HomeMy WebLinkAboutPW12-289 - Original - Nature's Way Tree Service, LLC - Contract - 12/04/2012 i
40*5ow.. Records M genie
Z�KEAT Document
W A9NINOTDN
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Nature's Way Tree Service
Vendor Number: 218589
JD Edwards Number 4c}
Contract Number: 7'"�" ( �—�O
This is assigned by City Clerk's Office
Project Name: Tree Removal 504 Hazel Avenue
Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract
❑ Other:
Contract Effective Date: 12/4/12 Termination Date: 2/2/13
Contract Renewal Notice (Days): N/A
Number of days required notice for termination or renewal or amendment
Contract Manager: Scott Schroeder Department: PWO-Vegetation
Detail: (i.e. address, location, parcel number, tax id, etc.):
Emergency removal of hazardous tree.
a
5•Publlc\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08
KENT
WASMINGTGN
PUBLIC WORKS AGREEMENT
between City of Kent and
Nature's Way Tree Service, LLC
THIS AGREEMENT is made by and between the City of Kent, a Washington municipal
corporation (hereinafter the "City"), and Nature's Way Tree Service, LLC organized under the
laws of the State of Washington, located and doing business at 1019 184th Ave Ct E Lake Tapps,
WA 98391, Mike Harrell (hereinafter the "Contractor").
AGREEMENT
The parties agree as follows:
I. DESCRIPTION OF WORK.
d
{
Contractor shall perform the following services for the City in accordance with the
following described plans and/or specifications:
Emergent removal of a cottonwood tree located at 504 Hazel Avenue as described
and incorporated in this document by this reference as exhibit A.
Contractor further represents that the services furnished under this Agreement will be
performed in accordance with generally accepted professional practices within the Puget Sound
region in effect at the time such services are performed.
II. TIME OF COMPLETION. The parties agree that work will begin on the tasks
described in Section I above immediately upon execution of this Agreement. Upon the effective
date of this Agreement, Contractor shall complete the work described in Section I within 60 '
days.
III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed
$1642.50, including any applicable Washington State Sales Tax, for the work and services
contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the
Contract amount upon completion and acceptance of the work by the City, and the remainder
upon fulfillment of the conditions listed below and throughout this Agreement. ;
A. No Payment and Performance Bond. Because this contract, including
applicable sales tax, is less than $25,000, and pursuant to Chapter 39.08
RCW the Contractor, in lieu of providing the City a payment and i
PUBLIC WORKS AGREEMENT - 1
(Under$10K and No Performance Bond)
performance bond, has elected to have the owner retain the final fifty
percent (50%) of the Contract amount for a period of sixty (60) days after
the date of final acceptance, or until receipt of all necessary releases from
the State Department of Revenue, the State Department of Labor &
Industries, and the State Employment Security Department, and until
settlement of any liens filed under Chapter 60.28 RCW, whichever is later.
B. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work. Defective
or unauthorized work includes, without limitation: work and materials that
do not conform to the requirements of this Agreement; and extra work and
materials furnished without the City's written approval. If Contractor is
unable, for any reason, to satisfactorily complete any portion of the work, the
City may complete the work by contract or otherwise, and Contractor shall be
liable to the City for any additional costs incurred by the City. "Additional
costs" shall mean all reasonable costs, including legal costs and attorney
fees, incurred by the City beyond the maximum Contract price specified
above. The City further reserves its right to deduct the cost to complete the
Contract work, including any Additional Costs, from any and all amounts due
or to become due the Contractor.
C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF
FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A
WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND
PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE
TIME FINAL PAYMENT IS MADE AND ACCEPTED.
IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent
Contractor-Employer Relationship will be created by this Agreement. By their execution of this
Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following
representations:
A. The Contractor has the ability to control and direct the performance and
details of its work, the City being interested only in the results obtained
under this Agreement.
B. The Contractor maintains and pays for its own place of business from which
Contractor's services under this Agreement will be performed.
C. The Contractor has an established and independent business that is eligible
for a business deduction for federal income tax purposes that existed before
the City retained Contractor's services and is a service other than that
furnished by the City, or the Contractor is engaged in an independently
established trade, occupation, profession, or business of the same nature as
that involved under this Agreement.
D. The Contractor is responsible for filing as they become due all necessary tax
documents with appropriate federal and state agencies, including the Internal
Revenue Service and the state Department of Revenue.
E. The Contractor has registered its business and established an account with
the state Department of Revenue and other state agencies as may be
PUBLIC WORKS AGREEMENT - 2
(Under$1OK and No Performance Bond)
required by Contractor's business, and has obtained a Unified Business
Identifier (UBI) number from the State of Washington.
F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW
or an electrical contractor license pursuant to Ch. 19.28 RCW.
G. The Contractor maintains a set of books dedicated to the expenses and
earnings of its business.
V. TERMINATION. The City may terminate this Agreement for good cause. "Good
cause" shall include, without limitation, any one or more of the following events:
A. The Contractor's refusal or failure to supply a sufficient number of properly
skilled workers or proper materials for completion of the Contract work.
B. The Contractor's failure to complete the work within the time specified in this
Agreement.
C. The Contractor's failure to make full and prompt payment to subcontractors
or for material or labor.
D. The Contractor's persistent disregard of federal, state or local laws, rules or
regulations.
E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt.
F. The Contractor's breach of any portion of this Agreement.
If the City terminates this Agreement for good cause, the Contractor shall not receive any
further money due under this Agreement until the Contract work is completed. After
termination, the City may take possession of all records and data within the Contractor's
possession pertaining to this project which may be used by the City without restriction. r
VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay
Prevailing Wages," with the State of Washington Department of Labor & Industries prior to
commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the
bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code
of Washington, as well as any other applicable prevailing wage rate provisions. The latest
prevailing wage rate revision issued by the Department of Labor and Industries is attached.
l
VII. CHANGES. The City may issue a written change order for any change in the
Contract work during the performance of this Agreement. If the Contractor determines, for any ,
reason, that a change order is necessary, Contractor must submit a written change order
request to the person listed in the notice provision section of this Agreement, section XV(D),
within fourteen (14) calendar days of the date Contractor knew or should have known of the
facts and events giving rise to the requested change. If the City determines that the change
increases or decreases the Contractor's costs or time for performance, the City will make an
equitable adjustment. The City will attempt, in good faith, to reach agreement with the
Contractor on all equitable adjustments. However, if the parties are unable to agree, the City
will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed
with the change order work upon receiving either a written change order from the City or an oral
order from the City before actually receiving the written change order. If the Contractor fails to
PUBLIC WORKS AGREEMENT - 3 F
(Under$10K and No Performance Bond)
require a change order within the time specified in this paragraph, the Contractor waives its
right to make any claim or submit subsequent change order requests for that portion of the
contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must
complete the change order work; however, the Contractor may elect to protest the adjustment
as provided in subsections A through E of Section VIII, Claims, below.
The Contractor accepts all requirements of a change order by: (1) endorsing it, (2)
writing a separate acceptance, or (3) not protesting in the way this section provides. A change
order that is accepted by Contractor as provided in this section shall constitute full payment and
final settlement of all claims for contract time and for direct, indirect and consequential costs,
including costs of delays related to any work, either covered or affected by the change.
VIII. CLAIMS. If the Contractor disagrees with anything required by a change order,
another written order, or an oral order from the City, including any direction, instruction,
interpretation, or determination by the City, the Contractor may file a claim as provided in this
section. The Contractor shall give written notice to the City of all claims within fourteen (14)
calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14)
calendar days of the date the Contractor knew or should have known of the facts or events
giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for
any reason, or extension of time, whether under this Agreement or otherwise, shall be
conclusively deemed to have been waived by the Contractor unless a timely written claim is
made in strict accordance with the applicable provisions of this Agreement.
At a minimum, a Contractor's written claim shall include the information set forth in
subsections A, items 1 through 5 below.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY
CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS
SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY.
A. Notice of Claim. Provide a signed written notice of claim that provides the following
information:
1. The date of the Contractor's claim;
2. The nature and circumstances that caused the claim;
3. The provisions in this Agreement that support the claim;
4. The estimated dollar cost, if any, of the claimed work and how that
estimate was determined; and
5. An analysis of the progress schedule showing the schedule change or
disruption if the Contractor is asserting a schedule change or
disruption.
B. Records. The Contractor shall keep complete records of extra costs and time
incurred as a result of the asserted events giving rise to the claim. The City shall
have access to any of the Contractor's records needed for evaluating the protest.
The City will evaluate all claims, provided the procedures in this section are
followed. If the City determines that a claim is valid, the City will adjust payment
for work or time by an equitable adjustment. No adjustment will be made for an
invalid protest.
PUBLIC WORKS AGREEMENT - 4
(Under$10K and No Performance Bond)
C. Contractor's Duty to Complete Protested Work. In spite of any claim, the
Contractor shall proceed promptly to provide the goods, materials and services
required by the City under this Agreement.
D. Failure to Protest Constitutes Waiver. By not protesting as this section provides,
the Contractor also waives any additional entitlement and accepts from the City any
written or oral order (including directions, instructions, interpretations, and
determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures
of this section, the Contractor completely waives any claims for protested work and
accepts from the City any written or oral order (including directions, instructions,
interpretations, and determination).
IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY
LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR
DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO
FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY
APPLICABLE STATUTORY LIMITATIONS PERIOD.
X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the
City a one-year warranty bond in a form and amount acceptable to the City. The Contractor
shall correct all defects in workmanship and materials within one (1) year from the date of the
City's acceptance of the Contract work. In the event any parts are repaired or replaced, only
original replacement parts shall be used—rebuilt or used parts will not be acceptable. When
defects are corrected, the warranty for that portion of the work shall extend for one (1) year
from the date such correction is completed and accepted by the City. The Contractor shall begin
to correct any defects within seven (7) calendar days of its receipt of notice from the City of the
defect. If the Contractor does not accomplish the corrections within a reasonable time as
determined by the City, the City may complete the corrections and the Contractor shall pay all
costs incurred by the City in order to accomplish the correction.
XI. DISCRIMINATION. In the hiring of employees for the performance of work under
this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on
behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age,
sexual orientation, national origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform the work to which the
employment relates.
Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy
Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract
work, file the attached Compliance Statement.
XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officers, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits, including all legal costs and attorney fees, arising out of or in
connection with the Contractor's performance of this Agreement, except for that portion of the
injuries and damages caused by the City's negligence.
The City's inspection or acceptance of any of Contractor's work when completed shall not
be grounds to avoid any of these covenants of indemnification.
PUBLIC WORKS AGREEMENT - 5
(Under$1OK and No Performance Bond)
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor
and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability
hereunder shall be only to the extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF
IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF
THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER.
In the event Contractor refuses tender of defense in any suit or any claim, if that tender
was made pursuant to this indemnification clause, and if that refusal is subsequently determined
by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the
Contractor's part, then Contractor shall pay all the City's costs for defense, including all
reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and
fees incurred because there was a wrongful refusal on the Contractor's part.
The provisions of this section shall survive the expiration or termination of this
Agreement.
XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the
Agreement, insurance of the types and in the amounts described in Exhibit B attached and
incorporated by this reference.
XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all
necessary precautions and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of the contract work and shall utilize all protection necessary
for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be
responsible for any loss of or damage to materials, tools, or other articles used or held for use in
connection with the work.
XV. MISCELLANEOUS PROVISIONS.
A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City
requires its contractors and consultants to use recycled and recyclable products whenever
practicable. A price preference may be available for any designated recycled product.
B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of
any of the covenants and agreements contained in this Agreement, or to exercise any option
conferred by this Agreement in one or more instances shall not be construed to be a waiver or
relinquishment of those covenants, agreements or options, and the same shall be and remain in
full force and effect.
C. Resolution of Disputes and Governing Law. This Agreement shall be governed by
and construed in accordance with the laws of the State of Washington. If the parties are unable
to settle any dispute, difference or claim arising from the parties' performance of this
Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by
filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court,
King County, Washington, unless the parties agree in writing to an alternative dispute resolution
process. In any claim or lawsuit for damages arising from the parties' performance of this
PUBLIC WORKS AGREEMENT - 6
(Under$10K and No Performance Bond)
Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or
bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award
provided by law; provided, however, nothing in this paragraph shall be construed to limit the
City's right to indemnification under Section XII of this Agreement.
D. Written Notice. All communications regarding this Agreement shall be sent to the
parties at the addresses listed on the signature page of the Agreement, unless notified to the
contrary. Any written notice hereunder shall become effective three (3) business days after the
date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to
the addressee at the address stated in this Agreement or such other address as may be
hereafter specified in writing.
