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an Additional Insured under the Contactor's Commercial General Liability insurance policy with respect to the work performed for the City. All endorsements adding Additional Insureds shall be issued on form CG 20 10 11 85 or a form deemed equivalent, providing the Additional Insureds with all policies and endorsements set forth in this section. 2. Automobile Liabilitv insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Commercial General Liability insurance shall be written with minimum limits of $3,000,000 per occurrence and in the aggregate for each 1 year policy period. This coverage may be any EXHIBIT B (Continued) combination of primary, umbrella or excess liability coverage affording total liability limits of not less than $3,000,000 per occurrence and in the aggregate. Products and Completed Operations coverage shall be provided for a period of 3 years following Substantial Completion of the work. 2. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Ji Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Contractor's Insurance for Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. i i EXHIBIT B (Continued) E. Waiver of Subrogation The Contractor and the City waive all rights against each other any of their Subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. F. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. G. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. H. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. 1 Page 1 of 18 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 1/11/2013 County Trade Job Classification Wage HolidayOvertime Note King Asbestos Abatement Workers Journey Level $40.83 5D 1 H IKing Boilermakers Journey Level $60.24 5N 1C King Brick Mason Brick And Block Finisher $42.21 5A 1M King Brick Mason Journey Level $49.07 5A 1M King Brick Mason Pointer-Caulker-Cleaner $49.07 5A 1M ,King Building Service Employees Janitor $19.98 5S 2F IKing Building Service Employees Traveling Waxer/shampooer $20.39 5S 2F King Building Sernce Employees Window Cleaner (Scaffold) $24.52 5S 2F King Building Service Employees Window Cleaner(non-scaffold) $23.66 5S 2F , King Cabinet Makers In Shop1 Journey Level $22.74 1 King Carpenters Acoustical Worker $49.57 5D 1M King Carpenters Bridge, Dock And Wharf $49.57 5D 1M Carpenters -King Carpenters Carpenter $49.57 5D 1M King Carpenters Carpenters on Stationary Tools $49.70 5D 1M 1King Carpenters Creosoted Material $49.67 5D 1M r King Carpenters Floor Finisher $49.57 5D 1M King Carpenters Floor Layer $49.57 5D 1M King Carpenters Scaffold Erector $49.57 5D 1M King Cement Masons Journey Level $50.13 7A 1M =King Divers Et Tenders Diver $100.28 5D 1M 8A IKing Divers 8 Tenders Diver On Standby $56 68 5D 1M King Divers Et Tenders Diver Tender $52.23 5D 1M ,King Divers £t Tenders Surface Rcv 8 Rov Operator $52.23 5D 1M ,King Divers Et Tenders Surface Rcv & Rov Operator $48.67 5A 1B Tender King Dredge Workers Assistant Engineer $49.57 5D 1T 8L King Dredge Workers Assistant Mate(deckhand) $49.06 5D 1T 8L https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 Page 2 of 18 King Dredge Workers Engineer Welder $49.62 5D 1T 8L King Dredge Workers Leverman, Hydraulic $51.19 5D 1T 8L King Dredge Workers Maintenance $49.06 5D 1T 8L .King Dredge Workers Mates And Boatmen $49.57 5D 1T 8L King Dredge Workers Oiler $49.19 5D 1T 8L King Drywall Applicator Journey Level $49.74 5D 1 H King Drywall Tapers Journey Level $49.79 5P 1 E King Electrical Fixture Maintenance Journey Level $25.08 5L 1 E Workers King Electricians - Inside Cable Splicer $62.74 7C 2W King Electricians - Inside Cable Splicer (tunnel) $67.451 7C 2W King Electricians - Inside Certified Welder $60.61 7C 2W King Electricians - Inside Certified Welder (tunnel) $65.10 7C 2W King Electricians - Inside Construction Stock Person $33.69 7C 2W King Electricians - Inside Journey Level $58.47 7C 2W King Electricians - Inside Journey Level (tunnel) $62.74 7C 2W King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $64.95 5A 4A Construction King Electricians - Powerline Certified Line Welder $59.37 5A 4A Construction King Electricians - Powerline Groundperson $42.16 5A 4A Construction ;King Electricians - Powerline Head Groundperson $44.50 5A 4A Construction King Electricians - Powerline Heavy Line Equipment $59.37 5A 4A I Construction Operator King Electricians - Powerline Jackhammer Operator $44.50 5A 4A Construction King Electricians - Powerline Journey Level Lineperson $59.37 5A 4A { Construction I King Electricians - Powerline Line Equipment Operator $49.95 5A 4A Construction ;King Electricians - Powerline Pole Sprayer $59.37 5A 4A Construction King Electricians - Powerline Powderperson $44.50 5A 4A Construction King Electronic Technicians Journey Level $31.00 1 I King Elevator Constructors Mechanic $75.24 7D 4A King Elevator Constructors Mechanic In Charge $82.00 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $14.15 5B 2K Products Work Only ;King Fence Erectors Fence Erector $15.18 1 l (King Fla¢gers Journey Level $34.61 7A 2Y i King Glaziers Journey Level $52.76 7L 1Y King Heat Et Frost Insulators And Journeyman $56.93 5J 15 3 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013 Page 3 of 18 Asbestos Workers King Heating Equipment Mechanics Journey Level $68.52 7F 1 E King Hod Carriers 8 Mason Tenders Journey Level $42.11 7A 2Y King Industrial Engine And Machine Journey Level $15.65 1 Mechanics King Industrial Power Vacuum Journey Level $9.24 1 Cleaner ;King Inland Boatmen Boat Operator $52.32 5B 1K ;King Inland Boatmen Cook $48.89 5B 1K !King Inland Boatmen Deckhand $48.96 5B 1K King Inland Boatmen Deckhand Engineer $49.95 5B 1K King Inland Boatmen Launch Operator $51.16 5B 1K King Inland Boatmen Mate $51.16 5B 1K King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 Sewer &Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $11.48 1 Sewer li Water Systems By Remote Control rKing Inspection/Cleaning/Sealing Of Head Operator $24.91 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 Sewer 8t Water Systems By l Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $49.57 5D 1M King Ironworkers Journeyman $59.02 7N 10 King Laborers Air, Gas Or Electric Vibrating $40 83 7A 2Y Screed King Laborers Airtrac Drill Operator $42.11 7A 2Y lKing Laborers Ballast Regular Machine $40.83 7A 2Y King Laborers Batch Weighman $34.61 7A 2Y King Laborers Brick Pavers $40 83 7A 2Y 'King Laborers Brush Cutter $40.83 7A 2Y King Laborers Brush Hog Feeder $40 83 7A 2Y ;King Laborers Burner $40.831 7A I 2Y King Laborers Caisson Worker $42.11 7A 2Y King Laborers Carpenter Tender $40.83 7A 2Y King Laborers Caulker $40.83 7A 2Y ? King Laborers Cement Dumper-paving $41.59 7A 2Y King Laborers Cement Finisher Tender $40.83 7A 2Y King Laborers Change House Or Dry Shack $40.83 7A 2Y King Laborers Chipping Gun (under 30 Lbs.) $40 83 7A 2Y King Laborers Chipping Gun(30 Lbs. And $41.59 7A 2Y i https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 j Page 4 of 18 Over) King Laborers Choker Setter $40.83 7A 2Y King Laborers Chuck Tender $40.83 7A 2Y King Laborers Clary Power Spreader $41.59 7A 2Y King Laborers Clean-up Laborer $40.83 7A 2Y King Laborers Concrete Dumper/chute $41.59 7A 2Y Operator (King Laborers Concrete Form Stripper $40.83 7A 2Y King Laborers Concrete Placement Crew $41.591 7A 2Y King Laborers Concrete Saw Operator/core $41.59 7A 2Y Driller ;King Laborers Crusher Feeder $34.61 7A 2Y King Laborers Curing Laborer $40.83 7A 2Y King Laborers Demolition: Wrecking Er Moving $40.83 7A 2Y (incl. Charred Material) King Laborers Ditch Digger $40.83 7A 2Y King Laborers Diver $42.11 7A 2Y King Laborers Drill Operator $41.59 7A 2Y (hydraulic,diamond) King Laborers Dry Stack Walls $40.83 7A 2Y King Laborers Dump Person $40.831 7A 2Y eKing Laborers Epoxy Technician $40.83 7A 2Y King Laborers Erosion Control Worker $40.83 7A 2Y King Laborers Faller Et Bucker Chain Saw $41.59 7A 2Y King Laborers Fine Graders $40.83 7A 2Y g King Laborers Firewatch $34.61 7A 2Y King Laborers Form Setter $40.83 7A 2Y King Laborers Gabian Basket Builders $40.83 7A 2Y x King Laborers General Laborer $40.83 7A 2Y King Laborers Grade Checker Et Transit $42.11 7A 2Y Person King Laborers Grinders $40.831 7A 2Y King Laborers Grout Machine Tender $40.83 7A 2Y King Laborers Groutmen (pressure)including $41.59 7A 2Y Post Tension Beams ! pKing Laborers Guardrail Erector $40.83 7A 2Y King Laborers Hazardous Waste Worker (level $42.11 7A 2Y A) King Laborers Hazardous Waste Worker (level $41.59 7A 2Y B) l King Laborers Hazardous Waste Worker (level $40.83 7A 2Y ; C) King Laborers High Scaler $42.11 7A 2Y :King Laborers Jackhammer $41.59 7A 2Y ;King Laborers Laserbeam Operator $41.59 7A 2Y `King Laborers Maintenance Person $40.83 7A 2Y z https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013 Page 5 of 18 King Laborers Manhole Builder-mudman $41.591 7A 2Y (King Laborers Material Yard Person $40.83 7A 2Y King Laborers Motorman-dinky Locomotive $41.59 7A 2Y King Laborers Nozzleman (concrete Pump, $41.59 7A 2Y Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gumte, Shotcrete, Water Bla King Laborers Pavement Breaker $41.59 7A 2Y King Laborers Pilot Car $34 61 7A 2Y King Laborers Pipe Layer Lead $42.11 7A 2Y , King Laborers Pipe Layer/tailor $41.59 7A 2Y King Laborers Pipe Pot Tender $41.591 7A 2Y King Laborers Pipe Reliner $41.591 7A 2Y King Laborers Pipe Wrapper $41.59 7A 2Y King Laborers Pot Tender $40.83 7A 2Y ; `King Laborers Powderman $42.11 7A 2Y King Laborers Powderman's Helper $40.83 7A 2Y King Laborers Power Jacks $41.59 7A 2Y King Laborers Railroad Spike Puller- Power $41.59 7A 2Y King Laborers Raker - Asphalt $42.11 7A 2Y King Laborers Re-timberman $42.11 7A 2Y !King Laborers Remote Equipment Operator $41.59 7A 2Y King Laborers Rigger/signal Person $41.59 7A 2Y King Laborers Rip Rap Person $40.83 7A 2Y King Laborers Rivet Buster $41.59 7A 2Y gKing Laborers Rodder $41.59 7A 2Y King Laborers Scaffold Erector $40.83 7A 2Y King Laborers Scale Person $40.83 7A 2Y King Laborers Sloper (over 20") $41.591 7A 2Y King Laborers SloperSprayer $40.831 7A 2Y King Laborers Spreader (concrete) $41.59 7A 2Y King Laborers Stake Hopper $40.83 7A 2Y King Laborers Stock Piler $40.83 7A 2Y King Laborers Tamper Et Similar Electric, Air $41.59 7A 2Y Et Gas Operated Tools King Laborers Tamper (multiple Et Self- $41.59 7A 2Y propelled) King Laborers Timber Person - Sewer (Lagger, $41.59 7A 2Y Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $40.83 7A 2Y sKing Laborers Topper $40.83 7A 2Y iKing Laborers Track Laborer $40.83 7A 2Y (King Laborers ITrack Liner (power) $41.591 7A I 2Y ;King Laborers ITraffic Control Laborer $37.011 7A 2Y 8R https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 Page 6 of 18 (King Laborers Traffic Control Supervisor $37.011 7A 2Y 8R King Laborers Truck Spotter $40.83 7A 2Y !King Laborers Tugger Operator $41.59 7A 2Y King Laborers Tunnel Work-Compressed Air $55.89 7A 2Y 8D , Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $60.92 7A 2Y 8D ? Worker 30.01-44.00 psi i King Laborers Tunnel Work-Compressed Air $64.60 7A 2Y 