Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PW12-183 - Original - Motors & Controls Corp. - Clark Springs Surge Electrical Upgrades - 06/12/2012
ecords M emen z, KENT ` WAS„,„G1p„ Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Motors & Controls Corp. Vendor Number: 33918 JD Edwards Number Contract Number: 05 )1 A- This is assigned by City Clerk Office Project Name: Clark Springs Surge Electrical Upgrades Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 6/12/12 Termination Date: 7/31/12 Contract Renewal Notice (Days): N/A Number of days required notice for termination or renewal or amendment Contract Manager: Bob Tollefson Department: PW Operations Water Detail: (i.e. address, location, parcel number, tax id, etc.): Clark Springs Surge Tank Electrical Upgrades. S Pub lic\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08 KENT WA$H1NGTON GOODS & SERVICES AGREEMENT between the City of Kent and Motors & Controls Corp, THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Motors & Controls Corp. organized under the laws of the State of Washington, located and doing business at 8030 S 222"d St Kent, WA 98032 253-872- 8010, Mike Elgas (hereinafter the "Vendor"). AGREEMENT I. DESCRIPTION OF WORK. i Vendor shall provide the following goods and materials and/or perform the following 1 services for the City: Clarks Springs Surge Tank Electrical Upgrades as described and incorporated in this contract as Exhibit A. 3 Vendor acknowledges and understands that it is not the City`s exclusive provider of these goods, materials, or services and that the City maintains its unqualified right to obtain these goods, materials, and services through other sources. II. TIME OF COMPLETION. Upon the effective date of this Agreement, Vendor shall complete the work and provide all goods, materials, and services by July 315t 2012. III. COMPENSATION. The City shall pay the Vendor an amount not to exceed $5179.35, including applicable Washington State Sales Tax, for the goods, materials, and services contemplated in this Agreement. The City shall pay the Vendor the following amounts according to the following schedule: GOODS & SERVICES AGREEMENT - 1 (Under$10,000.00, including WSST) Pay in full upon invoicing after completion of testing, start-up and training If the City objects to all or any portion of an invoice, it shall notify Vendor and reserves the option to only pay that portion of the invoice not in dispute. In that event, the parties will immediately make every effort to settle the disputed portion. A. Defective or Unauthorized Work. The City reserves its right to withhold payment from Vendor for any defective or unauthorized goods, materials or services. If Vendor is unable, for any reason, to complete any part of this Agreement, the City may obtain the goods, materials or services from other sources, and Vendor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Agreement price specified above. The City further reserves its right to deduct these additional costs incurred to complete this Agreement with other sources, from any and all amounts due or to become due the Vendor. B. Final Payment: Waiver of Claims. VENDOR'S ACCEPTANCE OF FINAL PAYMENT SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY VENDOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Vendor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Vendor maintains and pays for its own place of business from which Vendor's services under this Agreement will be performed. C. The Vendor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Vendor's services, or the Vendor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Vendor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Vendor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required GOODS & SERVICES AGREEMENT - 2 (Under$10,000.00, including WSST) by Vendor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Vendor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. Either party may terminate this Agreement, with or without cause, upon providing the other party thirty (30) days written notice at its address set forth on the signature block of this Agreement. VI. CHANGES. The City may issue a written amendment for any change in the goods, materials or services to be provided during the performance of this Agreement. If the Vendor determines, for any reason, that an amendment is necessary, Vendor must submit a written amendment request to the person listed in the notice provision section of this Agreement, section XIV(D), within fourteen (14) calendar days of the date Vendor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Vendor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Vendor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Vendor shall proceed with the amended work upon receiving either a written amendment from the City or an oral order from the City before actually receiving the written amendment. If the Vendor fails to require an amendment within the time allowed, the Vendor waives its right to make any claim or submit subsequent amendment requests for that portion of the contract work. If the Vendor disagrees with the equitable adjustment, the Vendor must complete the amended work; however, the Vendor may elect to protest the adjustment as provided in subsections A through E of Section VII, Claims, below. The Vendor accepts all requirements of an amendment by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. An amendment that is accepted by Vendor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VII. CLAIMS. If the Vendor disagrees with anything required by an amendment, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Vendor may file a claim as provided in this section. The Vendor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Vendor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Vendor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Vendor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. GOODS & SERVICES AGREEMENT - 3 (Under$10,000.00, Including WSST) A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Vendor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Vendor is asserting a schedule change or disruption. B. Records. The Vendor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Vendor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Vendor's Duty to Complete Protested Work. In spite of any claim, the Vendor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Vendor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Vendor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). VIII. LIMITATION OF ACTIONS. VENDOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR VENDOR'S ABILITY TO FILE THAT SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. IX. WARRANTY. This Agreement is subject to all warranty provisions established under the Uniform Commercial Code, Title 62A, Revised Code of Washington. Vendor warrants goods are merchantable, are fit for the particular purpose for which they were obtained, and will perform in accordance with their specifications and Vendor's representations to City. The Vendor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any part of the goods are repaired, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Vendor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Vendor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Vendor shall pay all costs incurred by the City in order to accomplish the correction. GOODS & SERVICES AGREEMENT - 4 (Under$10,000.00, including WSST) X. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Vendor, its sub-contractors, or any person acting on behalf of the Vendor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Vendor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XI. INDEMNIFICATION. Vendor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Vendor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Vendor's work when completed shall not be grounds to avoid any of these covenants of indemnification. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE VENDOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Vendor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Vendor's part, then Vendor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Vendor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XII. INSURANCE. The Vendor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIII. WORK PERFORMED AT VENDOR'S RISK. Vendor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Vendor's own risk, and Vendor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XIV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. GOODS & SERVICES AGREEMENT - 5 (Under$10,000.00, including WSST) B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XI of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Vendor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Vendor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Vendor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. GOODS & SERVICES AGREEMENT - 6 (Under$10,000.00, including WSST) I. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. VENDOR: CITY OF KENT: By: By: signature) (signature) Print Name: r �e Print Name: Brad Lake Its: Its: Operations Manager rtle) DATE: ./Z- DATE: ce l v2 n- NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: I VENDOR: CITY OF KENT: Mike Elgas Kevin Swinford Motors & Controls Corp. City of Kent 8030 South 222"d St 220 Fourth Avenue South Kent, WA 98032 Kent, WA 98032 253-872-8010 (telephone) (253) 856-5613 (telephone) 253-395-3725 (facsimile) (253) 856-6600 (facsimile) GOODS & SERVICES AGREEMENT - 7 (Under$10,000.00, including WSST) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. Dated this ls� day f 20-12, By: For: Title: Date: Sy*'/' EEO COMPLIANCE DOCUMENTS - 1 of 3 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. a Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 of 3 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this day of 120 By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 of 3 Page Iof17 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 5/29/2012 County Trade Job Classification Wa a Holiday Overtim I el Note King Asbestos Abatement Workers Journey Level $40.03 5D 1 H King Boilermakers Journey Level $60.24 5N 1C King Brick Mason Brick And Block Finisher $41.41 5A 1M King Brick Mason Journey Level $48.27 5A 1M King Brick Mason Pointer-Caulker-Cleaner $48.27 5A 1M King Building Service Emplovees Janitor $19.52 55 2F King Building Service Employees Traveling Waxer/shampooer $19.93 55 2F King Building Service Employees Window Cleaner (Scaffold) $23.94 55 2F King Building Service Employees Window Cleaner(non-scaffold) $23.08 5S 2F King Cabinet Makers (In Shop) Journey Level $22 74 1 King Carpenters Acoustical Worker $48.63 5D 1M King Carpenters Bridge, Dock And Wharf $48.47 5A 1M Carpenters ! King Carpenters Carpenter $48.47 5D 1M King Carpenters Creosoted Material $48.57 5D 1M King Carpenters Floor Finisher $48.60 5D 1M King Carpenters Floor Layer $48.60 5D 1M King Carpenters Floor Sander $48.60 5D 1M King Carpenters Sawfiler $48.60 5D 1M King Carpenters Shingler $48.60 5D 1M King Carpenters Stationary Power Saw Operator $48.60 5D 1M King Carpenters Stationary Woodworking Tools $48.60 5D 1M King Cement Masons Journey Level $49.15 7A 1M King Divers 8 Tenders Diver $100.28 5D 1M 8A King Divers Ft Tenders Diver On Standby $56.68 5D 1M King Divers 8 Tenders Diver Tender $52.23 5D 1M King Divers £t Tenders Surface Rcv 8 Rov Operator $52.23 5D 1M King Divers t* Tenders Surface Rcv Ft Rov Operator $48.67 5A 1B https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 Page 2of17 Tender King Dredge Workers Assistant Engineer $49.57 5D 1T 8L King Dredge Workers Assistant Mate(deckhand) $49.06 5D 1T 8L King Dredge Workers Engineer Welder $49.62 5D 1T 8L King Dredge Workers Leverman, Hydraulic $51.19 5D 1T 8L King Dredge Workers Maintenance $49.06 5D 1T 8L King Dredge Workers Mates And Boatmen $49.57 5D 1T 8L King Dredge Workers Oiler $49.19 5D 1T 8L King Drywall Applicator Journey Level $48.47 5D 1M King Drywall Tapers Journey Level $48.79 5P 1 E King Electrical Fixture Maintenance Journey Level $25.34 5L 1 E Workers King Electricians - Inside Cable Splicer $61.93 j 7C 2W King Electricians - Inside Cable Splicer (tunnel) $66.55 7C 2W King Electricians - Inside Certified Welder $59.83 7C 2W King Electricians - Inside Certified Welder (tunnel) $64.23 7C 2W King Electricians - Inside Construction Stock Person $31.83 7C 2W King Electricians - Inside Journey Level $57.72 7C 2W King Electricians - Inside Journey Level (tunnel) $61.93 7C 2W King Electricians Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $64.95 5A 4A Construction King Electricians - Powerline Certified Line Welder $59.37 5A 4A Construction King Electricians - Powerline Groundperson $42.16 5A 4A Construction King Electricians - Powerline Head Groundperson $44.50 5A 4A Construction King Electricians - Powerline Heavy Line Equipment $59.37 5A 4A Construction Operator King Electricians - Powerline Jackhammer Operator $44.50 5A 4A Construction King Electricians - Powerline Journey Level Lineperson $59.37 5A 4A Construction King Electricians - Powerline Line Equipment Operator $49.95 5A 4A Construction King Electricians - Powerline Pole Sprayer $59.37 5A 4A Construction King Electricians - Powerline Powderperson $44.50 5A 4A Construction King Electronic Technicians Journey Level $31.00 1 King Elevator Constructors Mechanic $75.241 7D 4A King Elevator Constructors Mechanic In Charge $82.00 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $14.15 56 2K Products Work Only King Fence Erectors Fence Erector $15.18 1 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 Page 3of17 King Flaggers Journey Level $33.93 7A 2Y King Glaziers Journey Level $50.91 7L 1Y King Heat Et Frost Insulators And Journeyman $55.68 5J 1s Asbestos Workers King Heating Equipment Mechanics Journey Level $67.82 7F 1 E King Hod Carriers Et Mason Tenders Journey Level $41.28 7A 2Y King Industrial Engine And Machine Journey Level $15.65 1 Mechanics s King Industrial Power Vacuum Journey Level $9.24 1 Cleaner King Inland Boatmen Boat Operator $51.95 5B 1 K King Inland Boatmen Cook $48.62 5B 1K King Inland Boatmen Deckhand $48.62 5B 1K King Inland Boatmen Deckhand Engineer $49.60 5B 1K King Inland Boatmen Launch Operator $50.80 5B 1K King Inland Boatmen Mate $50.80 5B 1K King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 Sewer Et Water Systems By Operator Remote Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $11.48 1 Sewer Et Water Systems By Remote Control € King Inspection/Cleaning/Sealing Of Head Operator $24.91 1 Sewer 8 Water Systems By Remote Control King Inspection/Cleaning/Seating Of Technician $19.33 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 Sewer it Water Systems By Remote Control King Insulation Applicators Journey Level $48.47 5D 1M King Ironworkers Journeyman $58.27 7N 10 King Laborers Air, Gas Or Electric Vibrating $40.03 7A 2Y Screed King Laborers Airtrac Drill Operator $41.28 7A 2Y King Laborers Ballast Regular Machine $40.03 7A 2Y King Laborers Batch Weighman $33.93 7A 2Y King Laborers Brick Pavers $40.03 7A 2Y King Laborers Brush Cutter $40.03 7A 2Y King Laborers Brush Hog Feeder $40.03 7A 2Y King Laborers Burner $40.03 7A 2Y King Laborers Caisson Worker $41.28 7A 2Y King Laborers Carpenter Tender $40.03 7A 2Y King Laborers Caulker $40.03 7A 2Y King Laborers Cement Dumper-paving $40.77 7A 2Y King Laborers Cement Finisher Tender $40.03 7A 2Y https://fortress.wa.gov/Ini/wagelookup/prvWageIookup.aspx 5/29/2012 Page 4 of 17 King Laborers Change House Or Dry Shack $40.031 7A 2Y King Laborers Chipping Gun (under 30 Lbs.) $40.03 7A 2Y King Laborers Chipping Gun(30 Lbs. And $40.77 7A 2Y Over) King Laborers Choker Setter $40.03 7A 2Y King Laborers Chuck Tender $40.03 7A 2Y King Laborers Clary Power Spreader $40.77 7A 2Y King Laborers Clean-up Laborer $40.03 7A 2Y King Laborers Concrete Dumper/chute $40.77 7A 2Y Operator King Laborers Concrete Form Stripper $40 03 7A 2Y King Laborers Concrete Placement Crew $40.77 7A 2Y King Laborers Concrete Saw Operator/core $40 77 7A 2Y Driller King Laborers Crusher Feeder $33.93 7A 2Y King Laborers Curing Laborer $40.03 7A 2Y King Laborers Demolition: Wrecking Et Moving $40.03 7A 2Y (incl. Charred Material) King Laborers Ditch Digger $40.031 7A 2Y King Laborers Diver $41.28 7A 2Y King Laborers Drill Operator $40.77 7A 2Y (hydraulic,diamond) King Laborers Dry Stack Walls $40.03 7A 2Y King Laborers Dump Person $40.03 7A 2Y King Laborers Epoxy Technician $40.03 7A 2Y King Laborers Erosion Control Worker $40.03 7A 2Y King Laborers Faller Et Bucker Chain Saw $40.77 7A 2Y King Laborers Fine Graders $40.03 7A 2Y King Laborers Firewatch $33 93 7A 2Y King Laborers Form Setter $40.031 7A 2Y King Laborers Gabian Basket Builders $40.03 7A 2Y King Laborers General Laborer $40.03 7A 2Y King Laborers Grade Checker Et Transit $41.28 7A 2Y Person King Laborers Grinders $40.03 7A 2Y King Laborers Grout Machine Tender $40.031 7A 2Y King Laborers Groutmen (pressure)including $40.77 7A 2Y Post Tension Beams King Laborers Guardrail Erector $40.03 7A 2Y King Laborers Hazardous Waste Worker ((eve[ $41.28 7A 2Y A) King Laborers Hazardous Waste Worker (level $40.77 7A 2Y B) King Laborers Hazardous Waste Worker (level $40.03 7A 2Y C) King Laborers High Scaler $41.28 7A 2Y https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 5/29/2012 Page 5of17 King Laborers Jackhammer $40.77 7A 2Y King Laborers Laserbeam Operator $40.77 7A 2Y King Laborers Maintenance Person $40.03 7A 2Y King Laborers Manhole Builder-mudman $40.77 7A 2Y King Laborers Material Yard Person $40.03 7A 2Y King Laborers Motorman-dinky Locomotive $40.77 7A 2Y King Laborers Nozzleman (concrete Pump, $40.77 7A 2Y Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $40.77 7A 2Y King Laborers Pilot Car $33.93 7A 2Y King Laborers Pipe Layer Lead $41.28 7A 2Y King Laborers Pipe Layer/tailor $40.77 7A 2Y King Laborers Pipe Pot Tender $40.77 7A 2Y King Laborers Pipe Reliner $40.77 7A 2Y King Laborers Pipe Wrapper $40.77 7A 2Y King Laborers Pot Tender $40.03 7A 2Y King Laborers Powderman $41.28 7A 2Y King Laborers Powderman's Helper $40.03 7A 2Y King Laborers Power Jacks $40.77 7A 2Y King Laborers Railroad Spike Puller - Power $40.77 7A 2Y King Laborers Raker - Asphalt $41.28 7A 2Y King Laborers Re-timberman $41.28 7A 2Y King Laborers Remote Equipment Operator $40.77 7A 2Y King Laborers Rigger/signal Person $40.77 7A 2Y King Laborers Rip Rap Person $40.03 7A 2Y King Laborers Rivet Buster $40.77 7A 2Y King Laborers Rodder $40.77 7A 2Y King Laborers Scaffold Erector $40.03 7A 2Y King Laborers Scale Person $40.03 7A 2Y King Laborers Sloper (over 20") $40.77 7A 2Y King Laborers SloperSprayer $40.03 7A 2Y King Laborers Spreader (concrete) $40.77 7A 2Y King Laborers Stake Hopper $40.03 7A 2Y King Laborers Stock Piler $40.03 7A 2Y King Laborers Tamper Et Similar Electric, Air $40.77 7A 2Y Et Gas Operated Tools 'King Laborers Tamper (multiple Et Self- $40.77 7A 2Y propelled) King Laborers Timber Person - Sewer (lagger, $40.77 7A 2Y Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $40.03 7A 2Y King Laborers Topper $40.03 7A 2Y https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 5/29/2012 Page 6 of 17 King Laborers Track Laborer $40.03 7A 2Y King Laborers Track Liner (power) $40.77 7A 2Y King Laborers Truck Spotter $40.03 7A 2Y King Laborers Tugger Operator $40.77 7A 2Y King Laborers Tunnel Work-Compressed Air $52.08 7A 2Y 880 Worker 0-30 psi King Laborers Tunnel Work-Compressed Air $57.08 7A 2Y 8Q Worker 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air $60.76 7A 2Y 8_C Worker 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air $66.46 7A 2Y 88 Worker 