E. Assignment. Any assignment of this Agreement by either party without the written
consent of the non-assigning party shall be void. If the non-assigning party gives its consent to
any assignment, the terms of this Agreement shall continue in full force and effect and no
further assignment shall be made without additional written consent.
F. Modification. No waiver, alteration, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative of
the City and Contractor.
G. Entire Agreement. The written provisions and terms of this Agreement, together
with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or
other representative of the City, and such statements shall not be effective or be construed as
entering into or forming a part of or altering in any manner this Agreement. All of the above
documents are hereby made a part of this Agreement. However, should any language in any of
the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms
of this Agreement shall prevail.
H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and
municipal laws, rules, and regulations that are now effective or in the future become applicable
to Contractor's business, equipment, and personnel engaged in operations covered by this
Agreement or accruing out of the performance of those operations.
i
3
S
{
PUBLIC WORKS AGREEMENT - 7
(Under$1OK and No Performance Bond)
I. Counterparts. This Agreement may be executed in any number of counterparts,
each of which shall constitute an original, and all of which will together constitute this one
Agreement.
IN WITNESS, the parties below execute this Agreement, which shall become
effective on the last date entered below.
CONTRACTOR: CITY OF KENT:
By: By: 44=
(signature) (signature)
Print Name:it/aJVu'c5 wai/ c Serf. -int Name: Brad Lake
Its cr— Its: Public Works Operations Manager
(tale)
DATE: I I '33-ec)kZ DATE:
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
CONTRACTOR: CITY OF KENT:
Mike Harrell Scott Schroeder
Nature's Way Tree Service, LLC City of Kent
1019 184th Ave Ct E 220 Fourth Avenue South
Lake Tapps, WA 98391 Kent, WA 98032
(253) 856-5600 (telephone)
253-740-4669 (telephone) (253) 856-6600 (facsimile)
(facsimile)
PUBLIC WORKS AGREEMENT - 8
(Under$1OK and No Performance Bond)
DECLARATION
CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY
The City of Kent is committed to conform to Federal and State laws regarding equal opportunity.
As such all contractors, subcontractors and suppliers who perform work with relation to this
Agreement shall comply with the regulations of the City's equal employment opportunity
policies.
The following questions specifically identify the requirements the City deems necessary for any
contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative
response is required on all of the following questions for this Agreement to be valid and binding.
If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the
directives outlines, it will be considered a breach of contract and it will be at the City's sole
determination regarding suspension or termination for all or part of the Agreement;
The questions are as follows:
1. I have read the attached City of Kent administrative policy number 1.2.
2. During the time of this Agreement I will not discriminate in employment on the basis of
sex, race, color, national origin, age, or the presence of all sensory, mental or physical
disability.
3. During the time of this Agreement the prime contractor will provide a written statement to
all new employees and subcontractors indicating commitment as an equal opportunity
employer.
4. During the time of the Agreement I, the prime contractor, will actively consider hiring and
promotion of women and minorities.
5. Before acceptance of this Agreement, an adherence statement will be signed by me, the
Prime Contractor, that the Prime Contractor complied with the requirements as set forth
above.
By signing below, I agree to fulfill the five requirements referenced above.
Dated this day of �we")Oe r , 2011—
i
By:
For:
Title: bv-34\.y,f
Date:
EEO COMPLIANCE DOCUMENTS - 1
CITY OF KENT
ADMINISTRATIVE POLICY
NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998
SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996
CONTRACTORS APPROVED BY Jim White, Mayor
POLICY:
Equal employment opportunity requirements for the City of Kent will conform to federal and
state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee
equal employment opportunity within their organization and, if holding Agreements with the City
amounting to $10,000 or more within any given year, must take the following affirmative steps:
1. Provide a written statement to all new employees and subcontractors indicating
commitment as an equal opportunity employer.
2. Actively consider for promotion and advancement available minorities and women.
Any contractor, subcontractor, consultant or supplier who willfully disregards the City's
nondiscrimination and equal opportunity requirements shall be considered in breach of contract
and subject to suspension or termination for all or part of the Agreement.
Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public
Works Departments to assume the following duties for their respective departments.
1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these
regulations are familiar with the regulations and the City's equal employment opportunity
policy.
2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines.
EEO COMPLIANCE DOCUMENTS - 2
CITY OF KENT
EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT
This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the
Agreement.
I, the undersigned, a duly represented agent of
Company, hereby acknowledge and declare that the before-mentioned company was the prime
contractor for the Agreement known as that was entered into on
the (date), between the firm I represent and the City of
Kent.
I declare that I complied fully with all of the requirements and obligations as outlined in the City
of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity
Policy that was part of the before-mentioned Agreement.
Dated this day of 120
:
By:
For: `
Title:
Date:
EEO COMPLIANCE DOCUMENTS - 3
PUBLIC WORKS OPERATIONS
Bradley Lake
Operations Manager
220 4`h Avenue South
Kent, WA 98032
Fax 253-856-6600
PHONE: 253-856-5670
Date: November 29th, 2012
To: Bill Thomas, Streets Superintendent
Cc. Bradley Lake, Public Works Operations Manager
From: Scott Schroeder
RE: Removal of Trees in Storm/Street Easement located next to 504 Hazel Ave. Kent,
Washington.
The City of Kent, Public Works Operations, and Vegetation Division are requesting the removal
of one cottonwood tree that have been deemed dangerous. The tree is located on the on the
south side of the Storm Channel, leaning over the properties at 504 Hazel Ave. This tree shall
be cut up and removed from the site. All branches and debris from the removal will be cleaned
up as well.
Three bids were not requested for this work due to the urgency for removing the tree.
Nature's Way is a vendor that we commonly use they are known to give a fair price and quality
work. A Bid was request for immediate removal of the tree, the bid is as follows:
Natures Way Tree Service, LLC $1,642.50 (including WSST)
We have decided this tree needs to be removed as soon as possible, as it is over leaning private
property (as risk to do damage), and is also caught up in a private power drop. This tree is
being removed on an emergent basis; therefore, we are preparing the Public Works contract at
the same time as the tree removal. We have current insurance information from Nature's Way
and they have already filed their intent to pay prevailing wages.
s
Thank You,
cott Sc r
Vegetation Supervisor
Public Works Operations
City of Kent Public Works Department
Timothy 3 LaPorte, P E , Public Works Director
r
EXHIBIT B
INSURANCE REQUIREMENTS FOR
SERVICE CONTRACTS
Insurance
The Contractor shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which
may arise from or in connection with the performance of the work hereunder
by the Contractor, their agents, representatives, employees or
subcontractors.
A. Minimum Scope of Insurance
Contractor shall obtain insurance of the types described below:
1. Automobile Liability insurance covering all owned, non-
owned, hired and leased vehicles. Coverage shall be written
on Insurance Services Office (ISO) form CA 00 01 or a
substitute form providing equivalent liability coverage. If
necessary, the policy shall be endorsed to provide
contractual liability coverage.
2. Commercial General Liability insurance shall be written on
ISO occurrence form CG 00 01 and shall cover liability
arising from premises, operations, independent contractors, ,
products-completed operations, personal injury and
advertising injury, and liability assumed under an insured
contract. The Commercial General Liability insurance shall be i
endorsed to provide the Aggregate Per Project Endorsement
ISO form CG 25 03 11 85. The City shall be named as an
insured under the Contractor's Commercial General Liability
insurance policy with respect to the work performed for the
City using ISO additional insured endorsement CG 20 10 11
85 or a substitute endorsement providing equivalent
coverage.
3. Workers' Compensation coverage as required by the
Industrial Insurance laws of the State of Washington.
B. Minimum Amounts of Insurance 1
d
Contractor shall maintain the following insurance limits:
1. Automobile Liability insurance with a minimum combined
single limit for bodily injury and property damage of
$1,000,000 per accident.
2. Commercial General Liability insurance shall be written with
limits no less than $1,000,000 each occurrence, $2,000,000
general aggregate and a $2,000,000 products-completed
operations aggregate limit.
EXHIBIT B (Continued )
C. Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following
provisions for Automobile Liability and Commercial General Liability
insurance:
1. The Contractor's insurance coverage shall be primary insurance as respect
the City. Any Insurance, self-insurance, or insurance pool coverage
maintained by the City shall be excess of the Contractor's insurance and
shall not contribute with it.
2. The Contractor's insurance shall be endorsed to state that coverage shall
not be cancelled by either party, except after thirty (30) days prior
written notice by certified mail, return receipt requested, has been given
to the City.
3. The City of Kent shall be named as an additional insured on all policies
(except Professional Liability) as respects work performed by or on behalf
of the contractor and a copy of the endorsement naming the City as
additional insured shall be attached to the Certificate of Insurance. The
City reserves the right to receive a certified copy of all required insurance
policies. The Contractor's Commercial General Liability insurance shall
also contain a clause stating that coverage shall apply separately to each
insured against whom claim is made or suit is brought, except with
respects to the limits of the insurer's liability.
D. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not
less than A:VII.
E. Verification of Coverage
Contractor shall furnish the City with original certificates and a copy of the
amendatory endorsements, including but not necessarily limited to the
additional insured endorsement, evidencing the insurance requirements of
the Contractor before commencement of the work.
F. Subcontractors
Contractor shall include all subcontractors as insureds under its policies or
shall furnish separate certificates and endorsements for each subcontractor.
All coverages for subcontractors shall be subject to all of the same insurance
requirements as stated herein for the Contractor.
Acbmy CERTIFICATE OF LIABILITY INSURANCE 03/13/2012
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS
-ERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
:LOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
rcEPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER.
IMPORTANT: U the certificate holder is an ADDITIONAL INSURED,the poiicyties)Faust he a dorsed. If SUBROGATION IS WAIVED,sub)ect to
the terms and conditions of the policy,certain pofiCles may require an endorsement. A statement on Oils certificate does not confer rights to the
certificate hotdet in ffm of such endoraement(s).
PRODUCER ACT Don Young
Young insurance Agency, LLC PHONE (253) S93-0011 (253) 833-0012
ssdon@youngins.net
PO Box 5340 WSUR GIAFFORDMCOVERAGB N=*
Kent WA 98064- INSURERA-St Paul Fine & Marine Ins. Co.
MURE INSURERa Lihart Yo=thwest
Nature's Way Tree Servicer LLC INSURER 0,
1019 184th Ave Ct E MMURERD-
INSURERE:
Lake Ta s *. 98391- ItIMURERFI
COVERAGES CERTIFICATE NUA713ER: REVISION NUMBER.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED SEL01W HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT VNTH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED CR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED --11Etl'4 IS -SUBJECT TO ALL THE TEFM8,
EXCLUSIONS AND CONDITIONS OF SUCH Pal-1012 .LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLA}Afis
H115R L9- r0UI T=FP P.,'Y:CY '? LIMVTS
LTR TYPRCF iN5UE3ANCE J — r� PCLICY 9JU;M16ER ttd/ DIYYYY IDWY)TYY111
Y
A ORNERALUAAILITY v-09103049 4107J2012 4J07j2i1i3 ct GCC .PEhGE $ 1,flflfl,Oflfl
`f'i COtFFriERC1AE GENERAL LfRB1LFFY ! / f `t Pr:EMSES Eaoccum me $ 1f?tTrOt)fl
CLAIMS-MADE ®OCCUR MFD EXP IAny one person) a' 5,000
PERSONAL&ADV INJURY 1,000,000
f f I f GEIdERALAGGRECATE $ 2,000,00()
GEN L AGGREGATE LIMIT AFFUES PER. PRODUCTS-CQMP/OP P.6G S 2,000,000
POLICY m LOC ! I J I $
AUTOthOSMS LIABILUY 3ASS4392707 3/14/2012 3/1412013 TER acI,dem) yGLE LIMIT
e ec��er = 1,000,000
ANY AUTO / I I / BODILY INJURY(Per Pusan} $
ALL OWNED 8REDULED / / / / BODILY INJURY(Per acadent) $
Rt/TO5 RU1
NON-ONJNED / / / / PROPERTY DAMAGE $
H{REDAUTw racctden Auros -
L'...SRELLA LIAR OC 4 ! ! ! ! EACH GtiCUf2REd+7CE 5
EYCeSS LIAD CLAIMS-MADE AGGREGATE Is
$
DED RETfid71{3N$
1 1 RS CORAPENSATION J / j f TCRRYSLIMITS OTH-
A,YDEPVLOYEF:TLASILITY YIN
ANY PRGPRIETORiPARTNEPJEXEGUT(VE I I I I E L EACH ACCIDENT $
OFRGERMEMOER EXCLUDED? MIA
IMa::e,ory m NP) E L a5EASE-EA EMPLOYE $
HyyeeS dsscn4e ander
DESCRIPTtOfI OF OPERATORS below / / Et DSEASE-POLICYLIMIT $
DESCRIPTION OF OPERATIONS I LOCATIONS 1 VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more space is required)
C:Lty of Kent is listed as an Additional insured.
