HomeMy WebLinkAboutPW12-152 - Original - J Bozeat & Associates, LLC - Pump Station 5 Valve Actuators - 07/25/2012 meh"Records M _aadogoa-�e
KENT
WASHINGTON moor,
Document
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: J Bozeat & Associates, LLC
Vendor Number:
JD Edwards Number
Contract Number: ew\ro� r
This is assigned by City Clerk's Office
Project Name: Pump Station 5 Valve Actuators
Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract
❑ Other:
Contract Effective Date: Date of the Mayor's signatureTermination Date: 10/31/12
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Kevin Swinford Department: PW Operations
Detail: (i.e. address, location, parcel number, tax id, etc.):
Provide and install three Auma valve actuators at Pump_Station 5.
S Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08
K E N T
wAS MII IT.N
IC 4'� �-
PUBLIC WORKS AGREEMENT
between City of Kent and
Bozeat & Associates, LLC
THIS AGREEMENT is made by and between the City of Kent, a Washington municipal
corporation (hereinafter the "City"), and J Bozeat Associates, LLC organized under the laws of
the State of Washington, located and doing business at 7333 California Ave. SW, Seattle, WA
98136, Phone: (206) 937-5719/Fax: (206) 937-5793, Contact: John Bozeat (hereinafter the
"Contractor").
AGREEMENT
The parties agree as follows:
I. DESCRIPTION OF WORK.
Contractor shall perform the following services for the City in accordance with the
following described plans and/or specifications:
The Contractor shall provide and install three Auma valve actuators at Pump Station
5. For a description, see the Scope of Work which is attached as Exhibit A and
incorporated by this reference.
Contractor further represents II ep esents that the services furnished under this Agreement will be
performed in accordance with generally accepted professional practices within the Puget Sound
region in effect at the time such services are performed.
II. TIME OF COMPLETION. The parties agree that work will begin on the tasks
described in Section I above immediately upon execution of this Agreement. Upon the effective
date of this Agreement, the Contractor shall complete the work described in Section I by October
31, 2012.
III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed
Fifteen Thousand Dollars ($15,000.00), including any applicable Washington State Sales Tax, for
the work and services contemplated in this Agreement. The City shall pay the Contractor fifty
percent (50%) of the Contract amount upon completion and acceptance of the work by the City,
and the remainder upon fulfillment of the conditions listed below and throughout this
Agreement.
A. No Payment and Performance Bond. Because this contract, including
applicable sales tax, is less than $35,000, and pursuant to Chapter 39.08
PUBLIC WORKS AGREEMENT - 1
(Over$10K, under$35K, and No Performance Bond)
► RCW, the Contractor, in lieu of providing the City a payment and
performance bond, has elected to have the owner retain the final fifty
percent (50%) of the Contract amount for a period of sixty (60) days after
the date of final acceptance, or until receipt of all necessary releases from
the State Department of Revenue, the State Department of Labor &
Industries, and the State Employment Security Department, and until
settlement of any liens filed under Chapter 60.28 RCW, whichever is later.
B. Defective or Unauthorized Work. The City reserves its right to withhold
payment from Contractor for any defective or unauthorized work. Defective
or unauthorized work includes, without limitation: work and materials that
do not conform to the requirements of this Agreement; and extra work and
materials furnished without the City's written approval. If Contractor is
unable, for any reason, to satisfactorily complete any portion of the work, the
City may complete the work by contract or otherwise, and Contractor shall be
liable to the City for any additional costs incurred by the City. "Additional
costs" shall mean all reasonable costs, including legal costs and attorney
fees, incurred by the City beyond the maximum Contract price specified
above. The City further reserves its right to deduct the cost to complete the
Contract work, including any Additional Costs, from any and all amounts due
or to become due the Contractor.
C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF
FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A
WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND
PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE
TIME FINAL PAYMENT IS MADE AND ACCEPTED.
IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent
Contractor-Employer Relationship will be created by this Agreement. By their execution of this
Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following
representations:
A. The Contractor has the ability to control and direct the performance and
details of its work, the City being interested only in the results obtained
under this Agreement.
B. The Contractor maintains and pays for its own place of business from which
Contractor's services under this Agreement will be performed.
C. The Contractor has an established and independent business that is eligible
for a business deduction for federal income tax purposes that existed before
the City retained Contractor's services and is a service other than that
furnished by the City, or the Contractor is engaged in an independently
established trade, occupation, profession, or business of the same nature as
that involved under this Agreement.
D. The Contractor is responsible for filing as they become due all necessary tax
documents with appropriate federal and state agencies, including the Internal
Revenue Service and the state Department of Revenue.
PUBLIC WORKS AGREEMENT - 2
(Over$1OK, under$35K, and No Performance Bond)
E. The Contractor has registered its business and established an account with
the state Department of Revenue and other state agencies as may be
required by Contractor's business, and has obtained a Unified Business
Identifier (UBI) number from the State of Washington.
F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW
or an electrical contractor license pursuant to Ch. 19.28 RCW.
G. The Contractor maintains a set of books dedicated to the expenses and
earnings of its business.
V. TERMINATION. The City may terminate this Agreement for good cause. "Good
cause" shall include, without limitation, any one or more of the following events:
A. The Contractor's refusal or failure to supply a sufficient number of properly
skilled workers or proper materials for completion of the Contract work.
B. The Contractor's failure to complete the work within the time specified in this
Agreement.
C. The Contractor's failure to make full and prompt payment to subcontractors
or for material or labor.
D. The Contractor's persistent disregard of federal, state or local laws, rules or
regulations.
E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt.
F. The Contractor's breach of any portion of this Agreement.
If the City terminates this Agreement for good cause, the Contractor shall not receive any
further money due under this Agreement until the Contract work is completed. After
termination, the City may take possession of all records and data within the Contractor's
possession pertaining to this project which may be used by the City without restriction.
VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay
Prevailing Wages," with the State of Washington Department of Labor & Industries prior to
commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the
bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code
of Washington, as well as any other applicable prevailing wage rate provisions. The latest
prevailing wage rate revision issued by the Department of Labor and Industries is attached.
VII. CHANGES. The City may issue a written change order for any change in the
Contract work during the performance of this Agreement. If the Contractor determines, for any
reason, that a change order is necessary, Contractor must submit a written change order
request to the person listed in the notice provision section of this Agreement, section XV(D),
within fourteen (14) calendar days of the date Contractor knew or should have known of the
facts and events giving rise to the requested change. If the City determines that the change
increases or decreases the Contractor's costs or time for performance, the City will make an
equitable adjustment. The City will attempt, in good faith, to reach agreement with the
Contractor on all equitable adjustments. However, if the parties are unable to agree, the City
will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed
PUBLIC WORKS AGREEMENT - 3
(Over$10K, under$35K, and No Performance Bond)
with the change order work upon receiving either a written change order from the City or an oral
order from the City before actually receiving the written change order. If the Contractor fails to
require a change order within the time specified in this paragraph, the Contractor waives its
right to make any claim or submit subsequent change order requests for that portion of the
contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must
complete the change order work; however, the Contractor may elect to protest the adjustment
as provided in subsections A through E of Section VIII, Claims, below.
The Contractor accepts all requirements of a change order by: (1) endorsing it, (2)
writing a separate acceptance, or (3) not protesting in the way this section provides. A change
order that is accepted by Contractor as provided in this section shall constitute full payment and
final settlement of all claims for contract time and for direct, indirect and consequential costs,
including costs of delays related to any work, either covered or affected by the change.
VIII. CLAIMS. If the Contractor disagrees with anything required by a change order,
another written order, or an oral order from the City, including any direction, instruction,
interpretation, or determination by the City, the Contractor may file a claim as provided in this
section. The Contractor shall give written notice to the City of all claims within fourteen (14)
calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14)
calendar days of the date the Contractor knew or should have known of the facts or events
giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for
any reason, or extension of time, whether under this Agreement or otherwise, shall be
conclusively deemed to have been waived by the Contractor unless a timely written claim is
made in strict accordance with the applicable provisions of this Agreement.
At a minimum, a Contractor's written claim shall include the information set forth in
subsections A, items 1 through 5 below.
FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM
WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY
CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS
SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY.
A. Notice of Claim. Provide a signed written notice of claim that provides the following
information:
1. The date of the Contractor's claim;
2. The nature and circumstances that caused the claim;
3. The provisions in this Agreement that support the claim;
4. The estimated dollar cost, if any, of the claimed work and how that
estimate was determined; and
5. An analysis of the progress schedule showing the schedule change or
disruption if the Contractor is asserting a schedule change or
disruption.
B. Records. The Contractor shall keep complete records of extra costs and time
incurred as a result of the asserted events giving rise to the claim. The City shall
have access to any of the Contractor's records needed for evaluating the protest.
The City will evaluate all claims, provided the procedures in this section are
followed. If the City determines that a claim is valid, the City will adjust payment
for work or time by an equitable adjustment. No adjustment will be made for an
PUBLIC WORKS AGREEMENT - 4
(Over$1OK, under$35K, and No Performance Bond)
invalid protest.
C. Contractor's Duty to Complete -Protested Work. In spite of any claim, the
Contractor shall proceed promptly to provide the goods, materials and services
required by the City under this Agreement.
D. Failure to Protest Constitutes Waiver. By not protesting as this section provides,
the Contractor also waives any additional entitlement and accepts from the City any
written or oral order (including directions, instructions, interpretations, and
determination).
E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures
of this section, the Contractor completely waives any claims for protested work and
accepts from the City any written or oral order (including directions, instructions,
interpretations, and determination).
IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY
LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR
DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO
FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY
APPLICABLE STATUTORY LIMITATIONS PERIOD.
X. WARRANTY. Upon acceptance of'the contract work, Contractor must provide the
City a one-year warranty bond in a form and amount acceptable to the City. The Contractor
shall correct all defects in workmanship and materials within one (1) year from the date of the
City's acceptance of the Contract work. In the event any parts are repaired or replaced, only
original replacement parts shall be used—rebuilt or used parts will not be acceptable. When
defects are corrected, the warranty for that portion of the work shall extend for one (1) year
from the date such correction is completed and accepted by the City. The Contractor shall begin
to correct any defects within seven (7) calendar days of its receipt of notice from the City of the
defect. If the Contractor does not accomplish the corrections within a reasonable time as
determined by the City, the City may complete the corrections and the Contractor shall pay all
costs incurred by the City in order to accomplish the correction.
XI. DISCRIMINATION. In the hiring of employees for the performance of work under
this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on
behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age,
sexual orientation, national origin, or the presence of any sensory, mental, or physical disability,
discriminate against any person who is qualified and available to perform the work to which the
employment relates.
Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy
Declaration, Comply with City Administrative iPohcy 1.2, and upon completion of the contract
work, file the attached Compliance Statement.
XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its
officers, officials, employees, agents and volunteers harmless from any and all claims, injuries,
damages, losses or suits, including all legal costs and attorney fees, arising out of or in
connection with the Contractor's performance of this Agreement, except for that portion of the
injuries and damages caused by the City's negligence.
PUBLIC WORKS AGREEMEN
T - 5
(Over$IOK, under$35K, and No Performance Bond)
4 The City's inspection or acceptance of any of Contractor's work when completed shall not
be grounds to avoid any of these covenants of indemnification.
Should a court of competent jurisdiction determine that this Agreement is subject to RCW
4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or
damages to property caused by or resulting from the concurrent negligence of the Contractor
and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability
hereunder shall be only to the extent of the Contractor's negligence.
IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE
INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF
IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF
THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY
NEGOTIATED THIS WAIVER.
In the event Contractor refuses tender of defense in any suit or any claim, if that tender
was made pursuant to this indemnification clause, and if that refusal is subsequently determined
by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the
Contractor's part, then Contractor shall pay all the City's costs for defense, including all
reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and
fees incurred because there was a wrongful refusal on the Contractor's part.
The provisions of this section shall survive the expiration or termination of this
Agreement.
XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the
Agreement, insurance of the types and in the amounts described in Exhibit B attached and
incorporated by this reference.
XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all
necessary precautions and shall be responsible for the safety of its employees, agents, and
subcontractors in the performance of the contract work and shall utilize all protection necessary
for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be
responsible for any loss of or damage to materials, tools, or other articles used or held for use in
connection with the work.
XV. MISCELLANEOUS PROVISIONS.
A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City
requires its contractors and consultants to use recycled and recyclable products whenever
practicable. A price preference may be available for any designated recycled product.
B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of
any of the covenants and agreements contained in this Agreement, or to exercise any option
conferred by this Agreement in one or more instances shall not be construed to be a waiver or
relinquishment of those covenants, agreements or options, and the same shall be and remain in
full force and effect.
C. Resolution of Disputes and Governing Law. This Agreement shall be governed by
and construed in accordance with the laws of the State of Washington. If the parties are unable
to settle any dispute, difference or claim arising from the parties' performance of this
Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by
PUBLIC WORKS AGREEMENT - 6
(Over$10K, under$35K, and No Performance Bond)
filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court,
King County, Washington, unless the parties agree in writing to an alternative dispute resolution
process. In any claim or lawsuit for damages arising from the parties' performance of this
Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or
bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award
provided by law; provided, however, nothing in this paragraph shall be construed to limit the
City's right to indemnification under Section XII of this Agreement.
D. Written Notice. All communications regarding this Agreement shall be sent to the
parties at the addresses listed on the signature page of the Agreement, unless notified to the
contrary. Any written notice hereunder shall become effective three (3) business days after the
date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to
the addressee at the address stated in this Agreement or such other address as may be
hereafter specified in writing.
E. Assignment. Any assignment of this Agreement by either party without the written
consent of the non-assigning party shall be void. If the non-assigning party gives its consent to
any assignment, the terms of this Agreement shall continue in full force and effect and no
further assignment shall be made without additional written consent.
F. Modification. No waiver, alteration, or modification of any of the provisions of this
Agreement shall be binding unless in writing and signed by a duly authorized representative of
the City and Contractor.
G. Entire Agreement. The written provisions and terms of this Agreement, together
with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or
other representative of the City, and such statements shall not be effective or be construed as
entering into or forming a part of or altering in any manner this Agreement. All of the above
documents are hereby made a part of this Agreement. However, should any language in any of
the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms
of this Agreement shall prevail.
H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and
municipal laws, rules, and regulations that are now effective or in the future become applicable
to Contractor's business, equipment, and personnel engaged in operations covered by this
Agreement or accruing out of the performance of those operations.
PUBLIC WORKS AGREEMENT - 7
(Over$1OK, under$35K, and No Performance Bond)
I. Counterparts. This Agreement may be executed in any number of counterparts,
each of which shall constitute an original, and all of which will together constitute this one
Agreement.
IN WITNESS, the parties below execute this Agreement, which shall become
effective on the last date entered below.
CONTRACTOR: CITY OF KENT:
By: By:
( lgnature) (signature)
Print Name: 12 5 z�z=� Pr' t Nam - S zette Cooke
Its �{ It ay or
title)
DATE: DATE: 6 / a-
NOTICES TO BE SENT TO: NOTICES TO BE SENT TO:
CONTRACTOR: CITY OF KENT:
John Bozeat Timothy J. LaPorte, P.E.
J Bozeat & Associates, LLC City of Kent
7333 California Ave. SW 220 Fourth Avenue South
Seattle, WA 98136 Kent, WA 98032
(206) 937-5719 (telephone) (253) 856-5500 (telephone)
(206) 937-5793 (facsimile) (253) 856-6500 (facsimile)
APPR VED AS O FO :
c
Kent Law Department
1 Bozeat-PS 5/Hal emon
PUBLIC WORKS AGREEMENT - 8
(Over$1OK, under$35K, and No Performance Bond)
DECLARATION
CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY
The City of Kent is committed to conform to Federal and State laws regarding equal opportunity.
As such all contractors, subcontractors and suppliers who perform work with relation to this
Agreement shall comply with the regulations of the City's equal employment opportunity
policies.
The following questions specifically identify the requirements the City deems necessary for any
contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative
response is required on all of the following questions for this Agreement to be valid and binding.
If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the
directives outlines, it will be considered a breach of contract and it will be at the City's sole
determination regarding suspension or termination for all or part of the Agreement;
The questions are as follows:
1. I have read the attached City of Kent administrative policy number 1.2.
2. During the time of this Agreement I will not discriminate in employment on the basis of
sex, race, color, national origin, age, or the presence of all sensory, mental or physical
disability.
3. During the time of this Agreement the prime contractor will provide a written statement to
all new employees and subcontractors indicating commitment as an equal opportunity
employer.
4. During the time of the Agreement I, the prime contractor, will actively consider hiring and
promotion of women and minorities.
5. Before acceptance of this Agreement, an adherence statement will be signed by me, the
Prime Contractor, that the Prime Contractor complied with the requirements as set forth
above.
By signing below, I agree to fulfill the five requirements referenced above.
Dated this day of lw�t , 2012 .
By: �
For: J , e ktoc- Lac
Title:
Date: �' to I �i 7
EEO COMPLIANCE DOCUMENTS - 1
CITY OF KENT
ADMINISTRATIVE POLICY
NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998
SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996
CONTRACTORS APPROVED BY Jim White, Mayor
POLICY:
Equal employment opportunity requirements for the City of Kent will conform to federal and
state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee
equal employment opportunity within their organization and, if holding Agreements with the City
amounting to $10,000 or more within any given year, must take the following affirmative steps:
1. Provide a written statement to all new employees and subcontractors indicating
commitment as an equal opportunity employer.
2. Actively consider for promotion and advancement available minorities and women.
Any contractor, subcontractor, consultant or supplier who willfully disregards the City's
nondiscrimination and equal opportunity requirements shall be considered in breach of contract
and subject to suspension or termination for all or part of the Agreement.
Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public
Works Departments to assume the following duties for their respective departments.
1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these
regulations are familiar with the regulations and the City's equal employment opportunity
policy.
2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines.
EEO COMPLIANCE DOCUMENTS - 2
10/31/2012 10:46 3602251235 AA LINED VALVE CO PAGE 01/01
CITY OF (CENT
EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT
This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the
Agreement.
I, the undersigned, a duly represented agent of ] @oge_gt_ Ssecia ac_ LLB Company, hereby
acknowledge and declare that the before-mentioned company was the prime contractor for the
Agreement known as Punno Station 5 valve Actuators that was entered into on the July 25,
2,012, between the firm I represent and the City of Kent.
I declare that I complied fully with all of the requirements and obligations as outlined in the City
of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity
Policy that was part of the before-mentioned Agreement. j
I
Dated this sX day of 2012-
I
i
y
Pry: �c,r�C i
For: C67 eiyr � Assoc-- LLC
1y i
Title:
Date: �CI3i 1�
EEO COMPLIANCE DOCUMENTS - 1
Received Tlme Oct. 31. 2012 10: 59AM No, 9343
EXHIBIT A
. I
Pump Station 5 Auma Valve Replacement
The City of Kent Water Division is replacing three (3) Auma Valve Actuators at the
following site:
Puml2Station 5 — 23825 981h Ave S, Kent, WA 98032
I
Scope of Work
Contractor will provide and install three (3) Auma valve actuators meeting same
functional specifications as existing models but updated to current mechanical and
electrical standards. Actuators shall be provided ready to install and work shall
include completed installation, commissioning or start-up, and any training
necessary for correct operation.
City of Kent Water Facilities will provide final measurements for flange and interior
input shaft sizes, access to facility, mechanical assistance on day of Installation, and
staff coordination for start-up and training.
Contractor will be paid in full upon final and successful installation, set up and
testing of each unit, and completed training of City personnel to the satisfaction of
the City.
I
Auma Valve Scope 20120611 Page 1 of 1 6/11/2012
05/29(2012 09:21 FAX 1 205 937 5793 J EOZEAT ASSOCIATES IM001/001
3"M CAlIFORNIA AYE S; .
6140 IE )NA5t MGTON 90136
Tit 206 M-5719 FAX 206 737-6193
E-MAIl t JOHNGBOXEMCOM
MASS VISIT Oft WEBSITEr WWW.BOZEA7.COM
TO: Ct•ty OF t(VIT - 4WAM'
F40QY # 1-253-856-6600 PACE 9 OF. 'I '
NMI: K Swinford--Water Facility Supr. flkomt JOHM SOGEAI'
SUBJECT: Pump Station #5
i
OUR REF. W10/1209/1
Dear Kevin
Thank you for your inquiry--we are pleased to update our budget proposal of Dec
20th 2010, as follows:-
A) Supply of Qty 3 x new Auma SA07.5 AumaMatic C, for 460.3-60 power supply
Price $2885.00 ea net FOB Seattle + applicable taxes
B) (One day) of installation services, and commissioning, of actuators In item A
Price$1300.00/lot + applicable taxes
Delivery 4-6 weeks ex-factory ; r
Terms net 10 days, Validity 30 days
Specification
The actuators are to the same specification as the existing units, but updated to
current standards. They include an integral starter, pushbuttons, lights and selector
switch, as well as a handwheel override,
Actuators will be supplied ready to install onto the existing bevel gear boxes, in place
of the existing actuators — including machining of actuator drive sleeves to suit the
existing b,g o. input shaft.
J Bozeat &Associates is familiar with the site and personnel, and has visited the site
to evaluate the project.
We trust the above meets with your approval and look forward to being of service to
the City—we assure you of our best attention
Thank you and regards
John Bozeat
I
S i
12/20/2010 18768 FAX 1 206 937 5793 J BOZEAT ASSOCIATBS 1@002/002
i
< 2 >
Installation—As discussed on site, prior to your order, In order to pre-machine the
actuator drive nut, it will be necessary to obtain the measurements of the input shaft
between the existing actuator and the existing bevel gearbox, This involves removing
the actuator temporarily in order to determine the shaft and key dimensions see
sketch below.
I
If I were to do it, I would merely hang the actuator on a strap from the grating, and
swing it to one side to disconnect,no need to disconnect the wiring if the conduit is
long enough.
Should you decide to take the measurements yourselves, and assist in mechanical
installation, i would co-ordinate my commissioning with you to be at the same time
and the cost would be as quoted on page 1.
*'"'The only real concern I have is the mounting flange dimension (see drawing note
below)—perhaps I could meet at site to re-check&resolve this question?
Electrical--functionality will be the same between the old units and the new BUT,
terminal numbers will be different, Power consumption (motor) is the same le '/2 hp.
We trust the above is acceptable and look forward to being of service—we assure
you of our best attention.
�!5+wm
B RAPT LENgTH
s '
CI',E1426a1c,
(-LANRF— tsc
/ I
&oLes ON 44 Bo�relacut?,
I,F Nor, IS �Nt2l ILoc�-ro pel0- G(FtS I (kr s�TE)
Thank you and regards
EXHIBIT B
INSURANCE REQUIREMENTS FOR
SERVICE CONTRACTS
Insurance
The Contractor shall procure and maintain for the duration of the Agreement,
insurance against claims for injuries to persons or damage to property which
may arise from or in connection with the performance of the work hereunder
by the Contractor, their agents, representatives, employees or
subcontractors.
A. Minimum Scope of Insurance
Contractor shall obtain insurance of the types described below:
1. Automobile Liability insurance covering all owned, non-
owned, hired and leased vehicles. Coverage shall be written
on Insurance Services Office (ISO) form CA 00 01 or a
substitute form providing equivalent liability coverage. If
necessary, the policy shall be endorsed to provide
contractual liability coverage.
Commercial General Liability insurance shall be written on
ISO occurrence form CG 00 01 and shall cover liability
arising from premises, operations, independent contractors,
products-completed operations, personal injury and
advertising injury, and liability assumed under an insured
contract. The Commercial General Liability insurance shall be
endorsed to provide the Aggregate Per Project Endorsement
ISO form CG 25 03 11 85. The City shall be named as an
insured under the Contractor's Commercial General Liability
insurance policy with respect to the work performed for the
City using ISO additional insured endorsement CG 20 10 11
85 or a substitute endorsement providing equivalent
coverage.