54.01-60.00 psi King Laborers Tunnel Work-Compressed Air $68.58 7A 2Y 88 Worker 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air $73.68 7A 2Y Worker 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air $75.58 7A 2Y 80 Worker 68.01-70.00 psi King Laborers Tunnel Work-Guage and Lock $41.38 7A 2Y AQ Tender King Laborers Tunnel Work-Miner $41.381 7A 2Y M King Laborers Vibrator $40.771 7A 2Y King Laborers Vinyl Seamer $40.031 7A r2YKing Laborers Watchman $30.84 7AKing Laborers Welder $40.77 7AKing Laborers Well Point Laborer $40.77 7AKing Laborers Window Washer/cleaner $30.84 7A King Laborers - Underground Sewer General Laborer Et Topman $40.03 7A 2Y Et Water King Laborers - Underground Sewer Pipe Layer $40.77 7A 2Y Et Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $48.74 5D 1H King Marble Setters Journey Level $48.27 5A 1M King Metal Fabrication In Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9 78 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shop) Painter $11.10 1 King Metal Fabrication (In Shop) Welder $15.48 1 King Millwright Journey Level $49.47 5D 1M King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings jElectrician $11.56 1 https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 Page 7 of 17 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $35.72 6Z 2B King Pile Driver Journey Level $48.67 5A 1M King Plasterers Journey Level $46.88 7Q 1R King Playground Et Park Equipment Journey Level $9.04 1 Installers King Plumbers 8 Pipe fitters Journey Level $70.84 6Z 1G King Power Equipment Operators Asphalt Plant Operators $50.39 7A 1T 8P King Power Equipment Operators Assistant Engineer $47.121 7A 1T 8P King Power Equipment Operators Barrier Machine (zipper) $49.90 7A 1T 8P King Power Equipment Operators Batch Plant Operator, $49.90 7A 1T 8P Concrete King Power Equipment Operators Bobcat $47.12 7A 1T 8P King Power Equipment Operators Brokk - Remote Demolition $47.12 7A 1T 8P Equipment King Power Equipment Operators Brooms $47.12 7A 1T 8P King Power Equipment Operators Bump Cutter $49.90 7A 1T 8P King Power Equipment Operators Cableways $50.39 7A 1T 8P King Power Equipment Operators Chipper $49.90 7A 1T 8P King Power Equipment Operators Compressor $47.12 7A 1T 8P King Power Equipment Operators Concrete Pump: Truck Mount $50.39 7A 1T 8P With Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $47.12 7A 1T 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $49.48 7A 1T 8P Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $49.90 7A 1T 8P With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $49.48 7A 1T 8P King Power Equipment Operators Cranes: 20 Tons Through 44 $49.90 7A 1T 8P Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators Cranes: 100 Tons Through 199 $50.94 7A 1T 8P Tons, or 150' of boom (including jib with attachments); Overhead, bridge type, 100 tons and over; Tower crane up to 175' in i height, base to boom. r https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 5/29/2012 Page 8of17 King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $51.51 7A 1T 8P Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 $50.39 7A 1T 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $47.12 7A 1T 8P Under King Power Equipment Operators Cranes: Friction 100 Tons $51.51 7A 1T 8P Through199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons $52.07 7A 1T 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' $52.07 7A 1T 8P Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: Through 19 Tons With $49.48 7A 1T 8P Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $49.90 7A 1T 8P King Power Equipment Operators Deck Engineer/deck Winches $49.90 7A 1T 8P (power) King Power Equipment Operators Derricks, On Building Work $50.39 7A 1T 8P King Power Equipment Operators Dozer Quad 9, HD 41, D10 and $50.39 7A 1T 8P Over King Power Equipment Operators Dozers D-9 Et Under $49.48 7A 1T 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck $49.48 7A 1T 8P Or Crane Mount King Power Equipment Operators Drilling Machine $49.90 7A 1T 8P King Power Equipment Operators Elevator And Man-lift: $47.12 7A 1T 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $49.90 7A 1T 8P Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $49.48 7A 1T 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $47.12 7A 1T 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $49.90 7A 1T 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $47.12 7A 1T 8P King Power Equipment operators Guardrail Punch/Auger $49.90 7A 1T 8P King Power Equipment Operators Hard Tail End Dump $50.39 7A 1T 8P Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $49.90 7A 1T 8P Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $49.48 7A 1T 8P Locator King Power Equipment Operators Horizontal/directional Drill $49.90 7A 1T 8P Operator https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 Page 9of17 King Power Equipment Operators Hydralifts/boom Trucks Over $49.48 7A 1T 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $47.12 7A 1T 8P Tons And Under King Power Equipment Operators Loader, Overhead 8 Yards. Et $50.94 7A 1T 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $50.39 7A 1T 8P Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $49.90 7A I 8P Yards King Power Eauipment Operators Loaders, Plant Feed $49.90 7A 1T 8P King Power Equipment Operators Loaders: Elevating Type Belt $49.48 7A 1T 8P King Power Equipment Operators Locomotives, All $49.90 7A 1T 8P King Power Equipment Operators Material Transfer Device $49.90 7A 1T 8P King Power Equipment Operators Mechanics, All (leadmen - $50.94 7A 1T 8P $0.50 Per Hour Over Mechanic) King Power Equipment Operators Mixers: Asphalt Plant $49.90 7A 1T 813 King Power Equipment Operators Motor Patrol Grader - Non- $49.48 7A 1T 8P finishing King Power Equipment Operators Motor Patrol Graders, Finishing $50.39 7A 1T 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $50.39 7A 1T 8P Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $47.12 7A 1T 8P Distribution Et Mulch Seeding , Operator King Power Equipment Operators Outside Hoists (elevators And $49.48 7A 1T 8P Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type: 45 $50.39 7A 1T 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $47.12 7A 1T 8P King Power Equipment Operators Pile Driver (other Than Crane $49.90 7A 1T 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $49.48 7A 1T 8P King Power Equipment Operators Posthole Digger, Mechanical $47.12 7A 1T 8P King Power Equipment Operators Power Plant $47.12 7A 1T 8P King Power Equipment Operators Pumps - Water $47.12 7A 1T 8P King Power Equipment