CERTIFICATE HOLDER CANCELLATION
SHOULD ANY Of THE ABOVE DESCRIBED POUCfES BE CANCELLED BEFORE
Tt9E EXPIRATi10M DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE-44#Tfd THE POLICY aRt3Ye310110.
City of Kent AUTHDRlzED?EP��N TATivg
499 West Gone
Kent WA 98032-
ACOR€t 25(2"141116) 1898-2010 ACORD CORPORATION. All rights reserved.
P dgeMK, -1 Tha arnan naaia Am Inner ArA rahictptAd mark-4 of ACORD
11/01/2012 11:24 2538930012 YOUNG INSURANCE AGEY PAGE 02/02
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement on this
certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an
endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such
endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between the Issuing
insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively
amend, extend or alter the coverage afforded by the policies listed thereon.
I
ORD 25(2001108)
029t610sloa AMS Pago2of2
11/0G/2012 12:45 2538930012 YOUNG INSURANCE AGEY PAGE 02/03
POLICY CHANGE ENDORSEMENT
This endorsement summarizes the changes to
your policy. All other terms of your policy
not affected by these changes remain the
same.
How Your Policy Is Changed
General Liability
------------------
Additional In.$ured G0323 (12/1997) is being added as per attached.
Premium Change Which Is Due Now
9
Additional premium -------------- Returned premium --- - -`
If issued after the date your policy P.olicv_Jssued_tu:----------------- ------
begins, these spaces must be completed U E' '
and our representative must sign below.
Authorized Representative ----------
Endo sement takes effect__��3/�5/Z2__:------
Policy numb®r: 1CLO8102045 '
Processing date: J/19/12-- 12.08-_002,
40704 Ed. 5-84 Endorsement
9 1984 The Travelers Indemnity Company, All rights reserved. Page
11/06/2012 12:45 2538930012 YOUNG INSURANCE AGEY PAGE 03/03
ADDITIONAL PROTECTED PERSONS ENDORSEMENT - CONTRACTORS
GENERAL LIABILITY - NOT INCLUDING COMPLETED WORK
This endorsement changes your Contractors
Commercial General Liability Protection.
How Coverage Is Changed Architect, engineer, or surveyor
professional services includes:
There are two changes which are described • the preparation or approval of maps,
below. drawings, opinions, reports, surveys,
change orders, designs, or
1. The following is added to the Who Is specification; and
Protected Under This Agreement section. • supervisory, inspection, or engineering
This change adds certain protected services.
persons and limits their protection.
2. The following is added to the Other
Additional protected person. The person or primary Insurance section. This change
organization named below is an broadens coverage.
additional protected person as required
by a contract or agreement entered into We'll consider this Insurance to be
by you. But only for covered injury or primary to and non-contributory with the
damage arising out of: - insurance issued directly to the additional
• your work for that person or protected persons listed below if:
organization; • your contract specifically requires that
we consider this insurance to he
• premises you own, rent, or lease from primary or primary and non-
that person or organization; or contributory Insurance; or
• your maintenance, operation, or use of o you request before a loss that we
equipment leased from that person or consider this insurance to be primary
organization. or primary and non-contributory
We explain what we mean by your work insurance,
In the Products and completed work total
limit section. Other Terms
If the additional protected person is an All other terms of your policy remain the
architect, engineer, or surveyor, we won't same.
cover injury or damage arising out of the
performance or failure to perform
architect, engineer, or surveyor
professional services.
Person Or Organization:
I
City of Kent
499 west Gowe
Rent, WA 98032
,- -----------------------, ...
Name of Insured _ Policy_ Number 'GL08102045 Effet,tlye_Nate;93/15/12
---_- -.- ------ ---- L - -
;NATIIRE1S WAY TREE SERVICE, LLC ' processingDate '03/19/12 12,06 0021
G0323 Rev. 12-97 Endorsement
at 1397 The Travelers Indemnity Company. All rights reserved. Page 1 of I
Department of Labia and Industries
Prevailing Wage STATEMENT OF INTENT TO
_s
www In wa goy/TradesLcnsm _PrevWa$Q a° PAY PREVAILING WAGES
• This form must be typed or printed in tnk ¢�toes Public Works Contract
• Fill in all blanks or the form will be returned for correction)see instructions). $40.00 Filing Fee Required
• Please a11oW a minimum of 10 corking days for processing Intent #(Assigned b L&I
• Once approved,your form will he posted online at }
hags//fortress wa og_v/lnilpwiaoub/ScarchFor asp
Your Company Inforrmdien AwanimmA h4woulNen
Your Company Name Project Name Contract Number
Nature's Way Tree Service LLC Tree Removal n!a
Your Address Awarding Agency
1019 184'Ave Ct E City Of Kent
City State Zip+4 Awatdrng Agency Address
Lake Tapps WA 98391-6442 202 4a'Ave S
Your Contractor Registration Nomber JYour UBI Number City State Ttp#4
NATURWT920JZ 602-810481 Kent WA 98032-5895
Your Industrial Insurance Account Number Awarding Agency Contact Name Phone Number
GLO8102045 Scott Schroeder 253-856-5600
Yom Email Address(required for notiticauca of approval) Your Phone Number County Where Work Will Be Performed Cnv Where Work Will Be Performed
mharrell3@comcast net 253-7404669 King Kent
Additional Details Contract Detafh
Your F�pected Job Start Date(mmldd/yyyy) Bid flue Date(Prime Contractor's) Award Date(Prince Contractor's)
11/29/2012 11/27/2012 11/28/2012
Job Site Address/Directions Total Dollar Amount of YM Contract(including
504 Hazel Ave N Kent WA 98030 sales tax)or indicate time and materials,if appluable $1,642 50 Q T&M
ARRA Funds Weadwrhation or E Eflieind Fmds
Dries this project utilize American Recovery and Reinvestment Act(ARRA)funds'? Does this protect utilize any weathenzation or energy efficiency upgrade funds
Q Yes ®No (ARRA or otherwisol 0 Yes ®No
Prime Contractor's Componu Information ffi Contractor's Company rrrfarmation
Prime Contractor's Company Name Prime Contractor s Intent Number Hiring Contraaor's Conipany Name
ature's Way Tree Service LLC
Prime Contractor's Registration Number Prime Contractor's UBI Number Hnnng C�iryvty's Contractor Registration Number Hmng Coniratrinxs UBI Number
1602-8 1 04 8 1
Emplayment tuftrnastlan
Do you intend to use ANY subcontractors? Q Yes ®No Will employees perform work on this protect"? ®Yes ❑No
Will ALL work besnbcoraracteert ❑Yes ®No Do you intend louse a entice pls n'alpltxyizs`t Q Yea ®No
Number of OwmerKJperators who own at least 3(3/a of the company who win peiiorm work on this project ❑None(0) ®One(1) ❑Two(2) Q Three(3)
CmfisrTmdes/Occupations-(Do not hA apprentices They are listed on the Atlidavit of Wages Paid
only)If an employee works in more than one trade,ensure that all hours worked in each trade are reported Number of Rate of Hourly Rate of Hourly Usual
below For additional craftsAradesloccupations please use Aadendum A Workers Pay ("Frunge")Beriefrts
clean-up laborer 1 4083 0
SWssitsure Block
I hereby a rb&that I have read arid,mnderamicl the wzftwtions W anuplete 9w fount and that the information,including any add nda are correct and Hiat all workers I ernplov on this
Public Work-Project will be paid no lei tbanthe prevailing Wage Rat s as determined •the Industrial Statistician of the Department of Labor and Industries.
Print Name:Michael Harrell PcintTiHe:OWnef Dale 11/28/2012
For only
Approved by sr iature of the Department of Labor and Industries Industrial Statistician
NOTICE: If the prime contract bat a cost ofom one meson dollars tsl,8e 0W.ft RCW 39.043M mpims you to conplem die EBB 305(RCW 39.0&370)Addadam and at6eh R to
ywr Afdarrt of Wages df Pad when your wwk oa the pre(ectroae4We.. 'this is only a notice.IlLe EBB 2W55 Addendum n out suhmlmd w6h thn hwtnt
F700-029.900 statement offs test to Pay Prevailing Wages 03.2011
Page 1of18
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate
of fringe benefits. On public works projects, worker's wage and benefit rates must add to
not less than this total. A brief description of overtime calculation requirements are
provided on the Benefit Code Key.
Journey Level Prevailing Wage Rates for the Effective Date:
12/4/2012
County Trade Job Classification Wage Holiday Overtime Note
King Asbestos Abatement Workers Journey Level $40.83 5D 1 H
King Boilermakers Journey Level $60.24 5N 1C
King Brick Mason Brick And Block Finisher $42.21 5A 1M
I
King Brick Mason Journey Level $49.07 5A 1M
King Brick Mason Pointer-Caulker-Cleaner $49.07 5A 1M
King Building Service Employees Janitor $19.98 5S 2F
;King Building Service Employees Traveling Waxer/shampooer $20.39 5S 2F
King Building Service Employees Window Cleaner (Scaffold) $24.52 5S 2F
=King Building Service Employees Window Cleaner(non-scaffold) $23.66 5S 2F
King Cabinet Makers (In Shop) Journey Level $22 74 1
King Carpenters Acousticat Worker $49.57 5D 1M
;King Carpenters Bridge, Dock And Wharf $49.57 5D 1M
Carpenters
King Carpenters Carpenter $49.57 5D 1M
King Carpenters Carpenters on Stationary Tools $49.70 5D 1M
iKing Carpenters Creosoted Material $49.67 5D 1M
King Carpenters Floor Finisher $49.57 5D 1M
King Carpenters Floor Layer $49.57 5D 1M
King Carpenters Scaffold Erector $49.57 5D 1M
King Cement Masons Journey Level $50.131 7A 1M
King Divers Et Tenders Diver $100.28 5D 1M 8A
King Divers 8t Tenders Diver On Standby $56.68 5D 1M
King Divers 8t Tenders Diver Tender $52.23 5D 1M
King Divers £t Tenders Surface Rcv £t Rov Operator $52.23 5D 1M
King Divers £t Tenders Surface Rcv 8 Rov Operator $48.67 5A 1 B
Tender
,King Dredge Workers Assistant Engineer $49.57 5D 1T 8L
King Dredge Workers Assistant Mate(deckhand) $49.06 5D 1T 8L '
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 2 of 18
King Dredge Workers Engineer Welder $49.62 5D 1T 8L
(King Dredge Workers Leverman, Hydraulic $51.19 5D 1T 8L ,
!King Dredge Workers Maintenance $49 06 5D 1T 8L
i
#King Dredge Workers Mates And Boatmen $49.57 5D 1T 8L
King Dredge Workers Oiler $49.19 5D 1T 8L
King Drywall Applicator Journey Level $49.741 5D 1 H
King Drywall Tapers Journey Level $49.79 5P 1 E
King Electrical Fixture Maintenance Journey Level $25.08 5L 1E
Workers
King Electricians - Inside Cable Splicer $62.74 7C 2W
King Electricians - Inside Cable Splicer (tunnel) $67.45 7C 2W
King Electricians - Inside Certified Welder $60.61 7C 2W
King Electricians - Inside Certified Welder (tunnel) $65.10 7C 2W
King Electricians - Inside Construction Stock Person $33.69 7C 2W
King Electricians - Inside Journey Level $58.47 7C 2W
King Electricians - Inside Journey Level (tunnel) $62.74 7C 2W
King Electricians Motor Shop Craftsman $15.37 1
King Electricians - Motor Shop Journey Level $14.69 1 I
King Electricians - Powerline Cable Splicer $64.95 5A 4A
Construction
King Electricians - Powerline Certified Line Welder $59.37 5A 4A
Construction
King Electricians - Powerline Groundperson $42.16 5A 4A
Construction
King Electricians - Powerline Head Groundperson $44.50 5A 4A
Construction
King Electricians - Powerline Heavy Line Equipment $59.37 5A 4A
Construction Operator
-King Electricians - Powerline Jackhammer Operator $44 50 5A 4A
Construction
King Electricians - Powerline Journey Level Lineperson $59.37 5A 4A
Construction
King Electricians - Powerline Line Equipment Operator $49.95 5A 4A
Construction
King Electricians - Powerline Pole Sprayer $59.37 5A 4A l
Construction
.King Electricians - Powerline Powderperson $44.50 5A 4A
Construction
King Electronic Technicians Journey Level $31.00 1
King Elevator Constructors Mechanic $75.24 7D 4A
King Elevator Constructors Mechanic In Charge $82.00 7D 4A
King Fabricated Precast Concrete All Classifications - In-Factory $14.15 5B 2K
Products Work Only
King Fence Erectors Fence Erector $15.18 1
King Flappers Journey Level $34.61 7A 2Y
King Glaziers Journey Level $52.76 7L 1Y
i
-King Heat Et Frost Insulators And Journeyman $56.93 5J 15
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2012
Page 3of18
Asbestos Workers
King Heating Equipment Mechanics Journey Level $68.52 7F 1 E
King Hod Carriers Et Mason Tenders Journey Level $42.11 7A 2Y
King Industrial Engine And Machine Journey Level $15.65 1
Mechanics
=King Industrial Power Vacuum Journey Level $9.24 1
Cleaner
!King Inland Boatmen Boat Operator $52.32 5B 1K
King Inland Boatmen Cook $48.89 5B 1K
King Inland Boatmen Deckhand $48.96 5B 1K
King Inland Boatmen Deckhand Engineer $49.95 5B 1K
King Inland Boatmen Launch Operator $51.16 5B 1K
King Inland Boatmen Mate $51.16 5B 1K `
King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1
Sewer Et Water Systems By Operator
Remote Control
King Inspection/Cleamng/Sealing Of Grout Truck Operator $11.48 1
Sewer Et Water Systems By
i Remote Control
King Inspection/Cleaning/Sealing Of Head Operator $24.91 1
Sewer Et Water Systems By
Remote Control
King Inspection/Cleaning/Sealing Of Technician $19.33 1
Sewer Et Water Systems By
Remote Control
King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1
Sewer Et Water Systems By
Remote Control
!King Insulation Applicators Journey Level $49.57 5D 1M
King Ironworkers Journeyman $59.02 7N 10
'King Laborers Air, Gas Or Electric Vibrating $40.83 7A 2Y
Screed
King Laborers Airtrac Drill Operator $42.11 7A 2Y
King Laborers Ballast Regular Machine $40.83 7A 2Y
King Laborers Batch Weighman $34.61 7A 2Y
King Laborers Brick Pavers $40.83 7A 2Y
'King Laborers Brush Cutter $40.83 7A 2Y
King Laborers Brush Hog Feeder $40.83 7A 2Y
King Laborers Burner $40.83 7A 2Y
King Laborers Caisson Worker $42.11 7A 2Y 1
King Laborers Carpenter Tender $40.83 7A 2Y
King Laborers Caulker $40.83 7A 2Y
King Laborers Cement Dumper-paving $41.59 7A 2Y
King Laborers Cement Finisher Tender $40.83 7A 2Y
King Laborers Change House Or Dry Shack $40.83 7A 2Y
`King Laborers Chipping Gun (under 30 Lbs.) $40.83 7A 2Y
King Laborers Chipping Gun(30 Lbs. And $41.59 7A 2Y ;
i
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 4of18
i Over)
a
=King Laborers Choker Setter $40.83 7A 2Y
King Laborers Chuck Tender $40.83 7A 2Y
,King Laborers Clary Power Spreader $41.59 7A 2Y
King Laborers Clean-up Laborer $40.83 7A 2Y
King Laborers Concrete Dumper/chute $41.59 7A 2Y
Operator
King Laborers Concrete Form Stripper $40.831 7A 2Y ;
King Laborers Concrete Placement Crew $41.591 7A 2Y
King Laborers Concrete Saw Operator/core $41.59 7A 2Y
Driller
King Laborers Crusher Feeder $34.61 7A 2Y
King Laborers Curing Laborer $40.83 7A 2Y ?
