Loading...
HomeMy WebLinkAboutPW13-053 - Original - Nature's Way Tree Service, LLC - Contract - 02/13/2013 Records Ma-n'J#00geMA KENT Do1)* cument WASHfNGTON CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Nature's Way Tree Service Vendor Number: JD Edwards Number Contract Number: 60 ( 3- (D 3 This is assigned by City Clerk's Office Project Name: Removal of Dangerous Trees Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 2/13/2013 Termination Date: 3/15/2013 Contract Renewal Notice (Days): N/A Number of days required notice for termination or renewal or amendment Contract Manager: Scott Schroeder Department: PWO - Vegetation Detail: (i.e. address, location, parcel number, tax id, etc.): 24803 351h Ave, 10720 242nd and 22923 127t" Ave SE. S Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11108 KENT WA5HINGTON PUBLIC WORKS AGREEMENT between City of Kent and Nature"s Way Tree Service, LLC THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Nature's Way Tree Service, LLC organized under the laws of the State of Washington, located and doing business at 1019 1841h Ave Ct E Lake Tapps, WA 98391, Mike Harrell (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: Contractor will remove trees deemed potentially dangerous at three locations. 1. Storm easement located at 24803 35th Ave S - Remove four alder trees and all wood and debris from the site. 2. Wetland located at 10720 242nd - Remove one dead alder tree and leave all wood on site for wildlife habitat. 3. Wetland located at 22923 127th Ave SE - Remove two alder trees and leave all wood on site for wildlife habitat. For a copy of the contractor bid see attached exhibit A, incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within 30 days. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed $3,865.35, including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (500/0) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this Agreement. PUBLIC WORKS AGREEMENT - 1 (Under$10K and No Performance Bond) A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $25,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. PUBLIC WORKS AGREEMENT - 2 (Under$1OK and No Performance Bond) - E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City PUBLIC WORKS AGREEMENT - 3 (Under$1OK and No Performance Bond) will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment PUBLIC WORKS AGREEMENT - 4 (Under$10K and No Performance Bond) for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. PUBLIC WORKS AGREEMENT - 5 (Under$10K and No Performance Bond) The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by PUBLIC WORKS AGREEMENT - 6 (Under$IOK and No Performance Bond) filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. a PUBLIC WORKS AGREEMENT - 7 (Under$10K and No Performance Bond) I. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By: .�� By: (signature)) (signature) Print Name: Aklc-' Print Name: Brad Lake Its ('6),AJ Its: Public Works Operations Manager (title) DATE: DATE: NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Mike Harrell Scott Schroeder Nature's Way Tree Service, LLC City of Kent 1019 1841h Ave Ct E 220 Fourth Avenue South Lake Tapps, WA 98391 Kent, WA 98032 (253) 856-5600 (telephone) 253-740-4669 (telephone) (253) 856-6600 (facsimile) N/A (facsimile) PUBLIC WORKS AGREEMENT - 8 (Under$10K and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. Dated this day of , 20_. By: For: ./I/.aekwe S L uL• /' k�G- Title: "<— Date: EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this day of , 20 By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 Lo CCL*On Estimate sheet Nature's Nay Tree Service, LLC Customer Information bate 101918416 Ave Ct rE 1111512012 Lake Tapps OVA 98391 City Of Kent 253-740-4669 24803 35th ave s Kent wa 98031 Services 9fours To Complete price Pruning Tree evaluation Tree removal Other comments 9?smovafof 4 12edAfders,1 dead tree and 3 live trees ACfwood and brusfi to be removedfrom site Wiffpay prevailing wage to any employs on this jo6 Sub total $2,440.00 Tax $231.80 Totaf $2,671.80 � Ilk Estimate sheet Nature's Way Tree Service, LLC Customer Information late 1019184tr Ave Ct E 1111512012 Lake Tapps W,4 98391 City Of Kent 253-740-4669 Wetland at 10720 242nd Xent wa 98031 Services Yours To Complete lr'rice Wruning Tree evaluation Tree removal Otfier comments 12emovafof 1 dead RedACdersnag in wetland ACf wood and brush to stay in wetland for ha6itat Wiffpay prevailing wage to any employs on this job Su6 total $600.00 Tax $57.00 Total $657.00 ccctl Estimate sheet 5Vature's Way Tree Service, LLC Customer Information Date 1019 184thAve Ct E 1111512012 Lake Tapps OVA 98391 City Of Kent 253-740-4669 Wetfand at 22923 127tj ave se Xent wa 98031 Services Yfours To Complete Dice Pruning Tree evaluation Tree removal Other comments 12emovafof 1 five 12ed.Alder and removal of 1 Alder snag caught in maple tree Affwood and brush to stay in wetlandfor habitat lOffpay prevailing wage to any employs on this job Sub total $490.00 Tax $46.55 Total $536.55 EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non- owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. EXHIBIT B (Continued ) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. CERTIFICATE OF LIABILITY INSURANCE 03/13/I�/2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF )NFORMAT!ON ONLY AND CONFERS NO RIGHTS UPON—1HE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES ELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED .4EPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is aft ADDITIONAL INSURED,the policy(ws)must be endorsed- If SUBROGATION IS WAIVED,su6)ect to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in Lieu ai such emforsemenf(s}, PRODUCER CONTACT Don Young NAW; Young Insurance Agency, LLC 11 . (253) 893-0011 (253) 893-0012 aD ss:donEyoungins.net PO Box 5340 - AFFORDING COVERAGE NAIG# Kent WA 98064- INSURERA.SG Paul Fire 9, Marine Ins. Co. INSURED jmvR--Ra,Lib- arty Northwest Mature's Way Tree Service, LLC INSURER G. 1019 184th Ave Ct E Ia�UR=R 0: IeSLiRER E• Lake Ta ps 98391- INSURERF: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIP/THAT THE POLICIES OF INSURANCE LISTED SELOVkf HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DECC-!BED HEREIN 1E SUBJECT TO ALL THE TERMS, EXCLLISIONIS AND CONDITIONS OFSUcH PoUcO8 L10T8 sHOWiN MAY HAVE BEEN REDUCED BY PAID GLAJ&ia SL SRR LWYEXP TYPEOPINSURANce POLICY NUMBER tOLID£� m2mm LIMITS K3ENgRAL LIA€AL3TY 31-08102045 4/07I2012 4J07/2013 EACH OCCUR RENCE 5 l,000,000 X COMMERCIAL GENERAL UAEILITY I I I I PRcMISES F3accEJrc $ 10E),OQtk CLAIMS-MWDE Fx-10CCLR I I I I MED EXP(Aay one€erscn) 5,000 PERSONAL&ADVINJURY Is 1,000,000 GENERALAGGREGATE 5 2,000,000 GEN'L AGGREGATE L1it9tT AFFLI£S PER. ! ! ! ! PRODUCTS-COk1P/oP AGO 3 2,000,000 POLICY El M=O- LOO AUT0740BREL1Ah3ILITY BASS4392707 3/14/2012 3114f2013 COMBINED SINGLE LIMIT 1,000,000 X ANY AUTO / / ! ! BODILY INJURY(Far pmon�) S ALL OvmED SCHEMLEII / / / / BODILY INJURY(For accident) $ AUTOS ALTOS HIRED AUTOS ON-OWNED / ! r / PRcpeOPERTY DAMAGEAUTOS � UMBRELLA LIAR OCCUR EXCESS LIAR CLAIMS-hIADE / / / / AGGREGATE $ u 9>;9 RETEA1TIC +NOP.tLERSCOMPEORATION I WC STATU. OTH• Am EMPLOYERS'LIABILITY YIIN TORY CATS ER ANY PROPRIETORRARTNER/EXECUTIVE i;lA / / j / EL EACH ACCIDENT $ OFnCERMd0wIaR ExcLUom? ! ! ! I EL DSEASE-EA EMPLOYE 3 yyes,dascnha undeT DESCRIPTION OF OPERATIONS&a(ow I I I I EL DISEASE-POLJCY LIMIT $ DESCRIPTION OF OPERATIONS I LOCATIONS 1 VEHICLES(Affach ACORD 101,Additional Remarks Schedule,if more space is required) Cs.t--V of Kent as listed as an Addztxonal insured, CERT)FICATE HOLDER CANCELLATION — SHOULD ANY OF THE ABOVE DESCRIBED POLICES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE Wf TH TIRE POLICY PR OVfa10US, City of Kent AUTHORIZ€DPERRES€NTATIVR 499 West Gowe Kent WA 98032- ACORD 25(201OMS) O 1988-2010 ACORD CORPORATION. Alt rights reserved. i'N S025 n0111M 011 TheA%bR®name and Mail ate reais£er®d 9T7adk6 Of ACI.?RtF. 11/01/2012 11:24 2538930012 YOUNG INSlR2ANCE AGEY PAGE 02/02 IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement($), If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. I I DRD 2g(2[101108) 028(otos;W AMS Pogo 2 of 2 11/06/2012 12:45 2538930012 YOUNG INSURANCE AGEY PAGE 02/03 POLICY CHANGE ENDORSEMENT This endorsement summarizes the changes to your policy. All other terms of your policy not affected by these changes remain the some. � II Now Your Policy Is Changed General Liability ------------- Additional Insured G0323 (12/1997) is being added as per attached. i I Premium Change which Is Due New Additional premium ---- - - Returned premium If issued after the date your policy P-oJi&.v_,issued_ttz:___________________ begins, these spaces must be completed and our representative must sign below. Authorized Representative Endorsement takes effect: �D3/15/12��____ _ Policy number: -GLO8102045 _.. Processing date: "b9/19ki. _ 1Z:08 -0021 40704 Ed. 5-84 Endorsement m 1984 The Travelers Indemnity Company. All rights reserved. Page I 11/06/2012 12:45 2538930012 YOUNG INSURANCE AGEY PAGE 03/03 ADDITIONAL PROTECTED PERSONS ENDORSEMENT • CONTRACTORS GENERAL LIABILITY - NOT INCLUDING COMPLETED WORK This endorsement changes your Contractors Commercial General Liability Protection. How Coverage Is Changed Architect, engineer, or surveyor professional services includes: There are two changes which are described • the preparation or approval of maps, below. drawings, opinions, reports, surveys, change orders, designs, or 1. The following is added to the Who Is specification; and Protected Under This Agreement section. • supervisory, inspection, or engineering This change adds certain protected services. persons and limits their protection. 