8D Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $70.30 7A 2Y 8 Worker 54.01-60.00 psi °King Laborers Tunnel Work-Compressed Air $72.42 7A 2Y Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $77.52 7A 2Y y Worker 64.01-68.00 psi ;King Laborers Tunnel Work-Compressed Air $79.42 7A 2Y 8D { Worker 68.01-70.00 psi King Laborers Tunnel Work-Compressed Air $81.42 7A 1H 8� Worker 70.01-72.00 psi King Laborers Tunnel Work-Compressed Air $83.42 7A 1H 8D Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $42.21 7A 2Y 8D ; Tender King Laborers Tunnel Work-Miner $42.21 7A r2Y 8D '_ King Laborers Vibrator $41.59 7AKing Laborers Vinyl Seamer $40.83 7AKing Laborers Watchman $31.46 7AKing Laborers Welder $41.59 7A King Laborers Well Point Laborer $41.59 7A 2Y King Laborers Window Washer/cleaner $31.46 7A 2Y King Laborers - Underground Sewer General Laborer Ft Topman $40.83 7A 2Y Et Water King Laborers - Underground Sewer Pipe Layer $41.59 7A 2Y i3 Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 ; Laborers King Lathers Journey Level $49.74 5D 1H King Marble Setters Journey Level $49.07 5A 1M i King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication In Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 'King Metal Fabrication (In Shop) Painter $11.10 1 King Metal Fabrication (In Shop) Welder $15.48 1 King Millwright Journey Level $50.67 5D 1M https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 Page 7 of 18 King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 ;King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $37.51 6Z 2B King Pile Driver Journey Level $49.82 5D 1M King Plasterers Journey Level $48.23 7Q 1R King Playground Et Park Equipment Journey Level $9.19 1 Installers lKing Plumbers £t Pipefitters Journey Level $70.84 6Z 1G King Power Equipment Operators Asphalt Plant Operators $51.89 7A 3C 8P IKing Power Eauipment Operators Assistant Engineer $48 62 7A 3C 8P RKing Power Equipment Operators Barrier Machine (zipper) $51.40 7A 3C 8P ;King Power Equipment Operators Batch Plant Operator, $51.40 7A 3C 8P x Concrete ,King Power Eauipment Operators Bobcat $48.62 7A 3C 8P King Power Eauipment Operators Brokk - Remote Demolition $48.62 7A 3C 8P E Equipment lKing Power Eauipment Operators Brooms $48.62 7A 3C 8P (King Power Eauipment Operators Bump Cutter $51 40 7A 3C 8P King Power Eauipment Operators Cableways $51.89 7A 3C 8P King Power Equipment Operators Chipper $51.40 7A 3C 8P King Power Equipment Operators Compressor $48.62 7A 3C 8P King Power Equipment Operators Concrete Pump: Truck Mount $51.89 7A 3C 8P With Boom Attachment Over 42 M King Power Eauipment Operators Concrete Finish Machine -laser $48.62 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $50.98 7A 3C 81 Trailer High Pressure Line Pump, Pump High Pressure. 'King Power Eauipment Operators Concrete Pump: Truck Mount $51.40 7A 3C 8P ' With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $50.98 7A 3C 8P King Power Eauipment Operators Cranes: 20 Tons Through 44 $51.40 7A 3C 8P Tons With Attachments King Power Eauipment Operators Cranes: 20 Tons Through 44 $51.40 7A 3C 8P Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons ;'King Power Eauipment Operators Cranes: 100 Tons Through 199 $52.44 7A 3C 8P , Tons, Or 150' Of Boom (including Jib With https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 Page 8 of 18 King Power Equipment Operators Cranes: 100 Tons Through 199 $52.44 7A 3C 8P Tons, or 150' of boom (including jib with attachments); Overhead, bridge type, 100 tons and over; Tower crane up to 175' in height, base to boom. King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $53.01 7A 3C 8P Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $51.89 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) 'King Power Equipment Operators Cranes: A-frame - 10 Tons And $48.62 7A 3C 8P Under King Power Equipment Operators Cranes: Friction 100 Tons $53.01 7A 3C 8P Through 199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons $53.57 7A 3C 8P , King Power Equipment Operators Cranes: Over 300 Tons Or 300' $53.57 7A 3C 8P Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes. Through 19 Tons With $50.98 7A 3C 8P Attachments A-frame Over 10 Tons 3 King Power Equipment Operators Crusher $51.40 7A 3C 8P i King Power Equipment Operators Deck Engineer/deck Winches $51.40 7A 3C 8P (power) King Power Equipment Operators Derricks, On Building Work $51.89 7A 3C 813 King Power Equipment Operators Dozer Quad 9, HD 41, D10 and $51.89 7A 3C 8P Over King Power Equipment Operators Dozers D-9 8t Under $50.98 7A 3C 8P 'King Power Equipment Operators Drill Oilers: Auger Type, Truck $50.98 7A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine $51.40 7A 1C 8P King Power Equipment Operators Elevator And Man-lift: $48.62 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $51.40 7A 3C 8P Gamaco 8t Similar Equipment § King Power Equipment Operators Forklift: 3000 Lbs And Over $50.98 7A 3C 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs With $48 62 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $51.40 7A 3C 8P l Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $48.62 7A 3C 8P King Power Equipment Operators Guardrail Punch $51.40 7A 3C 8P King Power Equipment Operators Guardrail Punch/Auger $51.40 7A 3C 8P King Power Equipment Operators Hard Tail End Dump $51.89 7A 3C 8P Articulating Off- Road https://fortress.wa.gov/In1/wagelookup/prvWagelookup.aspx 1/11/2013 Page 9of18 Equipment 45 Yards. £t Over King Power Equipment Operators Hard Tail End Dump $51.40 7A 3C 8P i Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $50.98 7A 3C 8P i Locator King Power Equipment Operators Horizontal/directional Drill $51.40 7A 3C 8P Operator 'King Power Equipment Operators Hydralifts/boom Trucks Over $50.98 7A 3C 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $48.62 7A 3C 8P Tons And Under :King Power Equipment Operators Loader, Overhead 8 Yards. £t $52.44 7A 3C 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $51.89 7A 3C 8P Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $51 40 7A 3C 8P Yards King Power Equipment Operators Loaders, Plant Feed $51.40 7A 3C 8P ;King Power Equipment Operators Loaders: Elevating Type Belt $50.98 7A 3C 8E King Power Equipment Operators Locomotives, All $51.40 7A 3C 8P King Power Equipment Operators Material Transfer Device $51.40 7A 3C 8P King Power Equipment Operators Mechanics, All (leadmen - $52.44 7A 3C 8P $0.50 Per Hour Over Mechanic) King Power Equipment Operators Mixers* Asphalt Plant $51.40 7A 3C 8P i King Power Equipment Operators Motor Patrol Grader - Non- $50.98 7A 3C 8P finishing King Power Equipment Operators Motor Patrol Graders, Finishing $51.89 7A 3C 8P 3 t King Power Equipment Operators Mucking Machine, Mole, Tunnel $51.89 7A 3C 8P Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $48.62 7A 3C 8P I Distribution Et Mulch Seeding Operator lKing Power Equipment Operators Outside Hoists (elevators And $50.98 7A 3C 8P ° Manhfts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane: $51.40 7A 3C 8P 20 Tons Through 44 Tons King Power Equipment Operators Overhead, Bridge Type: 100 $52.44 7A 3C 8P Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $51.89 7A 3C 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $48.62 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane $51.40 7A 3C 8P , Mount) `King Power Equipment Operators Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanical $48.62 7A 3C 8P King Power Equi affitaL Operators Power Plant $48.62 7A 3C 8P tKing Power Equipment Operators Pumps Water $48.62 7A 3C 8P , https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 Page 10of18 King Power Equipment Operators Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P 'King Power Equipment Operators Quick Tower - No Cab, Under $48.62 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $51.89 7A 3C 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Bellman $48.62 7A 3C 8P King Power Equipment Operators Rollagon $51.89 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $48.62 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $50.98 7A 3C 8P Materials King Power Equipment Operators Roto-milt, Roto-grinder $51.40 7A 3C 8P King Power Equipment Operators Saws - Concrete $50.98 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $51.40 7A 3C 8P l 45 Yards King Power Equipment Operators Scrapers - Concrete ft Carry All $50.98 7A 3C 8P King Power Equipment Operators Scrapers, Self-propelled: 45 $51.89 7A 3C 8P Yards And Over King Power Equipment Operators Service Engineers - Equipment $50.98 7A 3C 8P King Power Equipment Operators Shotcrete/gumte Equipment $48 62 7A 3C 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $50.98 7A 3C 8P Tractors Under 15 Metric Tons. x IKing Power Equipment Operators Shovel, Excavator, Backhoe: $51.89 7A 3C 8P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $51.40 7A 3C 8P Tractors. 15 To 30 Metric Tons <King Power Equipment Operators Shovel, Excavator, Backhoes: $52 44 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $53.01 7A 3C 8P Over 90 Metric Tons King Power Equipment operators Stipform Pavers $51.89 7A 3C 8P , King Power Equipment Operators Spreader, Topsider Et $51.89 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $51.40 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $50.98 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in $53.01 7A 3C 8P Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $52.44 7A 3C 8P r Height Base To Boom King Power Equipment Operators Transporters, All Track Or $51.89 7A 3C 8P Truck Type lKing Power Equipment Operators Trenching Machines $50.98 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $51.40 7A 3C 8P Tons And Over ,King Power Equipment Operators Truck Crane Oiler/driver Under $50.98 7A 3C 8P 100 Tons https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013 Page 11of18 King Power Equipment Operators Truck Mount Portable Conveyor $51.401 7A 3C 8P King Power Equipment Operators Welder $51.89 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farmall Type $48.62 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $51.40 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $51.89 7A 3C 8P Underground Sewer £t Water 3King Power Equipment Operators- Assistant Engineer $48.62 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Barrier Machine (zipper) $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $51.40 7A 3C 8P Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $48.62 7A 3C 8P Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $48.62 7A 3C 8P B Underground Sewer Et Water I King Power Equipment Operators- Bump Cutter $51.40 7A 3C 8P Underground Sewer Et Water ?King Power Equipment Operators- Cableways $51.89 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $51.40 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Compressor $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $51.89 7A 3C 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $48.62 7A 3C 8P Underground Sewer Et Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $50.98 7A 3C 8P Underground Sewer 8 Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $51.40 7A 3C 