King Laborers Demolition: Wrecking It Moving $40 83 7A 2Y
(incl. Charred Material)
King Laborers Ditch Digger $40.83 7A 2Y
King Laborers Diver $42.11 7A 2Y
.King Laborers Drilt Operator $41.59 7A 2Y
(hydraulic,diamond)
King Laborers Dry Stack Walls $40.83 7A 2Y
_King Laborers Dump Person $40.83 7A 2Y
King Laborers Epoxy Technician $40.83 7A 2Y
King Laborers Erosion Control Worker $40.83 7A 2Y
King Laborers Faller 8 Bucker Chain Saw $41.59 7A 2Y
King Laborers Fine Graders $40.83 7A 2Y
King Laborers Firewatch $34.61 7A 2Y
King Laborers Form Setter $40.83 7A 2Y
King Laborers Gabian Basket Builders $40.83 7A 2Y
King Laborers General Laborer $40.83 7A 2Y
King Laborers Grade Checker & Transit $42.11 7A 2Y
Person
(King Laborers Grinders $40.831 7A 2Y
King Laborers Grout Machine Tender $40.831 7A 2Y
King Laborers Groutmen (pressure)including $41.59 7A ff2YPost Tension Beams
IKing Laborers GuardrailErector $40.83 7AKing Laborers Hazardous Waste Worker (level $42.11 7A
A)
iKing Laborers Hazardous Waste Worker (level $41.59 7A 2Y
I B)
King Laborers Hazardous Waste Worker (level $40.83 7A 2Y
C)
King Laborers High Scaler $42.111 7A 2Y
King Laborers Jackhammer $41 59 7A 2Y
King Laborers Laserbeam Operator $41.59 7A 2Y
King Laborers imaintenance Person $40.83 7A 2Y
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2012
Page 5of18
King Laborers Manhole Builder-mudman $41.591 7A 2Y
King Laborers Material Yard Person $40.83 7A 2Y
King Laborers Motorman-dinky Locomotive $41.59 7A 2Y
„King Laborers Nozzleman (concrete Pump, $41.59 7A 2Y
Green Cutter When Using
Combination Of High Pressure
Air 8 Water On Concrete Et
Rock, Sandblast, Gunite,
Shotcrete, Water Bla
King Laborers Pavement Breaker $41.59 7A 2Y
King Laborers Pilot Car $34.61 7A 2Y
King Laborers Pipe Layer Lead $42.11 7A 2Y
King Laborers Pipe Layer/tailor $41.59 7A 2Y
King Laborers Pipe Pot Tender $41.59 7A 2Y
King Laborers Pipe Reliner $41.59 7A 2Y
King Laborers Pipe Wrapper $41.59 7A 2Y
King Laborers Pot Tender $40.83 7A 2Y
King Laborers Powderman $42.11 7A 2Y
King Laborers Powderman's Helper $40.83 7A 2Y
King Laborers Power Jacks $41.59 7A 2Y
King Laborers Railroad Spike Puller - Power $41.59 7A 2Y
King Laborers Raker - Asphalt $42.11 7A 2Y
King Laborers Re-timberman $42.11 7A 2Y
King Laborers Remote Equipment Operator $41.59 7A 2Y
jKing Laborers Rigger/signal Person $41.59 7A 2Y
King Laborers Rip Rap Person $40.83 7A 2Y
King Laborers Rivet Buster $41.59 7A 2Y
King Laborers Rodder $41.59 7A 2Y
King Laborers Scaffold Erector $40.83 7A 2Y
King Laborers Scale Person $40.83 7A 2Y
"King Laborers Sloper (over 20") $41.59 7A 2Y
King Laborers SloperSprayer $40.83 7A 2Y ;
King Laborers Spreader (concrete) $41 59 7A 2Y
King Laborers Stake Hopper $40.83 7A 2Y
King Laborers Stock Piler $40.83 7A 2Y
King Laborers Tamper Et Similar Electric, Air $41.59 7A 2Y
8 Gas Operated Tools
King Laborers Tamper (multiple £t Self- $41.59 7A 2Y
propelled)
King Laborers Timber Person - Sewer (lagger, $41.59 7A 2Y
Shorer Et Cribber)
King Laborers Toolroom Person (at Jobsite) $40.83 7A 2Y
King Laborers Topper $40.831 7A 2Y
King Laborers Track Laborer $40.83 7A 2Y
King Laborers Track Liner (power) $41.59 7A 2Y
King Laborers Traffic Control Laborer $37.01 7A 2Y 8R
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2012
Page 6 of 18
lKing Laborers Traffic Control Supervisor $37.011 7A 2Y 811 11
King Laborers Truck Spotter $40.83 7A 2Y
King Laborers Tugger Operator $41.59 7A 2Y
King Laborers Tunnel Work-Compressed Air $55.89 7A 2Y 8g
Worker 0-30 psi
King Laborers Tunnel Work-Compressed Air $60.92 7A 2Y 84
Worker 30.01-44.00 psi
;King Laborers Tunnel Work-Compressed Air $64.60 7A 2Y 8g
Worker 44.01-54.00 psi
King Laborers Tunnel Work-Compressed Air $70.30 7A 2Y 8D
Worker 54.01-60.00 psi
)King Laborers Tunnel Work-Compressed Air $72.42 7A 2Y 84
Worker 60.01-64.00 psi
King Laborers Tunnel Work-Compressed Air $77.52 7A 2Y 8g `
Worker 64.01-68.00 psi
King Laborers Tunnel Work-Compressed Air $79.42 7A 2Y 8D
Worker 68.01-70.00 psi
;King Laborers Tunnel Work-Compressed Air $81.42 7A 1H 8D
Worker 70.01-72.00 psi
King Laborers Tunnel Work-Compressed Air $83.42 7A 1H 8g
Worker 72.01-74.00 psi
King Laborers Tunnel Work-Guage and Lock $42.21 7A 2Y B
Tender '
King Laborers Tunnel Work-Miner $42.21 7A 2Y 8D
King Laborers Vibrator $41.591 7A 2Y
_King Laborers Vinyl Seamer $40.83 7A 2Y
King Laborers Watchman $31.46 7A 2Y
King Laborers Welder $41 59 7A 2Y
King Laborers Well Point Laborer $41.59 7A 2Y
King Laborers Window Washer/cleaner $31.46 7A 2Y
,King Laborers - Underground Sewer General Laborer Et Topman $40.83 7A 2Y
l
Et Water
King Laborers - Underground Sewer Pipe Layer $41.59 7A 2Y
Et Water
King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1
Installers
King Landscape Construction Landscape Equipment $28.17 1
Operators Or Truck Drivers
King Landscape Construction Landscaping or Planting $17.87 1
Laborers
King Lathers Journey Level $49.74 5D 1H
King Marble Setters Journey Level $49.07 5A 1M
King Metal Fabrication (In Shop) Fitter $15.86 1
King Metal Fabrication (In Shot)) Laborer $9.78 1
King Metal Fabrication (In Shop) Machine Operator $13 04 1
King Metal Fabrication (In Shop) Painter $11.10 1
King Metal Fabrication (In Shop) Welder $15.48 1
King Millwright Journey Level $50.67 5D 1M
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 7 of 18
King Modular Buildings Cabinet Assembly $11.56 1
King Modular Buildings Electrician $11 56 1
King Modular Buildings Equipment Maintenance $11.56 1
King Modular Buildings Plumber $11.56 1
King Modular Buildings Production Worker $9.40 1
King Modular Buildings Tool Maintenance $11.56 1
King Modular Buildings Utility Person $11.56 1
King Modular Buildings Welder $11.56 1
King Painters Journey Level $37.51 6Z 2B
King Pile Driver Journey Level $49.82 5D 1M
King Plasterers Journey Level $48.23 M 1R
King Playground Et Park Equipment Journey Level $9.04 1
Installers
King Plumbers Et Pipefitters Journey Level $70.84 6Z 1G
King Power Equipment Operators Asphalt Plant Operators $51.89 7A 3C 8P '
King Power Equipment Operators Assistant Engineer $48 621 7A 3C 8P
King Power Equipment Operators Barrier Machine (zipper) $51.40 7A 3C 8P
King Power Equipment Operators Batch Plant Operator, $51.40 7A 3C 8P
Concrete
King Power Equipment Operators Bobcat $48.62 7A 3C 8P
I King Power Equipment operators Brokk - Remote Demolition $48.62 7A 3C 8P
Equipment
:_King Power Equipment Operators Brooms $48.62 7A 3C 8P
King Power Equipment Operators Bump Cutter $51.40 7A 3C 8P
King Power Eauipment Operators Cableways $51.89 7A 3C 8P
King Power Equipment Operators Chipper $51.40 7A 3C 8P
King Power Equipment Operators Compressor $48.62 7A 3C 8P ;
King Power Equipment Operators Concrete Pump: Truck Mount $51.89 7A 3C 2P
With Boom Attachment Over 42
M
King Power Equipment Operators Concrete Finish Machine -laser $48.62 7A 3C 8P
Screed 3
King Power Equipment Operators Concrete Pump - Mounted Or $50.98 7A 3C 8P
Trailer High Pressure Line g
Pump, Pump High Pressure.