2. The following is added to the Other Additional protected person. The person or primary Insurance section. This change organization named below is an broadens coverage. additional protected person as required by a contract or agreement entered into We'll consider this Insurance to be by you. But only for covered injury or primary to and non-contributory with the damage arising out of: insurance issued directly to the additional • your work for that person or protected persons listed below if: organization; • your contract specifically requires that we consider this insurance to he • premises you own, rent, or lease from primary or primary and non- that person or organization; or contributory insurance; or • your maintenance, operation, or use of you request before a loss that we equipment leased from that person or consider this insurance to be primary organization. or primary and non-contributory We explain what we mean by your work insurance. In the Products and completed work total limit section. Oilier Terms If the additional protected person is an All other terms of your policy remain the architect, engineer, or surveyor, we won't same. cover injury or damage arising out of the performance or failure to perform architect, engineer, or surveyor professional services. Person Or organization: City of Kent 499 west Gowe Rent, WA 98032 I -103 15/1Z Name of Insured Policy Number �oL0810z_0.4_s_ _ 'NATIIREIS WAY TREE^SERVICE, LLC --,i Processing Oate '03/19/12._ 12,06 0021 G0323 Rev. 12-97 Endorsement a 1997 The Travelers Indemnity Company. All rights roserved. Page 1 of 1 Page 1 of 18 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 2/6/2013 County Trade Job Classification Wa e lHoUday Overtimel dote King Asbestos Abatement Workers Journey Level $40.83 5D 1 N (King Boilermakers Journey Level $60.24 5N 1C jKing Brick Mason Brick And Block Finisher $42.21 5A 1M 1King Brick Mason Journey Level $49.07 5A 1M E King Brick Mason Pointer-Caulker-Cleaner $49.07 5A 1M King Building Service Employees Janitor $19.98 55 2F King Building Service Employees Traveling Waxer/shampooer 520.39 5S 2F King Building Service Employees Window Cleaner (Scaffold) $24.52 5S 2F King Building Service Employees Window CLeaner(non-scaffold) $23.66 55 2F King Cabinet Makei s (In Sluopj Journey Level $22.74 1 King Carpenters Acoustical Worker $49.57 5D 1M King Carpenters Bridge, Dock And Wharf $49.57 5D 1M Carpenters King Carpenters Carpenter $49.57 5D 1M King Carpenters Carpenters on Stationary Tools $49.70 5D 1M ;King Carpenters Creosoted Material $49.67 5D 1M 'King Carpenters Floor Finisher $49.57 5D 1M King Carpenters Floor Layer $49.57 5D 1M ,King Carpenters Scaffold Erector $49.57 5D 1M King Cement Masons Journey Level $50.13 7A 1M ;King Divers Et Tenders Diver $100.28 5D 1M 8A King Divers Et Tenders Diver On Standby $56.68 5D 1M King Divers Et Tenders Diver Tender $52.23 5D 1M King Divers Et Tenders Surface Rcv Et Rov Operator $52.23 5D 1M King Divers Et Tenders Surface Rcv Et Rov Operator $48.67 5A 1B Tender King Dredge Workers Assistant Engineer $49.571 5D 1T 8L King J.DredgeWorkers Assistant Mate(deckhand) $49.061 5D 1T 8L ' hi+nc- //fnH-rracc Mli nrni/Ini/iniannlnnkun/nrvWacelookuD.asox 2/6/2013 Page 2 of 18 King Dredge Workers Engineer Welder $49.62 5D 1T 8L King Dredge Workers Leverman, Hydrautic $51.19 5D 1T 8L King Dredge Workers Maintenance $49.06 5D 1T 8L King Dredge Workers Mates And Boatmen $49.57 5D 1T 8L King Dredge Workers Oiler $49.19 5D 1T 8L King Drywall Applicator Journey Level $49.74 5D 1H King Drywall Tapers Journey Level $49.79 5P 1E King Electrical Fixture Maintenance Journey Level $25.08 5L I Workers King Electricians - Inside Cable Splicer $62.74 7C 2W King Electricians - Inside Cable Splicer (tunnel) $67.45 7C 2W King Electricians - Inside Certified Welder $60.61 7C 2W King Electricians - Inside Certified Welder (tunnel) $65.10 7C 2W Kind Electricians - Inside Construction Stock Person $33.69 7C 2W King Electricians - Inside Journey Level $58.47 7C 2W King Electricians - Inside Journey Level (tunnel) $62.74 7C 2W King Electra ians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $64.95 5A 4A Construction King Electricians - Powerline Certified Line Welder $59.37 5A 4A Construction King Etectricians - Powerline Groundperson $42,16 5A 4A Construction King Electi icians - Powerline Head Groundperson $44.50 5A 4A Construction King Electricians - Powerline Heavy Line Equipment $59.37 5A 4A Construction Operator King Etecti icians - Powerline Jackhammer Operator $44.50 5A 4A Construction King Electricians - Powerline Journey Level Lineperson $59.37 5A 4A Construction King Electricians - Powerline Line Equipment Operator $49.95 5A 4A Construction King Electricians - Powerline Pole Sprayer $59.37 5A 4A Construction King Electricians.- Powerline Powderperson $44.50 5A 4A Construction King Electronic Technicians Journey Level $31 00 1 King Elevator Constructors Mechanic $75.24 7D 4A King Elevator Constructors Mechanic In Charge $82.00 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $14.15 513 2K Products Work Only King Fence Erectors Fence Erector $15.18 1 King Ftao ers Journey Level $34.61 7A 2Y King Glaziers Journey Level $52.76 7L 1Y King Heat Et Frost Insulators And Journeyman $56.93I 51 1S https://fortress.wa.gov/lni/vvagelookup/prvWagelool<up.aspx 2/6/2013 Page 3 of 18 Asbestos Workers King Heating Equipment Mechanics Journey Level $68.52 7F 1E King Hod Carriers Et Mason Tenders Journey Level $42.11 7A 2Y King Industrial Engine And Machine Journey Level $15.65 1 i Mechanics King Industrial Power Vacuum Journey Level $9.24 ELIK Cleaner King Inland Boatmen Boat Operator $52.32 56King Inland Boatmen Cook $48.89 5BKing Inland Boatmen Deckhand $48.96 5BKing Inland Boatmen Deckhand Engineer $49.95 5B King Inland Boatmen Launch Operator $51.16 5B 1K King Inland Boatmen Mate $51.16 5B 1K 1 King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 Sewer Et Water Systerns BV Operator i Remote Control King Inspection/Cleaning/Sealing 0f Grout Truck Operator $11.48 1 Sewer Et Water Systems B Remote Control King Inspection/Cleaning/Sealing Of Head Operator $24.91 1 j Sewer Et Water SystemsBy Remote Control King Inspection/Cteaning/Sealing Of Technician $19.33 1 { Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 Sewer Et Water Systems BV Remote Control King Insulation Applicators Journey Level $49.57 5D 1M King Ironworkers Journeyman $59.02 7N 10 King Laborers Air, Gas Or Electric Vibrating $40.83 7A 2Y Screed King Laborers Airtrac Drill Operator $42.11 7A 2Y King Laborers Ballast Regular Machine $40.83 7A 2Y King Laborers Batch Weighman $34.61 7A 2Y King Laborers Brick Pavers $40.83 7A 2Y I King Laborers Brush Cutter $40.83 7A 2Y King Laborers Brush Hog Feeder $40.83 7A 2Y King Laborers Burner $40.83 7A 2Y King Laborers Caisson Worker $42.11 7A 2Y King Laborers Carpenter Tender $40.83 7A 2Y King Laborers Caulker $40 83 7A 2Y King Laborers Cement Dumper-paving $41.59 7A 2Y King Laborers Cement Finisher Tender $40.83 7A 2Y King Laborers Change House Or Dry Shack $40.83 7A 2Y King Laborers Chipping Gun (under 30 Lbs.) $40.83 7A 2Y King Laborers Chipping Gun(30 Lbs. And $41.59I 7A 2Y hfi-nc•//fnr- rPcc MIA nnu/Ini/tnraaelool<uD/DrvWactelookup.aspx 2/6/2013 Page 4 of 18 Over) King Laborers Choker Setter $40.83 7A 2Y King Laborers Chuck Tender $40.83 7A 2Y King Laborers Clary Power Spreader $41.59 7A 2Y King Laborers Clean-up Laborer $40.83 7A 2Y King Laborers Concrete Dumper/chute $41.59 7A 2Y Operator King Laborers Concrete Form Stripper $40.83 7A 2Y King Laborers Concrete Placement Crew $41.59 7A 2Y King Laborers Concrete Saw Operator/core $41.59 7A 2Y Driller `King Laborers Crusher Feeder $34.61 7A 2Y King Laborers Curing Laborer $40.83 7A 2Y .King Laborers Demolition: Wrecking Ft Moving $40.83 7A 2Y (incl. Charred Material) King Laborers Ditch Digger $40.83 7A 2Y King Laborers Diver $42.11 7A 2Y King Laborers Drill Operator $41.59 7A 2Y (hydraulic,diamond) King Laborers Dry Siack Walls $40.83 7A 2Y 'King Laborers Dump Person $40.83 7A 2Y 'King Laborers Epoxy Technician $40.83 7A 2Y King Laborers Erosion Control Worker $40.83 7A 2Y ;King Laborers Faller & Bucker Chain Saw $41.59 7A 2Y 'King Laborers Fine Graders $40.83 7A 2Y ;King Laborers Firewatch $34.61 7A 2Y King Laborers Form Setter $40.83 7A 2Y King Laborers Gabian Basket Builders $40.83 7A2Y King Laborers General Laborer $40.83 7A 2Y King Laborers Grade Checker &Transit $42.11 7A 2Y Person King Laborers Grinders $40.83 7A 2Y King Laborers Grout Machine Tender $40.83 7A 2Y King Laborers Groutmen (pressure)mcluding $41.59 7A 2Y Post Tension Beams King Laborers Guardrail Erector $40.83 7A 2Y King Laborers Hazardous Waste Worker (level $42.11 7A 2Y A) King Laborers Hazardous Waste Worker (level $41.59 7A 2Y B) - King Laborers Hazardous Waste Worker (level $40.83 7A 2Y C) King Laborers High Scaler $42.11 7A 2Y King Laborers Jackhammer $41.59 7A 2Y King Laborers Laserbeam Operator $41.59 7A 2Y King Laborers Maintenance Person $40.83 7A 2Y https,//fortress,wa.gov/Ini/wagelookup/prvWagelookup.aspx 2/6/2013 