8P Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $50.98 7A 3C 8P Underground Sewer Et Water iKing Power Equipment Operators- Cranes: 20 Tons Through 44 $51.40 7A 3C 8P Underground Sewer Et Water Tons With Attachments King Power Equipment Operators- Cranes: 20 Tons Through 44 $51.40 7A 3C 8P r Underground Sewer Et Water Tons With Attachments a Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators- Cranes: 100 Tons Through 199 $52.44 7A 3C 8P Underground Sewer Et Water Tons, Or 150' Of Boom (including Jib With King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $53.01 7A 3C 8P Underground Sewer Et Water Or 250' Of Boom (including Jib https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 Page 12 of 18 With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 $51 89 7A 3C 8P Underground Sewer Et Water Tons, Under 150' Of Boom i (including Jib With Attachments) King Power Equipment Operators- Cranes- A-frame - 10 Tons And $48.62 7A 3C 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $53.01 7A 3C 8P Underground Sewer Et Water Through 199 Tons 'King Power Equipment Operators- Cranes: Friction Over 200 Tons $53.57 7A 3C 8P , Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $53.57 7A 3C 8P Underground Sewer Et Water Of Boom (including Jib With Attachments) ,King Power Equipment Operators- Cranes: Through 19 Tons With $50 98 7A 3C 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches $51.40 7A 3C 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $51.89 7A 3C 8P Underground Sewer Et Water t King Power Equipment Operators- Dozer Quad 9, HD 41, D10 and $51.89 7A 3C 8P Underground Sewer Et Water Over King Power Equipment Operators- Dozers D-9 Et Under $50.98 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $50.98 7A 3C 8P b Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $51.40 7A 3C 2P D Underground Sewer Et Water King Power Equipment Operators- Elevator And Man-lift: $48.62 7A 3C 8P Underground Sewer Et Water Permanent And Shaft Type 4King Power Equipment Operators- Finishing Machine, Bidwell And $51.40 7A 3C 8P r Underground Sewer Et Water Gamaco Et Similar Equipment s King Power Equipment Operators- Forklift: 3000 Lbs And Over $50.98 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $48.62 7A 3C 8P Underground Sewer Et Water Attachments King Power Equipment operators- Grade Engineer: Using Blue $51.40 7A 3C 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $51.40 7A 3C 8P Underground Sewer Et Water `King Power Equipment Operators- Guardrail Punch/Auger $51.40 7A 3C 8P Underground Sewer Et Water -King Power Equipment Operators- Hard Tail End Dump $51.89 7A 3C 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards Et Over https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 Page 13 of 18 King Power Equipment Operators- Hard Tail End Dump $51.40 7A 3C 8P Underground Sewer Et Water Articulating Off-road ! Equipment Under 45 Yards `King Power Equipment Operators- Horizontal/directional Drill $50.98 7A 3C 8P i Underground Sewer Et Water Locator `King Power Equipment Operators- Horizontal/directional Drill $51.40 7A 3C 8P ° Underground Sewer Et Water Operator King Power Equipment Operators- Hydrahfts/boom Trucks Over $50.98 7A 3C 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $48.62 7A 3C 8P Underground Sewer 8 Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et $52.44 7A 3C 8P Underground Sewer Et Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. But $51.89 7A 3C 8P Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $51.40 7A 3C 8P Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $51.40 7A 3C 8P Underground Sewer Et Water EKing Power Equipment Operators- Loaders: Elevating Type Belt $50.98 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $51.40 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators- Material Transfer Device $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $52.44 7A 3C 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Mixers: Asphalt Plant $51.40 7A 3C 8P ? Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Grader - Non- $50.98 7A 3C 8P Underground Sewer Et Water finishing King Power Equipment Operators- Motor Patrol Graders, Finishing $51.89 7A 3C 8P Underground Sewer 8 Water ,King Power Equipment Operators- Mucking Machine, Mole, Tunnel $51.89 7A 3C 8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $48.62 7A 3C 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $50.98 7A 3C 8P Underground Sewer Et Water Manhfts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane $51.40 7A 3C 8P Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $52.44 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $51.89 7A 3C 8P Underground Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $48.62 7A 3C 8P Underground Sewer Et Water !King Power Equipment Operators- Pile Driver (other Than Crane $51.40 7A 3C 8P } https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013 Page 14 of 18 Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators. Posthole Digger, Mechanical $48.62 7A 3C 8P , Underground Sewer Et Water King Power Equipment Operators- Power Plant $48 62 7A 3C 8P , Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $48 62 7A 3C 8P Underground Sewer Et Water ;King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P " Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under $48.62 7A 3C 8P Underground Sewer Et Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $51.89 7A 3C 8P ` Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $51.89 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $50.98 7A 3C 8P Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $51.40 7A 3C 8P ' Underground Sewer Et Water °King Power Equipment Operators- Saws - Concrete $50.98 7A 3C 8P Underground Sewer Et Water ,King Power Equipment Operators- Scraper, Self Propelled Under $51.40 7A 3C 8P Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $50.98 7A 3C SP i Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 $51.89 7A 3C 8P Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $50.98 7A 3C 8P Underground Sewer Et Water 1 King Power Equipment Operators- Shotcrete/gunite Equipment $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $50.98 7A 3C 8P v Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $51.89 7A 3C 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons €King Power Equipment Operators- Shovel, Excavator, Backhoes, $51.40 7A 3C 8P I Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $52.44 7A 3C 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $53.01 7A 3C 8P i https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 Page 15 of 18 Underground Sewer Et Water Over 90 Metric Tons !King Power Equipment Operators- Slipform Pavers $51.89 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $51.89 7A 3C 8P Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $50.98 7A 3C 8P Underground Sewer Et Water King Power Equipment operators- Tower Crane Over 175'in $53.01 7A 3C 8P Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $52.44 7A 3C 8P Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $51.89 7A 3C 8P = Underground Sewer Et Water Truck Type £ King Power Equipment Operators- Trenching Machines $50.98 7A X 8P i Underground Sewer Et Water s King Power Equipment Operators- Truck Crane Oiler/driver - 100 $51.40 7A 3C 8P Underground Sewer Et Water Tons And Over ; ;King Power Equipment Operators- Truck Crane Oiler/driver Under $50 98 7A 3C 8P i Underground Sewer Et Water 100 Tons King Power Equipment Operators- Truck Mount Portable Conveyor $51.40 7A X 8P Undereround Sewer Et Water King Power Equipment Operators- Welder $51.89 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Wheel Tractors, Farmall Type $48.62 7A 3C 8P i a Underground Sewer Et Water %ng Power Equipment Operators- Yo Yo Pay Dozer $51.40 7A 3C 8P 9 Underground Sewer Et Water „King Power Line Clearance Tree Journey Level In Charge $42.91 5A 4A Trimmers King Power Line Clearance Tree Spray Person $40.73 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $41.29 5A 4A Trimmers !King Power Line Clearance Tree Tree Trimmer $38.38 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $28.95 5A 4A Trimmers ;King Refrigeration Et Air Journey Level $69.96 6Z 1G Conditioning Mechanics ;King Residential Brick Mason Journey Level $49.07 5A 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $38.081 5D 1M King Residential Drywall Tapers Journey Level $49.79 5P 1 E iKing Residential Electricians JOURNEY LEVEL $30.44 1 King Residential Glaziers Journey Level $34.60 7L 1 H iKing Residential Insulation Journey Level $26.28 1 t https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 Page 16 of 18 Applicators 'King Residential Laborers Journey Level $23.03 1 :King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Journey Level $34.69 1 Pipefitters °King Residential Refrigeration Et Air Journey Level $69.96 6Z 1G Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $41.30 7F 111 Workers King Residential Soft Floor Lavers Journey Level $41.78 5A 3D King Residential Sprinkler Fitters Journey Level $41.31 5C 211 (Fire Protection) iKing Residential Stone Masons Journey Level $49.07 5A 1M ,King Residential Terrazzo Workers Journey Level $45.43 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.17 1 ,King Roofers Journey Level $43.90 5A 111 ,King Roofers Using Irritable Bituminous $46 90 5A 1R Materials King Sheet Metal Workers Journey Level (Field or Shop) $68.52 7F 1 E ;King Shipbuilding Et Ship Repair Boilermaker $35.831 7M 1H King Shipbuilding Et Ship Repair Carpenter $38 24 70 3B King Shipbuilding Et Ship Repair Electrician $37.85 70 3B King Shipbuilding Et Ship Repair Heat Et Frost Insulator $56.93 5J 15 King Shipbuilding Et Ship Repair Laborer $36.81 70 3B King Shipbuilding Et Ship Repair Machinist $37.81 70 36 I King Shipbuilding Et Ship Repair Operator $40.20 70 3B King Shipbuilding Et Ship Repair Painter $37.81 70 3B King Shipbuilding Et Ship Repair Pipefitter $37.79 70 3B King Shipbuilding Et Ship Repair Rigger $37.78 70 313 i King Shipbuilding Et Ship Repair Sandblaster $36 81 70 3B 3 King Shipbuilding Et Ship Repair Sheet Metal $37.77 70 36 King Shipbuilding Et Ship Repair Shipfitter $37.78 70 3B King Shipbuilding Et Ship Repair Trucker $37.63 70 3B ;King Shipbuilding £t Ship Repair Warehouse $37.68 70 313 King Shipbuilding Et Ship Repair Welder/Burner $37.781 7O 3B King Sign Makers Et Installers Sign Installer $22.92 1 (Electrical) i t King Sign Makers Et Installers Sign Maker $21.36 1 IElectricaU King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electrical King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electrical t https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 1/11/2013 Page 17of18 King Soft Floor Lavers Journey Level $41.78 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $69.44 5C 1X i Protectionl 'King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) ,King Stone Masons Journey Level $49.07 5A 1M King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers EKing Surveyors Assistant Construction Site $50.98 7A 3C 8P Surveyor )King Surveyors Chainman $50.46 7A 3C 8P King Surveyors Construction Site Surveyor $51.89 7A 3C 