2. Workers' Compensation coverage as required by the
Industrial Insurance laws of the State of Washington.
B. Minimum Amounts of Insurance
Contractor shall maintain the following insurance limits:
1. Automobile Liability insurance with a minimum combined
single limit for bodily injury and property damage of
$1,000,000 per accident.
2. Commercial General Liability insurance shall be written with
limits no less than $1,000,000 each occurrence, $1,000,000
general aggregate and a $1,000,000 products-completed
operations aggregate limit.
EXHIBIT B (Continued )
C. Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following
provisions for Automobile Liability and Commercial General Liability
insurance:
1. The Contractor's insurance coverage shall be primary insurance as respect
the City. Any Insurance, self-insurance, or insurance pool coverage
maintained by the City shall be excess of the Contractor's insurance and
shall not contribute with it.
2. The Contractor's insurance shall be endorsed to state that coverage shall
not be cancelled by either party, except after thirty (30) days prior
written notice by certified mail, return receipt requested, has been given
to the City.
3. The City of Kent shall be named as an additional insured on all policies
(except Professional Liability) as respects work performed by or on behalf
of the contractor and a copy of the endorsement naming the City as
additional insured shall be attached to the Certificate of Insurance. The
City reserves the right to receive a certified copy of all required insurance
policies. The Contractor's Commercial General Liability insurance shall
also contain a clause stating that coverage shall apply separately to each
insured against whom claim is made or suit is brought, except with
respects to the limits of the insurer's liability.
D. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not
less than A:VII.
E. Verification of Coverage
Contractor shall furnish the City with original certificates and a copy of the
amendatory endorsements, including but not necessarily limited to the
additional insured endorsement, evidencing the insurance requirements of
the Contractor before commencement of the work.
F. Subcontractors
Contractor shall include all subcontractors as insureds under its policies or
shall furnish separate certificates and endorsements for each subcontractor.
All coverages for subcontractors shall be subject to all of the same insurance
requirements as stated herein for the Contractor.
07 06"2012 12. 02 2069373055 DON SWANSON INS PAGE 02/02
�+�p a DATE(MMODNY)
,C�St3L Q. "< f�" ,. 1' Rak� A ,'I' ' 07 05 Z 12
PRDDucep THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
DON SWANSON INSURANCE INC. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
4711 44TH AVE SW ALTER THE COVERAGE AFFORDED, BY THE POLICIES BELOW
COMPANIES AFFORDING COVERAGE
SEATTLE WA 98116 COMPANY
A EVANS.LUN INSUFzLNCE COMPANY
INSURED COMPANY 1
JOHN BOZEAT 6
DBA J BOZEAT & ASSOCIATES COMPANY
7333 CALIFORNIA AVE SW C
S EAT I ,E WA 98136 COMPANY
D
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY HEOUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MA`S PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXOI USIONS AMC) CONDITIONS Ott SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED DY PAID OL-AAME
CO TYPE OF INSUpANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPOIATION LIMITS
tTR DATE(MMMD/YY) DATE(MMIDDNYI
GENERAL LIABILITY 12 ELF 013 2 5 0 3 1 S 1 2 C 3 1 S 13 GENERAL AGGREGATE S i r 0 0 0 I 0 0 O
r--f.
X COMMERCIAL GENERAL LIABILITY PRODUCTS-COMPI 000 I O O O
—}CLAIMS MADE �� OCCUR PGRZONAL 8, •OV INJUD" &Z r tor,O , D O O
OWNER'S G GONTRACTOR'S PROTI, EACH OCCURRENCE g l , 0 0 0-1-0 0 0
FIRE DAM AG Z(Any one Ire) I$ 50 , 000
MED EAP(Any Ono pozon) S 5 , 000
AUTOMOBILE LIABILITY
COMBINED SINGLE LIMIT S
ANY AUTO
ALL OWNED AUTOS BODILY INJURY
SCHEDULED AUTOS (Per person)
niktU AU IOS BODILY INJURY d
NON OWNED AUTOS (Per anntdanl) ...-
PHDPtHIY DAMAGE $
OARAOE LIABILITY AUTO CNCY-EA ACCIDENT 3 __
ANY AUTO OTI ICR TVAN AUTO ONLY _
FACH DENT $
AGGREGATE S
EXCESS LIABILITY EACH OCCURRENCE g
UMERELLA FORM AGGPECPTE g —
OTHER THAN UMBRE11-A FORM E
6 ATU OTH-
WORKERS COMPENSATION AND TORY LIMIT
EMPLOYERS'UABILITY
EL EACH ACCIDENT g __
Trle Pao PaleTOar INCL I , EL DISEASE-POLICY LIMIT S
PARTN ERSIEXEGUTIVE
OFFICERS ARE EXCL I EL DISEASE-EA EMPLOYEE g
OTHER
DESCRIPTION OF OPERATIONS4.00A7IONSNENICLE&3PECIAL ITEMS
The City of Kent is named as an Additional Insured (as respects a specific
contract or for any and ail work performed witl-, the City) This insurance is
rima: and non-contrihuter over am insurance or self-ins . with the City
SHOULD ANY DE THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
City of Kent EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO MAIL
400 W e s L Gowe Street O DAYS WRITTEN NOTICE To THE CERTIFICATE HOLDER NAMED TO THE LEFT,
Kent, WA 98032 BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
OF NY KIN ON --,COMPANY IT'D AC NTS OR REPRESENTATIVES
AUTHORQE ;�,p 9E THE/
9
1IG �A �
07/19/2012 15:08 FAX 1 206 937 5793 J BOZEAT ASSOCIATES IM002/005
J.BOZE4T&ASSOCIATES,LLC
7333 CALIFORNIAAVE S.W.
- — - SEATTLE WA 98136-2112
POLICY NUMB R: 12ELF01325 (206)937-5719 COMMERCIAL GENERAL LIABILITY
CO 25 03 OB 09
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
DESIGNATED CONSTRUCTION PROJECT(S)
GENERAL AGGREGATE LIMIT
t. .,.
This endorsement modifies insurance provided undeirtheltillovAng:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
Designated Construcdon Project(s): City of Kent
Information required to complete this Schedule ifnot shown above will be shown in the Declarations.
A. For d sums which the Insured becomes legally S. Any payments made under Coverage A for
obligated to pay as damages caused by "oocur- damages or under Coverage C for medical
rences"under Section I—Coverage A,and for all expenses shall reduce the Designated Con-
medical expenses caused by accidents under struction Project General Aggregate Limit for
Section 1— Coverage C.which can be attributed that designated construction project Such
only to ongoing operations at a single designated payments shall not reduce the General Ag-
construction project shown it the Schedule gregate Limit shown in the Declarations nor
above: shall they reduce any other Designated Con-
1. A separate Designated Construction Project struction Project General Aggregate Umit for
General Aggregate Limit applies to each des- any other designated construction project
lgnated construction project, and that limit Is shown in the Schedule above.
equal to the amount of the General Aggregate 4. The limits shown in the Declarations for Each
Umit shown in the Declarations. Occurrence,Damage To Premises Rented To
2. The Designated Construction Project General You and Medical Expense continue to apply.
Aggregate Limit is the most we will pay for the However, instead of being subject to the
sum of all damages under Coverage A, ex- General Aggregate Urrot shown in the Decla-
cept damages because of "bodily injury" or nations,such limits will be subject to the app0-
"property damage" Included in the "products- cable Designated Construction Project Gen-
completed operations hazard% and for medi- eral Aggregate Limit.
cal expenses under Coverage C regardless of
the number of.'
a. Insureds;
b. Claims made or"suits"brought;or
c. Persons or organizations making claims or
bringing"suits".
CG 25 03 06 09 0 Insurance Services Office Inc. 2008 Pa9 e 1 of 2 Q
07/19/2012 15:08 FAX 1 206 937 5793 J BOZEAT ASSOCIATES [?]003/005
B. For all sums which the Insured becomes legally C. When coverage for liability arising out of the
obligated to pay as damages caused by "occur- "pmducts-completed operations hazard" Is pro-
rences"under Section 1—Coverage A.and for all vided, any payments for damages because of
medical expenses caused by accidents under "badly Injury' or "property damage" included in
Section 1 — Coverage C,which cannot be Ml>- the "products-completed operations hazard" will
uted only to ongoing operations at a single des- reduce the Products-complated Operations Ag-
Ignsted oonstnudion project shown in the Sched- gragate Limit, and not reduce the General Ag-
ule above: gregate Unit nor the Designated Constnxtion
1. Any payments made under Coverage A for eject General Aggregate UmIt
damages or under Coverage C for medical 0. If the applicable designated construction project
expenses shall reduce the amount available has been abandoned, delayed, or abandoned
under the General Aggregate Unit or the , and then restarted, or 5 the authorized contract
Products-completed Operations Aggregate hng partles deviate from plans, blueprints, de-
Unk,whichever is applicable,and signs,specifications or timetables,the project will
2. Such payments shall not reduoe any Desig- still be deemed to be the same construction pro-
nated Construction Project General Aggre. ject.
gate Limit. E. The provisions of Section all — Limits Of Insur-
ance not otherwise modified by this endorsement
shag continue to apply as stipulated
Page 2 of 2 0 Insurance Services Office, Inc.,2008 CG 25 03 05 09 0
Page 1of17
State of Washington
Department of Labor & Industries
Prevailing Wage Section - Telephone 360-902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate
of fringe benefits. On public works projects, worker's wage and benefit rates must add to
not less than this total. A brief description of overtime calculation requirements are
provided on the;B'enefit Code Key.