Page 5 of 18 King Laborers Manhole Builder-mudman $41.59I 7A 2Y King Laborers Material Yard Person $40.83 7A 2Y King Laborers Motorman-dinky Locomotive $41.59 7A 2Y King Laborers Nozzleman (concrete Pump, $41.59 7A 2Y f Green Cutter When Using Combination Of High Pressure Air Ft Water On Concrete if Rock, Sandblast, Gunite, { Shotcrete, Water Bla King Laborers Pavement Breaker $41.59 7A 2Y King Laborers Pilot Car $34.61 7A 2Y lKing Laborers Pipe Layer Lead $42.11 7A 2Y King Laborers Pipe Layer/tailor $41.59 7A 2Y ,King Laborers Pipe Pot Tender $41.591 7A 2Y ,King Laborers Pipe Reliner $41.59 7A 2Y King Laborers Pipe Wrapper $41.59 7A 2Y King Laborers Pot Tender $40.83 7A 2Y ;King Laborers Powderman $42.11 7A 2Y King Laborers Powderman's Helper $40.83 7A 2Y King Laborers Power Jacks $41.59 7A 2Y King Laborers Railroad Spike Puller - Power $41.59 7A 2Y ;King Laborers Raker - Asphalt $42.11 7A 2Y lKing Laborers Re-timberman $42.11 7A 2Y lKing Laborers Remote Equipment Operator $41.59I 7A 2Y King Laborers Rigger/signal Person $41.59I 7A 2Y King Laborers Rip Rap Person $�,0.83 7A 2Y King Laborers Rivet Buster $41.59 7A 2Y King Laborers Rodder $41.59 7A 2Y King Laborers Scaffold Erector $40.83 7A 2Y jKing Laborers Scale Person $40.83 7A 2Y King Laborers Sloper (over 20") $41.59 7A 2Y ,King Laborers Sloper Sprayer $40.83 7A 2Y ;King Laborers Spreader (concrete) $41.59 7A 2Y !King Laborers Stake Hopper $40.83 7A 2Y ;King Laborers Stock Piler $40.83 7A 2Y King Laborers Tamper ft Similar Electric, Air $41.59 7A 2Y a Gas Operated Tools King Laborers Tamper (multiple Ft Self- $41.59 7A 2Y propelled) King Laborers Timber Person - Sewer (lagger, $41.59 7A 2Y Shorer 0 Cribber) King Laborers Toolroom Person (at Jobsite) $40.83 7A 2Y King Laborers Topper $40.83 7A 2Y King Laborers Track Laborer $40.83 7A 2Y King Laborers Track Liner (power) $41.59 7A 2Y King Laborers Traffic Control Laborer $37.01 7A 2Y 8R httos://fortress.wa.qov/lni/wagelookup/prvWagelookup.aspx 2/6/2013 Page 6 of 18 King Laborers Traffic Control Supervisor $37.01 7A 2Y I 8R King Laborers Truck Spotter $40.83 7A 2Y King Laborers Tugger Operator $41.59 7A 2Y King Laborers Tunnel Work-Compressed Air $55.89 7A 2Y Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $60.92 7A 2Y Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $64,60 7A 2Y 8� Worker 44.01-54.00 psi I King Laborers Tunnel Work-Compressed Air $70.30 7A 2Y 8M Worker 54.01-60 00 psi King Laborers Tunnel Work-Compressed Air $72.42 7A 2Y Worker 60.01-64.00 psi iKing Laborers Tunnel Work-Compressed Air $77.52 7A 2Y 8� Worker 64.01-68.00 psi ,King Laborers Tunnel Work-Compressed Air $79.42 7A 2Y , Worker 68.01-70.00 psi j4 King Laborers Tunnel Work-Compressed Air $81.42 7A Worker 70.01-72.00 psi ;King Laborers Tunnel Work-Compressed Air $83.42 7A 1H Worker 72.01-74.00 psi King Laborers Tunnel Work-Guage and Lock $42.21 7A 2Y 8�( i Tender j (King Laborers Tunnel Work-Miner $42.21 7A 2Y 8� ',King Laborers Vibrator $41 59I 7A 2Y t 'King Laborers Vinyl Seamer $40.83I 7A 2Y lKing Laborers Watchman $31.46 7A 2Y i King Laborers Welder $41.59 7A 2Y King Laborers Well Point Laborer $41.59 7A 2Y King Laborers Window Washer/cleaner $31.46 7A 2Y King Laborers - Underground Sewer General Laborer Ft Topman $40.83 7A 2Y a Water l 'King Laborers - Underground Sewer Pipe Layer $41.59 7A 2Y &Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 { Operators Or Truck Drivers r King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $49.74 5D 1H King Marble Setters Journey Level $49.07 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication (in Shop) Painter $11.10 1 King Metal Fabrication (In Shop) Welder $15.48 1 King MillvrnQit Journey Level $50 67 5D 1M https://fortress.wa.gov/lni/iNagelookup/prvWagelookup.aspx 2/6/2013 Page 7 of 18 King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buitdings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $37.51 6Z 2B King Pile Driver Journey Level $49.82 5D 1M King Plasterers Journey Level $48.23 7Q 1R 'King Playground Et Park Equipment Journey Level $9.19 1 j Installers 'King Plumbers Et Pipefitters Journey Level $70.841 6Z 1G King Power Equipment Operatoi s Asphalt Plant Operators $51.891 7A 3C 8P ,King Power Equipment Operators Assistant Engineer $48.621 7A 3C 8P :King Power Equipment Operators Barrier Machine (zipper) $51.40 7A 3C 8P jKing Pow Equipment Operators Batch Plant Operator, $51.40 7A 3C 8P Concrete (King Power Equipment Operators Bobcat $48.62 7A 3C 8P ;King Power Equipment Operators Brokk - Remote Demolition $48.62 7A 3C 8P Equipment 'King Power Equipment Operators Brooms $48.62 7A 3C 8P King Power Equipment Operators Bump Cutter $51.40 7A 3C 8P King Power Equipment Operators Cableways $51.89 7A 3C 8P ; 'King Power Equipment Operators Chipper $51.40 7A 3C 8P King Power Equipment Operatoi s Compressor $48.62 7A 3C 8P King P_owei Equipment Operators Concrete Pump: Truck Mount $51.89 7A 3C 8P With Boom Aixachment Over 42 M I King Power Equipment Operators Concrete Finish Machine -laser $48.62 7A 3C 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $50.98 7A 3C 8P I Trailer High Pressure Line Pump, Pump High Pressure. I King Power Equipment Operators Concrete Pump: Truck Mount $51.40 7A 3C 8P With Boom Attachment Up To 42m King Power EquipMgaL Operators Conveyors $50.98 7A 3C 8P King Power Equipment Operators Cranes: 20 Tons Through 44 $51.40 7A 3C 8P Tons With Attachments King Power Equipment Operators Cranes: 20 Tons Through 44 $51.40 7A 3C 8P Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators Cranes: 100 Tons Through 199 $52.44 7A 3C 8P Tons, Or 150' Of Boom (including Jib With https://fortress.ova.gov/Ini/iNagelool(up/prvWagelool<up.asp)( 2/6/2013 Page 8 of 18 King Power Equipment Operators Cranes: 100 Tons Through 199 $52.44 7A 3C 8P Tons, or 150' of boom (including jib with I attachments); Overhead, l bridge type, 100 tons and over; Tower crane up to 175' in height, base to boom. King Power Equipment Operators Cranes: 200 Tons To 300 Tans, $53.Q1 7A 3C 8P Or 259 Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $51.89 7A 3C 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $48.62 7A 3C 8P Under 'King Power Equipment Operators Cranes: Friction 100 Tons $53.01 7A 3C SP Through 199 Tons t King Power Equipment Operators Cranes: Friction Over 200 Tons $53.57 7A 3C 8P ,King Powei Equipment Operators Cranes: Over 300 Tons Or 300' $53.57 7A 3C 8P Of Boom (including Jib With { Attachments) ;King Power Equipment Operators Cranes: Through 19 Tons With $50.98 7A 3C 8P ' Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $51.40 7A 3C 8P King Power Equipment Operators Deck Engineer/deck Winches $51.40 7A 3C 8P (power) I King Power Equipment Operators Derricks, On Building Work $51.89 7A 3C 8P King Power Equipment Operators Dozer Quad 9, HD 41, D10 and $51 89 7A 3C 8P ' Over King Power Equipment Operators Dozers D-9 & Under $50.98 7A 3C 8P King Power Equipment Operators Drilt Oilers: Auger Type, Truck $50.98 77A 3C 8P Or Crane Mount King Power Equipment Operators Drilling Machine I $51.40 7A 3C 8P King Power Equipment Operators Elevator And Man-lift: $48.62 7A 3C 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $51.40 7A 3C 8P Gamaco & Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $50.98 7A 3C 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $48.62 7A 3C 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $51.40 7A 3C 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stake man $48.62 7A 3C 8P King Power Equipment Operators Guardrail Punch $51.40 7A 3C 8P King Power Equipment Operators Guardrail Punch/Auger $51.40 7A 3C SP King Power Equipment Operators Hard Tail End Dump $51.89 7A 3C 8P Articulating Off- Road http.s://fortress.wa.gov/Ini/wagelookup/prvWagelookup.asp)< 2/6/2013 Page 9 of 18 Equipment 45 Yards. It Over King Power Equipment Operators Hard Tail End Dump $51.40 7A 3C 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $50.98 7A 3C 8P Locator King Power Equipment Operators Horizontal/directional Drill $51.40 7A 3C 8P Operator King Power Equipment Operators Hydralifts/boom Trucks Over $50.98 7A 3C 8P 10 Tons i King Power Equipment Operators Hydralifts/boom Trucks, 10 $48.62 7A 3C 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. 