8P ' King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $35.09 5A 2B 1 Outside King Telephone Line Construction - Hole Digger/Ground Person $19 22 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $33.63 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $35.09 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $34.37 5A 2B I Outside King Telephone Line Construction - Telephone Equipment Operator $35.09 5A 2B Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operator $32.62 5A 2B Outside (Light) King Telephone Line Construction - Telephone Lineperson $32.62 5A 2B Outside lKing Telephone Line Construction - Television Groundperson $18.65 5A 2B l Outside ;King Telephone Line Construction - Television Lineperson/Installer $24.66 5A 2B Outside King Telephone Line Construction - Television System Technician $29.42 5A 2B Outside King Telephone Line Construction - Television Technician $26.43 5A 2B Outside King Telephone Line Construction - Tree Trimmer $32.95 5A 2B Outside King Terrazzo Workers Journey Level $45.43 5A 1M King Tile Setters Journey Level $21.65 1 lKing Tile, Marble Et Terrazzo Finisher $37.76 5A 16 Finishers King Traffic Control Stripers Journey Level $41.27 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards (W. $47.91 5D 3A 8L WA-Joint Council 28) 'King Truck Drivers Asphalt Mix To 16 Yards (W. $47.07 5D 3A 81 l [ i https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013 Page 18 of 18 WA-Joint Council 28) King Truck Drivers Dump Truck Ft Trailer $47.91 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $47.07 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $47.91 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Drillers Ft IrriQation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers Ft Irrigation Puma Oiler $12.97 1 Installers King Well Drillers Ft Irrigation Pump Well Driller $18.00 1 Installers https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 1/11/2013 Benefit Code Key-Effective 08-31-2012 thru 03-02-2013 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly rate must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the worker 1 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES TI IE HOURLY RATE OF WAGE B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C. The first two (2) hours after eight(8) regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other overtime hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage D. The first two (2)hours before or after a five - eight (8)hour workweek day or a four-ten (10)hour workweek day and the first eight (8) hours worked the next day after either workweek shall be paid at one and one-half times the hourly rate of wage All additional hours worked and all worked on Sundays and holidays shall be paid at double the hourly rate of wage. E The first two (2)hours after eight (8)regular hours Monday through Friday and the first eight(8) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage G The first ten(10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four - ten hour schedule, shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage H All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage I All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage J The first two(2)hours after eight(8) regular hours Monday through Friday and the first ten (10) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over ten (10) hours Monday through Saturday,Sundays and holidays shalt be paid at double the hourly rate of wage K All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage N All hours worked on Saturdays(except makeup days)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage 1. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays, holidays and after twelve(12)hours,Monday through Friday and after ten (10)hours on Saturday shall be paid at double the hourly rate of wage Benefit Code Key—Effective 08-31-2012 thru 03-03-2013 P All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All horns worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day) shall be paid at double the hourly rate of wage All hours worked on Christmas day shall be paid at two and one-half times the hourly rate of wage R All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage S The first two(2) hours after eight(8) regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid atone and one-half times the hourly rate of wage All hours worked on holidays and all other overtime hours worked, except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the hourly rate of wage T. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the noimal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked over twelve hours (12) in a single shift and all work performed after 6 00 pm Saturday to 6 00 am Monday and holidays shall be paid at double the straight time rate of pay The employer shall have the sole discietion to assign overtime work to employees Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations After an employee has worked eight(8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more. U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays (except Labor Day)shall be paid at two times the hourly rate of wage All hours worked on Labor Day shall be paid at three tunes the hourly rate of wage V. All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at one and one-half times the hourly rate of wage All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly rate of wage W All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage X. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve(12) hours Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage When holiday falls on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday,Monday, shall be considered the holiday and all work performed shall be paid at double the hourly rate of wage Y. All hours worked outside the hours of 5 00 am and 5 00 pm (or such other hours as may be agreed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half tunes the hourly rate of wage (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time rate until they have worked 8 hours in a day(10 in a 4 x 10 workweek)or 40 hours during that workweek) All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage 1. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay 2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B. All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage. —2 — Benefit Code Key—Effective 08-31-2012 thru 03-03-2013 2. C. All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be paid at two times the hourly rate of wage F. The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday pay All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly i ate of wage G All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on paid holidays shall be paid at two and one-half times the hourly rate of wage including holiday pay H. All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage K. All hours worked on holidays shall be paid at two times the hourly rate of wage in addition to the holiday pay. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage R. All hours worked on Sundays and holidays and all hours worked over sixty(60) in one week shall be paid at double the hourly rate of wage U All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage W. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage On a four-day.ten- hom weekly schedule,either Monday thou Thursday or Tuesday thru Friday schedule,all hours worked after ten shall be paid at double the hourly rate of wage The first eight(8)hours worked on the fifth day shall be paid at one and one-half times the hourly rate of wage All other hours worked on the fifth, sixth, and seventh days and on holidays shall be paid at double the hourly rate of wage Y. All hours worked on Saturdays (except for make-up days) shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage 3 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A Work performed in excess of eight(8)hours of straight time per day, or ten (10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked over twelve hours (12) in a single shift and all work performed after 6 00 pm Saturday to 6 00 am Monday and holidays shall be paid at double the straight time rate of pay Any shift starting between the hours of 6 00 pm and midnight shall receive an additional one dollar($1 00)per hour for all hours worked that shift The employer shall have the sole discretion to assign overtime work to employees Primary consideration for overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more B. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve (12)hours Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when four ten (10) hour shifts are established, or forty (40) hours of straight time per week Monday through Friday, or outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage All work performed after 6 00 pm Saturday to 5:00 am Monday and Holidays shall be paid at double the hourly rate of wage After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more —3— Benefit Code Key—Effective 08-31-2012 thru 03-03-2013 3. D. All hours worked between 6 00 pm Monday through 6.00 am Saturday,shall be paid at an overtime rate of 15%over the hourly rate of wage All other hours worked after 6 00 am on Saturdays,shall be paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E All hours worked Sundays and holidays shall be paid at double the hourly rate of wage Each week,once 40 hours of straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid at double the hourly wage rate 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A All hours worked in excess of eight(8)hours per day or forty (40)hours per week shall be paid at double the hourly rate of wage All hours worked on Saturdays,Sundays and holidays shall be paid at double the hourly rate of wage B. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve(12) hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage Holiday Codes 5. A Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,and Christmas Day(7). B Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day,the day before Chnstmas,and Christmas Day(8) C. Holidays New Year's Day,Presidents' Day,Memorial Day,Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,And Christmas Day(8) D Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day (8) H. Holidays New Year's Day,Memorial Day,Independence Day, Thanksgiving Day,the Day after Thanksgiving Day, And Christmas(6) I Holidays New Year's Day,Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6) J. Holidays: New Year's Day,Memorial Day, Independence Day, Thanksgiving Day,Friday after Thanksgiving Day, Christmas Eve Day,And Christmas Day(7) K Holidays. New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, The Day Before Christmas,And Christmas Day(9) L. Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8) N. Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9). P. Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9) If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday R. Paid Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day (7 1l2) —4— Benefit Code Key—Effective 08-31-2012 thru 03-03-2013 5. S. Paid Holidays New Year's Day,Presidents' Day,Memorial Day,Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7) T. Paid Holidays- New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9) Z. Holidays New Year's Day. Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Chi istmas Day(8) Holiday Codes Continued 6. A. Paid Holidays-New Year's Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, The Friday After Thanksgiving Day,And Christmas Day(8) E Paid Holidays New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, Christmas Day, And A Half-Day On Chistmas Eve Day (9 1/2) G Paid Holidays New Year's Day,Martin Luther King Jr.Day,Presidents'Day,Memorial Day, Independence Day,Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day, Christmas Day, And Christmas Eve Day(11) H. Paid Holidays New Year's Day,New Year's Eve Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday(10) L Paid Holidays New Year's Day,Memorial Day,Independence Day,Labor Day, Thanksgiving Day,Friday 1 After Thanksgiving Day.And Christmas Day(7) Q Paid Holidays New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day,The Day After Thanksgiving Day And Christmas Day(8) Unpaid Holiday_ Presidents' Day T. Paid Holidays: New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Friday After Thanksgiving Day, The Last Working Day Before Christmas Day,And Christmas Day(9) Z. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday after Thanksgiving Day, And Christmas Day (7) If a holiday falls on Saturday, the preceding Friday shall be considered as the holiday If a holiday falls on Sunday, the following Monday shall be considered as the holiday Holiday Codes Continued 7 A Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And Saturday After Thanksgiving Day, And Christmas Day (8) Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day B. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday C. Holidays New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday �5� Benefit Code Key—Effective 08-31-2012 thru 03-03-2013 7. D Paid Holidays New Year's Day, Memorial Day,Independence Day,Labor Day Veteran's Day.Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8) Unpaid Holidays President's Day Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday E. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day And Chnstmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday F. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the last working day before Christmas day and Christmas day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday G. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday H. Holidays New Year's Day, Martin Luther King Jr. Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday I Holidays New Year's Day, President's Day Independence Day, Memorial Day,Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, The Day Before Christmas Day And Christmas Day(9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday J Holidays New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday K. Holidays New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday L. Holidays New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day, the Last Work Day before Christmas Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday M Paid Holidays New Year's Day, The Day after or before New Year's Day. President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day,Christmas Day, And the Day after or before Christmas Day 10) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday N. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday When Christmas falls on a Saturday,the preceding Friday shall be observed as a holiday i O. Paid Holidays. New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, The Day After Or Before Christmas Day, And The Employees Birthday 11) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday P. Holidays New Year's Day, Memorial Day. Independence Day, Labor Day, Thanksgiving Day, Friday after Thanksgiving Day, And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday —6— Benefit Code Key—Fffectne 08-31-2012 thru 03-03-2013 7. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, the Last Working Day before Christmas Day and Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day R. Paid Holidays New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day after or before Christmas Day (10) If any of the listed holidays fall on Saturday. the preceding Friday shall be observed as the holiday If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly Note Codes S. A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more- Over 50' To 100'-$2 00 per Foot for Each Foot Over 50 Feet ; Over 100'To 150'-$3 00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-$4 00 per Foot for Each Foot Over 150 Feet Over 220'-S5 00 per Foot for Each Foot Over 220 Feet a C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more- Over 50' To 100'-$1 00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$1 50 per Foot for Each Foot Over 100 Feet Over 150'To 200'-S2 00 per Foot for Each Foot Over 150 Feet ' Over 200'-Divers May Name Their Own Price D. Workers working with supplied air on hazmat projects receive an additional$1.00 per hour 1 L. Workers on hazmat projects receive additional hourly premiums as follows - Level A $0 75, Level B $0 50, And Level C $0 25 M. Workers on hazmat projects receive additional hourly premiums as follows Levels A & B $1 00, Levels C & D: $0 50 N Workers on hazmat projects receive additional hourly premiums as follows -Level A. $1 00, Level B. $0 75, Level C.$0 50,And Level D-$0 25 P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit $2 00,Class B Suit $1.50, Class C Suit $1.00,And Class D Suit$0 50. Q The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the shift shall be used in determining the scale paid R. Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during construction operations Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho These classifications are only effective on or after August 31,2012 S Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012 —7— Benefit Code Key—Effective 08-31-2012 thru 03-0;-2013 8. T. Effective August 31,2012—A Traffic Control Laborer performs the setup.maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle and pedestrian traffic during construction operations Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or where directed by the Engineer.All flaggers and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012 —8— Page 1 of 3 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Statement of Intent to Pay Prevailing Wage Document Received Date: Intent ID: Affidavit ID: Status: Approved On 1/17/2013 552385 1/18/2013 Company Details Company Name: PETERSEN BROTHERS INC 4 Address: 2008 E VALLEY HWY SUMNER, WA, 98390 Contractor Registration No. PETER61187NZ WA UBI Number 600072474 Phone Number 253-863-8136 Industrial Insurance Account ID 190,856-00 Email Address kim@petersenbrothers.com Filed By Knox, Kim Prime Contractor 1 Company Name PETERSEN BROTHERS INC Contractor Registration No. PETERB1187NZ WA UBI Number 600072474 Phone Number 253-863-8136 Project Information Awarding Agency KENT, CITY OF 220 - 4TH AVE S KENT, WA - 98032-5895 Awarding Agency Contact Kristin Lykken Awarding Agency Contact Phone Number 253-856-5650 Contract Number 13-004 Project Name 277th St SE Guardrail Repair Contract Amount $77388.55 https://fortress.wa.gov/Ini/wagelookup/IntentDetaiIs.aspx 1/23/2013 Page 2of3 Bid due date 12/27/2012 Award Date 1/14/2013 Project Site Address or Directions Payment Details Check Number: Transaction Id: 103790366 Intent Details Expected project start date: (MM-DD-YYYY) 1/22/2013 In what county (or counties) will the work be King performed? In what city (or nearest city) will the work be Kent performed? What is the estimated contract amount? OR is this $7,388.55 a time and materials estimate? Will this project utilize American Recovery and No Reinvestment Act (ARRA) funds? Specifically, will this project utilize any No weatherization or energy efficiency upgrade funds (ARRA or otherwise)? Does your company intend to hire ANY No subcontractors? Does your company intend to hire subcontractors No to perform ALL work? Will your company have employees perform work Yes on this project? Do you intend to use any apprentices? No (Apprentices are considered employees.) How many owner/operators performing work on 0 the project own 30% or more of the company? journey Level Wages County Trade Occupation Wage Fringe # �� Workers King Laborers General Laborer $31.31 $9.52 2 King Power Equipment Operators Guardrail Punch/Auger $35 50 $15.90 1 King Power Equipment Operators Cranes: Through 19 Tons With $35.08 $15.90 1 https://fortress.wa.gov/Ini/wagelookup/IntentDetaiIs.aspx 1/23/2013 Page 3of3 Attachments A-frame Over 10 Tons Y King Power Equipment Operators Hydratifts/boom Trucks Over $35.08 $15.90 1 10 Tons King Power Equipment Operators Assistant Engineer $32.72 $15.90 1 Public Notes s Show/Hide Existing, Notes No note exists https:Hfortress.wa.gov/lni/wagelookup/IntentDetails.aspx 1/23/2013 ® K ANT PAYMENT AND PERFOP.MANCE BOND Bond No 105856985 W. k' °" TO CITY OF KENT KNOW ALL MEN BY THESE PRESENTS: That we, the undersigned, Petersen Brothers, Inc. as Principal, and Travelers Casualty and Surety Company of America a Corporation organized and existing under the laws of the State of Washington, as a Surety Corporation, and qualified under the laws of the State of Washington to become Surety upon bonds of Contractors with Municipal Corporations, as Surety, are jointly and severally held and firmly bound to the CITY OF KENT in the penal sum of $ $7,388 55 , together with any adjustments, up or down, in the total contract price because of changes in the contract work, for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators or personal representatives, as the case may be. This obligation is entered into in pursuance of the statutes of the State of Washington, and the Codes and Ordinances of the CITY OF KENT. Nevertheless, the conditions of the above obligation are such that: WHEREAS, under and pursuant to a motion, duly made, seconded and passed by the City Council of the City of Kent, King County, Washington, the Mayor of the City of Kent has let or is about to let to the above bounden Principal, a certain contract, the sald contract providing for construction of Repair Damaged Guardrail on SE 277th Street W/B Lane (which contract is referred to herein and is made a part hereof as though attached hereto), and WHEREAS, the Principal has accepted, or is about to accept, the contract, and undertake to perform the work therein provided for in the manner and within the time set forth: NOW, THEREFOR-Er for non-FHWA projects only, if the Principal shall faithfully perform a€I the provisions of said contract in the manner and within the time herein set forth, or within such extensions of time as may be granted under the said contract, and shall pay all laborers, mechanics, subcontractors and material men, and all persons who shalt supply the Principal or subcontractors with provisions