Operators Quick Tower - No Cab, Under $47.12 7A 1T 8P 100 Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On $50.39 7A 1T 8P Rubber Tired Earth Moving Equipment 'King Power Eauipment Operators Rigger And Bellman $47.12 7A 1T 8P King Power Equipment Operators Rollagon $50.39 7A 1T 8P King Power Equipment Operators Roller, Other Than Plant Mix $47.12 7A 1T 8P King Power Equipment Operators Roller, Plant Mix Or Multi-lift $49.48 7A 1T 8P Materials P https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 Page 10 of 17 King Power Equipment Operators Roto-mill, Roto-grinder $49.901 7A 1T 8P King Power Equipment Operators Saws - Concrete $49.481 7A 1T 8P King Power Equipment Operators Scraper, Self Propelled Under $49.90 7A 1T 8P 45 Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $49.48 7A 1T 8P King Power Equipment Operators Scrapers, Self-propelled: 45 $50.39 7A 1T 8P Yards And Over King Power Equipment Operators Service Engineers - Equipment $49.48 7A 1T 8P King Power Equipment Operators Shotcrete/gunite Equipment $47.12 7A 1T 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $49.48 7A 1T 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $50.39 7A 1T 8P Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $49.90 7A 1T 8P Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $50.94 7A 1T 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $51.51 7A 1T 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $50.39 7A 1T 8P King Power Equipment Operators Spreader, Topsider Et $50.39 7A 1T 8P Screedman King Power Equipment Operators Subgrader Trimmer $49.90 7A 1T 8P King Power Equipment Operators Tower Bucket Elevators $49.48 7A 1T 8P King Power Equipment Operators Tower Crane Over 175'm $51.51 7A 1T 8P Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $50 94 7A 1T 8P Height Base To Boom King Power Equipment Operators Transporters, All Track Or $50.39 7A 1T 8P Truck Type King Power Equipment Operators Trenching Machines $49.48 7A 1T 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $49.90 7A 1T 8P Tons And Over King Power Equipment Operators Truck Crane Oiler/driver Under $49.48 7A 1T 8P 100 Tons King Power Equipment Operators Truck Mount Portable Conveyor $49.901 7A 1T 8P King Power Equipment Operators Welder $50 391 7A 1T 8P - King Power Equipment Operators Wheel Tractors, Farman Type $47.12 7A 1T 8P King Power Equipment Operators Yo Yo Pay Dozer $49.90 7A 1T 8P King Power Equipment Operators- Asphatt Plant Operators $50.39 7A 1T 8P Underground Sewer fx Water King Power Equipment Operators- Assistant Engineer $47.12 7A 1T 8P Underground Sewer l3 Water King Power Equipment Operators- Barrier Machine (zipper) $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $49.90 7A 1T 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 5/29/2012 Page 11 of 17 Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $47.12 7A 1T 8P Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $47.12 7A 1T 8P Underground Sewer Ft Water King Power Equipment Operators- Bump Cutter $49.90 7A 1T 8P ' Underground Sewer Ft Water King Power Eauipment Operators- Cableways $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Compressor $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $50.39 7A 1T 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $47.12 7A 1T 8P Underground Sewer 8 Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $49.48 7A 1T 8P Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. i King Power Equipment Operators- Concrete Pump: Truck Mount $49.90 7A 1T 8P Underground Sewer Et Water With Boom Attachment Up To 42m King Power Equipment Operators- Conveyors $49.48 7A 1T 8P a Underground Sewer Et Water King Power Equipment Operators- Cranes. 20 Tons Through 44 $49.90 7A 1T 8P Underground Sewer Et Water Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $51.51 7A 1T 8P Underground Sewer Et Water Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 $50.39 7A 1T 8P Underground Sewer Et Water Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And $47.12 7A IT 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $51.51 7A 1T 8P Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $52.07 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $52.07 7A 1T 8P Underground Sewer Et Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $49.48 7A 1T 8P 3 Underground Sewer 8 Water Attachments A-frame Over 10 Tons https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 5/29/2012 Page 12 of 17 King Power Eauipment Operators- Crusher $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches $49.90 7A 1T 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Dozer Quad 9, HD 41, D10 and $50.39 7A 1T 8P Underground Sewer Et Water Over King Power Equipment Operators- Dozers D-9 Et Under $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $49.48 7A 1T 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $49.90 7A 1T 8P Underground Sewer Et Water King Power Eauipment Operators- Elevator And Man-lift: $47.12 7A 1T 8P Underground Sewer Et Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $49.90 7A 1T 8P Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $49.48 7A 1T 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $47.12 7A 1T 8P Underground Sewer Et Water Attachments King Power Equipment Operators- Grade Engineer: Using Blue $49.90 7A 1T 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch/Auger $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $50.39 7A 1T 8P Underground Sewer Et Water Articulating off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $49.90 7A 1T 8P Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $49.48 7A 1T 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $49.90 7A 1T 8P Underground Sewer Et Water Operator King Power Equipment Operators- Hydralifts/boom Trucks Over $49.48 7A 1T 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $47.12 7A 1T 8P Underground Sewer Et Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et $50.94 7A 1T 8P Underground Sewer Et Water Over King Power Equipment Operators- Loader, Overhead, 6 Yards. But $50.39 7A 1T 8P Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $49.90 7A 1T 8P Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $49.90 7A 1T 8P Underground Sewer Et Water https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 Page 13 of 17 King Power Equipment Operators- Loaders: Elevating Type Belt $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $50.94 7A 1T 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Mixers: Asphalt Plant $49.90 7A 1T 8P Underground Sewer It Water King Power Equipment Operators- Motor Patrol Grader - Non- $49.48 7A 1T 8P Underground Sewer It Water finishing King Power Eauipment Operators- Motor Patrol Graders, Finishing $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel $50.39 7A 1T 8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield King Power Eauipment Operators- Oil Distributors, Blower $47.12 7A 1T 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $49.48 7A 1T 8P , Underground Sewer Et Water Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type- 45 $50.39 7A 1T 8P Underground Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane $49.90 7A 1T 8P Underground Sewer 8t Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $49.48 7A 1T 8P � Underground Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $47.12 7A 1T 8P Underground Sewer Et Water King Power Eauipment Operators- Power Plant $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under $47.12 7A 1T 8P Underground Sewer 8 Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $50.39 7A I 8P Underground Sewer Et Water Rubber Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $49.48 7A 1 T 81) Underground Sewer Et Water Materials https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 Page 14of17 King Power Equipment Operators- Roto-mill, Roto-grinder $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under $49.90 7A 1T 8P Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 $50.39 7A 1T 8P Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $49.48 7A 1T 8P Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $50.39 7A 1T 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $49.90 7A 1T 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $50.94 7A 1T 8P Underground Sewer It Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $51.51 7A 1T 8P Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- Slipform Pavers $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider a $50.39 7A 1T 8P Underground Sewer Et Water Screedman King Power Equipment Operators- Subgrader Trimmer $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in $51.51 7A 1T 8P Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $50.94 7A 1T 8P Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $50.39 7A 1T 8P Underground Sewer Et Water Truck Type King Power Equipment Operators- Trenching Machines $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 $49.90 7A 1T 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver Under $49.48 7A 1T 8P Underground Sewer Et Water 100 Tons King Power Equipment Operators- Truck Mount Portable Conveyor $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Welder $50.39 7A 1T 8P Underground Sewer a Water https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 Page 15 of 17 King Power Equipment Operators- Wheel Tractors, Farmall Type $47.12 7A 1T 8P Underground Sewer a Water King Power Equipment Operators- Yo Yo Pay Dozer $49.90 7A 1T 8P Underground Sewer a Water King Power Line Clearance Tree Journey Level In Charge $42.91 5A 4A Trimmers King Power Line Clearance Tree Spray Person $40.73 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $41.29 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $38.38 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $28.95 5A 4A Trimmers King Refrigeration a Air Journey Level $69.96 6Z 1G Conditioning Mechanics King Residential Brick Mason Journey Level $48.27 5A 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $38.08 5D 1M King Residential Drywall Tapers Journey Level $48.79 5P 1 E King Residential Electricians JOURNEY LEVEL $30.44 1 King Residential Glaziers Journey Level $34.60 7L 1H 3 King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 j King Residential Plumbers a Journey Level $34.69 1 Pipefitters King Residential Refrigeration a Air Journey Level $69.96 6Z 115 Conditioning Mechanics King Residential Sheet Metal Journey Level (Field or Shop) $40.04 7F 1 R Workers ; King Residential Soft Floor Lavers Journey Level $41.95 5A 2Z King Residential Sprinkler Fitters Journey Level $41.31 5C 211 (Fire Protection) King Residential Stone Masons Journey Level $48.27 5A 1M King Residential Terrazzo Workers Journey Level $43.93 5A 1M King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers s King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $43.65 5A I King Roofers Using Irritable Bituminous $46.65 5A 1R Materials King Sheet Metal Workers Journey Level (Field or Shop) $67.82 7F 1 E King Shipbuilding a Ship Repair lBoitermaker $35.83 7M 1H King Shipbuilding a Ship Repair Icarpenter 1 $36.621 7O 3B I https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 Page 16 of 17 King Shipbuilding Et Ship Repair Electrician $36.23 70 3B King Shipbuilding Et Ship Repair Heat Et Frost Insulator $55.68 5J 15 King Shipbuilding Et Ship Repair Laborer $34.82 70 3B King Shipbuilding Et Ship Repair Machinist $36.19 70 3B King Shipbuilding Et Ship Repair Operator $38.58 70 3B King Shipbuilding Et Ship Repair Painter $36.21 70 3B King Shipbuilding Et Ship Repair Pipefitter $36.16 70 3B King Shipbuilding & Ship Repair Rigger $36.16 70 3B King Shipbuilding Et Ship Repair Sandblaster $35.17 70 3B King Shipbuilding Et Ship Repair Sheet Metal $36.14 70 3B King Shipbuilding Et Ship Repair Shipfitter $36.16 70 3B King Shipbuilding Et Ship Repair Trucker $36.00 70 3B King Shipbuilding Et Ship Repair Warehouse $36.06 70 3B King Shipbuilding Et Ship Repair Welder/Burner $36.16 70 3B King Sign Makers Et Installers Sign Installer $22.92 1 (Electrical) King Sign Makers Et Installers Sign Maker $21.36 1 (Electrical) King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electrical King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electrical King Soft Floor Lavers Journey Level $41.95 5A 2Z King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $68.79 5C 1X Protection) King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Journey Level $48.27 5A 1M King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $49 48 7A 1T 8P Surveyor King Surveyors Chainman $48.961 7A 1T 8P King Surveyors Construction Site Surveyor $50.39 7A 1T 8P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $34.20 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $18.72 5A 2B Outside King Telephone Line Construction - Installer (Repairer) $32.78 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $34.20 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $33.51 5A 2B Outside https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 Page 17 of 17 King Telephone Line Construction - Telephone Equipment Operator $34.21 5A 2B Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operator $31.81 5A 2B