Loading...
HomeMy WebLinkAboutPK12-222 - Change Order - #1 - Holmes Electric - Electrical Capacity for HVAC IT Server Room - 11/20/2012 Records Manng- --e- ment� KEN T Document WwSHINGTOX ^M CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Holmes Electric, Inc. Vendor Number: ID Edwards Number Contract Number: Pk u _ 2 a-J� This is assigned by City Clerk's Office Project Name: I T Server Room — Electrical Panel Upgrade for HVAC Equip Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 11/20/12 Termination Date: 12/10/12 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Nancy Clary Department: Parks Facilities Detail: (i.e. address, location, parcel number, tax id, etc.): S Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08 KENT I CHANGE ORDER NO, 1 NAME OF CONTRACTOR: Holmes Electric ("Contractor") I CONTRACT NAME & PROJECT NUMBER: Electrical Upgrade for I T Server Room ORIGINAL CONTRACT DATE: October 12, 2012 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: In the original scope of work the XA panel was identified as a viable source to draw additional power from, When the XA panel was disassembled to make the connections, it was discovered there had been prior work done in the panel and it was no longer a power source that could be used. This change order will allow us to get power from a source that has been identified as acceptable. This work will be done for the I.T, server room located at Kent City Hall 220 Fourth Avenue South, Kent in accordance with Proposal dated November 9, 2012, which is attached as Exhibit A. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $5534.13 i (including applicable alternates and WSST) Net Change by Previous Change Orders $0 (incl. applicable WSST) Current Contract Amount $5534,13 (incl, Previous Change Orders) Current Change Order $1484.00 Applicable WSST Tax on this Change $140.98 Order Revised Contract Sum $7159.11 Original Time for Completion November 11,2012 (Insert date) Revised Time for Completion under N/A prior Change Orders (insert date) Days Required (t) for this Change 30 calendar days Order Revised Time for Completion December 10,2012 (insert date) I In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By; By; /(signature) (signature) Print Name; 1410HAM I HOMES P Cnta e: a Its PRE ANT It cryAl (title (title) DATE: I Z DATE; rloy 2c> , ZO('Z APPROVED AS TO FORM: (applicable if Mayor's signature required) Kent Law Department Holmes Ekd6e.I T.Servler Room Charge Order 1 F� X ELECTRIC F.6,8ax 339 "Rent,WA 98t133 fi M3)479-CO} I Aft; Ales Aoldoy Qflmtarty: Mwof m � Ked city trait Address: 220 Pcia'th AV5 A Fie Number.. 12R97M-2 K tta WA 98=3 Frain; Arigst ovio Phorfw 253.740.7 E-Midi: la FLaammoholmos.czvn Vie: E-Mail: aaokt M mt'JV.A.9vk Ali regnested,we are pleased to afr car ei=trfeal pmposal far the ehovt t fenced?roject as follows: INCLUSIONS 1. Demo ex€sdng mftduit and wire;roan dtseo nw tc panrd XA. Z. Demo cx-Mng=amp diacn =t 3. Provide and install(1)ow boa. 4. Prc cle and install conduit snd Min fmm,luneri=,bmc to roam&xI ihution panoL 5.' I'DaYWe oral hwail(1)anP t5lka y 2pol,bmv3=in wain dishibud as,Psael. 6. pmvido M.00 creA#'crwmdrilling ae prpwicusj& 7. Provide State of waal=gwnn elecwml p = f,IUAUF"T*N$ 1_ Our cffir is firm far(M)ttnirty days fi m the date 8sled abcwa 2. tsar offor is pred=ed upon a Clow am3 alas that will b�,mad,a'fanably by rsthe VVLMe cur UV&it to be perfMtwed. 3. Unl s s noted m the specific laOusrons,om cowrie wfl t be per:Parmed during our normal wmkcin$hems and Wg Away SPfCtFtCEXt:LU91QNs 1. wasiuvlDn Stale sales tag. 4, All work of oftr 4rait5. 2. Hazanlaus materials handling. 5. slaudly,a motme,end Sllft}vurii. 3. tiLMY charges. 4, Hfdden cbn>ZiEonx 'hotel Ttmt tied Wtartal Not to exceed Noposal as Oul&n Above. W84A Credit Coors DrIHIng .............. .............................r$Stlt A I TOWThnoand rdaferlal riot to Exceed..........................................................................$1f�tiei.U4f tlar goal u to prravido quality electrical cnnstrurirrnr and aa¢zgcti#ir y pricing. we will acmirg>t A tidy by perfomm ng eff kimtly,lively,Safely and to yaur complete and told sadsfaeHnm Thank yen for allowing us to pracaed by anthmr zing the work,in the spa=Faneid'sd bolosv.