Journey Level Prevailing Wage Rates for the Effective Date:
7/2/2012
County Trade Job Classification Wage Holiday Overtimel Note
King Asbestos Abatement_Workers Journey Level $40 03 5D 1H
King Boilermakers Journey Level $60.24 514 1C
King Brick Mason Brick And Block Finisher $41.41 5A 1M
King Brick Mason Journey Level $48.27 5A 1M
King Brick Mason Pointer-Caulker-Cleaner $48.27 5A 1M
King Building Service Employees Janitor $19.52 5S 2F
King BuAdmg Service Em 1p oxees Traveling Waxer/shampooer $19.93 5S 2F
King Building Service Employees Window Cleaner (Scaffold) $23.94 5S 2F
King Building Service Employees Window Cleaner(non-scaffold) $23.08 5S 2F
King Cabinet Makers (In Shops Journey Level $22.74 1
King Carpenters Acoustical Worker $48.63 5D 1M
King Carpenters Bridge, Dock,And Wharf $48.47 5A 1M
Carpenters
King Carpenters Carpenter $48.47 5D 1M
King Carpenters Creosoted Material $48.57 5D 1M
King Carpenters Floor Finisher $48.60 5D 1M
King Carpenters Floor Layer $48.60 5D 1M
King Carpenters Floor Sander $48.60 5D 1M
King Carpenters Sawfiler $48.60 5D 1M
King Carpenters Shingler $48.60 5D 1M
King Carpenters Stationary Power Saw Operator $48.60 5D 1M
King Carpenters Stationary Woodworking Tools $48.60 5D 1M
King Cement Masons Journey Level $49.15 7A 1M
King Divers Et Tenders Diver $100.28 5D 1M 8A
King Divers Et Tenders Diver On Standby $56.68 5D 1M
King Divers Et Tenders Diver Tender $52.23 5D 1M
King Divers-Et Tenders Surface Rcv Et Rov Operator $52.23 5D 1M
King D_iv_ers_Ex Tenders Surface Rcv Et Rov Operator $48.67 5A 1B
rF
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 2 of 17
I
Tender
King Dredge Workers Assistant Engineer $49.57 5D 1T 8L
King Dredge Workers Assistant Mate(deckhand) $49.06 5D 1T 8L
King Dredge Workers Engineer Welder $49.62 5D 1T 8L
King Dredge Workers Leverman, Hydraulic $51.19 5D 1T 8L
King Dredge Workers Maintenance $49.06 5D 1T 8L
King Dredge Workers Mates And Boatmen $49.57 5D 1T 8L
King Dredpe Workers Oiler $49 19 5D 1T 8L
King Drywall A phcator Journey Level $48.47 5D 1M
King Drywall Tapers Journey Level $48.79 5P 1 E
King Electrical Fixture Maintenance Journey Level $25.34 5L 1E
Workers
King Electricians - Inside Cable Splicer $61.93 7C 2W
King Electricians - Inside Cable Splicer (tunnel) $66.55 7C 2W
King Electricians- Inside Certified Welder $59.83 7C 2W
King Electricians - Inside Certified Welder (tunnel) $64.23 7C 2W
King Electricians - Inside Construction Stock Person $31.83 7C 2W
King Electricians - Inside Journey Level $57.72 7C 2W
King Electricians - Inside Journey Level (tunnel) $61.93 7C 2W
King Electricians - Motor_Shop Craftsman $15.37 1
King Electricians - Motor Shop Journey Level $14 69 1
King Electricians- Powerline Cable Splicer $64.95 5A 4A
Construction
King Electricians - Powerline Certified Line Welder $59.37 5A 4A
Construction
King Electricians Powerline Groundperson $42.16 5A 4A
Construction
King Electricians -_Powerline Head Groundperson $44.50 5A 4A
Construction
King Electricians - Powerline Heavy Line Equipment $59.37 5A 4A
Construction Operator
King Electricians - Powerline Jackhammer Operator $44.50 5A 4A
Construction
King Electricians- Powerline Journey Level Lineperson $59.37 5A 4A
Construction
King Electricians Powerline Line Equipment Operator $49.95 5A 4A
Construction
King Electricians - Powerline Pole Sprayer $59.37 5A 4A
Construction
King Electricians - Powerline Powderperson $44.50 5A 4A
Construction
King Electronic Technicians Journey Level $31.00 1
King Elevator Constructors Mechanic $75 24 7D 4A
King Elevator Constructors Mechanic In Charge $82.00 7D 4A
King Fabricated Precast concrete All Classifications - In-Factory $14.15 5B 2K
Products Work Only
King Fence Erectors Fence Erector $15.18 1
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 3of17
King Flaggers Journey Level $33.93 7A 2Y
King Glaziers Journey Leven $50.91 7L 1Y
King Heat Et Frost Insulators And Journeyman $55.68 5J 1S
Asbestos Workers
King Heatine Epument Mechanics Journey Level $67 82 7F 1 E
King Hod Carriers Et Mason Tenders Journey Level $41.28 7A 2Y
King Industrial Engine And Machine Journey Level $15.65 1
Mechanics
King Industrial Power Vacuum Journey Level $9.24 1
Cleaner
King Inland Boatmen Boat Operator $51.95 5B 1 K
King Inland Boatmen Cook $48.62 5B 1K
King Inland Boatmen Deckhand $48.62 5B 1K
King Inland Boatmen Deckhand Engineer $49.60 5B 1K
King Inland Boatmen Launch Operator $50.80 5B 1K
King Inland Boatmen Mate $50.80 5B 1K
King Inspection/Cleamng/Seating Of Cleaner Operator, Foamer $31.49 1
Sewer Et Water Systems-By Operator
Remote Control
King Inspection/Cleamng/Sealing Of Grout Truck Operator $11.48 1
Sewer Et Water Systems By
Remote Control
King Inspection/CleaninglSealing-Of Head Operator $24.91 1
Sewer Et Water Systems-By
Remote Control
King Inspection/Cleaning/Seating Of Technician $19.33 1
Sewer Et Water Systems By
Remote Control
King Inspection/CleaninQ/Sealing- f Tv Truck Operator $20.45 1
Sewer Et Water Systems By
Remote Control
King Insulation Apphcators Journey Level $48.47 5D 1M
King Ironworkers Journeyman $58.27 7N 10
King Laborers Air, Gas Or Electric Vibrating $40 03 7A 2Y
Screed
King Laborers Airtrac Drill Operator $41.28 7A 2Y
King Laborers Ballast Regular Machine $40.03 7A 2Y
King Laborers Batch Weighman $33.93 7A 2Y
King Laborers Brick Pavers, $40.03 7A 2Y
King Laborers Brush Cutter. '' $40.03 7A 2Y
King Laborers Brush Hog Feeder $40.03 7A 2Y
King Laborers Burner $40.03 7A 2Y
King Laborers Caisson Worker $41 28 7A 2Y
King Laborers Carpenter Tender $40.03 7A 2Y
King Laborers Caulker $40.03 7A 2Y
King Laborers Cement Dumper-paving $40.77 7A 2Y
King Laborers Cement Finisher Tender $40.03 7A 2Y
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 4of17
King Laborers Change House Or Dry Shack $40.03 7A 2Y
King Laborers Chipping Gun (under 30 Lbs.) $40.03 7A 2Y
King Laborers Chipping Gun(30 Lbs. And $40.77 7A 2Y
Over)
King Laborers Choker Setter $40.03 7A 2Y
King Laborers Chuck Tender $40.03 7A 2Y
King Laborers Clary Power•Spreader $40.77 7A 2Y
King Laborers Cleanup Laborer $40.03 7A 2Y
King Laborers Concrete Dumper/chute $40.77 7A 2Y
Operator
King Laborers Concrete Form Stripper $40.03 7A 2Y
King Laborers Concrete Placement Crew $40.77 7A 2Y
King Laborers Concrete Saw Operator/core $40.77 7A 2Y
Driller
King Laborers Crusher Feeder $33.93 7A 2Y
King Laborers Curing Laborer $40.03 7A 2Y
King Laborers Demolition: Wrecking £t Moving $40.03 7A 2Y
(incl. Charred Material)
King Laborers Ditch Digger $40.03 7A 2Y
King Laborers Diver $41.28 7A 2Y
King Laborers Drill Operator $40.77 7A 2Y
(hydraulic,diamond)
King Laborers Dry Stack Walls $40.03 7A 2Y
King Laborers Dump Person $40.03 7A 2Y
King Laborers Epoxy Technician $40.03 7A 2Y
King Laborers Erosion Control Worker $40.03 7A 2Y
King Laborers Faller Et Bucker Chain Saw $40.77 7A 2Y
King Laborers Fine Graders $40.03 7A 2Y
King Laborers Firewatch $33.93 7A 2Y
King Laborers Form Setter $40.03 7A 2Y
King Laborers Gabian Basket Builders $40.03 7A 2Y
King Laborers General Laborer $40.03 7A 2Y
King Laborers Grade Checker Et Transit $41.28 7A 2Y
Person
King Laborers Grinders $40.03 7A 2Y
King Laborers Grout Machine Tender $40.03 7A 2Y
King Laborers Groutmen (pressure)including $40.77 7A 2Y
Post Tension Beams
King Laborers Guardrail Erector $40 03 7A 2Y
King Laborers Hazardous Waste Worker (level $41.28 7A 2Y
A)
King Laborers Hazardous Waste Worker (level $40.77 7A 2Y
B)
King Laborers Hazardous Waste Worker (level $40 03 7A 2Y
C)
King I Laborers I High Scaler $41.281 7A I 2Y
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 5 of 17
King Laborers Jackhammer $40.77 7A 2Y
King Laborers Laserbeam Operator $40.77 7A 2Y
King Laborers Maintenance Person $40.03 7A 2Y
King Laborers Manhole Builder-mudman $40.77 7A 2Y
King Laborers Material Yard Person $40.03 7A 2Y
King Laborers Motorman-dinky Locomotive $40.77 7A 2Y
King Laborers Nozzleman (concrete Pump, $40.77 7A 2Y
Green Cutter When Using
Combination Of High Pressure
Air Et Water On Concrete It
Rock, Sandblast, Gumte,
Shotcrete, Water Bla
King Laborers Pavement Breaker $40.77 7A 2Y
King Laborers Pilot Car $33.93 7A 2Y
King Laborers Pipe Layer Lead $41 28 7A 2Y
King Laborers Pipe Layer/taitor $40.77 7A 2Y
King Laborers Pipe Pot Tender $40.77 7A 2Y
King Laborers Pipe Reliner $40.77 7A 2Y
King Laborers Pipe Wrapper $40.77 7A 2Y
King Laborers Pot Tender $40.03 7A 2Y
King Laborers Powderman $41.28 7A 2Y
King Laborers Powderman's Helper $40.03 7A 2Y
King Laborers Power Jacks $40.77 7A 2Y
King Laborers Railroad Spike Puller - Power $40.77 7A 2Y
King Laborers Raker - Asphalt $41.28 7A 2Y
King Laborers Re-timberman $41.28 7A 2Y
King Laborers Remote Equipment Operator $40.77 7A 2Y
King Laborers Rigger/signal Person $40.77 7A 2Y
King Laborers Rip Rap Person $40.03 7A 2Y
King Laborers Rivet Buster,' ,, $40.77 7A 2Y
King Laborers Rodder 4 $40.77 7A 2Y
King Laborers Scaffold Erector $40 03 7A 2Y
King Laborers Scale Person $40.03 7A 2Y
King Laborers Sloper (over 20") $40.77 7A 2Y
King Laborers SloperSprayer $40.03 7A 2Y
King Laborers Spreader (concrete) $40.77 7A 2Y
King Laborers Stake Hopper $40.03 7A 2Y
King Laborers Stock Piler $40.03 7A 2Y
King Laborers Tamper Et Similar Electric, Air $40.77 7A 2Y
Et Gas Operated Tools
King Laborers Tamper (multiple Et Self- $40.77 7A 2Y
propelled)
King Laborers Timber Person - Sewer (lagger, $40.77 7A 2Y
Shorer Et Cribber)
King Laborers Toolroom Person (at Jobsite) $40.03 7A 2Y
King Laborers Topper $40.03 7A 2Y
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 6 of 17
King Laborers Track Laborer $40.03 7A 2Y
King Laborers Track Liner (power) $40.77 7A 2Y
King Laborers Truck Spotter $40.03 7A 2Y
King Laborers Tugger Operator $40.77 7A 2Y
King Laborers Tunnel Work-Compressed Air $52.08 7A 2Y BQ
Worker 0-30 psi
King Laborers Tunnel Work-Compressed Air $57.08 7A 2Y 8Q
Worker 30.01-44.00 psi
King Laborers Tunnel Work-Compressed Air $60.76 7A 2Y 8Q
Worker 44.01-54.00 psi
King Laborers Tunnel Work-Compressed Air $66.46 7A 2Y 8g
Worker 54.01-60.00 psi
King Laborers Tunnel Work-Compressed Air $68.58 7A 2Y 88
Worker 60.01-64.00 psi
King Laborers Tunnel Work-Compressed Air $73.68 7A 2Y 84
Worker 64.01-68 00 psi
King Laborers Tunnel Work-Compressed Air $75.58 7A 2Y 88Q
Worker 68.01.70.00 psi
King Laborers Tunnel Work-Guage and Lock $41.38 7A 2Y 84
Tender
King Laborers Tunnel Work-Miner $41.38 7A 2Y M
King Laborers Vibrator $40.77 7A 2Y
King Laborers Vinyl Seamer $40.03 7A 2Y
King Laborers Watchman $30.84 7A 2Y
King Laborers Welder $40.77 7A 2Y
King Laborers Well Point Laborer $40 77 7A 2Y
King Laborers Window Washer/cleaner $30.84 7A 2Y
King Laborers - Underground Sewer General Laborer Et Topman $40.03 7A 2Y
Et Water
King Laborers - Underground Sewer Pipe Layer $40.77 7A 2Y
$ Water
King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1
Installers
King Landscape Construction Landscape Equipment $28.17 1
Operators Or Truck Drivers
King Landscape Construction Landscaping or Planting $17.87 1
Laborers
King Lathers Journey Level $48.74 5D 1H
King Marble Setters Journey Level $48.27 5A I 1M
King Metal Fabrication (In Shop) Fitter $15 86 1
King Metal Fabrication In Shop) Laborer $9.78 1
King Metal Fabrication (In Shoo Machine Operator $13.04 1
King Metal Fabrication (In Shoe Painter $11.10 1
King Metal FabricationAin_Shop) Welder $15.48 1
King Millwright Journey Level $49.47 5D 1M
King Modular Buildings Cabinet Assembly $11.56 1
King Modular Buildings Electrician $11 56 1
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 7 of 17
King Modular Buildings Equipment Maintenance $11.56 1
11.56 1
Kin Modular Buildings Plumber $ _
g �
King Modular Buildings Production Worker $9.40 1
King Modular Buildings Tool Maintenance $11.56 1
King Modular Buildings Utility Person $11.56 1
King Modular Buildings Welder $11.56 1
King Painters Journey Level $35.72 6Z 2B
King Pile Driver Journey Level $48.67 5A 1M
King Plasterers Journey Level $46.88 7ZQ 1R
King Playground 8 Park Equipment Journey Level $9.04 1
Installers
King Plumbers Et Pmefitters Journey Level $70.84 6Z 1G
King Power Equipment Operators Asphalt Plant Operators $50.39 7A 1T 8P
King Power Equipment Operators Assistant Engineer $47.12 7A 1T 8P
King Power Equipment Operators Barrier Machine (zipper) $49.90 7A 1T 8P
King Power Equipment Operators Batch Plant Operator, $49.90 7A 1T 8P
Concrete
King Rower-Equipment Operators Bobcat $47.12 7A 1T 8P
King Power Equipment Operators Brokk - Remote Demolition $47.12 7A 1T 8P
Equipment
King Power Equipment Operators Brooms $47.12 7A 1T 8P
King Power Equipment Operators Bump Cutter; $49.90 7A 1T 8P
King Power E ui ment_Operators Cableways ; $50.39 7A 1T 8P
King Power Equipment Operators Chipper $49.90 7A 1T 8P
King Power Equipment Operators Compressor $47.12 7A 1T 8P
King Power Equipment Operators Concrete Pump: Truck Mount $50.39 7A 1T 813
With Boom Attachment Over
42 M
King Power Equipment Operators Concrete Finish Machine -laser $47.12 7A 1T 8P
Screed
King Power Equipment Operators Concrete Pump - Mounted Or $49.48 7A 1T 8P
Trailer High Pressure Line
Pump, Pump High Pressure.