Outside (Light) King Telephone Line Construction - Telephone Lineperson $31.81 5A 2B Outside King Telephone Line Construction - Television Groundperson $18.16 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $24.09 5A 2B Outside King Telephone Line Construction - Television System Technician $28.72 5A 2B Outside King Telephone Line Construction - Television Technician $25.81 5A 2B Outside King Telephone Line Construction - Tree Trimmer $31.82 5A 2B Outside i King Terrazzo Workers Journey Level $43.93 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble Et Terrazzo Finisher $37.76 5A 1 B Finishers King Traffic Control Stripers Journey Level $40.73 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards (W. $46.97 5D 3A 8L WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $46.13 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck 8 Trader $46.97 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint $46.13 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $46.97 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $23.45 1 King Well Drillers Ft Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers £t Irrigation Pump Oiler $12.97 1 Installers King Well Drillers £t Irrigation Pump Well Driller $18.00 1 Installers https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 5/29/2012 EXfl1b1TA PUBLIC WORKS Timothy J. LaPorte, P.E., Director OPERATIONS DIVISION Brad Lake, Public Works Operations Manager KEN T Phone: 253-856-5600 WASNIII GTGN Fax: 253-856-6600 F Mailing Address: 220 Fourth Avenue South Kent, WA 98032-5895 Location Address: 5821 South 240th a To: Sean Bauer-Interim Water Superintendent From: Kevin R. Swinford-Water Facilities Field Supervisor Date: May 22nd 2012 Re: Clark Springs Surge Tank Electrical Upgrades Scope of Work: Provide UL508A listed Control Panel including controls components as required per customer's request, Dead Front Fiberglas Panel, Eaton Contactors, Misc circuit breakers, power supply,pushbuttons and terminals. Labor and material to assemble and wire 1 ea. Control panel. Start up,testing and training. This control panel will replace an existing out dated control panel in the Clark Springs Surge building which houses critical equipment for both disinfection and surge system automation. Three local area vendors were contacted to provide a panel as described above and are as follows. • Specialty Controls Inc, Duvall, WA (Unable to provide a UL 508 panel) • Unit Process Company, Everett, WA(Unable to provide a UL 508 panel) • Motors and Controls Corp,Kent, WA(UL508 panel shop) It is requested that the City proceed with a Goods and Services Agreement with Motors and Controls Corporation, Kent WA to build the required panel and install components to UL standards in the amount not to exceed$ 5179,35 including WSST. Kevin R. Swinford i P•Operations\FormsVAdnun\PWOpsMemoForm A loop* 11���T Motors�+ Motors and Controls Corporation C� 8030 South 222nd Sheet II' Controls Kent,WA 98032 Corp Phone 253-872-8010 FAX: 253-395-3725 May 16, 2012 Bob Tollefson City of Kent Kent, WA 98032 Subject: Motor Control Systems Proposal#MGE-51012-COFK-1 Dear Bob, Motors and Controls Corporation is pleased to provide this budgetary price quotation, we will provide a complete documented, assembled Motor panel for your Pump Station as described and discussed in our previous meeting. Our control panel shop is UL508a listed, our staff has the ability to take an ideal all the way from concept to start up. You will find our versatility and common sense approach refreshing and easy to work with. Job Scone: ➢ Provide UL508A listed Control Panel including controls components as required per customer's request, Dead Front Fiberglas Panel, Eaton Contactors, Misc circuit breakers,power supply,pushbuttons and terminals. ➢ Labor and material to assemble and wire 1 ea. Control panel. ➢ Start up,testing and training. Pricing Per Each Control System: Description PRICE Labor, Material and all control components to assemble 1 EA. $4,730.00 Motor control Panel rated for 10 HP 35 Full Load Amp 480VAC 3 Phase. Including dead front panel, individual disconnects for each motor starter, pilots and pushbuttons, circuit breakers, and all necessary hardware. UL508A Rated and listed, all drawings and documentation Start up assistance. Motors and Controls Corporation iM r Motors`" 8030 South 222"d Street �,���� Col role Kent,WA 99032 CQr p. Phone, 253-872-8010 FAX: 253-395-3725 Requirements of Customer: • Installation and wiring,terminal connections. Price does not include: • Any Federal, State,Local or Sales tax if applicable. • Any building, construction, electrical permits that may be required. • Shipping or Freight Charges for any components or equipment used for this project. Terms: • Net 30 ALL MERCHANDISE SOLD HEREBY WILL REMAIN THE PROPERTY OF MOTORS AND CONTROLS CORPORATION UNTIL THE PURCHASE PRICE HAS BEEN PAID IN FULL. Freight: All Freight and Shipping Charges will be prepaid and added to invoice Delivery: 3 weeks after receipt of down payment and PO. This quotation is valid or 30 days The warranties that apply are those offered by the product's manufacturer. We will repair or replace any defective products we provide if product is within the manufacturer's warranty period. All sales are subject to Motor and Controls Corporation's standard Terms & Conditions of Sale. Sincerely, Mike Elgas Motors & Controls Corp. 1-253-670-6047 I EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non- owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 2. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. I EXHIBIT B (Continued ) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. M N y \ ® m 00 M / 3 2 2 / \ U § @ ® (0 \ § k ) \ { / \ Ln \ \ \ E E " E @ \ _ t e y � o § f # w o .� 7 / / 3 g G o@ » 7 G f �e rj < u@ 9 » f ? « > / f ® & � \ % E 7 £ f C / / \ > § \ z o \ / o \ k o \ 00 m n o o o o r o \ ' o 0 o r 0 < 9 » _ � � m N & 2 � k m rq $� & < in0 \ % 2 / � IL c \ 4w q oo / 3 A / � 2 \ ? E o \ R � e � 0 / m E /4 «_ k * § me O § y e3o p \ � t CL [ / \ 0 ) N / / ® f c \ C; k z > j 0 [ § % 4 \ � \ S . k / a 7 % \ u u ' b 2 E / / b 2 ® E E ° a m E z ® E 5 \ t 2 § E t t / _ o > \ z 2 o c » ,. 