and supplies for the carrying on of said work and shall indemnify and hold the CITY OF KENT harmless from any damage or expense by reason of failure of performance as specified in said contract or from defects appearing or developing in the material or workmanship provided or performed under said contract, then and In that event this obligation shall be void; but otherwise it shall be and remain in full force and effect. IN WITNESS WHEREOF, the above bounden parties have executed this instrument under their separate seals. The name and corporate seal (if required by PAYMENT AND PERFORMANCE BOND Page 1 of 2 law) of each corporate party is hereto affixed and duly signed by Its undersigned representatives pursuant to authority of its governing body. V0 WITNESSES: Petersen Brothers, Inc PRINCIPAL Can pr+n is name above) V-0-'tiaa br6 T. eYsCn TITLE: __ vSODC-t.Yt' DATE: January 17, 2013 DATE: January 17, 2013 CORPORATE SEAL: PRINT NAME DATE: �r,�� � D�� Travelers Casualty and Surety Company of America ��=" SURETY CORPORATE SEAL: BY: ry D TE: January 17, 2013 TITLE: Karen J Smith, Attorney-In-Fact ADDRESS: 621 Pacific Ave #400 Tacoma, WA 98402 CERTIFICATE AS TO CORPORATE SEAL I hereby certify that I am the (Assistant)Secretary of the Corporation named as Principal in the within Bond; that 'W-r=fPrci_n c:, - R§il LS� Who signed the said band on behalf of the Principal . givsenl rii _sue Of the said Corporation; that I know his signature thereto is genuine, and that said Bond was duly signed, sealed, and attested for and in behalf of said Corporation by authority of its governing body. SECRETARY OR ASSISTA T SECRETARY C r isi `c>, Pr--T&g-5C—t`3 P.1tiv4yamuSSaarzaV RaeueolFerh'muricv9onE dw i PAYMENT AND PERFORMANCE BOND Page 2 of 2 WARNING THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER POWER OF ATTORNEY TRAVELERSJ� Farmington Casualty Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Marine Insurance Company United States Fidelity and Guaranty Company St.Paul Guardian Insurance Company Attorney-In Fact No. 218993 Certificate No 004820220 KNOW ALL MEN BY THESE PRESENTS That St Paul Fire and Marine Insurance Company,St Paul Guardian Insurance Company and St Paul Mercury Insurance Company are corporations duly organized under the laws of the State of Minnesota that Farmington Casualty Company,Travelers Casualty and Surety Company,and Travelers Casualty and Surety Company of America are corporations duly organized under the laws of the State of Connecticut,that United States Fidelity and Guaranty Company is a corporation duly organized under the laws of the State of Maryland,that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa,and that Fidelity and Guaranty Insurance Underwtrters,Inc,is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the `Companies"),and that the Companies do hereby make,constitute and appoint Karen Ingram,Karen J Smith,Julie Craker,Thomas P Hentschell,Leslie A Parks,Brad Roberts,and Joanne Reinkensmeyer of the City of Tacoma ,State of Washington ,their true and lawful Attomey(s)-m-Fact, each in their separate capacity if more than one is named above,to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of petsons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings iequued or permitted in any actions or proceedings allowed by law 23rd IN WITNESS AYHEREOF,the Couparttels�iave caused this instrument to be signed and their corporate seals to be hereto affixed,this day of AprilLUU Farmington Casualty Company St.Paul Mercury Insurance Company Fidelity and Guaranty Insurance Company Travelers Casualty and Surety Company Fidelity and Guaranty Insurance Underwriters,Inc. Travelers Casualty and Surety Company of America St.Paul Fire and Maine Insurance Company United States Fidelity and Guaranty Company St.Paul Guardian Insurance Company G q(� �F\RE64 \R% IpgG p�,NSUq J,,,FY RryA r�W�Dw�y�gR� Y Z`�Go��qFf t,V�� aP�iy PO. y 9 LJ _4 q1 W P qL .S SE ! o �-5 �n s dYCaVPa[4tEO �„ 'u� �ICOPPONq)Fy/ W LOPPORgT n� y 9i Q a0 TT 195 < �e SE ALa i ;tea SEAL : fit' HAflTFOaJ, CONN o Caa1�' $ AN at 'E'1886 � State of Connecticut By City of Hartford ss Georg L Thompson, error lice President 23rd April 2012 On this the day of , before me personally appeared George W Thompson, who acknowledged himself to be the Senior Vice President of Farmington Casualty Company, Fidelity and Guaranty Insurance Company,Fidelity and Guaranty Insurance Underwiners, Inc, St Paul Fire and Mature Insurance Company, St Paul Guardian Insurance Company, St Paul Mercury Insurance Company, Travelers Casualty and Surety Company,Tiavelers Casualty and Surety Company of Amerca,and United States Fidelity and Guaranty Company, and that be, as such,being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer W r In Witness Whereof,I hereunto se[my hand and official seal Taff C My Commission expires the 30th day of June,2016 'OUBU� tM Mane C Teneanit,Notary Publi, 58440-6-11 Printed in U S A. WARNING THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER '4� CERTIFICATE OF LIABILITY INSURANCE 1/17i 013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the pollcy(ies)must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s) PRODUCER CONE C Karen Smith NAME HENTSCHELL 6 ASSOC INC PHONE (253)272-1151 FAXJAJC P. Ed) IAIC Na (253)272-1225 One Pacific Building karens@hentschell.com 621 PacLflc Ave. , Sumte 400 INSURERS AFFORDING COVERAGE NAICX Tacoma WA 98402 INSURERA The Travelers Indei Co. INSURED INSURER The Travelers Indemnity Co. Petersen Brothers, Inc. INSURERc Travelers Prop Cas Co Of Am 2008 East Valley Hwy INSURERD Great American Insurance Co -INSURER E Sumner WA 98390 INSURERF COVERAGES CERTIFICATE NUMBER:2012 GL/Auto/Umb/Ex REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR TYPE Of INSURANCE ADDL SUeR POLICY EFF POLICY EXP LIMITS LTR POLICY NUMBER MMIDDfYYYY MMIDDJYYY GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGEINIII X COMMERCIAL GENERAL LIABILITY PREM SESOEa occurrence) cwence $ 300,000 A CLAIMS-MADE X❑OCCUR X Y T-CO-526D9518-IND-12 1/1/2012 1/1/2013 MED EXP(Any one person) $ 10,000 PERSONAL B ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $ 2,000,000 17 POLICY X P LOC $ RO AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Ea accident 1,000,000 A X ANY AUTO BODILY INJURY(Per person) $ AUTOALL ED SCHEDULED T-810-52W9518-M-12 1/1/2012 1/1/2013 BODILY INJURY(Per accident) $ l AUTOS NON-OWNED PROPERTY DAMAGE X HIRED AUTOS X AUTOS Per accident $ Medical paynnents $ 5,000 C X UMBRELLA LIAB X OCCUR TSM-CUP-526D9518-TIL-12 1/1/2012 1/1/2013 EACH OCCURRENCE $ 1,000,000 D X EXCESS LIAB CLAIMS-MADE AGGREGATE $ 1,000,000 DED I X RETENTION$ 10,ODO X Y UE0196241-02 (Excess) 1/1/2012 1/1/2013 Each Occurrence/Aggregate $ 5,000,000 A WORKERS COMPENSATION WCSTATU- OTH- AND EMPLOYERS'LIABILITY YIN ANY PROPRIETOR/PARTNEWEXECUTIVE EL EACH ACCIDENT $ 1,000,000 OFFICEWMEMBER EXCLUDED? NIA (Mandatory In NH) T—CO-526D9518-11TD-12 1/1/2012 1/1/2013 EL DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS bli (WA-Stop Gap) EL DISEASE-POLICY LIMIT $ 2,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if morespace Is required) RE: Repair Damaged Guardrail on BE 277th Street W/B Lane. Blanket Additional Insured - Pr3mary and Non-Contributory basis as required by written contract or agreement per the attached Endorsement #CGD246(8/05) . Blanket Waiver of Subrogation as required by written contract or agreement per the attached Endorsement #CGD316(11/11) . (#13-004) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City of Kent ACCORDANCE WITH THE POLICY PROVISIONS 220 Fourth Avenue South Kent, WA 98032 AUTHORIZED REPRESENTATIVE Thomas Hentschell/KJS ACORD 26(2010105) (D1988-2010 ACORD CORPORATION. All rights reserved. INS025(201005)01 The ACORD name and logo are registered marks of ACORD Policy# DT-CO-526D9518-IND-12 COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY BLANKET ADDITIONAL INSURED (CONTRACTORS) This endorsement modifies insurance provided under the following- COMMERCIAL GENERAL LIABILITY COVERAGE PART 1. WHO IS AN INSURED —(Section il) is amended c) The insurance provided to the additional in- to include any person or organization that you sured does not apply to "bodily injury" or agree in a "written contract requiring insurance" "property damage" caused by "your work' to include as an additional insured on this Cover- and included in the "products-completed op- age Part, but erations hazard" unless the "written contract a) Only with respect to liability for'bodily injury', requiring insurance" specifically requires you "property damage"or"personal injury", and to provide such coverage for that additional insured, and then the insurance provided to b) If, and only to the extent that, the injury or the additional insured applies only to such damage is caused by acts or omissions of 'bodily injury" or 'property damage" that oc- you or your subcontractor in the performance curs before the end of the period of time for of "your work" to which the 'written contract which the "written contract requiring insur- requiring insurance" applies The person or ance" requires you to provide such coverage organization does not qualify as an additional or the end of the policy period, whichever is insured with respect to the independent acts earlier or omissions of such person or organization 3. The insurance provided to the additional insured 2. The insurance provided to the additional insured by this endorsement is excess over any valid and by this endorsement is limited as follows collectible 'other insurance", whether primary, a) In the event that the Limits of Insurance of excess, contingent or on any other basis, that is this Coverage Part shown in the Declarations available to the additional insured for a loss we exceed the limits of liability required by the cover under this endorsement However, if the "written contract requiring insurance", the in- 'written contract requiring insurance" specifically surance provided to the additional insured requires that this insurance apply on a primary shall be limited to the limits of liability re- basis or a primary and non-contributory basis, quired by that "written contract requiring in- this insurance is primary to 'other insurance' surance" This endorsement shall not in- available to the additional insured which covers crease the limits of insurance described in that person or organization as a named insured Section III—Limits Of Insurance for such loss, and we will not share with that 'other insurance" But the insurance provided to b) The insurance provided to the additional in- the additional insured by this endorsement still is sured does not apply to "bodily injury", 'prop- excess over any valid and collectible "other in- erty damage" or "personal injury" arising out surance", whether primary, excess, contingent or of the rendering of, or failure to render, any on any other basis, that is available to the addi- professional architectural, engineering or sur- tional insured when that person or organization is veying services, including an additional insured under such 'other insur- 1. The preparing, approving, or fading to ance' prepare