King Power Equipment Operators Concrete Pump- Truck Mount $49.90 7A 1T 8P
With Boom Attachment Up To
42m
King Power Equipment Operators Conveyors $49.48 7A 1T 8P
King Power Equipment aerators Cranes: 20 Tons Through 44 $49.90 7A 1T 8P
Tons With Attachments
Overhead, Bridge Type Crane:
20 Tons Through 44 Tons
King Power Equipment Operators Cranes: 100 Tons Through 199 $50.94 7A 1T 8P
Tons, or 150' of boom
(including jib with
attachments); Overhead,
bridge type, 100 tons and over;
Tower crane up to 175' in
height, base to boom.
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 7/2/2012
Page 8 of 17
Y
King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $51.51 7A 1T 8P
Or 250' Of Boom (including Jib
With Attachments)
King Power Equipment Operators Cranes: 45 Tons Through 99 $50.39 7A 1T 8P
Tons, Under 150' Of Boom
(including Jib With
Attachments)
King Power Equipment Operators Cranes: A-frame - 10 Tons And $47.12 7A 1T 8P
Under
King Power Equipment Operators Cranes: Friction 100 Tons $51.51 7A 1T 8P
Through199 Tons
King Power EquipmeRt Operators Cranes: Friction Over 200 Tons $52.07 7A 1T 8P
King Power Equipment Operators Cranes: Over 300 Tons Or 300' $52.07 7A 1T 8P
Of Boom (including Jib With
Attachments)
King Power Equipment Operators Cranes: Through 19 Tons With $49.48 7A 1T 8P
Attachments A-frame Over 10
Tons
King Power Equipment Operators Crusher $49.90 7A 1T 8P
King Power E ui ment Operators Deck Engineer/deck Winches $49.90 7A 1T 8P
(power)
King Power Equipment Operators Derricks, On Building Work $50.39 7A 1T 8P
King P_owerE uipment Operators Dozer Quad 9, HD 41, D10 and $50 39 7A 1T 8P
Over
King Power Equipment Operators Dozers D-9 Et Under $49.48 7A 1T 8P
King Power Equipment Operators Drill Oilers: Auger Type, Truck $49.48 7A 1T 8P
Or Crane Mount
King Power Equipment Operators Drilling Machine $49.90 7A 1T 8P
King Power Equipment Operators Elevator And Man-lift: $47.12 7A 1T 8P
Permanent And Shaft Type
King Power Equipment Operators Finishing Machine, Bidwell And $49.90 7A 1T 8P
Gamaco Et Similar Equipment
King Power Equipment Operators Forklift: 3000 Lbs And Over $49.48 7A 1T 8P
With Attachments
King Power Equipment Operators Forklifts: Under 3000 Lbs. With $47.12 7A 1T 8P
Attachments
King Power Equipment Operators Grade Engineer: Using Blue $49.90 7A 1T 8P
Prints, Cut Sheets, Etc
King Power Equipment Operators Gradechecker/stakeman $47.12 7A 1T 8P
King Power Equipment Operators Guardrail Punch/Auger $49.90 7A 1T 8P
King Power Equipment Operators Hard Tail End Dump $50.39 7A 1T 8P
Articulating Off- Road
Equipment 45 Yards. Et Over
King Power Equipment Operators Hard Tail End Dump $49.90 7A 1T 8P
Articulating Off-road
Equipment Under 45 Yards
King Power Equipment Operators Horizontal/directional Drill $49.48 7A 1T 8P
Locator
King Power EquiQment Operators Horizontal/directional Drill $49.90 7A 1T 8P
Operator
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 7/2/2012
Page 9 of 17
King Power Equipment Operators Hydralifts/boom Trucks Over $49.48 7A 1T 8P
10 Tons
King Power Equipment Operators Hydralifts/boom Trucks, 10 $47.12 7A 1T 8P
Tons And Under
King Power E ui ment Operators Loader, Overhead 8 Yards. a $50.94 7A 1T 8P
Over
King _Power Equipment Operators Loader, Overhead, 6 Yards. But $50.39 7A 1T BP
Not Including 8 Yards
King Power Equipment Operators Loaders, Overhead Under 6 $49.90 7A 1T 8P
Yards
King Power Equipment Operators Loaders, Plant Feed $49.90 7A 1T 8P
King Power E ui merit Operators Loaders: Elevating Type Belt $49.48 7A 1T 8P
King Power Eqment Operators Locomotives, All $49.90 7A 1T 8P
King Power Equipment Operators Material Transfer Device $49.90 7A 1T 8P
King Power Equipment Operators Mechanics, All (leadmen - $50.94 7A 1T 8P
$0.50 Per Hour Over Mechanic)
King Power Equipment Operators Mixers: Asphalt Plant $49.90 7A 1T 8P
King Power Equipment Operators Motor Patrol Grader - Non- $49.48 7A 1T 8P
finishing
King Power Equipment._Operators Motor Patrol Graders, Finishing $50.39 7A 1T 8P
King Power Equipment Operators Mucking Machine, Mole, Tunnel $50.39 7A 1T 8P
Drill, Boring, Road Header
And/or Shield
King Power Equipment Operators Oil Distributors, Blower $47.12 7A 1T 8P
Distribution Et Mulch Seeding
Operator
King Power_Equipment Operators Outside Hoists (elevators And $49.48 7A 1T 8P
Manlifts), Air Tuggers,strato
King Power Equipment Operators Overhead, Bridge Type: 45 $50.39 7A 1T 8P
Tons Through 99 Tons
King Power_Equipment_Operators Pavement Breaker $47.12 7A 1T 8P
King Power Equipment Operators Pile Driver (other Than Crane $49.90 7A 1T 8P
Mount)
King Power Equipment Operators Plant Oiler - Asphalt, Crusher $49.48 7A 1T 1 8P
King Power Equipment Operators Posthole Digger, Mechanical $47.12 7A 1T 8P
King Power Equipment Operators Power Plant $47.12 7A 1T 8P
King Power Equipment operators Pumps - Water $47.12 7A 1T 8P
King Power Equipment Operators Quick Tower No Cab, Under $47.12 7A 1T 8P
100 Feet in Height Based To
Boom
King Power Equipment Operators Remote Control Operator On $50.39 7A 1T 8P
Rubber Tired Earth Moving
Equipment
King Power Equipment Operators Rigger And Bellman $47.12 7A 1T 8P
King Power Equipment Operators Rollagon $50.39 7A 1T 8P
King Power Equipment Operators Roller, Other Than Plant Mix $47.12 7A 1T 8P
King Power Equipment Operators Roller, Plant Mix Or Multi-hft $49.48 7A 1T 8P
Materials
https://fortress,wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 10 of 17
King Power Equipment Operators Roto-mill, Roto-grinder $49.901 7A 1T 8P
King Power Equipment Operators Saws - Concr'ete $49.48 7A 1T 8P
King Power Equipment Operators Scraper, Self Propelled Under $49.90 7A 1T 8P
45 Yards
King Power Equipment Operators Scrapers - Concrete Et Carry All $49.48 7A 1T 8P
King Power Equipment Operators Scrapers, Self-propelled: 45 $50.39 7A 1T 8P
Yards And Over
King Power Equipment Operators Service Engineers - Equipment $49.48 7A 1T 8P
King Power Equipment Operators Shotcrete/gunite Equipment $47.12 7A 1T 8P
King Power Equment Operators Shovel , Excavator, Backhoe, $49.48 7A 1T 8P
Tractors Under 15 Metric Tons.
King Power Equipment Operators Shovel, Excavator, Backhoe: $50.39 7A 1T 8P
Over 30 Metric Tons To 50
Metric Tons
King Power Equipment Operators Shovel, Excavator, Backhoes, $49.90 7A 1T 8P
Tractors: 15 To 30 Metric Tons
King Power Equipment Operators Shovel, Excavator, Backhoes: $50.94 7A 1T 8P
Over 50 Metric Tons To 90
Metric Tons
King Power Equipment Operators Shovel, Excavator, Backhoes: $51.51 7A 1T 8P
Over 90 Metric Tons
King Power Equipment Operators Slipform Pavers $50.39 7A 1T 8P
King Power Equipment Operators Spreader, Topsider Et $50.39 7A 1T 8P
Screedman
King Power Equipment Operators Subgrader Trimmer $49.90 7A 1T 8P
King Power Equipment Operators Tower Bucket Elevators $49.48 7A 1T 8P
King Power Equipment Operators Tower Crane Over 175'in $51.51 7A 1T 8P
Height, Base To Boom
King Power Equipment 0 erp ators Tower Crane Up To 175' In $50.94 7A 1T 8P
Height Base To Boom
King Power Equipment Operators Transporters, All Track Or $50.39 7A 1T 8P
Truck Type
King Power Equipment Operators Trenching Machines $49.48 7A 1T 8P
King Power Equipment Operators Truck Crane Oiler/driver - 100 $49 90 7A 1T 8P
Tons And Over
King Power Equipment Operators Truck Crane Oiler/driver Under $49.48 7A 1T 8P
100 Tons
King Power Equipment Operators Truck Mount Portable Conveyor $49.90 7A 1T 8P
King Power E ui merit Operators Welder $50.39 7A 1T 8P
King Power E ui ment Operators Wheel Tractors, Farman Type $47.12 7A 1T 8P
King Power Equipment Operators Yo Yo Pay Dozcr $49.90 7A 1T 8P
King Power Equipment Operators- Asphalt Plant Operators $50.39 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Assistant Engineer $47 12 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Barrier Machine (zipper) $49.90 7A 1T 8P
Undergrround Sewer Et Water
King Power Equipment Operators Batch Plant Operator, $49.90 7A 1T 8P
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 11 of 17
Underground Sewer Et Water Concrete
King Power Equipment Operators- Bobcat $47.12 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Brokk - Remote Demolition $47.12 7A 1T 8P
Underground Sewer Et Water Equipment
King Power-Equipment Operators- Brooms $47.12 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Bump Cutter' $49 90 7A 1T 8P
Under round Sewer Et Water
King Power Equipment Operators- Cableways $50.39 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Chipper $49.90 ZA 1T 8P
Underground Sewer Et Water
King Power E ui merit Operators- Compressor $47.12 7A 1T 8P
Underground Sewer Et Water
King Power E uV ment Operators- Concrete Pump: Truck Mount $50.39 7A 1T 8P
Underground Sewer Et Water With Boom Attachment Over
42 M
King Power Eauioment Operators- Concrete Finish Machine -laser $47.12 7A 1T 8P
d Se Undergrounwer Et Water Screed
King Power Equipment Operators- Concrete Pump - Mounted Or $49.48 7A 1T 8P
Underground Sewer Et Water Trailer High Pressure Line
Pump, Pump High Pressure.