8t $52.44 7A 3C 8P 1 Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $51.89 7A 3C 8P Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $51.40 7A 3C 8P Yards ~King Power Equipment Operators Loaders, Plant Feed $51.40 7A 3C 8P King Power Equipment Operators Loaders: Elevating Type Belt $50.98 7A 3C 8P King Power Equipment Operator s Locomotives, All $51.40 7A 3C 8P i ;King Power Equipment Operators Material Transfer Device $51.40 7A 3C 8P King Power Equipment Operators Mechanics, All (leadmen - $52.44 7A 3C 8P $0.50 Per Hour Over Mechanic) !King Power Equipment Operators Mixers: Asphalt Plant $51.40 7A 3C 8P King Power Equipment Operators Motor Patrol Grader- Non- $50.98 7A 3C 8P finishing j {King Power Equipment Operators Motor Patrol Graders, Finishing $51.891 7A 3C 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $51.89 7A 3C 8P I Drill, Boring, Road Header i And/or Shield King Power Equipment Operators Oil Distributors, Blower $48.62 7A 3C 8P Distribution EL MUlch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $50.98 7A 3C 8P i Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type Crane: $51.40 7A 3C 8P i 20 Tons Through 44 Tons j King Power Equipment Operators Overhead, Bridge Type: 100 $52.44 7A 3C 8P , Tons And Over King Power Equipment Operators Overhead, Bridge Type: 45 $51.89 7A 3C 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $48.62 7A 3C 8P King Power Equipment Operators Pile Driver (other Than Crane $51.40 7A 3C 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P King Power Equipment Operators Posthole Digger, Mechanical $48.62 7A 3C 8P King Power Equipment 0 erp ators Power Plant $48.62 7A 3C 8P King Power Equipment Operators Pumps - Water $48.62 7A 3C 8P __ httDs://fortress.wa.qov/Ini/vvagelool(up/prv)JVagelookup.aspx 2/6/2013 Page 10 of 18 King Power Equipment Operators Quad 9, Hd 41, D10 And Over $51.891 7A 3C I 8P King Power Equipment Operators Quick Tower - No Cab, Under $48.62 7A 3C 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $51 89 7A 3C 8P Rubber Tired Earth Moving r Equipment King Power Equipment Operators Rigger And Beltman $48.62 7A 3C 8P King Power Equipment Operators Rollagon $51.89 7A 3C 8P King Power Equipment Operators Roller, Other Than Plant Mix $48.62 7A 3C 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $50.98 7A 3C 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $51.40 7A 3C 8P 'King Power Equipment Operators Saws - Concrete $50.98 7A 3C 8P King Power Equipment Operators Scraper, Self Propelled Under $51.40 7A 3C 8P i 45 Yards iKing Power Equipment operators Scrapers - Concrete Et Carry All $50.98 7A 3C 8P I King Power Equipment Operators Scrapers, Self-propelted: 45 $51.89 7A 3C 8P Yards And Over i King Power Equipment Operators Service Engineers - Equipment $50.98 7A 3C 8P ,King Power Equipment Operators Shotcrete/gunite Equipment I $48.62 7A 3C 8P i King Power Equipment Operators Shovel , Excavator, Backhoe, $50.98 7A 3C 8P Tractors Under 15 Metric Tons. j King Power Equipment Operators Shovel, Excavator, Backhoe: $51.89 7A 3C 8P Over 30 Metric Tons To 50 I Metric Tons ;King Power Equipment Operators Shovel, Excavator, Backhoes, $51.40 7A 3C 8P Tractors. 15 To 30 Metric Tons j King Power Equipment Operators Shovel, Excavator, Backhoes: $52.44 7A 3C 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $53 01 7A 3C 8P Over 90 Metric Tons King Power Equipment operators Slipform Pavers $51.89 7A 3C 8P King Power Equipment Operators Spreader, Topsider it $51.89 7A 3C 8P Screedman King Power Equipment Operators Subgrader Trimmer $51.40 7A 3C 8P King Power Equipment Operators Tower Bucket Elevators $50.98 7A 3C 8P King Power Equipment Operators Tower Crane Over 175'in $53.01 7A 3C 8P Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $52.44 7A 3C 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $51.89 7A 3C 8P Truck Type King Power Equipment Operators Trenching Machines $50.98 7A 3C 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $51.40 7A 3C 8P Tons And Over King Power Equipment Operators Truck Crane Oiler/driver Under $50.98 7A 3C 8P 100 Tons https://fortress.wa.gov/lni/vvagelookup/prvWagelookup.aspx 2/6/2013 Page 11 of 18 King Power Equipment Operators Truck Mount Portable Conveyor $51.40 7A 3C 8P King Power Equipment Operators Welder $51.89 7A 3C 8P King Power Equipment Operators Wheel Tractors, Farmall Type $48.62 7A 3C 8P King Power Equipment Operators Yo Yo Pay Dozer $51.40 7A 3C 8P King Power Equipment Operators- Asphalt Plant Operators $51.89 7A 3C 8P Underground Sewer 8: Water King Power Equipment Operators- Assistant Engineer $48.62 7A 3C 8P ! Underground Sewer Et Water I King Power Equipment Operators- Barrier Machine (zipper) $51.40 7A 3C 8P Underground Sewer Et Water iKing Power Equipment Operators Batch Plant Operator, $51.40 7A 3C 8P Underground Sewer Et Water Concrete ;King Power Equipment Operators- Bobcat $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $48.62 7A 3C 8P s Underground Sewer It Water Equipment King Power Equipment Operators- Brooms $48.62 7A 3C 8P I Underground Sewer Et Water King Power Equipment Operators- Bump Cutter $51.40 7A 3C 81 Underground Sewer Et Water King Power Equipment Operators- Cableways $51.89 7A 3C 8P 1 Underground Sewer Et Water !King Power Equipment Operators- Chipper $51.40 7A 3C 8P i Underground Sewer a Water King Power Equipment Operators- Compressor $48.62 7A 3C 8P I Underground Sewer Et Water (King Power Equipment Operators- Concrete Pump: Truck Mount $51.89 7A 3C 8P Underground Sewer rt Water With Boom Attachment Over 42 I I M King Power Equipment Operators- Concrete Finish Machine -laser $48.62 7A 3C 8P Underground Sewer Et Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $50.98 7A 3C 8P Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $51.40 7A 3C 8P Underground Sever It Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $50.98 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 $51.40 7A 3C 8P Underground Sewer Et Water Tons With Attachments King Power Equipment Operators- Cranes: 20 Tons Through 44 $51.40 7A 3C 8P Underground Sewer Et Water Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators- Cranes: 100 Tons Through 199 $52.44 7A 3C 8P Underground Sewer Et Water Tons, Or 150' Of Boom (including Jib With King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $53.01 7A 3C 8P Underground Sewer Et Water Or 250' Of Boom (including Jib https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.asp)( 2/6/2013 Page 12 of 18 With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 $51.89 7A 3C 8P Underground Sewer Et Water Tons, Under 159 Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $48.62 7A 3C 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $53.01 7A 3C 8P Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes- Friction Over 200 Tons $53.57 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Cranes: Over 300 Tons Or 300' $53.57 7A 3C 8P Underground Sewer Ft Water Of Boom (including Jib With I Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $50.98 7A 3C 8P Underground Sewer£t Water Attachments A-frame Over 10 i Tons 'King Power Equipment Operators- Crusher $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Deck Engineer/deck Winches $51.40 7A 3C 8P Underground Sewer Et Water (power) `King Power Equipment Operators- Derricks, On Budding Work $51.89 7A 3C 8P Underground Sewer Et Water 'King Power Equipment Operators Dozer Quad 9, HD 41, DI and $51.89 7A 3C 8P Underground Sewer Et Water Over King Power Equipment Operators- Dozers D-9 Et Under $50.98 7A 3C 8P " Underground Sewer It Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $50.98 7A 3C 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $51.40 7A 3C 8P Underground Sewer Et Water i KingPower EQLnpment Operators- Elevator And Man-lift: $48.62 7A 3C 8P Under round Sewer Et Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $51.40 7A 3C 8P Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $50.98 7A 3C 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $48 62 7A 3C 8P Underground Sewer Et Water Attachments King Power Equipment Operators- Grade Engineer: Using Blue $51.40 7A 3C 8P Underground Sewer a Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch/Auger $51.40 7A 3C 8P Underground Sewer 8: Water King Power Equipment Operators Hard Tail End Dump $51.89 7A 3C 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over httpso//fortress.v/a.gov/lni/lfvagelookup/prvWagelookup.aspx 2/6/2013 Page 13 of 18 King Power Equipment Operators- Hard Tail End Dump $51.40 7A 3C 8P Underground Sewer & Water Articulating Off-road Equipment Under 45 Yards 'King Power Equipment Operators- Horizontal/directional DrAL $50.98 7A 3C 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $51.40 7A 3C 8P Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over $50.98 7A 3C 2P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $48.62 7A 3C 8P Underground Sewer Et Watei Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. 8t $52.44 7A 3C 8P Underground Sewer Et Water Over (King Power Equipment Operators Loader, Overhead, 6 Yards. But $51.89 7A 3C 8P Underground Sewer Et Water Not Including 8 Yards `King Power Equipment Operators Loaders, Overhead Under 6 $51.40 7A 3C 8P i UnderqroundL Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $51.40 7A 3C 8P i Underground Sewer Et Water King Power Equipment Operators- Loaders: Elevating Type Belt $50.98 7A 3C 8P Underground Sewer Et Water !King Power Equipment Operators- Locomotives, All $51.40 7A 3C 8P Underground Sewer Et Water !King Power Equipment Operators- Material Transfer Device $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $52.44 7A 3C 2P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Mixers: Asphalt Plant $51 40 7A 3C 8P t Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Grader- Non- $50.98 7A 3C 8P Underground Sewer Et Water finishing King Power Equipment Operators- Motor Patrol Graders, Finishing $51.89 7A 3C 2P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel $51.89 7A 3C 8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Equipment Operators- Oil Distributors, Blower $48.62 7A 3C 8P Underground Sewer Et Water Distribution Et Mulch Seeding i Operator King Power Equipment Operators Outside Hoists (elevators And $50.98 7A 3C 8P Underground Sewer & Water Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type Crane: $51.40 7A 3C 8P Underground Sewer Et Water 20 Tons Through 44 Tons King Power Equipment Operators- Overhead, Bridge Type: 100 $52.44 7A 3C 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Overhead, Bridge