or approve, maps, shop draw- 4. As a condition of coverage provided to the ings, opinions, reports, surveys, field or- additional insured by this endorsement ders or change orders, or the preparing, a The additional insured must give us written approving, or failing to prepare or ap ) notice soon as practicable of 'occur- prove,drawings and specifications, and o re rence" or an offense which may result in a II. Supervisory, inspection, architectural or claim To the extent possible, such notice engineering activities should include CG D2 46 08 05 0 2005 The St.Paul Travelers Companies, Inc Page 1 of 2 COMMERCIAL GENERAL LIABILITY I. How, when and where the "occurrence" any provider of "other insurance'which would or offense took place, cover the additional insured for a loss we If. The names and addresses of any injured cover under this endorsement However, this persons and witnesses, and condition does not affect whether the insur- ance provided to the additional insured by III. The nature and location of any injury or this endorsement is primary to 'other insur- damage ansing out of the"occurrence"or ance" available to the additional insured offense which covers that person or organization as a b) If a claim is made or 'suit" is brought against named insured as described in paragraph 3. the additional insured, the additional insured above must 5. The following definition is added to SECTION V I. Immediately record the specifics of the —DEFINITIONS claim or"suit" and the date received, and "Written contract requiring insurance" means If. Notify us as soon as practicable that part of any written contract or agreement under which you are required to include a The additional insured must see to it that we person or organization as an additional in- receive written notice of the claim or"suit" as sured on this Coverage Part, provided that soon as practicable the "bodily injury" and "property damage" oc- c) The additional insured must immediately curs and the "personal injury" is caused by an send us copies of all legal papers received in offense committed connection with the claim or "suit", cooperate a. After the signing and execution of the with us in the investigation or settlement of the claim or defense against the "suit", and contract or agreement by you, otherwise comply with all policy conditions b. While that part of the contract or d) The additional insured must tender the de- agreement is in effect,and fense and indemnity of any claim or "suit' to c. Before the end of the policy period i' Page 2 of 2 0 2005 The St.Paul Travelers Companies, Inc. CG 1146 08 05 DT-130-52609518-1ND-12 COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTORS XTEND ENDORSEMENT This endorsement modifies insurance provided under the following COMMERCIAL GENERAL LIABILITY COVERAGE PART GENERAL DESCRIPTION OF COVERAGE—This endorsement broadens coverage_However,coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to this Coverage Part,and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement The following listing is a general cover- age description only Limitations and exclusions may apply to these coverages Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights,duties, and what Is and is not covered A. Aircraft Chartered With Pilot H. Blanket Additional Insured — Lessors Of Leased B. Damage To Premises Rented To You Equipment C. Increased Supplementary Payments 1. Blanket Additional Insured — States Or Political Subdivisions—Permits D. Incidental Medical Malpractice E. J Knowledge And Notice Of Occurrence Or Offense . Who Is An Insured— Newly Acquired Or Formed Organizations K. Unintentional Omission F. Who Is An Insured— Broadened Named Insured L. Blanket Waiver Of Subrogation —Unnamed Subsidiaries M. Amended Bodily Injury Definition G. Blanket Additional Insured — Owners, Managers N. Contractual Liability—Railroads Or Lessors Of Premises PROVISIONS INJURY AND PROPERTY DAMAGE ll A. AIRCRAFT CHARTERED WITH PILOT ABILITY The following is added to Exclusion g., Aircraft, Exclusions c.and g. through n. do not apply Auto Or Watercraft, in Paragraph 2.of SECTION to "premises damage" Exclusion f.(1)(a) I — COVERAGES - COVERAGE A BODILY IN- does not apply to"premises damage"caused JURY AND PROPERTY DAMAGE LIABILITY by. This exclusion does not apply to an aircraft that a. Fire; is b. Explosion, (a) Chartered with a pilot to any insured, c. Lightning, (b) Not owned by any insured,and d. Smoke resulting from such fire,explosion, (c) Not being used to carry any person or prop- or lightning,or erty for a charge. e. Water, B. DAMAGE TO PREMISES RENTED TO YOU unless Exclusion L of Sei I—Coverage A 1. The first paragraph of the exceptions in Ex- — Bodily Injury And Property Damage Liability elusion j., Damage To Property, in Para- is replaced by another endorsement to this graph 2. of SECTION I — COVERAGES — Coverage Part that has Exclusion—All Pollu- COVERAGE A BODILY INJURY AND tion Injury Or Damage or Total Pollution Ex- PROPERTY DAMAGE LIABILITY is deleted. elusion in its title. 2. The following replaces the last paragraph of A separate limit of insurance applies to Paragraph 2., Exclusions, of SECTION I — "premises damage" as described in Para- COVERAGES — COVERAGE A. BODILY graph 6. of SECTION III — LIMITS OF IN- SURANCE CG DS 1611 11 0 2011 The Travelers Indemnity Company An rights reserved Page 1 of 6 COMMERCIAL GENERAL LIABILITY 3. The following replaces Paragraph 6. of SEC- C. INCREASED SUPPLEMENTARY PAYMENTS TION III—LIMITS OF INSURANCE I. The following replaces Paragraph 1.b. of Subject to 5, above, the Damage To Prem- SUPPLEMENTARY PAYMENTS — COVER- ises Rented To You Limit is the most we will AGES A AND B of SECTION I — COVER- pay under Coverage A for damages because AGE: of"premises damage" to any one premises. b. Up to $2,500 for the cost of bail bonds The Damage To Premises Rented To You required because of accidents or traffic Limit will apply to all "property damage" law violations arising out of the use of any proximately caused by the same "occur- vehicle to which the Bodily Injury Liability rence , whether such damage results from. Coverage applies We do not have to fur- fire, explosion, lightning;smoke resulting from nish these bonds such fire, explosion, or lightning, or water, or 2 any combination of any of these causes. The following replaces Paragraph 1.d. ofSUPPLEMENTARY PAYMENTS — COVER- The Damage To Premises Rented To You AGES A AND B of SECTION I — COVER- Limit will be AGES. a. The amount shown for the Damage To d. All reasonable expenses incurred by the t Premises Rented To You Limit on the insured at our request to assist us in the Declarations of this Coverage Part, or investigation or defense of the claim or b. $300,000 if no amount is shown for the "suit", including actual loss of earnings up Damage To Premises Rented To You to $500 a day because of time off from Limit on the Declarations of this Coverage work Part D. INCIDENTAL MEDICAL MALPRACTICE 4. The following replaces Paragraph a. of the 1. The following is added to the definition of"oc- definition of insured contract in the DEFINI- currence"in the DEFINITIONS Section. TIONS Section: "Occurrence" also means an act or omission a. A contract for a lease of premises How- committed in providing or fading to provide ever, that portion of the contract for a "incidental medical services", first aid or lease of premises that indemnities any "Good Samaritan services"to a person person or organization for "premises damage"is not an"insured contract"' y The following is added t Paragraph 2.a(1)of o INSURED 5. The following is added to the DEFINITIONS SECTION II—WHO IS to Section Paragraph (1)(d) above does not apply to "Premises damage" means dam- "bodily injury" arising out of providing or fail- 9 "property Ing to provide. age"to (i) "Incidental medical services" by any of a. Any premises while rented to you or tem- your "employees" who is a nurse practi- porarily occupied by you with permission goner,registered nurse,licensed practical of the owner,or nurse, nurse assistant, emergency medi- b. The contents of any premises while such cal technician or paramedic;or premises is rented to you,if you rent such (11) First aid or"Good Samaritan services"by premises for a period of seven or fewer consecutive days. any of your "employees" or "volunteer workers", other than an employed or vol- 6. The following replaces Paragraph 4.b.(1)(b) unteer doctor Any such "employees" or of SECTION IV—COMMERCIAL GENERAL "volunteer workers" providing or failing to LIABILITY CONDITIONS' provide first aid or "Good Samaritan ser- (b) That is insurance for"premises damage"; vlces" during their work hours for you will or be deemed to be acting within the scope 7. Paragraph 4.b.(1)(c) of SECTION IV — of their employment by you or performing COMMERCIAL GENERAL LIABILITY CON- duties related to the conduct of your busi- DITIONS is deleted. ness Page 2 of 6 02011 The Travelers Indemnfty Company A6 rigits reserved CG D3 16 1111 COMMERCIAL GENERAL LIABILITY 3. The following is added to Paragraph 5. of 4. Any organization you newly acquire or form, SECTION III—LIMITS OF INSURANCE other than a partnership, joint venture or lim- For the purposes of determining the applica- tied liability company, of which you are the ble Each Occurrence Limit, all related acts or sole owner or in which you maintain the ma- omissions committed in providing or fading to jority ownership interest, will qualify as a provide"incidental medical services", first aid Named Insured if there is no other insurance or"Good Samaritan seances"to any one per- which provides similar coverage to that Or- son will be deemed to be one"occurrence". ganization However: 4. The following exclusion Is added to Para- a. Coverage under this provision is afforded graph 2., Exclusions, of SECTION I —COV- only ERAGES—COVERAGE A BODILY INJURY (1) Until the 180th day after you acquire or AND PROPERTY DAMAGE LIABILITY form the organization or the end of the Sale Of Pharmaceuticals policy period, whichever is earlier, if you "Bodily injury" or "property damage" arising do not report such organization in writing out of the willful violation of a penal statute or to us within 180 days after you acquire or ordinance relating to the sale of pharmaceuti- form if,or cals committed by, or with the knowledge or (2) Until the end of the policy period, when consent of,the insured that date is later than 180 days after you 6. The following is added to the DEFINITIONS acquire or form such organization, if you Section report such organization in writing to us "Incidental medical services"means: within 180 days after you acquire or form a. Medical, surgical, dental, laboratory,x-ray it, and we agree in writing that it will con- or nursing service or treatment, advice or tlnue to be a Named Insured until the end instruction, or the related furnishing of of the policy period; food or beverages,or b. Coverage A does not apply to "bodily injury" b. The furnishing or dispensing of drugs or or "property damage" that occurred before medical, dental, or surgical supplies or you acquired or formed the organization,and appliances c. Coverage B does not apply to "personal in- "Good Samaritan services" means any emer- jury" or "advertising injury" arising out of an gency medical services for which no compen- offense committed before you acquired or sation is demanded or received formed the organization 6. The following is added to Paragraph 4.b., Ex- F. WHO IS AN INSURED— BROADENED NAMED cess Insurance, of SECTION IV — COM- INSURED—UNNAMED SUBSIDIARIES MERCIAL GENERAL LIABILITY CONDI- The following is added to SECTION 11 —WHO IS TIONS AN INSURED The insurance is excess over any valid and collectible other insurance available to the in- Any of your subsidiaries,other than a partnership, sured,whether primary, excess,contingent or joint venture or limited liability Company, that is on any other basis, that is available to any of not shown as a Named Insured in the Declara- your "employees" or "volunteer workers" for bons is a Named Insured if you maintain an own- "bodily injury" that arises out of providing or ership interest of more than 50% in such subsidi- fading to provide "incidental medical ser- ary on the first day of the policy penod vices", first aid or"Good Samaritan services" No such subsidiary is an insured for"bodily injury" to any person to the extent not subject to or"property damage" that occurred, or "personal Paragraph 2.a.