King Power Equipment Operators Concrete Pump: Truck Mount $51.40 7A 3C 8P
With Boom Attachment Up To
42m
King Power Equipment Operators Conveyors $50.98 7A 3C 8P
King Power Equipment Operators Cranes: 20 Tons Through 44 $51.40 7A 3C 8P
Tons With Attachments
King Power Equipment Operators Cranes: 20 Tons Through 44 $51.40 7A 3C 8P
Tons With Attachments
Overhead, Bridge Type Crane:
20 Tons Through 44 Tons
King Power Equipment Operators Cranes: 100 Tons Through 199 $52.44 7A 3C 8P €
Tons, Or 150' Of Boom
(including Jib With
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 8of18
King Power Equipment Operators Cranes: 100 Tons Through 199 $52.44 7A 3C 8P
Tons, or 150' of boom i
(including jib with i
attachments); Overhead,
bridge type, 100 tons and over;
Tower crane up to 175' in
height, base to boom.
'King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $53.01 7A 3C 8P
Or 250' Of Boom (including Jib
With Attachments)
King Power Equipment Operators Cranes 45 Tons Through 99 $51.89 7A 3C 8P
Tons, Under 150' Of Boom
(including Jib With
Attachments)
King Power Equipment Operators Cranes: A-frame - 10 Tons And $48.62 7A 3C 8P
Under
King Power Equipment Operators Cranes: Friction 100 Tons $53.01 7A 3C 8P
Through199 Tons
King Power Equipment Operators Cranes: Friction Over 200 Tons $53.57 7A 3C 8P
King Power Equipment Operators Cranes: Over 300 Tons Or 300' $53.57 7A 3C 8P
Of Boom (including Jib With
Attachments)
King Power Equipment Operators Cranes Through 19 Tons With $50.98 7A 3C 8P
Attachments A-frame Over 10
? Tons °
King Power Equipment Operators Crusher $51.40 7A 3C 8P
King Power Equipment Operators Deck Engineer/deck Winches $51.40 7A 3C 8P
(power)
King Power Equipment Operators Derricks, On Building Work $51.89 7A 3C 8P
King Power Equipment Operators Dozer Quad 9, HD 41, D10 and $51.89 7A 3C 8P
Over
-King Power Equipment Operators Dozers D-9 £t Under $50.98 7A 3C 8P
King Power Equipment Operators Drill Oilers: Auger Type, Truck $50.98 7A 3C 8P
Or Crane Mount
IKmg Power Equipment Operators Drilling Machine $51.40 7A 3C 8P
k
`King Power Equipment Operators Elevator And Man-lift: $48.62 7A 3C 8P s
Permanent And Shaft Type
King Power Equipment Operators Finishing Machine, Bidwell And $51.40 7A 3C 8P
Gamaco 8 Similar Equipment
King Power Equipment Operators Forklift: 3000 Lbs And Over $50.98 7A 3C 8P
With Attachments
King Power Equipment Operators Forklifts: Under 3000 Lbs. With $48.62 7A 3C 8P
Attachments
,King Power Equipment Operators Grade Engineer: Using Blue $51.40 7A 3C 8P
Prints, Cut Sheets, Etc
I King Power Equipment Operators Gradechecker/stakeman $48.62 7A 3C 8P '
[King Power Equipment Operators Guardrail Punch $51.40 7A 3C 8P
King Power Equipment Operators Guardrail Punch/Auger $51.40 7A 3C 8P
King Power Equipment Operators Hard Tail End Dump $51.89 7A 3C 8P
Articulating Off- Road
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 9of18
i Equipment 45 Yards. 8: Over
King Power Equipment Operators Hard Tail End Dump $51.40 7A 3C 8P j
Articulating Off-road
Equipment Under 45 Yards
<King Power Equipment Operators Horizontal/directional Drill $50.98 7A 3C 8P
Locator
King Power Equipment Operators Horizontal/directional Drill $51.40 7A 3C 8P
Operator
King Power Equipment Operators Hydralifts/boom Trucks Over $50.98 7A 3C 8P
10 Tons
King Power Equipment Operators Hydralifts/boom Trucks, 10 $48.62 7A 3C 8P §
3 Tons And Under
King Power Equipment Operators Loader, Overhead 8 Yards. Et $52.44 7A 3C 8P
Over
King Power Eauipment Operators Loader, Overhead, 6 Yards. But $51.89 7A 3C 8P
i Not Including 8 Yards
King Power Equipment Operators Loaders, Overhead Under 6 $51.40 7A 3C 8P
Yards #
King Power Equipment Operators Loaders, Plant Feed $51 40 7A 3C 8P
King Power Equipment Operators Loaders: Elevating Type Belt $50.981 7A 3C 8P
King Power Equipment Operators Locomotives, All $51.40 7A 3C 8P
'King Power Equipment Operators Material Transfer Device $51.40 7A 3C 8P
King Power Equipment Operators Mechanics, All (leadmen - $52.44 7A 3C 8P
$0.50 Per Hour Over Mechanic)
King Power Equipment Operators Mixers: Asphalt Plant $51.40 7A 3C 8P
King Power Eauipment Operators Motor Patrol Grader - Non- $50.98 7A 3C 8P
finishing d
King Power Equipment Operators Motor Patrol Graders, Finishing $51.89 7A 3C 8P
King Power Eauipment Operators Mucking Machine, Mole, Tunnel $51.89 7A 3C 8P i
Drill, Boring, Road Header
And/or Shield
King Power Equipment Operators Oil Distributors, Blower $48.62 7A 3C 8P =
Distribution Et Mulch Seeding
Operator
King Power Equipment Operators Outside Hoists (elevators And $50.98 7A 3C 8P
Manlifts), Air Tuggers,strato
King Power Equipment Operators Overhead, Bridge Type Crane: $51.40 7A 3C 8P ,
20 Tons Through 44 Tons
King Power Equipment Operators Overhead, Bridge Type: 100 $52.44 7A 3C 8P
Tons And Over ; 'y
King Power Equipment Operators Overhead, Bridge Type: 45 $51 89 7A 3C 8P
Tons Through 99 Tons
;King Power Eauipment Operators Pavement Breaker $48.62 7A 3C 8P
King Power Equipment Operators Pile Driver (other Than Crane $51.40 7A 3C 8P
Mount)
King Power Eauipment Operators Plant Oiler - Asphalt, Crusher $50.981 7A 3C 8P ?
King Power Equipment Operators Posthote Digger, Mechanical $48.62 7A 3C 8P
i
King Power Equipment Operators Power Plant $48.62 7A 3C 8P {
King JE2wer Eauipment Operators Pumps - Water $48.62 7A 3C 8P
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 10 of 18
King Power Equipment Operators Quad 9, Hd 41, D10 And Over $51.891 7A 3C 8P
King Power Equipment Operators Quick Tower - No Cab, Under $48.62 7A 3C 8P
100 Feet In Height Based To
Boom
King Power Equipment Operators Remote Control Operator On $51.89 7A 3C 8P 1
Rubber Tired Earth Moving
Equipment
King Power Equipment Operators Rigger And Bellman $48.62 7A 3C 8P
King Power Equipment Operators Rollagon $51.89 7A 3C 8P
King Power Equipment Operators Roller, Other Than Plant Mix $48.621 7A 3C 8P
King Power Equipment Operators Roller, Plant Mix Or Multi-lift $50.98 7A 3C 2P
Materials I l
King Power Equipment Operators Roto-mill, Roto-grinder $51.401 7A 3C 8P
King Power Equipment Operators Saws - Concrete $50.98 7A 3C 8P
King Power Equipment Operators Scraper, Self Propelled Under $51.40 7A 3C 8P a
45 Yards
King Power Equipment Operators Scrapers - Concrete Et Carry All $50.981 7A 3C 8P
King Power Equipment Operators Scrapers, Self-propelled. 45 $51.89 7A 3C 8P
Yards And Over
King Power Equipment Operators Service Engineers - Equipment $50 981 7A 3C 8P
King Power Equipment Operators Shotcrete/gumte Equipment $48.62 7A 3C 8P
King Power Equipment Operators Shovel , Excavator, Backhoe, $50.98 7A 3C 8P
Tractors Under 15 Metric Tons.
King Power Equipment Operators Shovel, Excavator, Backhoe: $51.89 7A 3C 8P
Over 30 Metric Tons To 50
Metric Tons
King Power Equipment Operators Shovel, Excavator, Backhoes, $51.40 7A 3C 8P
Tractors: 15 To 30 Metric Tons
lKing Power Equipment Operators Shovel, Excavator, Backhoes: $52.44 7A 3C 8P
Over 50 Metric Tons To 90 1
l
Metric Tons
King Power Equipment Operators Shovel, Excavator, Backhoes: $53.01 7A 3C 8P
Over 90 Metric Tons
King Power Equipment Operators Shpform Pavers $51.89 7A 3C 8P
'King Power Equipment Operators Spreader, Topsider Et $51.89 7A 3C 8P
Screedman
King Power Equipment Operators Subgrader Trimmer $51.40 7A 3C 8P t
King Power Equipment Operators Tower Bucket Elevators $50.98 7A 3C 8P '
King Power Equipment Operators Tower Crane Over 175'in $53.01 7A 3C 8P
Height, Base To Boom
King Power Eauipment Operators Tower Crane Up To 175' In $52.44 7A 3C 8P
Height Base To Boom
'King Power Equipment Operators Transporters, All Track Or $51.89 7A 3C 8P
Truck Type
King Power Eauipment Operators Trenching Machines $50.98 7A 3C 8P
King Power Equipment Operators Truck Crane Oiler/driver - 100 $51.40 7A 3C 8P
Tons And Over
King Power Equipment Operators Truck Crane Oiler/driver Under $50.98 7A 3C j 8P
100 Tons
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 11of18
King Power Equipment Operators Truck Mount Portable Conveyor $51.401 7A 3C 8P
King Power Equipment Operators Welder $51.89 7A 3C 8P
King Power Equipment Operators Wheel Tractors, Farman Type $48.62 7A 3C 8P
;King Power Equipment Operators Yo Yo Pay Dozer $51.40 7A 3C 8P
King Power Equipment Operators- Asphalt Plant Operators $51.89 7A 3C 8P
Underground Sewer & Water
King Power Equipment Operators Assistant Engineer $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Barrier Machine (zipper) $51.40 7A 3C 8P
Underground Sewer Et Water
lKing Power Equipment Operators- Batch Plant Operator, $51.40 7A 3C 8P
Underground Sewer Et Water Concrete
King Power Equipment Operators- Bobcat $48.62 7A 3C 8P
Underground Sewer Et Water I I =
King Power Equipment Operators- Brokk - Remote Demolition $48.62 7A 3C 8P
Underground Sewer Et Water Equipment
King Power Equipment Operators- Brooms $48.62 7A 3C 8P
i Underground Sewer Et Water
[King Power Equipment Operators- Bump Cutter $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Cableways $51.89 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Chipper $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Compressor $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Concrete Pump: Truck Mount $51.89 7A 3C 8P
Underground Sewer Et Water With Boom Attachment Over 42
M
King Power Equipment Operators- Concrete Finish Machine -laser $48.62 7A 3C 8P i
Underground Sewer Et Water Screed
-King Power Equipment Operators- Concrete Pump - Mounted Or $50.98 7A 3C 8P
Underground Sewer Et Water Trailer High Pressure Line
Pump, Pump High Pressure.