2 \ _ c u z § rd / \ § f \ ° / d 2 0 § E % t \ § 2 \ § § < 2 4 U / < / y ± £ 3 3 u U & a- t 0 q � m 00 2 g m # \ / / q 00 / G D \ � c\ \ � /� 2 o \ 2 w A J Ln / o ® E � 0 o o ® ' o ¥ m = / s / e \ \ \ \ / \ \ r \ E w = r « t & z / c \ / Q V / / \ \ \ / f } 7 k k t & x < Q / _ m % 8 k / / E 2 § 0 (D \ ® 5 \ / ° N § CL ® \ ± 2fo ) m � / 0 0 � / \ / / b o / 0 ± a o = ± o / e / 0 / ¥ ƒ g r 7 fa\ / 0 0)0 / \ $ \ \ \ k 'g > c - o { _ § / » 0 0 § / « e o \4 u u § ° $ m a : \ o \ c c c / \ 2 k ) C f E « 2 E § # % \ o 0 0 m 2 o c ° \ / � % + \ 2 < < < 2 7 / # $ S c % / & _ » E G / > = t I e g o o . / 0- = g \ 2 / / / U 4 t A ® / \ \ ° / n 5 / c \ \ / 8 \ § f u \ % % — • / o n n a / m o K ) _ u / _ _ # \ _ \ Q Q a ƒ J \ 3 a_ 3 a J a / \ x � c / 2 \ < c\ � — y / !.. _ / Ln e{ 00\ � k ■ Mn 7 L % � \ Ln } \ � . � / k \ k o \ 0 / fu 0 ( / � u ! k 0 2 c § � / § \ / 0 \ E \ / & § 20 k a on u . c ° J \ a / 7 f E E �Ln 2 \ 2 2 2 0 \ k> £ 2 E Ln > 2 \ % _ \ \ \ e y EE k / > < 7 EG aj s m c » g 7 & E $ \ 7 E E G a GS » L. / \ = � R § al \ o � 2 \ » / � \ ƒ \ 0 0 § z \ % �\ k | § § u / ±/e § 3 L m a/ / \ o $ \ k � k= # OP ID. KTH A(✓'R�ry CERTIFICATE OF LIABILITY INSURANCE 06/o/12 )DA THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT If the certificate holder is an ADDITIONAL INSURED, the pollcy(ies) must be endorsed If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER 425-489-4500 CONTACT NAME Hub International Northwest 425-489-4601 PHONE A/C No Ext A/C Na P. O Box 3018 E-MAIL ADDRESS Bothell,WA 98041-3018 PRODUCER MOTOR-1 Richard Malowney CUSTOMER inu INSURER(S)AFFORDING COVERAGE NAIC 4 INSURED Motors&Controls Corp INSURER Western National Assurance Co. 8030 S 222nd St INSURERB Hartford Fire Insurance Co Kent,WA 98032 INSURER C INSURER D INSURER E INSURER F COVERAGES CERTIFICATE NUMBER, REVISION NUMBER THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR TYPE OF INSURANCE ADD SUBR POLICY EFF POLICY EXP LIMITS LTR SR WVD POLICY NUMBER MMIDDlYYYY MM/DD/YYYY GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A X COMMERCIAL GENERAL LIABILITY CPP1015405 11/01111 11/01/12 PREMISES Ea occurrence $ 100,000 CLAIMS-MADE FVT OCCUR MED EXP(Any one person) $ 5,000 PERSONAL&ADV INJURY $ 1,000,000 GENERAL4GGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/CP AGG $ 2,000,000 JECT POLICY PRO LOC $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 A X ANYAUTG CPP1016447 11/01/11 11/01/12 (Ea accident) BODILY INJURY(Per person) $ ALL OWNED AUTOS BODILY INJURY(Per accident) $ SCHEDULED AUTOS PROPERTY DAMAGE $ X HIREDAUTOS tPeraccident) X NON-OWNEDAUTOS $ $ UMBRELLA LIAR X OCCUR EACH OCCURRENCE $ 2,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $ 2,000,000 A CUUMB1002538 11101/11 11/01/12 DEDUCTIBLE $ X I RETENTION $ 10,000 $ WORKERS COMPENSATION WC STATU OTH- AND EMPLOYERS'LIABILITY TO RY LIM T- X ER A ANY PROPRIETORPARTNER/EXECUTIVE YIN CPP1015405 11/01/11 11/01/12 EL EACH ACCIDENT $ 1,000,000 OFFICE4IMEMBER EXCLUDED ❑ NIA (Mandatory in NH) WA STOP-GAP EL DISEASE-EA EMPLOYE $ 1,000,000 If yes,describe under DESCRI1TICN OF OPERATIONS below EL DISEASE-POLICY LIMIT $ 1,000,000 B Property Coverage 52SBQVY7047 11/01/11 11/01/12 Blnkt Bid 2,953,800 &BPP Ded $1,000 DESCRIPTION OF OPERATIONS I LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) Certificate holder Is an additional insured, primary/non-contributory,but only if required by written contract or agreement per form WN GL49 01/09 attached. CERTIFICATE HOLDER CANCELLATION CITYKE2 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE The Cityof Kent THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. 220 Fourth Avenue South Kent,WA 98032-5895 AUTHORIZED REPRESENTATIVE If ©1988-2009 ACORD CORPORATION All rights reserved. ACORD 25(2009109) The ACORD name and logo are registered marks of ACORD COMMERCIAL GENERAL LIABILITY WIN GL 49 0109 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS WHEN REQUIRED IN CONSTRUCTION AGREEMENT WITH YOU PRIMARY AND NONCONTRIBUTORY This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section It—Who Is An insured is amended to in- a. The preparing, approving, or fading to pre- clude as an additional insured any person or organ- pare or approve, maps, shop drawings, opin- ization for whom you are performing operations ions, reports, surveys, field orders, change when you and such person or organization have orders or drawings and specifications; or agreed in writing in a contract or agreement that b. Supervisory, inspection, architectural or en- such person or Organization be added as an addi- gineering activities tional insured onyouUolicy.Such person or organ- ization is an additional insured only with respect to 2. "Bodily injury" or "property damage" occurring liability for "bodily injury", "property damage" or after: "personal and advertising injury" caused, in whole or in part, by: a. All work, including materials, parts or equip- ment furnished in connection with such 1. Your acts or omissions; or work, on the project (other than service. 2. The acts or omissions of those acting on your maintenance or repairs) to be performed by behalf; or on behalf of the additional insured(s) at the location of the covered operations has in the performance of your ongoing operations for been completed;or the additional insured. b. That portion of"your work" out of which the A person's or organization's status as an additional injury or damage arises has been put to its insured under this endorsement ends when your intended use by any person or organization operations for that additional insured are com- other than another contractor or subcontrac- pleted, for engaged in performing operations for a B. The Limits of Insurance applicable to the additional principal as a part of the same project. insured are those specified in the written contract D. As respects the coverage provided under this en- or written agreement or in the Declarations of this dorsement, Paragraph 4.b. of the Other Insurance policy, whichever is less. These Limits of Insur- Condition is deleted and replaced by the following- ante are inclusive of, and not in addition to Limits 4. Other Insurance of Insurance shown in the Declarations. C. With respect to the insurance afforded to these ad- b. Excess Insurance ditional insureds, the following additional exclusions This insurance is excess over any other in- apply: surance naming the additional insured as an This insurance does not apply to: insured whether primary, excess, contingent or on any other basis unless the written con- 1. "Bodily injury", "property damage" or "personal tract or agreement described in A, above and advertising injury" arising out of the render- specifically requires that this insurance be ing of, or the failure to render, any professional provided on either a primary basis or a pri- architectural, engineering or surveying services, mary and noncontributory basis. including: WN GL 49 0109 Includes copyrighted material of Insurance Services Offices Inc.with ds permission. Page 1 of 1