(1) of Section It —Who Is An injury" or "advertising injury" caused by an of- Insured fense committed after the date, if any, during the E. WHO IS AN INSURED — NEWLY ACQUIRED policy period, that you no longer maintain an OR FORMED ORGANIZATIONS ownership interest of more than 50% in such sub- The following replaces Paragraph 4.of SECTION sidiary 11—WHO IS AN INSURED- CO D3 16 11 11 c 2011 The Travelers IrWamnity,Company AA rights reserved Page 3 of 6 COMMERCIAL GENERAL LIABILITY G. BLANKET ADDITIONAL INSURED—OWNERS, H. BLANKET ADDITIONAL INSURED—LESSORS MANAGERS OR LESSORS OF PREMISES OF LEASED EQUIPMENT The following is added to SECTION II —WHO 13 The following is added to SECTION II—WHO IS AN INSURED. AN INSURED. Any person or organization that Is a premises Any person or organtzation that Is an equipment owner, manager or lessor and that you have lessor and that you have agreed in a wrden con- agreed in a written contract or agreement to in- tract or agreement to include as an insured on elude as an additional insured on this Coverage this Coverage Part is an insured,but only with re- Part is an insured, but only with respect to liability t "bodily injury", "property dam- „ sped to liability for bodrl m'u for "bodily injury", property damage", personal age","personal injury"or"advertising injury"that, injury"or"advertising injury' that a. Is "bodily injury" or "property damage" that o :a a. "badly injury" "property damage" that occurs, or is "personal injury" or "advertising occurs, is "personal injury" or "advertising injury" caused by an offense that is commit- injury" caused by an offense that is commit- injury" subsequent to the execution of that con- ted, subsequent to the execution of that con- tract or agreement, and tract or agreement, and a b. Arises out of the ownership, maintenance or b. Is caused, in whole or in part, by your ads or use of that part of any premises leased to omissions in the maintenance, operation oruse of equipment leased to you by such 9 YOU equipment lessor The insurance provided to such premises owner, The insurance provided to such equipment lessor manager or lessor is subject to the following pro- is subject to the following 9 provisions: visions a. The limits of insurance provided to such a. The limits of insurance provided to such equipment lessor will be the minimum limb premises owner, manager or lessor will be which you agreed to provide in the written the minimum limits which you agreed to pro- contract or agreement, or the limits shown on j vide in the written contract or agreement, or the Declarations, whichever are less the limits shown on the Declarations, which- ever are less b. The insurance provided to such equipment lessor does not apply to any"bodily injury"or b. The insurance provided to such premises "property damage" that occurs, or "personal owner,manager or lessor does not apply to injury"or"advertising injury"caused by an of- (1) Any "bodily injury" or "property damage" fense that is committed, after the equipment that occurs, or"personal injury"or"adver- lease expires, tising injury"caused by an offense that is committed,after you cease to be a tenant C. The Insurance provided to such equipment lessor is excess over any valid and collectible in that premises;or other insurance available to such equipment (2) Structural alterations, new construction or lessor, whether primary, excess, contingent demolition operations performed by or on or on any other basis, unless you have behalf of such premises owner, lessor or agreed in the written contract or agreement manager, that this insurance must be primary to, or c. The insurance provided to such premises non-contnbulory with, such other insurance, owner, manager or lessor is excess over any in which case this insurance will be primary valid and collectible other Insurance available to, and non-contributory with, such other in- to such premises owner, manager or lessor, surance whether primary, excess, contingent or on 1. BLANKET ADDITIONAL INSURED — STATES any other basis, unless you have agreed in OR POLITICAL SUBDIVISIONS—PERMITS the written contract or agreement that this in- surance must be primary to, or non- The following is added to SECTION 11—WHO IS contributory with, such other insurance, in INSURED, which case this insurance will be primary to, Any state or political subdivision that has issued a and non-contributory with, such other insur- permit in connection with operations performed by ance you or on your behalf and that you are required Page 4 of 6 0 2011 The Travelers Indemnity Company AN rigtrts reserved CG D3 16 11 11 COMMERCIAL GENERAL LIABILITY by any ordinance, law or building code to include (it) A manager of any limited liability as an additional insured on this Coverage Part is company,or an insured, but only with respect to liability for (tjj)An executive officer or director of "bodily injury", "property damage", "personal In- any other organization; jury"or"advertising injury"arising out of such op- that is your partner, joint venture eratlons• member or manager,or The insurance provided to such state or political (b) Any "employee" authorized by such subdivision does not apply to partnership, joint venture, limited la a. Any "bodily injury," "property damage," "per- ability company or other organization sonal injury"or"advertising injury" arising out to give notice of an "occurrence" or of operations performed for that state or po- offense. litical subdivision,or (3) Notice to us of such"occurrence"or of an b. Any "bodily injury" or "property damage" in- offense will be deemed to be given as cluded in the"products-completed operations soon as practicable if it is given In good hazard" faith as soon as practicable to your work- J. KNOWLEDGE AND NOTICE OF OCCUR- ers' compensation insurer This applies RENCE OR OFFENSE only if you subsequently give notice to us The following Is added to Paragraph 2., Duties In of the"occurrence"or offense as soon as The Event of Occurrence, Offense, Claim or practicable after any of the persons de- Suit, of SECTION IV — COMMERCIAL GEN. scribed in Paragraphs e. (1) or(2) above ERAL LIABILITY CONDITIONS, discovers that the"occurrence"or offense may result in sums to which the insurance e. The following provisions apply to Paragraph provided under this Coverage Part may a. above, but only for the purposes of the in- apply surance provided under this Coverage Part to you or any insured listed in Paragraph 1.or 2. However, if this Coverage Part includes an en- of Section II—Who Is An Insured dorsement that provides limited coverage for "bodily injury" or "property damage" or pollution (1) Notice to us of such "occurrence" or of- costs arising out of a discharge, release or es- fense must be given as soon as practica- cape of"pollutants"which contains a requirement ble only after the "occurrence" or offense that the discharge, release or escape of "pollut- is known by you(if you are an individual), ants" must be reported to us vnthin a specific any of your partners or members who is number of days after its abrupt commencement, an individual (if you are a partnership or this Paragraph e. does not affect that require- joint venture), any of your managers who ment is an individual(if you are a limited liability K UNINTENTIONAL OMISSION company), any of your "executive offi- cers"or directors (if you are an organiza- The following is added to Paragraph 6., Repre- tion other than a partnership,joint venture sentations, of SECTION IV — COMMERCIAL or limited liability company) or any "am- GENERAL LIABILITY CONDITIONS- played' authorized by you to give notice The unintentional omission of, or unintentional of an"occurrence"or offense error In, any information provided by you which (2) If you are a partnership, joint venture or we relied upon in issuing this policy will not preju- limited liability company, and none of your dice your rights under ttus insurance However, partners, joint venture members or man- this provision does not affect our right to collect alters are individuals, notice to us of such additional premium or to exercise our rights of "occurrence"or offense must be given as cancellation or nonrenewal In accordance with soon as practicable only after the "occur- applicable insurance laws or regulations. rence"or offense is known by L. BLANKET WAIVER OF SUBROGATION (a) Any individual who is The following is added to Paragraph 8., Transfer (i) A partner or member of any part- Of Rights Of Recovery Against Others To Us, nership or joint venture, of SECTION IV —COMMERCIAL GENERAL LI- ABILITY CONDITIONS CG D316 111111 0 2011 The Travelers Irrderrcdty company All Aahts reserved Page 5 of a COMMERCIAL GENERAL LIABILITY If the insured has agreed in a contract or agree- 3. "Bodily injury" means bodily injury, mental ment to waive that insured's right of recovery anguish, mental injury,shock,fright,disability, against any person or organization,we waive our humiliation, sickness or disease sustained by right of recovery against such person or organiza- a person, including death resulting From any tion, but only for payments we make because of of these at any time a. "Bodily injury' or"property damage" that oo- N. CONTRACTUAL LIABILITY—RAILROADS curs, or 1. The following replaces Paragraph c. of the b. "Personal injury" or "advertising injury" definition of'insured contract" in the DEFINI- caused by an offense that is committed, TIONS Section; subsequent to the execution of that contract or c. Any easement or license agreement, agreement 2. Paragraph f.(1) of the definition of "insured M. AMENDED BODILY INJURY DEFINITION contract" In the DEFINITIONS Sechon is de- The following replaces the definition of "bodily leted injury"in the DEFINITIONS Section 1 Page 6 of 6 0201'1 The Travelers Indemnity Company All fights reserved co D3 1611 11