Type: 45 $51.89 7A 3C 8P Underground Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $51.40 7A 3C 8P hffnc•//fr)r�rPgq rAia nnv/Ini/�nrr9nelnokub/orvVVaaelookuo.aspx 2/6/2013 Page 14 of 18 Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler- Asphalt, Crusher $50.98 7A 3C 8P UndergrouncL Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $48.62 7A 3C 8P Underground Sewer It Water King Power Equipment Operators- Power Plant $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Pumps - Water $48.62 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Quick lower- No Cab, Under $48.62 7A 3C 8P Underground Sewer Et Water 100 Feet In Height Based To { y Boom King Power Equipment Operators-' Remote Control Operator On $51.89 7A 3C 8P Underground Sewer Et Water Rubber Tired Earth Moving I Equipment iKing Power Equipment Operators- Rigger And Beltman $48.62 7A 3C 8P Underground Sewer Et Water r King Power Equipment Operators- Rollagon $51.89 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $48.62 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators Roller, Plant Mix Or Multi-lift $50.98 7A 3C 8P Underground Sewer £t Water Materials ,King Power Equipment Operators Roto-mill, Roto-grinder $51.40 7A 3C 8P Underground Sewer a Water 'King Power Equipment Operators Saws - Concrete $50.98 7A 3C 8P Underground Sewer a Water King Power Eq uipment Operators Scraper, Self Propelled Under $51.40 7A 3C 8P Under ground Sewer a Water 45 Yards King Power Equipment Operators- Scrapers - Concrete a Carry All $50.98 7A 3C 8P Underground Sewer Et Water King Power Equipment operators Scrapers, Self-propelled: 45 $51 89 7A 3C 8P Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $50.98 7A 3C 8P Unclerqroundl Sewer Et Water King Power Equipment Operators Shotcrete/gunite Equipment $48.62 7A 3C 8P Underground Sewer a Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $50.98 7A 3C 8P Underground Sewer a Water Tractors Under 15 Metric Tons. .King Power Equipment Operators- Shovel, Excavator, Backhoe: $51.89 7A 3C 8P Undergi ound Sewer a Water over 30 Metric Tons To 50 Metric Tans King Power Equipment Operators- Shovel, Excavator, Backhoes, $51.40 7A 3C 8P Underground Sewer a Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $52.44 7A 3C 8P Underground Sewer a Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $53.01 7A 3C 8P https://foriress.wa.gov/ini/vvagelookup/prvWagelookup.aspx 2/6/2013 Page 15 0l` 18 Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $51.89 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $51.89 7A 3C 8P Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $51.40 7A 3C 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $50.98 7A 3C 8P- Underground Sewer 8t Water King Power Equipment Operators- Tower Crane Over 175'in $53.01 7A 3C 8P Underground Sewer 8t Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $52.44 7A 3C 8P Underground Sewer 8t Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $51.89 7A 3C 8P Underground Sewer Et Water Truck Type King Power Equipment Opetators- Trenching Machines $50.98 7A 3C 8P Underground Sewer Et Water j King Power Equipment operators- Truck Crane Oiler/driver - 100 $51.40 7A 3C 8P I Undei ground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver Under $50.98 7A 3C 8P Underground Sewer Et Water 100 Tans King Power Equipment Operators- Truck Mount Portable Conveyor $51.40 7A 3C 8P Underground Sewer 8t Water IKing Power Equipment Operators- Welder $51.89 7A 3C 8P I Underground Sewer B.Water 'King Power Equipment Operators- Wheel Tractors, Farman Type 548.62 7A 3C 813 j Underground Sewer Ft Water King Power Equipment Operators- Yo Yo Pay Dozer $51.40 7A 3C 8P Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $42.91 5A 4A Trimmers 1 King Power Line Clearance Tree Spray Person $40.73 5A 4A Trimmers ' 'King Power Line Clearance Tree Tree Equipment Operator $41.29 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $38.38 5A 4A j Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $28.95 5A 4A Trimmers l King Refrigeration Et Air Journey Level $69.96 6Z 1G Conditioning Mechanics I King Residential Brick Masan Journey Level $49.07 5A 1M King Residential Carpenters Jout ney Level $28.20 1 r King Residential Cement Masons Journey Level $22.64 1 King Residential Drvwdll Applicators Journey Level $38.08 5D 1M King Residential Dtvwall Tapers Journey Level $49.79 5P 1E King Residential Electricians JOURNEY LEVEL $30.44 1 King Residential Glaziers Journey Level $34.60 7L 1H King Residential Insulation Journey Level $26.28 1 .,.,�,/IniItAin nnInn Li en/nnilAlanalnn let in ;;rny 7/6/2013 Page 16 of 18 Awticators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1' King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Journey Level $34.69 1 Pipefitters King Residential Refrigeration Et Air Journey Level $69.96 6Z 1G Conditioning Mechanics I i C King Residential Sheet Metal Journey Level (Field or Shop) $41.30 7F 1 RR E Workers i King Residential Soft Floor Lavers Journey Level $41.78 5A 3D King Residential Sprinkler Fitters Journey Level $41.31 5C 2R i (Fire Protection) 1 'King Residential Stone Masons Journey Level $49.07 5A 1M I 'King Residential Terrazzo Workers (Journey Level $45.43 5A 1M 'King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers 'King Residential Tile Setters Journey Level $25.17 1 i jKing Roofers Journey Level $43.90 5A I jKing Roofers Using Irritable Bituminous $46.90 5A 1R l Materials ,King Sheet Metal Workers Journey Level (Field or Shop) $68.52 7F I ,King Shipbuilding Et Ship Repair Boilermaker $35.83 7M I (King Shipbuilding Et Ship Repair Carpenter $38.24 70 3B King Shipbuilding Et Ship Repair (Electrician $37.85 70 3B King Shipbuilding EL Ship Repair Heat 0 Frost Insulator $56.93 5J 15 'King Shipbuilding Et Ship Repair Laborer $36.31 70 33 King Shipbuilding Et Ship Repair Machinist $37.81 70 3B King Shipbuilding & Ship Reparr Operator $40.20 70 3B i King Shipbuilding Et Ship Repair Painter $37.81 70 3B King Shipbuilding Et Ship Repair Pipefltter $37.79 70 3B King Shipbuilding Et Ship Repair Rigger $37 78 70 3B King Shipbuilding Et Ship Repair Sandblaster $36.81 70 3B King Shipbuilding Et Slip Repair Sheet Metal $37.77 70 3B King Shjpbuilding Et Ship Repair Shipfitter $37.78 70 3B King Shipbuilding Et Ship Repair Trucker $37.63 70 3B King Shipbuilding Et Ship Repair Warehouse $37.68 70 3B King Shipbuilding Et Ship Repair Welder/Burner $37.78 70 3B King Sign Makers Et Installers Sign Installer $22.92 1 Electrical King Sign Makers Et Installers Sign Maker $21.36 1 (Electricall King Sian Makers Et Installers (Non- Sign Installer $27.28 1 Electrical King Sign Makers 8t Installers (Non- Sign Maker $33.25 1 Electrical https://fortress.wa.gov/lnl/wagelool<up/prvWagelookLip.aspx 2/6/2013 Page 17 of 18 King Soft Floor Lavers Journey Level $41.78 5A 3D King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $69.44 5C 1X Protection) King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) i King Stone Masons Journey Level $49.071 5A 1M ' tKing Street And Parking Lot Journey Level $19.09 1 j Sweeper Workers King Surveyors Assistant Construction Site $50.98 7A 3C 8P Surveyor ,King Surveyors Chainman $50.46 7A 3C 8P 'King Surveyors Construction Site Surveyor $51.89 7A 3C 8P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $35.09 5A 2B j Outside King Telephone Line Construction Hole Digger/Ground Person $19.22 5A 2B _Outside King Telephone Line Construction - Installer (Repairer) $33 63 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $35.09 5A 2B Outside 1 King Telephone Line Construction - Special Apparatus Installer II $34.37 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator $35.09 5A 2B Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operator $32.62 5A 2B ' Outside (Light) King Telephone Line Construction - Telephone Lineperson $32.62 5A 2B Outside 'King Telephone Line Construction- Television Groundperson $18.65 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $24.66 5A 2B Outside King Telephone Line Construction - Television System Technician $29.42 5A 2B Outside King Telephone Line Construction - Television Technician $26.43 5A 2B Outside King Telephone Line Construction - Tree Trimmer $32.95 5A 2B Outside King Terrazzo Workers Journey Level $45.43 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble Et Terrazzo Finisher $37.76 5A 1B Finishers King Traffic Control Stripers Journey Level $41.27 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards (W. $47.91 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $47.07 5D 3A 8L i_,- _„. tic ._s._ n„ I,.,,nr InnL,ir�/nr�,l�lanalnnLiin acnv 91612ni ii Page 18 of 18 WA-Joint Council 28) King Truck Drivers Dump Truck &Trailer $47.91 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $47.07 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $47.91 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $43.23 1 King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Dritlers i't Irrigation Pump Oiler $12.97 1 Installers King Well Drillers Ft Irrigation Pump Well Driller $18.00 1 I Installers https://fortress.wa.gov/lni/vvagelookup/prv`JVageloot(up.asp)( 2/6/2013 Benefit Code Key-Effective 08-31-2012 thru 03-02-2013 Overtime Codes Overtime calculations are based on the hourly rate actually paid to the worker. On public works projects,the hourly r ate must be not less than the pievadmg rate of wage minus