,King Power Equipment Operators- Concrete Pump: Truck Mount $51.40 7A 3C 8P
Underground Sewer 8: Water With Boom Attachment Up To
42m
[King Power Equipment Operators- Conveyors $50.98 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Cranes: 20 Tons Through 44 $51.40 7A 3C 8P
Underground Sewer Et Water Tons With Attachments
,King Power Equipment Operators- Cranes: 20 Tons Through 44 $51.40 7A 3C 8P
Underground Sewer Et Water Tons With Attachments
Overhead, Bridge Type Crane:
20 Tons Through 44 Tons
King Power Equipment Operators- Cranes. 100 Tons Through 199 $52.44 7A 3C 8P
Underground Sewer Et Water Tons, Or 150' Of Boom
(including Jib With
i King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $53.01 7A 3C 8P
Underground Sewer Et Water Or 250' Of Boom (including Jib
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup,aspx 12/4/2012
Page 12 of 18
With Attachments)
xKing Power Equipment Operators- Cranes: 45 Tons Through 99 $51.89 7A 3C 8P ,
Underground Sewer 8 Water Tons, Under 150' Of Boom
(including Jib With
Attachments)
King Power Equipment Operators- Cranes: A-frame - 10 Tons And $48.62 7A 3C 8P
Underground Sewer Et Water Under
King Power Equipment Operators- Cranes: Friction 100 Tons $53.01 7A 3C 8P
Underground Sewer Et Water Through 199 Tons
King Power Equipment Operators- Cranes: Friction Over 200 Tons $53.57 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $53 57 7A 3C 8P
Underground Sewer Et Water Of Boom (including Jib With
Attachments)
King Power Equipment Operators- Cranes: Through 19 Tons With $50 98 7A 3C 8P
g Underground Sewer Et Water Attachments A-frame Over 10
€ Tons
King Power Eauipment Operators- Crusher $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Deck Engineer/deck Winches $51.40 7A 3C 8P
Underground Sewer Et Water (power)
King Power Equipment Operators- Derricks, On Building Work $51.89 7A 3C 8P
Underground Sewer Et Water
,King Power Equipment Operators- Dozer Quad 9, HD 41, D10 and $51.89 7A 3C 8P '
Underground Sewer Et Water Over
King Power Equipment Operators- Dozers D-9 Et Under $50.98 7A 3C 8P
E
Underground Sewer Et Water
King Power Equipment Operators- Drill Oilers: Auger Type, Truck $50.98 7A 3C 8P
Underground Sewer Et Water Or Crane Mount
!King Power Equipment Operators- Drilling Machine $51.40 7A 3C 8P
Underground Sewer Et Water a
King Power Equipment Operators- Elevator And Man-lift: $48.62 7A 3C 8P
Underground Sewer Et Water Permanent And Shaft Type
King Power Equipment Operators- Finishing Machine, Bidwell And $51.40 7A 3C 8P
5
Underground Sewer Et Water Gamaco Et Similar Equipment
King Power Equipment Operators- Forklift: 3000 Lbs And Over $50.98 7A 3C 8P '
Underground Sewer Et Water With Attachments
King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $48.62 7A 3C 8P
Underground Sewer Et Water Attachments
a King Power Equipment Operators- Grade Engineer: Using Blue $51.40 7A 3C 8P 9
Underground Sewer Et Water Prints, Cut Sheets, Etc
King Power Equipment Operators- Gradechecker/stakeman $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Guardrail Punch $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Guardrail Punch/Auger $51.40 7A 3C 8P
' Underground Sewer Et Water
King Power Equipment Operators- Hard Tail End Dump $51.89 7A 3C 8P
i
Underground Sewer Et Water Articulating Off- Road
Equipment 45 Yards. Ft Over
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2012
Page 13 of 18
lKing Power Equipment Operators- Hard Tail End Dump $51.40 7A 3C 8P
Underground Sewer Et Water Articulating Off-road
Equipment Under 45 Yards
King Power Equipment Operators- Horizontal/directional Drill $50.98 7A 3C 8P
Underground Sewer Et Water Locator
King Power Equipment Operators- Horizontal/directional Drill $51.40 7A 3C 8P
Underground Sewer Et Water Operator
King Power Equipment Operators- Hydralifts/boom Trucks Over $50.98 7A 3C 8P
Underground Sewer Et Water 10 Tons
King Power Equipment Operators- Hydratifts/boom Trucks, 10 $48.62 7A 3C 8P
Underground Sewer Et Water Tons And Under
King Power Equipment Operators- Loader, Overhead 8 Yards. Et $52.44 7A 3C 8P
Underground Sewer Et Water Over
s
King Power Equipment Operators- Loader, Overhead, 6 Yards. But $51.89 7A 3C 8P
Underground Sewer Et Water Not Including 8 Yards
King Power Equipment Operators- Loaders, Overhead Under 6 $51.40 7A 3C 8P
Underground Sewer Et Water Yards
King Power Equipment Operators- Loaders, Plant Feed $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Loaders: Elevating Type Belt $50.98 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Locomotives, All $51.40 7A 3C 8P
i Underground Sewer Et Water
King Power Equipment Operators- Material Transfer Device $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Mechanics, AIL (Leadmen - $52.44 7A 3C 8P
Underground Sewer Et Water $0.50 Per Hour Over Mechanic)
King Power Equipment Operators- Mixers: Asphalt Plant $51.40 7A 3C 8P
Underground Sewer Et Water I
i King Power Equipment Operators- Motor Patrol Grader - Non- $50.98 7A 3C 8P
Underground Sewer Et Water finishing
King Power Equipment Operators- Motor Patrol Graders, Finishing $51.89 7A 3C 8P
Underground Sewer Et Water
lKing Power Equipment Operators- Mucking Machine, Mole, Tunnel $51.89 7A 3C 8P i
Underground Sewer Et Water Drill, Boring, Road Header
And/or Shield
;King Power Equipment Operators- Oil Distributors, Blower $48.62 7A 3C 8P
Underground Sewer Et Water Distribution Et Mulch Seeding
Operator
King Power Equipment Operators- Outside Hoists (elevators And $50.98 7A 3C 8P j
Underground Sewer Et Water Manlifts), Air Tuggers,strato
King Power Equipment Operators- Overhead, Bridge Type Crane: $51.40 7A 3C 8P
Underground Sewer Et Water 20 Tons Through 44 Tons )
a
King Power Equipment Operators- Overhead, Bridge Type: 100 $52.44 7A 3C 8P
3 Underground Sewer Et Water Tons And Over
'King Power Equipment Operators- Overhead, Bridge Type: 45 $51.89 7A 3C 8P
Underground Sewer Et Water Tons Through 99 Tons
King Power Equipment Operators- Pavement Breaker $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Pile Driver (other Than Crane $51.40 7A 3C 8P
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012 ,
Page 14 of 18
Underground Sewer Ft Water Mount) '
King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $50.98 7A 3C 8P
Underground Sewer Et Water
'King Power Equipment Operators- Posthole Digger, Mechanical $48.62 7A 3C 8P
Underground Sewer £t Water
King Power Equipment Operators- Power Plant $48 62 7A 3C 8P
Underground Sewer B Water
King Power Equipment Operators- Pumps - Water $48.62 7A 3C 8P ,
Underground Sewer Et Water
King Power Equipment Operators- Quad 9, Hd 41, D10 And Over $51.89 7A 3C 8P
Underground Sewer Et Water
€King Power Equipment Operators- Quick Tower - No Cab, Under $48.62 7A 3C 8P
Underground Sewer Et Water 100 Feet In Height Based To
Boom
King Power Equipment Operators- Remote Control Operator On $51.89 7A 3C 8P
Underground Sewer Et Water Rubber Tired Earth Moving
Equipment
King Power Equipment Operators. Rigger And Bellman $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Rollagon $51.89 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Roller, Other Than Plant Mix $48.62 7A 3C 813
Underground Sewer Et Water
IF King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $50.98 7A 3C 8P r
Underground Sewer Et Water Materials
King Power Equipment Operators- Roto-mill, Roto-grinder $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Saws - Concrete $50.98 7A P3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Scraper, Self Propelled Under $51.40 7A 8P
Underground Sewer Et Water 45 Yards
King Power Equipment Operators- Scrapers - Concrete Et Carry All $50.98 7A 8P
Underground Sewer Et Water
,King Power Equipment Operators- Scrapers, Self-propelled: 45 $51.89 7A 3C 8P
Underground Sewer Et Water Yards And Over
°King Power Equipment Operators- Service Engineers - Equipment $50.98 7A 3C 8P ,
Underground Sewer Et Water
King Power Equipment Operators Shotcrete/gunite Equipment $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Shovel , Excavator, Backhoe, $50.98 7A 3C 8P
Underground Sewer Et Water Tractors Under 15 Metric Tons. ,
;King Power Equipment Operators- Shovel, Excavator, Backhoe: $51.89 7A 3C 8P
Underground Sewer Et Water Over 30 Metric Tons To 50 j
Metric Tons l
King Power Equipment Operators- Shovel, Excavator, Backhoes, $51.40 7A 3C 8P
i Underground Sewer Et Water Tractors: 15 To 30 Metric Tons
King Power Equipment Operators- Shovel, Excavator, Backhoes: $52.44 7A 3C 8P
Underground Sewer Et Water Over 50 Metric Tons To 90
Metric Tons
,King Power Equipment Operators- Shovel, Excavator, Backhoes: $53.01 7A 3C 8P
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 15 of 18
Underground Sewer a Water Over 90 Metric Tons
King Power Equipment Operators- Slipform Pavers $51.89 7A 3C 8P
Underground Sewer a Water
King Power Equipment Operators- Spreader, Topsider it $51.89 7A 3C 8P
Underground Sewer Ft Water Screedman
King Power Equipment Operators- Subgrader Tnmmer $51.40 7A 3C 8P ,
Underground Sewer Ft Water
King Power Equipment Operators- Tower Bucket Elevators $50.98 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Tower Crane Over 175'in $53.01 7A 3C 8P
Underground Sewer Et Water Height, Base To Boom
King Power Equipment Operators- Tower Crane Up To 175' In $52.44 7A 3C 8P
Underground Sewer it Water Height Base To Boom
King Power Equipment Operators- Transporters, All Track Or $51.89 7A 3C 8P
Underground Sewer it Water Truck Type !
King Power Equipment Operators- Trenching Machines $50.98 7A 3C 8P
Underground Sewer Et Water
!King Power Equipment Operators- Truck Crane Oiler/driver - 100 $51.40 7A 3C 8P
Underground Sewer Et Water Tons And Over
King Power Equipment Operators- Truck Crane Oiler/driver Under $50 98 7A 3C 8P w
Underground Sewer Ft Water 100 Tons
King Power Equipment Operators- Truck Mount Portable Conveyor $51.40 7A 3C 8P
f Underground Sewer Ft Water
King Power Equipment Operators- Welder $51.89 7A 3C 8P
Underground Sewer Et Water
IKing Power Equipment Operators- Wheel Tractors, Farman Type $48.62 7A 3C 8P
Underground Sewer Et Water
King Power Equipment Operators- Yo Yo Pay Dozer $51.40 7A 3C 8P
Underground Sewer Et Water
King Power Line Clearance Tree Journey Level In Charge $42.91 5A 4A
Trimmers
King Power Line Clearance Tree Spray Person $40.73 5A 4A
Trimmers
King Power Line Clearance Tree Tree Equipment Operator $41.29 5A 4A
Trimmers
King Power Line Clearance Tree Tree Trimmer $38.38 5A 4A
Trimmers
King Power Line Clearance Tree Tree Trimmer Groundperson $28.95 5A 4A
Trimmers
,King Refrigeration Et Air Journey Level $69.96 6Z 1G
Conditioning Mechanics
;King Residential Brick Mason Journey Level $49.07 5A 1M
King Residential Carpenters Journey Level $28.201 1 ;
King Residential Cement Masons Journey Level $22.64 1
King Residential Drywall Applicators Journey Level $38.08 5D 1M
King Residential Drywall Tapers Journey Level $49.79 5P 1 E
King Residential Electricians JOURNEY LEVEL $30.44 1
,King Residential Glaziers Journey Level 1 $34.60 7L 1H
King Residential Insulation Journey Level 1 $26.28 1 1
3
3
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 16 of 18
Applicators
King Residential Laborers Journey Level $23.03 1
King Residential Marble Setters Journey Level $24.09 1
King Residential Painters Journey Level $24.46 1
King Residential Plumbers Et Journey Level $34.69 1
Ei2efitters
King Residential Refrigeration Et Air Journey Level $69.96 6Z 1G
Conditioning Mechanics
King Residential Sheet Metal Journey Level (Field or Shop) $41.30 7F 1 R
Workers
King Residential Soft Floor Lavers Journey Level $41.78 5A 3D
King Residential Sprinkler Fitters Journey Level $41.31 5C 2R
(Fire Protection)
`King Residential Stone Masons Journey Level $49.07 5A 1M z
King Residential Terrazzo Workers Journey Level $45.43 5A 1M
King Residential Terrazzo/Tile Journey Level $21.46 1
Finishers
King Residential Tile Setters Journey Level $25.17 1
King Roofers Journey Level $43.901 5A 1R
King Roofers Using Irritable Bituminous $46.90 5A 1R