King Power Equipment Operators- Concrete Pump: Truck Mount $49.90 7A 1T 8P
Underground Sewer ii Water With Boom Attachment Up To
42m
King Power Equipment-Operators- Conveyors $49.48 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Cranes: 20 Tons Through 44 $49.90 7A iT 8P
Underground Sewer Et Water Tons With Attachments
Overhead, Bridge Type Crane:
20 Tons Through 44 Tons
King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $51.51 7A 1T 8P
Underground Sewer Et Water Or 250' Of Boom (including Jib
With Attachments)
King Power Equipment Operators- Cranes: 45 Tons Through 99 $50.39 7A 1T 8P
Underground Sewer Et Water Tons, Under 150' Of Boom
(including Jib With
Attachments)
King Power Equipment Operators- Cranes: A-frame - 10 Tons And $47.12 7A 1T 8P
Underground Sewer Et Water Under
King Power E uq ipment Operators Cranes: Friction 100 Tons $51.51 7A 1T 8P
Underground Sewer Et Water Through 199 Tons
King Power Equipment Operators- Cranes: Friction Over 200 Tons $52.07 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators Cranes: Over 300 Tons Or 300' $52 07 7A 1T 8P
Underground Sewer Et Water Of Boom (including Jib With
Attachments)
King Power Equipment Operators- Cranes: Through 19 Tons With $49.48 7A 1T 8P
Underground Sewer Et Water Attachments�A-frame Over 10
Tons
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 12 of 17
King Power Equipment Operators- Crusher $49.90 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Deck Engineer/deck Winches $49.90 7A 1T 8P
Underground Sewer Et Water (power)
King Power Equipment Operators- Derricks, On Building Work $50.39 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Dozer Quad 9, HD 41, D10 and $50 39 7A 1T 8P
Under round Sewer Et Water Over
King Power Equipment Operators- Dozers D-9 8t Under $49.48 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Drill Oilers: Auger Type, Truck $49.48 7A 1T 8P
Underground Sewer & Water Or Crane Mount
King Power Equipment Operators- Drilling Machine $49.90 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Elevator And Man-lift- $47.12 7A 1T 8P
Underground Sewer Et Water Permanent And Shaft Type
King Power Equipment Operators- Finishing Machine, Bidwell And $49.90 7A 1T 8P
Underground Sewer Et Water Gamaco Et Similar Equipment
King Power Eq jpment Operators- Forklift: 3000 Lbs And Over $49.48 7A 1T 8P
Underground Sewer Et Water With Attachments
King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $47.12 7A 1T 8P
Underground Sewer & Water Attachments
King Power Equipment Operators- Grade Engineer: Using Blue $49.90 7A 1T 8P
Underground_Sewer 8t Water Prints, Cut Sheets, Etc
King Power Equipment Operators- Gradechecker/stakeman $47.12 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Guardrail Punch/Auger $49.90 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Hard Tail End Dump $50.39 7A 1T 8P
Underground Sewer Et Water Articulating Off- Road
Equipment 45 Yards. 8t Over
King Power Equipment Operators- Hard Tail End Dump $49 90 7A 1T 8P
Underground Sewer Et Water Articulating Off-road
Equipment Under 45 Yards
King Power Equipment Operators_ Horizontal/ritrectional Drill $49.48 7A 1T 8P
Underground Sewer Et Water Locator
King Power Equipment Operators- Horizontal/directional Drill $49 90 7A 17 8P
Underground Sewer Et Water Operator
King Power Equipment 0perators- Hydralifts/boom Trucks Over $49.48 7A 1T 8P
Underground Sewer Et Water 10 Tons
King Power Equipment Operators- Hydrahfts/boom Trucks, 10 $47.12 7A 1T 8P
Underground Sewer Et Water Tons And Under
King Power Equipment Operators- Loader, Overhead 8 Yards. Et $50.94 7A 1T 8P
Underground Sewer Et Water Over
King Power Equipment Operators- Loader, Overhead, 6 Yards. But $50.39 7A 1T 8P
Underground Sewer Et Water Not Including 8 Yards
King Power Equipment Operators- Loaders, Overhead Under 6 $49.90 7A 1T 8P
Underground Sewer Et Water Yards
King Power Equipment Operators- Loaders, Plant Feed $49.90 7A 1T 8P
Underground Sewer_Et Water
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 13of17
-t.
King Power Equipment Operators- Loaders: Elevating Type Belt $49.48 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Locomotives, All $49.90 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Material Transfer Device $49.90 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Mechanics, All (leadmen - $50.94 7A 1T 8P
Underground Sewer Et Water $0.50 Per Hour Over Mechanic)
King Power Equipment Operators- Mixers: Asphalt Plant $49.90 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Motor Patrol Grader - Non- $49.48 7A 1T 8P
Underground Sewer Et Water finishing
King Power E ui merit Operators- Motor Patrol Graders, Finishing $50.39 7A 1T 8P
Under round Sewer 8t Water
King Power Equipment Operators- Mucking Machine, Mole, Tunnel $50.39 7A 1T 8P
Underground Sewer Et Water Drill, Boring, Road Header
And/or Shield
King Power Equipment Operators- Oil Distributors, Blower $47.12 7A 1T 8P
Underground Sewer Et Water Distribution Et Mulch Seeding
Operator
King Power Equipment Operators- Outside Hoists (elevators And $49.48 7A 1T 8P
Underground Sewer Et Water Manlifts), Air Tuggers,strato
King Power Equipment Operators- Overhead, Bridge Type: 45 $50.39 7A 1T 8P
Underground Sewer Et Water Tons Through 99 Tons
King Power-Equipment Operators- Pavement Breaker $47.12 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Pile Driver (other Than Crane $49.90 7A 9T 8P
Underground Sewer Et Water Mount)
King Power Equipment Operators- Plant Oiler- Asphalt, Crusher $49.48 7A 1T 8P
Underground Sewer Et Water
King Power Equui merit Operators- Posthole Digger, Mechanical $47.12 7A 1T 8P
Underground Sewer_8t Water
King Power Equipment Operators_ Power Plant $47.12 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Pumps - Water $47 12 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Quick Tower - No Cab, Under $47.12 7A 1T 8P
Underground Sewer Et Water 100 Feet In Height Based To
Boom
King Power Equipment Operators- Remote Control Operator On $50.39 7A 1T 8P
Underground Sewer Et Water Rubber Tired Earth Moving
Equipment
King Power Equipment Operators- Rigger And BeRman $47.12 7A 1T 8P
Undergro_u_nd Sewer Et Water
King Power Equipment Operators- Rollagon $50.39 7A 1T 8P
Underground Sewer It Water
King Power Equipment Operators- Roller, Other Than Plant Mix $47.12 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $49.48 7A 1T 8P
Underground Sewer a Water Materials
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 14 of 17
King Power Equipment Operators- Roto-mill, Roto-grinder $49.90 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Saws - Concrete $49.48 7A 1T 8P
Underground Sewer Et Water
King Power Equipment-Operators- Scraper, Self Propelled Under $49.90 7A 1T 8P
Underground Sewer Et Water 45 Yards
King Power Equipment Operators- Scrapers - Concrete Et Carry All $49.48 7A 1T 8P
Underground_Sewer Et Water
King Power Equipment Operators- Scrapers, Self-propelled: 45 $50.39 7A 1T 8P
Underground Sewer Et Water Yards And Over
King Power Equipment Operators- Service Engineers - Equipment $49.48 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Shotcrete/gunite Equipment $47.12 7A 1T 8P
Underground Sewer ft Water
King Power Equipment Operators- Shovel , Excavator, Backhoe, $49.48 7A 1T 8P
Underground-Sewer Et Water Tractors Under 15 Metric Tons.
King Power Equipment Operators- Shovel, Excavator, Backhoe: $50 39 7A 1T 8P
Underground Sewer _Et_ Water Over 30 Metric Tons To 50
Metric Tons
King Power Equipment Operators- Shovel, Excavator, Backhoes, $49.90 7A 1T 8P
Underground Sewer Et Water Tractors: 15 To 30 Metric Tons
King Power Equipment Operators- Shovel, Excavator, Backhoes: $50.94 7A 1T 8P
Underground Sewer Et Water Over 50 Metric Tons To 90
Metric Tons
King Power Equipment Operators_ Shovel, Excavator, Backhoes: $51.51 7A 1T 8P
Underground Sewer Et Water Over 90 Metric Tons
King Power Equipment Operators- Shpform Pavers $50.39 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Spreader, Topsider 8: $50.39 7A 1T 8P
Underground Sewer Et Water Screedman
King Power E ui merit O-erators- Subgrader Trimmer $49.90 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators_ Tower Bucket Elevators $49.48 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Tower Crane Over 175'in $51.51 7A 1T 8P
Underground Sewer Et Water Height, Base To Boom
King Power Equipment Operators_ Tower Crane Up To 175' In $50.94 7A 1T 8P
Underground Sewer Et Water Height Base To Boom
King Power Equipment Operators- Transporters, All Track Or $50.39 7A 1T 8P
UndergroundSewerA_Water Truck Type
King Power Equipment Operators- Trenching Machines $49.48 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators- Truck Crane Oiler/driver - 100 $49.90 7A 1T 8P
Underground Sewer Et Water Tons And Over
King Power Equipment Operators_ Truck Crane Oiler/driver Under $49.48 7A 1T 8P
Underground Sewer Et Water 100 Tons
King Power Equipment Operators- Truck Mount Portable Conveyor $49 90 7A 1T 8P
Underground Sewer Et Water
King Power Equipment-Operators Welder $50.39 7A 1T 8P
Undereround_Sewer_Et Water
https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 7/2/2012
Page 15 of 17
King Power Equipment Operators- Wheel Tractors, Farman Type $47.12 7A 1T 8P
Underground Sewer Et Water
King Power Equipment Operators-, Yo Yo Pay Dozer $49.90 7A 1T 8P
Underground Sewer &_Water
King Power Line Clearance Tree Journey Level In Charge $42 91 5A 4A
Trimmers
King Power Line Cl_earanceTree Spray Person $40.73 5A 4A
Trimmers
King Power Line Clearance Tree Tree Equipment Operator $41.29 5A 4A
Trimmers
King Power Line Clearance Tree Tree Trimmer $38.38 5A 4A
Trimmers
King Power Line Clearance Tree Tree Trimmer Groundperson $28.95 5A 4A
Trimmers
King Refrigeration Et Air Journey Level $69.96 6Z 1G
Conditioning Mechanics
King Residential Brick Mason Journey Level $48.27 5A 1M
King Residential Carpenters Journey Level $28 20 1
King Residential Cement Masons-- Journey Level $22.64 1
King Residential Drywall Applicators Journey Level $38.08 5D 1M
King Residential Drywall Tapers Journey Level $48.79 5P 1 E
King Residential Electricians JOURNEY LEVEL $30.44 1
King Residential Glaziers Journey Level $34.60 71. 1H
King Residential Insulation Journey Level $26.28 1
Aphcators
King Residential Laborers Journey Level $23.03 1
King Residential Marble Setters Journey Level $24.09 1
King Residential Painters Journey Level $24.46 1
King Residential Plumbers a. Journey Level $34.69 1
Pi�efitters
King Residential Refrigeration 8 Air Journey Lev-el, $69.96 6Z 115
Conditioning_Mechanics
King Residential Sheet Metal Journey Level (Field or Shop) $40.04 7F 1R
Workers
King Residential Soft Floor Layers Journey Level $41.95 5A 2Z
King Residential Sprinkler Fitters Journey Level $41.31 5C 2R
(Fire Protection)
King Residential Stone Masons Journey Level $48.27 5A 9M
King Residential Terrazzo Workers Journey Level $43.93 5A 1M
King Residential Terrazzo/Tile Journey Level $21.46 1
Finishers
King Residential Tile Setters Journey Level $25.17 1
King Roofers Journey Level $43.65 5A 1 R
King Roofers Using Irritable Bituminous $46.65 5A 111
Materials
King Sheet Metal Workers Journey Level (Field or Shop) $67.82 7F 1E
King Shipbuilding Et-Ship-Repair Boilermaker $35.83 7M 1H
https://fortress.wa.gov/lnl/wagelookup/prvWagelookup.aspx 7/2/2012
a ,
Page 16 of 17
King Shiibuilding a Shi Rp epair Carpenter $36.62 70 3B
King Shipbuildine£t Ship Repair Electrician $36.23 70 3B
King Shipbuilding 8 Ship Repair Heat Et Frost Insulator $55.68 5J 1s
King Shipbuilding 8 Ship Repair Laborer $34.82 70 3B
King Shipbuilding 8 Ship Repair Machinist $36.19 70 3B