the hourly rate of the cost of fimge benefits actually provided foi the wei ker 1 ALL HOURS WORKED 1N EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. B. All hours woilced on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hourly late of wage. C. The first two(2)houis after eight(8)megulai hours Monday through Friday and the first ten(10) hours on Saturday shall be paid at one and one-half tines the hourly rate of wage All other overtime hours and all lmouis worked on Sundays and holidays shall be paid at double the houily rate of wage D The first two (2)hours before or after a five-eight(8)hour workweek day or a few -ten(10) hour workweek day and the fiist eight (8) houis worked the next day aftei either woilcweek shall be paid at one and one-half times the hourly late of wage. All additional houis worked and all worked on Sundays and holidays shall be paid at double the hour ly r ate of wage E. The first two (2)homs after eight(8)regular hours Monday through Friday and the first eight(8)houis on Saturday shall be paid at one and one-half times the houily rate of wage All other horns worked Monday through Saturday, and all hours worked oil Sundays and holidays shall be paid at double the hourly rate of wage F. The first two(2)houis after eight(8)regular houis Monday through Friday and the first ten (10)homs on Saturday shall be paid at one and one-half times the hourly rate of wage All other oveihme houis worked, except Labor Day, shall be paid at double the houily rate of wage All hours worked on Laboi Day shall be paid at three tunes the houily late of wage G. The fiist ten(10)hows worked on Satui days and the first tun(10)hours worked on a fifth calendar weekday in a four - ten hour schedule, shall be paid at one and one-half times the hourly rate of wage. All hours woilced in excess of tell (10) hours per day Monday tluough Saturday and all hows worked on Sundays and holidays shall be paid at double the houily rate of wage H All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions or equipment breakdown) shall be pail at one and one-half times the howly late of wage All hours worked Monday through Saturday over twelve(12)homs and all hows worked on Sundays and holidays shall be paid at double the hourly rate of wage I. All homs woilced on Sundays and holidays shall also be paid at double the hourly rate of wage. J. The first two(2)homs after eight(8)regular houis Monday through Friday and the first ten(10)hours on Saturday shall be paid at one and one-half times the hourly rate of wage All hows worked over ten (10) hours Monday through Saturday,Sundays and holidays shall be paid at double the hourly late of wage K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All hows worked on holidays shall be paid at double the hourly rate of wage. 3 M. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be paid atone and one-half tunes the houily late of wage All houis worked on Sundays and holidays shall be paid at double the hourly i ate of wage. N. All hours worked on Saturdays(except makeup days)shall be paid at one and one-half times the hourly rate of wage. All hours worked on Sundays and holidays shall be paid at double the hour ly rate of wage 1. 0. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage. All hours woilced on Sundays, holidays and after twelve(12)horns,Monday through Friday and after ten(10)hows on Saturday shall be paid at double the hourly rate of wage. Benefit Corte Key—Effective 08-31-2012 thru 03-03-2013 P. All hours worked on Saturdays(except makeup days if circumstances wan ant)and Sundays shall be paid at one and one-half times the hourly late of wage All hours worked on holidays shall be paid at double the hourly i ate of wage. Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked in excess of ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Chustnias day)shall be paid at double the hourly rate of wage. All hours woilced on Christmas day shall be paid at two and one-half times the how ly rate of wage R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage. S. The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday shall be paid atone and one-half tunes the how ly rate of wage All hours worked on holidays and all other overtime houis worked, except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at thiee tunes the hourly rate of wage T Work performed in excess of eight(8)hours of straight time per day,or ten(I0)hems of straight time per day when four ten (10) how shifts are established, or foity (40) hours of straight time per week, Monday through Friday, or outside the noimal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate Hours worked over twelve hours (12) in a single shift and all work performed after 6 00 pill Satuiday to 6 00 am Monday and holidays shall be paid at double the straight time rate of pay The employer shall have the sole discretion to assign overtime woik to employees. Primary consideration for overtime woilc shall be given to employees regularly assigned to the woik to be performed on overtime situations After an employee has woihed eight (8) hours at an applicable overtime rate,all additional hours shall be at the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours woilced on Sundays and holidays (except Labor Day) shall be paid at two times the houily rate of wage. All hours woiked oil Labor Day shall be paid at three tunes the hourly rate of wage V. All hours worked on Sundays and holidays(except Thanksgiving Day and Chustmas day) shall be paid at one and one-half times the hourly rate of wage All hours worked on Thanksgiving Day and Christmas day shall be paid at double the hourly late of wage. W All hours woilced on Saturdays and Sundays (except make-up days due to conditions beyond the control of the employer)) shall be paid at one and one-half times the houily late of wage All hours worked on holidays shall be paid at double the hourly rate of wage X. The first four (4) hours after eight (8) regular horns Monday through Friday and the fast twelve (12) hows on Saturday shall be paid at one and one-half tines the Itourly late of wage All hours worked over twelve (12) hows Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage When holiday falls on Saturday of Sunday, the day befoie Saturday, Friday, and the day after Sunday,Monday, shall be considered the holiday and all woik peifoi coed shall be paid at double the hourly rate of wage Y. All hours worked outside the hours of 5.00 am and 5 00 pm (or such other hours as may be agieed upon by any employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10 workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half tines the hourly rate of wage (except for employees who are absent from work without prior approval on a scheduled workday during the workweek shall be paid at the straight-time late until they have worked 8 hours in a day(10 in a 4 x 10 workweek)or 40 homs during that workweek) All hours worked Monday through Saturday over twelve (12)hours and all hours worked on Sundays and Labor Day shall be paid at double the hourly rate of wage. 1. Z. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay 2. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TINIES THE HOURLY RATE OF WAGE. B. All bows worked on holidays shall be paid at one and one-half tines the hourly late of wage. —2— Benefit Code Key—Effective 08-31-2012 thi a 03-03-2013 2. C. All hours worked on Sundays shall be paid at one and one-half times the houily late of wage. All hours worked on holidays shall be paid at two times the hourly rate of wage F. The first eight(8)hours worked on holidays shall be paid at the straight houily rate of wage in addition to the holiday pay. All hours worked in excess of eight(8)houis on holidays shall be paid at double the hourly rate of wage. G. All hours worked on Sunday shall be paid at two times the houily rate of wage. All hours worked on paid holidays shall be paid at two and one-half times the hourly late of wage including holiday pay H. All hours worked on Sunday shall be paid attwo times the hourly rate of wage. All houis woiked on holidays shall be paid at one and one-half tunes the houily late of wage. K. All hours worked on holidays shall be paid at two times the houily rate of wage in addition to the holiday pay. O. All hours worked on Sundays and holidays shall be paid at one and one-half times the houily late of wage. R. All hours worked on Sundays and holidays and all hours worked over sixty(60) in one week shall be paid at double the hour ly rate of wage U All hours worked on Saturdays shall be paid at one and one-half times the houily late of wage. All houis woiked over 12 houis in a day of on Sundays and holidays shall be paid at double the houily rate of wage. W. The first two(2)horns after eight(8)iegular lioins Monday through Fiiday and the fist eight(8)hours on Saturday shall be paid at one and one-half tunes the hourly late of wage All othei houis woiked Monday thiough Satuiday, and all houis woiked on Sundays and holidays shall be paid at double the houily rate of wage. On a four-day, ten- hour weekly schedule,either Monday thin Thursday or Tuesday thin Fiiday schedule,all hours worked after ten shall be paid at double the houily late of wage The fist eight(8) hours worked on the fifth day shall be paid at one and one-half tunes the hourly iate of wage All other houis worked on the fifth,sixth, and seventh days and on holidays shall be paid at double the houily iate of wage. Y. All hours worked on Saturdays(except for make-up days) shall be paid at one and one-half times the houily late of wage. All houis worked Monday thiough Satutday over twelve (12) houis and all houis worked on Sundays and holidays shall be paid at double the houily late of wage. 