Materials
King Sheet Metal Workers Journey Level (Field or Shop) $68.52 7F 1 E
King Shipbuilding Et Ship Repair Boilermaker $35.83 7M 1H
King Shipbuilding Et Ship Repair Carpenter $38.24 70 3B
King Shipbuilding Et Ship Repair Electrician $37.85 70 3B
King Shipbuilding Et Ship Repair Heat Et Frost Insulator $56.93 5J 1s
iKing Shipbuilding Et Ship Repair Laborer $36.81 70 3B
King Shipbuilding Et Ship Repair Machinist $37.811 70 3B
King Shipbuilding Et Ship Repair Operator $40.20 70 3B
.King Shipbuilding Et Ship Repair Painter $37.81 70 3B
King Shipbuilding Et Ship Repair Pipefitter $37.79 70 3B
King Shipbuilding Et Shia Repair Rigger $37.78 70 3B
King Shipbuilding Et Ship Repair Sandblaster $36.81 70 3B
King Shipbuilding Et Ship Repair Sheet Metal $37.77 70 3B
King Shipbuilding Et Ship Repair Shipfitter $37.78 70 3B
King Shipbuilding Et Ship Repair Trucker $37.63 70 3B
King Shipbuilding Et Ship Repair Warehouse $37.68 70 3B
King Shipbuilding Et Ship Repair Welder/Burner $37.78 70 3B
King Sign Makers Et Installers Sign Installer $22.92 1
(Electrical)
King Sign Makers a Installers Sign Maker $21.36 1 s
(Electrical)
FKing Sign Makers Et Installers (Non- Sign Installer $27.28 1
Electrical s
King Sign Makers Et Installers (Non- Sign Maker $33.25 1
Electrical
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 17 of 18
King Soft Floor Lavers Journey Level $41.78 5A 3D
King Solar Controls For Windows Journey Level $12 44 1
tKing Sprinkler Fitters (Fire Journey Level $69.44 5C 1x I
s Protection
`King Stage Rigging Mechanics (Non Journey Level $13.23 1
Structurall
King Stone Masons Journey Level $49.07 5A 1M
King Street And Parking Lot Journey Level $19.09 1
Sweeper Workers
King Surveyors Assistant Construction Site $50.98 7A 3C 8P
Surveyor
IKing Surveyors Chainman $50.46 7A 3C 8P
=King Surveyors Construction Site Surveyor $51.89 7A 3C 8P
King Telecommunication Journey Level $22.76 1
Technicians
King Telephone Line Construction - Cable Splicer $35.09 5A 2B
Outside
King Telephone Line Construction - Hole Digger/Ground Person $19.22 5A 2B
Outside
King Telephone Line Construction - Installer (Repairer) $33.63 5A 2B
Outside
King Telephone Line Construction - Special Aparatus Installer 1 $35.09 5A 2B
Outside
King Telephone Line Construction - Special Apparatus Installer II $34.37 5A 2B
Outside
I King Telephone Line Construction - Telephone Equipment Operator $35.09 5A 2B
Outside (Heavy)
King Telephone Line Construction - Telephone Equipment Operator $32.62 5A 2B
Outside (Light)
King Telephone Line Construction - Telephone Lineperson $32.62 5A 2B
Outside
King Telephone Line Construction - Television Groundperson $18.65 5A 2B
Outside
King Telephone Line Construction - Television Lineperson/Installer $24.66 5A 2B
Outside
;King Telephone Line Construction - Television System Technician $29.42 5A 2B
Outside
King Telephone Line Construction - Television Technician $26.43 5A 2B
Outside
King Telephone Line Construction - Tree Trimmer $32.95 5A 2B
Outside
King Terrazzo Workers Journey Level $45.43 5A 1M
lKing Tile Setters Journey Level $21.65 1
King Tile, Marble Et Terrazzo Finisher $37.76 5A 1 B
Finishers
King Traffic Control Stripers Journey Level $41.27 7A 1K
King Truck Drivers Asphalt Mix Over 16 Yards (W. $47.91 5D 3A 8L
WA-Joint Council 28)
:King Truck Drivers Asphalt Mix To 16 Yards (W. $47.07 5D I 3A 8L
https://fortress.wa.gov/ini/wagelookup/prvWagelookup.aspx 12/4/2012
Page 18 of 18
WA-Joint Council 28)
King Truck Drivers Dump Truck Et Trailer $47.91 5D 3A 8L ,
King Truck Drivers Dump Truck (W. WA-Joint $47.07 5D 3A 8L
Council. 28)
King Truck Drivers Other Trucks (W. WA-Joint $47.91 5D 3A 8L a
f
Council 28)
King Truck Drivers Transit Mixer $23.451 1
King Well Drillers It Irrigation Pump Irrigation Pump Installer $17.71 1
Installers
King Well Drillers Et Irrigation Pump Oiler $12.97 1
Installers
King Well Drillers 8 Irrigation Pump Well Driller $18.00 1
Installers
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/4/2012
3
3
Benefit Code Key-Effective 08-31-2012 thru 03-02-2013
•rr**r*►***��**gars*r++**+***************xr*r*rx*rrs�s��****sx«xx�*t**s�:�**�**��*srs**rx*■m��**�*�**r*r�*+*+
Overtime Codes
Overtime calculations are based on the hourly rate actually paid to the worker On public works projects,the hourly rate
must be not less than the prevailing rate of wage minus the hourly rate of the cost of fringe benefits actually provided for the
worker
1. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
B. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage
C. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten(10)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All other overtime hours and all hours worked on
Sundays and holidays shall be paid at double the hourly rate of wage
D. The first two (2) hours before or after a five - eight (8) hour workweek day or a four- ten (10)hour workweek day
and the first eight (8) hours worked the next day after either workweek shall be paid at one and one-half times the ;
hourly rate of wage All additional hours worked and all worked on Sundays and holidays shall be paid at double the
hourly rate of wage
E. The first two (2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage
F. The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All other overtime hours worked,except Labor Day,
shall be paid at double the hourly rate of wage All hours worked on Labor Day shall be paid at three times the
hourly rate of wage
G. The first ten(10)hours worked on Saturdays and the first ten(10)hours worked on a fifth calendar weekday in a four
-ten hour schedule, shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of
ten (10) hours per day Monday through Saturday and all hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage
H. All hours worked on Saturdays(except makeup days if work is lost due to inclement weather conditions or equipment
breakdown) shall be paid at one and one-half times the hourly rate of wage All hours worked Monday through
Saturday over twelve(12)hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate
of wage
I. All hours worked on Sundays and holidays shall also be paid at double the hourly rate of wage.
J The first two (2)hours after eight(8)regular hours Monday through Friday and the first ten (10)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All hours worked over ten (10) hours Monday
through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage
3
K. All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage All
hours worked on holidays shall be paid at double the hourly rate of wage
M All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be
paid at one and one-half times the hourly rate of wage All hours worked on Sundays and holidays shall be paid at
double the hourly rate of wage
N. All hours worked on Saturdays(except makeup days)shall be paid at one and one-half times the hourly rate of wage.
All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage.
1. O. The first ten (10) hours worked on Saturday shall be paid at one and one-half times the hourly rate of wage All
hours worked on Sundays, holidays and after twelve(12)hours,Monday through Friday and after ten (10)hours on
Saturday shall be paid at double the hourly rate of wage
Benefit Code Key—Effective 08-31-2012 thru 03-03-2013
P. All hours worked on Saturdays(except makeup days if circumstances warrant)and Sundays shall be paid at one and
one-half times the hourly rate of wage All hours worked on holidays shall be paid at double the hourly rate of wage
Q. The first two (2) hours after eight (8) regular hours Monday through Friday and up to ten (10) hours worked on
Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked in excess of ten (10)
hours per day Monday through Saturday and all hours worked on Sundays and holidays(except Christmas day)shall
be paid at double the hourly rate of wage All hours worked on Christmas day shall be paid at two and one-half times
the hourly rate of wage
R. All hours worked on Sundays and holidays shall be paid at two times the hourly rate of wage.
S The first two (2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays and all other overtime
hours worked. except Labor Day, shall be paid at double the hourly rate of wage All hours worked on Labor Day
shall be paid at three times the hourly rate of wage
T. Work performed in excess of eight(8) hours of straight time per day,or ten(10)hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate Hours
worked over twelve hours (12) in a single shift and all work performed after 6 00 pm Saturday to 6 00 am Monday
and holidays shall be paid at double the straight time rate of pay The employer shall have the sole discretion to
assign overtime work to employees Primary consideration for overtime work shall be given to employees regularly
assigned to the work to be performed on overtime situations After an employee has worked eight (8) hours at an
applicable overtime rate, all additional hours shall be at the applicable overture rate until such time as the employee
has had a break of eight(8)hours or more
U All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage All hours worked on
Sundays and holidays (except Labor Day) shall be paid at two times the hourly rate of wage All hours worked on
Labor Day shall be paid at three times the hourly rate of wage
V All hours worked on Sundays and holidays(except Thanksgiving Day and Christmas day) shall be paid at
one and one-half times the hourly rate of wage All hours worked on Thanksgiving Day and Christmas day shall be
paid at double the hourly rate of wage
W All hours worked on Saturdays and Sundays (except make-up days due to conditions beyond the control of the
employer)) shall be paid at one and one-half times the hourly rate of wage All hours worked on holidays shall be
paid at double the hourly rate of wage
X The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on
Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve (12)hours
Monday through Saturday, Sundays and holidays shall be paid at double the hourly rate of wage When holiday falls
on Saturday or Sunday, the day before Saturday, Friday, and the day after Sunday, Monday, shall be considered the
holiday and all work performed shall be paid at double the hourly rate of wage
Y. All hours worked outside the hours of 5 00 am and 5 00 pm (or such other hours as may be agreed upon by any
employer and the employee)and all hours worked in excess of eight(8)hours per day(10 hours per day for a 4 x 10
workweek) and on Saturdays and holidays (except labor day) shall be paid at one and one-half times the hourly rate
of wage (except for employees who are absent from work without prior approval on a scheduled workday during the
workweek shall be paid at the straight-time rate until they have worked 8 hours in a day(10 in a 4 x 10 workweek)or
40 hours during that workweek) All hours worked Monday through Saturday over twelve (12) hours and all hours
worked on Sundays and Labor Day shall be paid at double the hourly rate of wage
1. Z All hours worked on Saturdays and Sundays shall be paid at one and one-half times the hourly rate of wage. All
hours worked on holidays shall be paid the straight time rate of pay in addition to holiday pay
2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
B All hours worked on holidays shall be paid at one and one-half times the hourly rate of wage
—2 —
Benefit Code Key—Effective 08-31-2012 thru 03-03-2013
a
2. C All hours worked on Sundays shall be paid at one and one-half times the hourly rate of wage All hours worked on
holidays shall be paid at two times the hourly rate of wage
1
F The first eight(8)hours worked on holidays shall be paid at the straight hourly rate of wage in addition to the holiday
pay All hours worked in excess of eight(8)hours on holidays shall be paid at double the hourly rate of wage
G. All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on paid holidays
shall be paid at two and one-half times the hourly rate of wage including holiday pay.
H. All hours worked on Sunday shall be paid at two times the hourly rate of wage All hours worked on holidays shall
be paid at one and one-half times the hourly rate of wage
K. All hours worked on holidays shall be paid at two times the hourly rate of wage in addition to the holiday pay.
O. All hours worked on Sundays and holidays shall be paid at one and one-half times the hourly rate of wage
R. All hours worked on Sundays and holidays and all hours worked over sixty (60) in one week shall be paid at double
the hourly rate of wage
)
U. All hours worked on Saturdays shall be paid at one and one-half times the hourly rate of wage. All hours worked
over 12 hours in a day or on Sundays and holidays shall be paid at double the hourly rate of wage
W The first two(2)hours after eight(8)regular hours Monday through Friday and the first eight(8)hours on Saturday
shall be paid at one and one-half times the hourly rate of wage All other hours worked Monday through Saturday,
and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage On a four-day, ten-
hour weekly schedule,either Monday thru Thursday or Tuesday thru Friday schedule,all hours worked after ten shall
be paid at double the hourly rate of wage The first eight(8) hours worked on the fifth day shall be paid at one and
one-half times the hourly rate of wage All other hours worked on the fifth, sixth, and seventh days and on holidays
shall be paid at double the hourly rate of wage
Y. All hours worked on Saturdays (except for make-up days) shall be paid at one and one-half times the hourly rate of
wage All hours worked Monday through Saturday over twelve (12) hours and all hours worked on Sundays and
holidays shall be paid at double the hourly rate of wage
3 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
i
A Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week, Monday through Friday, or i
outside the normal shift, and all work on Saturdays shall be paid at time and one-half the straight time rate Hours
worked over twelve hours (12) in a single shift and all work performed after 6 00 pm Saturday to 6 00 am Monday
and holidays shall be paid at double the straight time rate of pay Any shift starting between the hours of 6 00 pm and
midnight shall receive an additional one dollar($1 00)per hour for all hours worked that shift
The employer shall have the sole discretion to assign overtime work to employees Primary consideration for
overtime work shall be given to employees regularly assigned to the work to be performed on overtime situations ;
After an employee has worked eight (8) hours at an applicable overtime rate, all additional hours shall be at the )
applicable overtime rate until such time as the employee has had a break of eight(8)hours or more )
B. The first four (4) hours after eight (8) regular hours Monday through Friday and the first twelve (12) hours on
Saturday shall be paid at one and one-half times the hourly rate of wage All hours worked over twelve (12)hours
Monday through Saturday, and all hours worked on Sundays and holidays shall be paid at double the hourly rate of
wage
C. Work performed in excess of eight(8)hours of straight time per day,or ten(10)hours of straight time per day when
four ten (10) hour shifts are established, or forty (40) hours of straight time per week. Monday through Friday, or
outside the normal shift, and all work on Saturdays shall be paid at one and one-half times the hourly rate of wage
All work performed after 6 00 pm Saturday to 5 00 am Monday and Holidays shall be paid at double the hourly rate
of wage After an employee has worked eight(8)hours at an applicable overtime rate,all additional hours shall be at
the applicable overtime rate until such time as the employee has had a break of eight(8)hours or more
—3—
Benefit Code Key—Effective 08-31-2012 thru 03-03-2013
3 D. All hours worked between 6 00 pm Monday through 6-00 am Saturday,shall be paid at an overtime rate of 15%over
the hourly rate of wage All other hours worked after 6 00 am on Saturdays,shall be paid at one and one-half times
the hourly rate of wage All hours worked on Sundays and holidays shall be paid at double the hourly rate of wage
E All hours worked Sundays and holidays shall be paid at double the hourly rate of wage Each week,once 40 hours of
straight time work is achieved,then any hours worked over 10 hours per day Monday through Saturday shall be paid
at double the hourly wage rate
4 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
A. All hours worked in excess of eight(8)hours per day or forty (40)hours per week shall be paid at double the hourly
rate of wage All hours worked on Saturdays.Sundays and holidays shall be paid at double the hourly rate of wage
B. All hours worked on Saturdays (except makeup days if work is lost due to inclement weather conditions) shall be
paid at one and one-half times the hourly rate of wage All hours worked Monday through Saturday over twelve(12)
hours and all hours worked on Sundays and holidays shall be paid at double the hourly rate of wage
Holiday Codes
5 A Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day,and Christmas Day(7)
B. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day,the day before Christmas,and Christmas Day(8)
C Holidays New Year's Day,Presidents' Day,Memorial Day,Independence Day,Labor Day, Thanksgiving Day, the
Friday after Thanksgiving Day.And Christmas Day(8)
D Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday and
Saturday after Thanksgiving Day,And Christmas Day (8)
H Holidays New Year's Day,Memorial Day,Independence Day,Thanksgiving Day,the Day after Thanksgiving Day,
And Christmas(6)
I. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
(6)
J. Holidays New Year's Day Memorial Day, Independence Day, Thanksgiving Day, Friday after Thanksgiving Day,
Christmas Eve Day,And Christmas Day(7)
K Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day,
Friday After Thanksgiving Day, The Day Before Christmas,And Christmas Day(9)
L. Holidays New Year's Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day,Friday After Thanksgiving Day,And Christmas Day(8)
N Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day, Veterans' Day,
Thanksgiving Day,The Friday After Thanksgiving Day,And Christmas Day(9)
P. Holidays New Year's Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,Friday And Saturday
After Thanksgiving Day, The Day Before Christmas, And Christmas Day (9) If A Holiday Falls On Sunday, The
Following Monday Shall Be Considered As A Holiday
R Paid Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Day After
Thanksgiving Day,One-Half Day Before Christmas Day,And Christmas Day (7 1/2)
—4—
Benefit Code Key—Effecth a 08-31-2012 thru 03-03-2013
5. S Paid Holidays- New Year's Day,Presidents'Day,Memorial Day,Independence Day, Labor Day, Thanksgiving
Day,And Christmas Day(7)
T Paid Holidays. New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, And The Day Before Or After Christmas
(9)
Z. Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, the
Friday after Thanksgiving Day,And Christmas Day(8)
Holiday Codes Continued
6. A Paid Holidays New Year's Day,Presidents'Day,Memorial Day,Independence Day,Labor Day,Thanksgiving Day,
The Friday After Thanksgiving Day,And Christmas Day(8)
E. Paid Holidays New Year's Day, Day Before Or After New Year's Day, Presidents Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, Day After Thanksgiving Day, Christmas Day, And A Half-Day
On Christmas Eve Day. (9 l l2).
G. Paid Holidays New Year's Day,Martin Luther King Jr Day,Presidents' Day,Memorial Day, Independence
Day,Labor Day.Veterans'Day,Thanksgiving Day,The Friday After Thanksgiving Day, Christmas Day, And
Christmas Eve Day(11)
H Paid Holidays- New Year's Day,New Year's Eve Day,Memorial Day,Independence Day,Labor Day,Thanksgiving
Day,Friday After Thanksgiving Day,Christmas Day,The Day After Christmas,And A Floating Holiday (10)
I. Paid Holidays. New Year's Day,Memorial Day,Independence Day,Labor Day, Thanksgiving Day,Friday
After Thanksgiving Day,And Christmas Day(7)
Q. Paid Holidays- New Year's Day, Memorial Day. Independence Day, Labor Day, Veterans Day,
Thanksgiving Day,The Day After Thanksgiving Day And Chnstmas Day(8) Unpaid Holiday_ Presidents'
Day
T Paid Holidays New Year's Day, Presidents' Day, Memorial Day, Independence Day, Labor Day,
Thanksgiving Day,The Friday After Thanksgiving Day,The Last Working Day Before Christmas Day,And
Christmas Day(9)
Z. Holidays-New Year's Day.Memorial Day, Independence Day, Labor Day, Thanksgiving Day,Friday after
Thanksgiving Day, And Christmas Day (7) If a holiday falls on Saturday, the preceding Friday shall be
considered as the holiday If a holiday falls on Sunday, the following Monday shall be considered as the
holiday
a
a
Holidav Codes Continued
7. A Holidays- New Year's Day, Memonal Day, Independence Day, Labor Day, Thanksgiving Day, The Friday And
Saturday After Thanksgiving Day, And Christmas Day (8) Any Holiday Which Falls On A Sunday Shall Be
Observed As A Holiday On The Following Monday if any of the listed holidays falls on a Saturday,the preceding
Friday shall be a regular work day
B Holidays- New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Fnday and
Saturday after Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as
a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a holiday on the
preceding Friday.
C Holidays New Year's Day, Martin Luther King Jr. Day, Memorial Day, Independence Day, Labor Day, i
Thanksgiving Day, The Friday After Thanksgiving Day, And Christmas Day (8) Any holiday which falls on a i
Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday.
5—
Benefit Code Key—Effective 08-31-2012 thru 03-03-2013
7. D Paid Holidays- New Year's Day,Memorial Day,Independence Day, Labor Day, Veteran's Day, Thanksgiving Day,
the Friday after Thanksgiving Day, And Christmas Day (8) Unpaid Holidays President's Day Any paid holiday
which falls on a Sunday shall be observed as a holiday on the following Monday. Any paid holiday which falls on a
Saturday shall be observed as a holiday on the preceding Friday
E Holidays New Year's Day, Memorial Day. Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday
F. Holidays. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day,the last working day before Christmas day and Christmas day (8) Any holiday which falls on a
Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday
G Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day
(6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday.
H Holidays New Year's Day, Martin Luther King Jr Day, Independence Day, Memorial Day, Labor Day,
Thanksgiving Day,the Friday after Thanksgiving Day,the Last Working Day before Christmas Day and Christmas
Day(9) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday
which falls on a Saturday shall be observed as a holiday on the preceding Friday
I Holidays New Year's Day.President's Day, Independence Day, Memorial Day, Labor Day, Thanksgiving Day, The
Friday After Thanksgiving Day.The Day Before Christmas Day And Christmas Day (9) Any holiday which falls on
a Sunday shall be observed as a holiday on the following Monday Any holiday which falls on a Saturday shall be
observed as a holiday on the preceding Friday
J. Holidays New Year's Day, Independence Day, Memorial Day. Labor Day, Thanksgiving Day and Christmas Day
(6) Any holiday which falls on a Sunday shall be observed as a holiday on the following Monday Any holiday
which falls on a Saturday shall be observed as a holiday on the preceding Friday
K Holidays New Year's Day, Memorial Day, Independence Day, Thanksgiving Day, the Friday and Saturday after
Thanksgiving Day,And Christmas Day(8) Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday
L Holidays New Year's Day, Memorial Day, Labor Day, Independence Day, Thanksgiving Day the Last Work Day
before Christmas Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday
on the following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding
Friday
M. Paid Holidays New Year's Day, The Day after or before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day,the Friday after Thanksgiving Day. Christmas Day, And the Day
after or before Christmas Day 10) Any holiday which falls on a Sunday shall be observed as a holiday on the
following Monday Any holiday which falls on a Saturday shall be observed as a holiday on the preceding Friday
N Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day, And Christmas Day(7) Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday When Christmas falls on a Saturday.the preceding Friday shall be observed as a holiday
O Paid Holidays New Year's Day, The Day After Or Before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day, Thanksgiving Day, The Friday After Thanksgiving Day, Christmas Day, The Day
After Or Before Christmas Day, And The Employees Birthday 11) Any holiday which falls on a Sunday shall be
observed as a holiday on the following Monday. Any holiday which falls on a Saturday shall be observed as a
holiday on the preceding Friday
P. Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Friday after
Thanksgiving Day,And Christmas Day (7) Any holiday which falls on a Sunday shall be observed as a holiday on
the following Monday
—6—
Benefit Code Key-Effeethe 08-31-2012 thru 03-03-2013
s
7 Q Holidays New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, the Friday after
Thanksgiving Day,the Last Working Day before Christmas Day and Christmas Day(8) Any holiday which falls on
a Sunday shall be observed as a holiday on the following Monday If any of the listed holidays falls on a Saturday,
the preceding Friday shall be a regular work day
R Paid Holidays New Year's Day, the day after or before New Year's Day, President's Day, Memorial Day,
Independence Day, Labor Day Thanksgiving Day, the Friday after Thanksgiving Day, Christmas Day, and the day
after or before Christmas Day (10) If any of the listed holidays fall on Saturday, the preceding Friday shall be
observed as the holiday If any of the listed holidays falls on a Sunday. the day observed by the Nation shall be
considered a holiday and compensated accordingly
Note Codes
8 A In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more.
Over 50' To 100'-$2 00 per Foot for Each Foot Over 50 Feet
Over 100'To 150'-$3 00 per Foot for Each Foot Over 100 Feet
Over 150'To 220'-$4 00 per Foot for Each Foot Over 150 Feet
Over 220'-$5 00 per Foot for Each Foot Over 220 Feet
C. In addition to the hourly wage and fringe benefits,the following depth premiums apply to depths of fifty feet or more-
Over 50' To 100'-$1 00 per Foot for Each Foot Over 50 Feet
Over 100'To 150'-$1 50 per Foot for Each Foot Over 100 Feet
Over 150'To 200'-$2 00 per Foot for Each Foot Over 150 Feet
Over 200'-Divers May Name Their Own Price
D. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour.
L. Workers on hazmat projects receive additional hourly premiums as follows - Level A• $0 75, Level B: $0.50, And
Level C $0 25
M. Workers on hazmat projects receive additional hourly premiums as follows- Levels A & B• $1 00, Levels C & D:
$0 50
N. Workers on hazmat projects receive additional hourly premiums as follows -Level A. $1.00,Level B $0 75,Level
C $0 50,And Level D.$0 25
P. Workers on hazmat projects receive additional hourly premiums as follows-Class A Suit $2 00,Class B Suit $1 50,
Class C Suit S1 00,And Class D Suit$0 50
Q. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the
shift shall be used in determining the scale paid
R Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or
spotting or other traffic control labor is being utilized A Traffic Control Laborer performs the setup,maintenance and
removal of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and
pedestrian traffic during construction operations Flaggers and Spotters shall be posted where shown on approved
Traffic Control Plans or where directed by the Engineer All flaggers and spotters shall possess a current flagging
card issued by the State of Washington, Oregon, Montana, or Idaho These classifications are only effective on or
after August 31,2012
S Effective August 31, 2012 — A Traffic Control Supervisor shall be present on the project whenever flagging or
spotting or other traffic control labor is being utilized Flaggers and Spotters shall be posted where shown on
approved Traffic Control Plans or where directed by the Engineer All flappers and spotters shall possess a current
flagging card issued by the State of Washington,Oregon, Montana,or Idaho. This classification is only effective on
or after August 31,2012
—7—
Benefit Code Key—Effective 08-31-2012 thru 03-03-2013
8 T. Effective August 31,2012—A Traffic Control Laborer performs the setup,maintenance and removal of all temporary
traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian traffic during
construction operations Flaggers and Spotters shall be posted where shown on approved Traffic Control Plans or
where directed by the Engineer All flaggers and spotters shall possess a current flagging card issued by the State of
Washington,Oregon,Montana,or Idaho This classification is only effective on or after August 31,2012
�g