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A. Work peiformed in excess of eight(8)hours of straight time pen day,or ten(10)houis of straight time per day when four ten (10) hour shifts ate established, or forty (40) hours of stiaight time per week, Monday thiough Friday, or outside the noimal shift, and all work on Satuidays shall be paid at time and one-half the straight time late Houis worked over twelve horns (12) in a single shift and all woik petformed aftei 6 00 pm Satuiday to 6.00 am Monday and holidays shall be paid at double the stiaiglt time rate of pay Any shift starting between the houis of 6.00 pin and midnight shall receive an additional one dollar($1 00)pei hour foi all hoins v,oiked that shift. The employei shall have the sole diseietion to assign oveitime wodc to employees. Primary consideiation for overtime work shall be given to employees regularly assigned to the work to be petformed on overtime situations. After an employee has worked eight (8) hours at an applicable oveitime rate, all additional houis shall be at the applicable overtime sate until such time as the employee has had a bt eak of eight(8)houis or more B. The first four (4) hours after eight (8) regular houis Monday thiough Friday and the fist twelve (12) hours on Satuiday shall be paid at one and one-half times the hourly late of wage All hours worked over twelve (12)houis Monday thiough Satuiday, and all houis wotked oil Sundays and holidays shall be paid at double the hourly late of wage. C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)homs of stiaight time per day when fout ten (10) hour shifts aie established, or forty (40) hours of stiaight time per week, Monday thiough Fiiday, or outside the noimal shift, and all work on Saturdays shall be paid at one and one-half tunes the houily rate of wage. All wodc petformed afet 6.00 pill Satuiday to S 00 am Monday and Holidays shall be paid at double the houily rate of wage After an employee has woiked eight(8)houis at an applicable overtime rate,all additional hours shall be at the applicable overtime sate until such time as the employee has had a break of eight(8)houis el more. —3— Benefit Code Key—Effective 08-31-2012 thru 03-03-2013 3. D. All bouts worked between 6 00 pm Monday through 6.00 am Satuiday,shall be paid at an overtime rate of 15%over the hourly Late of wage All other hours worked after 6.00 am on Saturdays,shall be paid at one and one-half tines the hourly Late of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage. E. All hunts worked Sundays and holidays shall be paid at double the hourly rate of wage. Each week,once 40 hours of straight time work is achieved,then any houta worked over 10 hows per day Monday through Saint day shall be paid at double the hourly wage late. 4 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIVIES THE HOURLY RATE OF WAGE A. All hours worked in excess of eight(8)hours pet day of forty(40)bouts per week shall be paid at double the hourly rate of wage All hours worked on Saturdays,Sundays and holidays shall be paid at double the houily rate of wage. B All hours worked on Satutdays (except makeup days if work is lost due to inclement weather conditions) shall be paid at one and one-half times the houily rate of wage. All hoots worked Monday through Saturday over twelve(12) hours and all bouts worked on Sundays and holidays shall be paid at double the hourly tare of wage Holiday Codes 5. A. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thatksgiving Day, Friday after Thanksgiving Day,and Chu ishnas Day(7) B. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Fiiday after Thanksgiving Day,the day before Chu istmas,and Cluistmas Day(8) C. Holidays: New Year's Day,Presidents' Day,Memoual Day,Independence Day,Labor Day,Thanksgiving Day,the Friday after Thanksgiving Day,And Cluistmas Day(8). D. Holidays New Yeat's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and Satutday after Thanksgiving Day,And Cluistmas Day(8) H Holidays. New Year's Day,Memortal Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day, And Chi istmas(6) I. Holidays: New Yeat's Day,Memorial Day, Independence Day, Labot Day, Thanksgiving Day, and Cluistmas Day (6). J. Holidays. New Yeat's Day,Memorial Day,Independence Day,Thanksgiving Day,Friday after Thanksgiving Day, Christmas Eve Day,And Chi stmas Day(7). K. Holidays New Year's Day, Presidents' Day, Memoual Day, Independence Day, Labor Day, Thanksgiving Day, Friday After Thanksgiving Day, The Day Befote Christmas,And Christmas Day(9). L. Holidays: New Yeat's Day, Maitm Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(9). N Holidays, New Yeat's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,The Fiiday After Thanksgiving Day,And Cluistmas Day(9) P. Holidays- New Year's Day,Memoi ial Day,Independence Day,Labor Day,Thanksgiving Day,Fiiday And Satwday After Thanksgiving Day, The Day Before Cluistmas, And Christmas Day(9) If A Holiday Falls On Sunday, The Following Monday Shall Be Considered As A Holiday. R Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day,One-Half Day Before Chustmas Day,And Cluistmas Day.(7 1/2) —4— Benefit Code Key—Effective 08-31-2012 thru 03-03-2013 5. S. Paid Holidays: New Year's Day,Presidents' Day,Memorial Day,Independence Day, Labor Day, Thanksgiving Day,And Christmas Day(7). T. Paid Holidays: New Year's Day, Washington's Biithday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas (9). Z. Holidays- New Year's Day,Memorial Day,Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Chi istmas Day(8) Holidav Codes Continued 6. A. Paid Holidays-New Yeat's Day,Presidents' Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day, The Friday After Thanksgiving Day,And Christmas Day(8) E Paid Holidays: New Year's Day, Day Before Or After New Year's Day, Piesidents Day, Memorial Day, Independence Day, Laboi Day, Thanksgiving Day,Day After rhanksgiving Day, Christmas Day, And A Half-Day On Christmas Eve Day. (9 1/2) G Paid Holidays-New Year's Day,Martin Luther King Ji Day,Presidents'Day,Memoi ial Day, Independence Day,Labor Day,Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day, Chiistmas Day, And Chiistmas Eve Day(11). H. Paid Holidays: New Year's Day,New Year's Eve Day,Memoi ial Day,Independence Day,Labor Day,Thanksgiving Day,Friday Aftei Thanksgiving Day,Christmas Day,The Day After Chi istmas,And A Floating Holiday(10). I. Paid Holidays: New Year's Day,Memoual Day,Independence Day,Labor Day,Thanksgiving Day,Fiiday After Thanksgiving Day,And Cluistmas Day(7). Q. Paid Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, The Day Aftei Thanksgiving Day And Chiistmas Day(8) Unpaid Holiday_ Piesidents' Day T Paid Holidays: New Year's Day, Piesidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,The Fiiday Aftei Thanksgiving Day,The Last Woikmg Day Before Christmas Day,And Clnistinas Day (9) Z. Holidays-New Year's Day,Memorial Day,Independence Day,Laboi Day,Thanksgiving Day,Fiiday after Thanksgiving Day, And Christmas Day (7). If a holiday falls on Saturday, the preceding Fiiday shall be considered as the holiday. If a holiday falls on Sunday, the following Monday shall be considered as the holiday Holiday Codes Continued 7 A. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Fiiday And Saturday After Thanksgiving Day, And Christmas Day (8) Any Holiday Which Falls On A Sunday Shall Be Observed As A Holiday On The Following Monday If any of the lusted holidays falls on a Saturday, the preceding Friday shall be a regular work day. B. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Fiiday and Saturday after Thanksgiving Day,And Chi stmas Day(8). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. C. Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, The Fiiday Aftei Thanksgiving Day, And Chiistmas Day (8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Fiiday a a Benefit Code Key—Effective 08-31-2012 thru 03-03-2013 7. D. Paid Holidays: New Year's Day,Memorial Day,Independence Day,Labor Day,Veteran's Day,Thanksgiving Day, the Friday after Thanksgiving Day, And Christmas Day (8). Unpaid Holidays President's Day. Any paid holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any paid holiday which falls on a Saturday shall be observed as a holiday on the preceding Fiiday E Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday F. Holidays: New Yeai's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the last working day before Chi stmas day and Christmas day (9). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday. G. Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday H. Holidays- New Year's Day, Martin Luther King h Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, the Fuday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(9) Any holiday which falls on a Sunday shall be obseived as a holiday on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday oil the preceding Friday, I Holidays-New Year's Day,President's Day,Independence Day,Memorial Day,Labor Day,Thanksgiving Day,The Friday Aftei Thanksgiving Day,The Day Before Christmas Day And Chnstnias Day(9).Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be obseived as aholiday on the pieceduig Fiiday. J. Holidays. New Year's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day and Christmas Day (6). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be obseived as a holiday on the preceding Fuday K. Holidays- New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after Thanksgiving Day,And Cluistmas Day (8) Any holiday which falls on a Sunday shall be obseived as a holiday on the following Monday Any holiday which falls on a Saturday shall be obseived as a holiday on the preceding Friday L. Holidays- New Year's Day,Memorial Day, Laboi Day, Independence Day, Thanksgiving Day, the Last Woik Day before Christmas Day,And Clistmas Day(7). Any holiday which falls on a Sunday shall be obseived as a holiday on the following Monday Any holiday winch falls on a Saturday shall be observed as a holiday on the preceding Fiiday M. Paid Holidays New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Laboi Day,Thanksgiving Day,the Friday after Thanksgiving Day, Chi stmas Day, And the Day after of before Christmas Day 10). Any holiday which falls on a Sunday shall be obseived as a holiday on the following Monday Any holiday which falls on a Saturday shall be obseived as a holiday on the preceding Fiiday N. Holidays: New Year's Day, Memorial Day, Independence Day, Laboi Day, Thanksgiving Day, the Friday after Thanksgiving Day, And Chustmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday When Christmas falls on a Saturday,the preceding Fiiday shall be obseived as a holiday. O Paid Holidays, New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day, Independence Day, Laboi Day, Thanksgiving Day, The Fiiday After Thanksgiving Day, Chustmas Day, The Day Aftei Or Before Chustmas Day, And The Employees Birthday 11). Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be obseived as a holiday on the piccediEg Fiiday. P. Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Fiiday after Thanksgiving Day,And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. —6— Benefit Code I{ey—Effective 08-31-2012 thi u 03-03-2013 7. Q. Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday. If any of the listed holidays falls on a Saturday, the preceding Friday shall be a regular work day R. Paid Holidays: New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day, Independence Day,Labor Day, Thanksgiving Day, the Friday after Thanksgiving Day, Cluistmas Day, and the day after or before Clurstmas Day (10) If any of the listed holidays fall on Saturday, the preceding Friday shall be observed as the holiday If any of the listed holidays falls on a Sunday, the day observed by the Nation shall be considered a holiday and compensated accordingly. Dote Codes 8 A. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To 100'-$2 00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$3 00 per Foot for Each Foot Over 100 Feet Over 150'To 220'-$4 00 per Foot fot Each Foot Over 150 Feet Civet 220'-$5 00 pet Foot for Each Foot Over 220 Feet C. In addition to the houily wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more: Over 50'To 100'-$1 00 per Foot for Each Foot Over 50 Feet Over 100'To 150'-$1.50 per Foot for Each Foot Ovci 100 Feet Over 150'To 200'-$2 00 per Foot for Each Foot Over 150 Feet Over 200'-Divots May Name Then Own Piice D. Workers working with supplied air on hazmat projects receive an additional$1 00 per hour. L. Workers on hazmat projects receive additional houily piemiums as follows -Level A: $0.75,Level B- $0.50,And Level C• $0.25 M. Workers on hazmat projects receive additional houily piemiums as follows- Levels A & B: $1 00, Levels C & D: $0.50 N. Workers on hazmat projects receive additional hourly piemiums as follows-Level A: $1 00, Level B: $0 75,Level C: $0 50,And Level D.$0 25 P. Workers on hazmat projects receive additional houily piemiums as follows-Class A Suit:$2.00,Class B Suit-$1.50, Class C Suit $1.00,And Class D Suit$0 50 Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15)minutes during the shift shall be used in detetmmmg the scale paid. R Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or spotting or other traffic control label is being utilized A Traffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian Uaffic dwing construction operations Flaggers and Spotters shall be posted whete shown on approved Ttaffic Control Plans of whole dnected by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of Washington, Oregon, Montana, or Idaho. These classifications are only effective on or aftet August 31,2012 S. Effective August 31, 2012 — A Traffic Contiol Supervisor shall be present on the project whenever flagging or spotting or other traffic control labor is being utilized Flaggers and Spotters shall be posted whole shown on appioved Ttaffic Contiol Plans of whole duetted by the Engineer All flaggers and spotters shall possess a current flagging cat issued by the State of Washington,Oregon,Montana,or Idaho This classification is only effective on of after August 31,2612, —7— Benefit Code Key—Effective 08-31-2012 thru 03-03-2013 8 T. Effective August 31,2012—A Tiaffic Control Laborer performs the setup,maintenance and removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian haffic during construction operations Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans of where dnected by the Engineer All flaggeis and spotters shall possess a current flagging card issued by the State of Washington,Oregon,Montana,or Idaho. This classification is only effective on or after August 31,2012 —8— Deport-trill[of Labor and Industries �`"'� STATEMENT OF INTENT TO Prevarhng Wage o '� (3,) ' "'4 PAY PREVAILING WAGES w�vtiv lm wa.gov/TradesLtcensmpJPrevWage �° • This form must be typed or printed in ink ��rase Public Works Contract • Fill in an Wanks or the form will be returned for correction(see instructions). $40.00 Filing Fee Required • Please allow a minimum of 10 working days for processing • Once approved.your form will be posted online at Intent ID#(Assigned by L&I) has//fortress wa govflm/pwiapub/Searchfor asp Your Company InNrmatien Awarding Agency h&rmatiew Your Ctvniutnp Name Project Name Contract Number Nature's Way Tree Service LLC Tree Removal n/a Your Address Awarding Agency 1019 180 Ave Ct E City of Kent City State Ztp+4 Awarding Agency Address Lake Tapps WA 98391-6442 2204d'Ave S Your Contractor Registration Number Your UBI Number City State Ztp+4 NATURWT920JZ 602-810481 Kent WA 98032-5895 Your Industrial Insurance Account Number Awarding Agency Contact Name Phone Number 248,199-00 Scon Schroeder 253-856-5600 Your Email Address(retlnired for nouficaum of appivvai) Your Phone Number Count Where Work Will Be PaIrmned City Where Work Will Be Performed Mharrell3@comcast net 253-740-4669 King Kent Additional Details Contract Detalls Your 1:xpected Job Start Date(imnldd/yM1yy) Bid Due Date(Prime Contractor's) Award Date(Prime Contractor's) 2/14/2013 H/15/2012 2/6/2013 Job Sale Address/Directions Total Dollar Amount of Your Contract(including 24803 35"'Ave S Kent Wa 98032 sales tax)or indicate time and materials,if applicable 5i3,865 35 ❑ T&M ARRA Funds Weit*&-rizatim or Rnergy EffeciadFunds Does this project utilize American Recovery and Remvestment Act(ARRA)hmds9 Does this project milize any ueatheaisanon or energy efficiency upgrade funds Yes N No (ARRA or otherwise)9 0 Yes N No Prime Contractor's Company Information Hiring Contractor's Company Information Prune Wiinaetoi's Company Name Prime Contractor's Intent Number Hiring Contractor's Company Name Nature's Way Tree Service LLC Prime Contractors Registration Number Prime Contractor's UBI Number Hmng Company's Contractor Registration Number Hiring Contractors UHI Number NATLTRWT920JZ 602-810481 [ ttea Do you intend to use ANY subcontractors? Q Yes ®No Will employees perform work on this project? N Yes ❑No Will ALL work be subcemtraeted`r 0 Yes N No Do you trend to use apprentice employees? ❑Yes O No Number of ChvnerhJperators who own at least 30%of the company who will perform work on this project 0 None()) ®thee(1) N Two(2) n Three(3) Craftsfrrades/Occupations—(Do not list apprentices They are fisted on the Affidavit of Wages Paid Rate of Hourly only)If an employee works inmore than one trade,ensure that all hours worked ineach trade are reported Number of Rate of Houry usual(—Fringe) below For additional crafts/trades/occupattons please use Addendum A Workers Pay Benefits clean-up laborer 1 4083 0 Signature Block I hereby c e tifv that I have read and understated the instructions to complete this form mad that the mformatawt,including any addeada are correct and that all workers I employ on this Public Works Pro ect will be paid no less than the Prevailing Wage Rat s as determined by the Industrial Statistician of the Department of La"Industries Print Name:Michael Harrell Prat TiNe:ownerer.2/10/2013 For L&I J&e A roved b v ature of the Department of labor and Industries Indmtriat Statistreman NOTICE: Usee prime contract bat a cost of over ale miNion dollars(S1,0Q,00A00),RCW 39.04.370 iegdm you to codpkle fie 011128M(RCW 39.013M AMedum and attwh it to year Afidava of wages of Pad when your nark on the praimteemludea This moat}a aolfea The EHR 2W_%Addendum saw submitted with d s intent F700-029-M Statement of intent to Pay Pravailmg Wages 03-2011