King Shipbuilding 8 Ship Repair Operator $38.58 70 3B
King Shipbuilding 8 Ship Repair Painter $36.211 70 3B
King Shipbuilding 8 Ship Repair Pipefitter $36.16 70 3B
King Shipbuilding a Ship Repair Rigger $36.16 70 3B
King Shipbuilding 8 Ship Repair Sandblaster $35.17 70 3B
King Shipbuilding, Et Ship Repair Sheet Metal $36.14 70 3B
King Shipbuilding 8 Ship Repair Shipfitter $36.16 70 3B
King Shipbuilding 8 Ship Repair Trucker $36.00 70 3B
King Shipbuilding 8 Ship Repair Warehouse $36.06 70 3B
King Shipbuilding 8 Ship Repair Welder/Burner $36.16 70 3B
King Sign Makers 8 Installers Sign Installer $22.92 1
(Electrical
King Sin Makers 8 Installers Sign Maker $21.36 1
(Electrical)
King Sign Makers 8 Installers (Non- Sign Installer $27 28 1
Electrical)
King Sin Makers 8 Installers (Non- Sign Maker $33.25 1
Electrical
King Soft Floor Layers Journey Level $41.95 5A 2Z
King Solar Controls For Windows Journey Level $12.44 1
King Sprinkler Fitters Fire Journey Level $68.79 5C 1X
Protection)
King Stage Rig-Ping Mechanics (Non Journey Level $13.23 1
Structural
King Stone Masons Journey Level $48.27 5A 1M
King Street And Parklng,_Lot Journey Level $19.09 1
Sweeper Workers
King Surveyors Assistant Construction Site $49.48 7A 1T 8P
Surveyor
King Surveyors Chamman $48.96 7A 1T 8P
King Surveyors Construction Site Surveyor $50.39 7A 1T 8P
King Telecommunication Journey Level $22.76 1
Technicians
King Telephone Line Construction • Cable Splicer $34.20 5A 2B
Outside
King Telephone Line Construction - Hole Digger/Ground Person $18.72 5A 2B
Outside
King Telephone Line Construction - Installer (Repairer) $32.78 5A 2B
Outside
King Telephone Line Construction - Special Aparatus Installer I $34.20 5A 2B
Outside
King Telephone Line Construction - Special Apparatus Installer II $33.51 5A 2B
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
Page 17 of 17
Outside
King Telephone Line Construction - Telephone Equipment Operator $34.21 5A 213
Outside (Heavy)
King Telephone Line Construction - Telephone Equipment Operator $31.81 5A 2B
Outside (Light)
King Telephone Line Construction - Telephone Lineperson $31.81 5A 2B
Outside
King Telephone Line Construction - Television Groundperson $18.16 5A 2B
Outside
King Telephone Line Construction - Television Lineperson/Installer $24.09 5A 2B
Outside
King Telephone Line Construction - Television System Technician $28.72 5A 2B
Outside
King Telephone Line Construction - Television Technician $25.81 5A 2B
Outside
King Telephone Line Construction - Tree Trimmer $31.82 5A 2B
Outside
King Terrazzo Workers Journey Level $43.93 5A 1M
King Tile Setters Journey Level $21.65 1
King Tile, Marble Et Terrazzo Finisher $37.76 5A 1B
Finishers
King Traffic_Control Stri>I ers Journey Level $40 73 7A 1K
King Truck Drivers Asphalt Mix Over 16 Yards (W. $46.97 5D 3A 8L
WA-Joint Council 28)
King Truck Drivers Asphalt Mix To 16 Yards (W. $46.13 5D 3A 8L
WA-Joint Council 28)
King Truck Drivers Dump Truck Et Trailer $46.97 5D 3A 8L
King Truck Drivers Dump Truck (W. WA-Joint $46.13 5D 3A 8L
Council 28)
King _Truck Drivers Other Trucks (W. WA-Joint $46.97 5D 3A 8L
Council 28)
King Truck Drivers Transit Mixer $23.45 1
King Well Drillers 8 Irrigation Pump Irrigation Pump Installer $17.71 1
Installers
King Well Drillers Et Irrigation Pump Oiler $12.97 1
Installers
King Wet( Drillers Et Irngation Pump Well Driller $18.00 1
Installers
https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 7/2/2012
BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012
kk####t######t######t#t#####################t#t+#+t####+############tt#+####t####t#+t##+##t#t#######+########k##+ktktk+#
OVERTIME CODES
OVERTIME CALCULATIONS ARE BASED ON THE HOURLY RATE ACTUALLY PAID TO THE WORKER ON PUBLIC
WORKS PROJECTS,THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE
HOURLY RATE OF THE COST OF FRINGE BENEFITS ACTUALLY PROVIDED FOR THE WORKER
1 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40) HOURS PER WEEK SHALL BE PAID AT
ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
B ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE
OF WAGE
C THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST
TEN(10)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
ALL OTHER OVERTIME HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT
DOUBLE THE HOURLY RATE OF WAGE
D THE FIRST TWO(2)HOURS BEFORE OR AFTER A FIVE-EIGHT(8)HOUR WORKWEEK DAY OR A FOUR-TEN(10)
HOUR WORKWEEK DAY AND THE FIRST EIGHT (8) HOURS WORKED THE NEXT DAY AFTFR EITHER
WORKWEEK SHALL BE PAID ATONE AND ONE-HALF IIMES THE HOURLY RATE OF WAGE ALL ADDI FIONAL
HOURS WORKED AND ALL WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY
RATE OF WAGE
E THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST
EIGHT(8)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY,AND ALL HOURS WORKED ON SUNDAYS AND
HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
F. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST
TEN(10)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY
RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE
OF WAGE
G. THE FIRST TEN(10) HOURS WORKED ON SATURDAYS AND THE FIRST TEN(10) HOURS WORKED ON A FIFTH
CALENDAR WEEKDAY IN A FOUR-TEN HOUR SCHEDULE,SHALL BE PAID AT ONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OFTEN (10)HOURS PER DAY MONDAY THROUGH
SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE
HOURLY RATE OF WAGE
H ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT
WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE(12)HOURS
AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF
WAGE
I ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID AT ONE AND DOUBLE THE HOURLY
RATE OF WAGE
J. THE FIRST TWO (2) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST
TEN(10)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
ALL HOURS WORKED OVER TEN (10) HOURS MONDAY THROUGH SATURDAY, SLNDAYS AND HOLIDAYS
SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
K ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY
RATE OF WAGE
L. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL
HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
M ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT
WEATHER CONDI I IONS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL
HOLES WORKED ON SUNDAYS AND HOLIDAYS SHALL BE RAID AT DOUBLE THE HOURLY RATE OF WAGE
N ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) SHALL BE PAID AT ONE AND ONE-HALF
TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT
DOUBLE THE HOURLY RATE OF WAGE
Y BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012
-2-
0 THE FIRST TEN (10) HOURS WORKED ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS, HOLIDAYS AND AFTER TWELVE (12)HOURS,
MONDAY THROUGH FRIDAY, AND AFTER TEN (10) HOURS ON SATURDAY SHALL BE PAID AT DOUBLE THE
HOURLY RATE OF WAGE
P ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF CIRCUMSTANCES WARRANT) AND
SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED
ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
Q THE FIRST TWO (2) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND UP TO TEN
(10) HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND
ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT DOUBLE
THE HOURLY RATE OF WAGE ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE
R ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF
WAGE
S. THE FIRST TWO (2) HOURS AFTER EIGHT (8)I.Ril
GULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST
EIGHT(8)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
ALL HOURS WORKED ON HOLIDAYS AND ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY,
SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE
PAID AT THREE TIMES THE HOURLY RATE OF WAGE
T WORK PERFORMED IN EXCESS OF EIGHT (8) HOURS OF STRAIGHT TIME PER DAY, OR TEN (10) HOURS OF
STRAIGHT TIME PER DAY WHEN FOUR TEN (10) HOUR SHIFTS ARE ESTABLISHED, OR FORTY (40) HOURS OF
STRAIGHT TIME PER WEEK, MONDAY THROUGH FRIDAY,OR OUTSIDE THE NORMAL SHIFT,AND ALL WORK
ON SATURDAYS SHALL BE PAID AT TIME AND ONE-HALF THE STRAIGHT TIME RATE HOURS WORKED OVER
TW ELVE HOURS (12)IN A SINGLE SHIFT AND ALL WORK PERFORMED AFTER 6 00 PM SATURDAY TO 6 00 AM
MONDAY AND HOLIDAYS SHALL BE PAID AT DOUBLE nIE STRAIGHT FIME RATE OF PAY THE EMPLOYER
SHALL HAVE THE SOLE DISCRETION TO ASSIGN OVERTIME WORK TO EMPLOYEES PRIMARY
CONSIDERATION FOR OVERTIME WORK SHALL BE GIVEN TO EMPLOYEES REGULARLY ASSIGNED TO THE
WORK TO BE PERFORMED ON OVERTIME SITUATIONS AFTER AN EMPLOYEE HAS WORKED EIGHT(8)HOURS
AT AN APPLICABLE OVERTIME RATE, ALL ADDITIONAL HOURS SHALL BE AC THE APPLICABLE OVERTIME
RATE UNTIL SUCH I IME AS THE EMPLOYEE HAS HAD A BREAK OF SIGH I(8)HOURS OR MORE
U. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO
TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES
THE HOURLY RATE OF WAGE
V ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS(EXCEPT THANKSGIVING DAY AND CHRISTMAS DAY)
SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON
THANKSGIVING DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
W ALL HOURS WORKED ON SATURDAYS AND SUNDAYS(EXCEPT MAKE-UP DAYS DUE TO CONDITIONS BEYOND
THE CONTROL OF THE EMPLOYER)) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
X THE FIRST FOUR(4) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST
TWELVE (12) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED OVER TWELVE (12) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND
HOLIDAYS SHALL BE PAID AT DOUBLE ]HE HOURLY RATE OF WAGE WHEN HOLIDAY FALLS ON SATURDAY
OR SUNDAY, THE DAY BEFORE SATURDAY, FRIDAY, AND THE DAY AFTER SUNDAY, MONDAY, SHALL BE
CONSIDERED THE HOLIDAY AND ALL WORK PERFORMED SHALL BE PAID AT DOUBLE THE HOURLY RATE OF
WAGE
Y. ALL HOURS WORKED OUTSIDE THE HOURS OF 5 00 AM AND 5 00 PM (OR SUCH OTHER HOURS AS MAY BE
AGREED UPON BY ANY EMPLOYER AND THE EMPLOYEE)AND ALL HOURS WORKED IN EXCESS OF EIGHT(8)
HOURS PER DAY (10 HOURS PER DAY FOR A 4 X 10 WORKWEEK) AND ON SATURDAYS AND HOLIDAYS
(EXCEPT LABOR DAY)SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE (EXCEPT
FOR EMPLOYEES WHO ARE ABSENT FROM WORK WITHOUT PRIOR APROVAL ON A SCHEDULED WORKDAY
DURING IHE WORKWEEK SHALL BE PAID AT THE STRAIGHT-TIME RAZE UNTIL THEY HAVE WORKED 8
HOURS IN A DAY(10 IN A 4 X 10 WORKWEEK)OR 40 HOURS DURING THAT WORKWEEK)ALL HOURS WORKED
MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND
LABOR DAY SHALL BE PAID AT DOUBLE I HE HOURLY RATE OF WAGE
I
BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012
-3-
] Z ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID THE STRAIGHT TIME RATE OF
PAY IN ADDITION TO HOLIDAY PAY
2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT
ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
B, ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE
C ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE
F THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF
WAGE IN ADDITION TO THE HOLIDAY PAY ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON
HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
G ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS
WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
INCLUDING HOLIDAY PAY
H ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS
WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
K ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN
ADDITION TO THE HOLIDAY PAY
0, ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE
R. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS AND ALL HOURS WORKED OVER SIXTY(60)IN ONE WEEK
SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
U ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED OVER 12 HOURS IN A DAY,OR ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT
DOUBLE THE HOURLY RATE OF WAGE
W THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST
EIGHT(8)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY,AND ALL HOURS WORKED ON SUNDAYS AND
HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ON A FOUR-DAY, TEN-HOUR WEEKLY
SCHEDULE,EIT HER MONDAY THRU THURSDAY OR TUESDAY THRU FRIDAY SCHEDULE,ALL HOURS WORKED
AFTER TEN SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE THE FIRST EIGHT(8)HOURS WORKED
ON THE FIFTH DAY SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL.OTHER
HOURS WORKED ON THE FIFTH,SIXTH,AND SEVENTH DAYS AND ON HOLIDAYS SHALL BE PAID AT DOUBLE
THE HOURLY RATE OF WAGE
Y ALL HOURS WORKED ON SATURDAYS(EXCEPT FOR MAKE-UP DAYS)SHALL BE PAID AT ONE AND ONE-HALF
TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED MONbAY THROUGH SATURDAY OVER TWELVE
(12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE
HOURLY RATE OF WAGE
Z ALL HOURS WORKED MONDAY THROUGH FRIDAY BETWEEN THE HOURS OF 6 00 P M AND 6 00 A M AND ALL
HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HAL F TIMES THE HOURLY RATE OF
WAGE, EXCEPT FOR COMMERCIAL, OCCUPIED BUILDINGS WHERE FLOOR COVERING WORK CANNOT BE
PERFORMED IN THE REGULAR DAYTIME HOURS DUE TO OCCUPANCY FOR SUCH OCCUPIED, COMMERCIAL
BUILDINGS, THE EMPLOYEE MAY AGREE TO WORK BETWEEN THE HOURS OF 6 00 PM TO 6 00 AM MONDAY
THROUGH SATURDAY MORNING AT 6 00 AM AT AN OVERTIME PAY RATE OF 10%OVER THE STRAIGHT TIME
RATE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF
WAGE
r
BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012
-4-
3 ALL HOURS WORKED IN EXCESS OF EIGHT(8) HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT
ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
A WORK PERFORMED IN EXCESS OF EIGHT (8) HOURS OF STRAIGHT TIME PER DAY, OR TEN (10) HOURS OF
STRAIGHT TIME PER DAY WHEN FOUR TEN (10) HOUR SHIFTS ARE ESTABLISHED, OR FORTY (40) HOURS OF
STRAIGHT TIME PER WEEK, MONDAY THROUGH FRIDAY, OR OUTSIDE THE NORMAL SHIFT,AND ALL WORK
ON SATURDAYS SHALL BE PAID AT TIME AND ONE-HALF THE STRAIGHT TIME RATE HOURS WORKED OVER
TWELVE HOURS (12) IN A SINGLE SHIFT AND ALL WORK PERFORMED AFTER 6 00 PM SATURDAY TO 6 00 AM
MONDAY AND HOLIDAYS SHALL BE PAID AI DOUBLE THE STRAIGHT TIME RATE OF PAY ANY SHIFT
STARTING BETWEEN THE HOURS OF 6 00 PM AND MIDNIGHT SHALL RECEIVE AN ADDITIONAL ONE DOLLAR
(S1 00)PER HOUR FOR ALL HOURS WORKED THAT SHIFT
THE EMPLOYER SHALL HAVE THE SOLE DISCRETION TO ASSIGN OVERTIME WORK TO EMPLOYEES PRIMARY
CONSIDERATION FOR OVERTIME WORK SHALL BE GIVEN TO EMPLOYEES REGULARLY ASSIGNED TO THE
WORK TO BE PERFORMED ON OVERTIME SITUATIONS AFTER AN EMPLOYEE HAS WORKED EIGHT(8)HOURS
AT AN APPLICABLE OVERTIME RATE, ALL ADDITIONAL HOURS SHALL BE AT THE APPLICABLE OVERTIME
RATE UNTIL SUCH TIME AS THE EMPLOYEE HAS HAD A BREAK OF EIGHT(8)HOURS OR MORE
B. THE FIRST FOUR(4) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST
TWELVE (12) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED OVER TWELVE (12)HOURS MONDAY THROUGH SATURDAY, AND ALL HOURS
WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
4 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT
ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
4 ,
A ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID
AT DOUBLE THE HOURLY RATE OF WAGE, ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS
SHALL BF PAID AT DOUBLE THE HOURLY RATE OF WAGE
B ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER
CONDITIONS)SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED
MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND
HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
HOLIDAY CODES
5. A HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7)
B HOLIDAYS, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
FRIDAY AFTER THANKSGIVING DAY,THE DAY BEFORE CHRISTMAS,AND CHRISTMAS DAY(8)
C HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8)
D HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE
FRIDAY AND SATURDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8)
H HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY, INDEPENDENCE DAY,THANKSGIVING DAY,THE DAY AFTER
THANKSGIVING DAY,AND CHRISTMAS(6)
1 HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
AND CHRISTMAS DAY(6)
J. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, FRIDAY AFTER
THANKSGIVING DAY,CHRISTMAS EVE DAY,AND CHRISTMAS DAY(7)
K HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS,AND CHRISIMAS
DAY(9)
BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012
-5-
5 L, HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY,THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8)
N HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
VETERANS'DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(9)
P HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVNG DAY,
FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS,AND CHRIS I MAS DAY
(9) IF A HOLIDAY FALLS ON SUNDAY,THE FOLLOWING MONDAY SHALL BE CONSIDERED AS A HOLIDAY
R PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, DAY AFTER THANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7
1/2)
S PAID HOLIDAYS NEW YEAR'S DAY,PRESIDENTS' DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,
THANKSGIVING DAY,AND CHRISTMAS DAY(7)
T PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,CHRISTMAS DAY,AND THE DAY
BEFORE OR AFTER CHRISTMAS(9)
Z HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8)
6. A PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8)
E PAID HOLIDAYS NEW YEAR'S DAY,DAY BEFORE OR AFTER NEW YEAR'S DAY,PRESIDENTS DAY,MEMORIAL
DAY, INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,DAY AFTER THANKSGIVING DAY, CHRISTMAS
DAY,AND A HALF-DAY ON CHRISTMAS EVE DAY (9 1/2)
G PAID HOLIDAYS NEW YEAR'S DAY, MARTIN,LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER
THANKSGIVING DAY,CHRISTMAS DAY,AND CHRISTMAS EVE DAY(11)
H PAID HOLIDAYS NEW YEAR'S DAY, NEW YEAR'S EVE DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, IHANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER
CHRISTMAS,AND A FLOATING HOLIDAY(10)
I PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7)
Q PAID HOLIDAYS NEW YEAR'S DAY.MEMORIAL DAY,INDEPENDENCE DAY, LABOR DAY,VETERANS
DAY,THANKSGIVING DAY,THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY(8) UNPAID
HOLIDAY PRESIDENTS'DAY
T PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING
DAY BEFORE CHRISTMAS DAY,AND CHRISTMAS DAY(9)
Z HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,THANKSGIVING
DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7) IF A HOLIDAY FALLS ON
SATURDAY,THE PRECEDING FRIDAY SHALL BE CONSIDERFD AS THE HOLIDAY IF A HOLIDAY FALLS
ON SUNDAY,THE FOLLOWING MONDAY SHALL BE CONSIDERED AS THE HOLIDAY,
7 A HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE
FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) ANY HOLIDAY WHICH
FALLS ON A SUNDAY SHALL BE OBSERVED Al A HOLIDAY ON THE FOLLOWING MONDAY IF ANY OF THE
LISTED HOLIDAYS FALLS ON A SATURDAY,J HE,PRECEDING FRIDAY SHALL BE A REGULAR WORK DAY
B. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE
FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) ANY HOLIDAY WHICH
FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOI IDAY
WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY
BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012
-6-
7 C. HOLIDAYS NEW YEAR'S DAY,MARTIN LUTHER KING JR DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR
DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) ANY
HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY
ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL. BE OBSERVED AS A HOLIDAY ON THE PRECEDING
FRIDAY.
D PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) UNPAID
HOLIDAYS PRESIDENT'S DAY ANY PAID HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A
HOLIDAY ON THE FOLLOWING MONDAY ANY PAID HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE
OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY.
E HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY;INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE
FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY (7) ANY HOLIDAY WHICH FALLS ON A SUNDAY
SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A
SA EURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY
F. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE
FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY AND CHRISTMAS
DAY (8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SI4ALL BE OBSERVED AS A HOLIDAY ON THE
FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY
ON THE PRECEDING FRIDAY
G. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,AND
CHRISTMAS DAY (6) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON
THE FOLLOWING MONDAY
H. HOLIDAYS NEW YEAR'S DAY,MARTIN LUTHER KING JR.DAY,INDEPENDENCE DAY,MEMORIAL DAY,LABOR
DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE
CHRISTMAS DAY AND CHRISTMAS DAY(9) ANY HOLIDAY WHICH FALLS ON A SLNDAY SHALL BE OBSERVED
AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATLRDAY SHALL BE
OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY
I. HOLIDAYS NEW YEAR'S DAY, PRESIDENT'S DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS DAY AND
CHRISTMAS DAY (9) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON
THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A
HOLIDAY ON THE PRECEDING FRIDAY
J. HOLIDAYS NEW YEAR'S DAY,INDEPENDENCE DAY,MEMORIAL DAY,LABOR DAY,THANKSGIVING DAY AND
CHRISTMAS DAY (6) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON
THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A
HOLIDAY ON THE PRECEDING FRIDAY
K HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,THANKSGIVING DAY,THE FRIDAY AND
SATURDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) ANY HOLIDAY WHICH FALLS ON A
SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON EHE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS
ON A SA ELRDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY
L. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,LABOR DAY,INDEPENDENCE DAY,THANKSGIVING DAY,THE
LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7) ANY HOLIDAY WHICH FALLS ON A
SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE TOLLOWING MONDAY ANY HOLIDAY WHICH FALLS
ON A SA 1 URDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY
M. PAID HOLIDAYS NEW YEAR'S DAY, THE DAY AFTER OR BEFORE NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER
THANKSGIVING DAY, CHRISTMAS DAY, AND THE DAY AFTER OR BEFORE CHRISTMAS DAY 10) ANY
HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY
ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING
FRIDAY
N. HOLIDAYS-NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE
FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY (7) ANY HOLIDAY WHICH FALLS ON A SUNDAY
SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING N40NDAY WHEN CHRISTMAS FALLS ON A
SATURDAY,THE PRECEDING FRIDAY SHALL BE OBSERVED AS A HOLIDAY
r�
st
y
BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012 ,
-7-
7. O PAID HOLIDAYS NEW YEAR'S DAY, THE DAY AFTER OR BEFORE NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER
THANKSGIVING DAY,CHRISTMAS DAY,THE DAY AFTER OR BEFORE CHRISTMAS DAY,AND THE EMPLOYEES
BIRTHDAY 11) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE
FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY
ON THE PRECEDING FRIDAY
P HOLIDAYS, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7) ANY HOLIDAY WHICH FALLS ON A SUNDAY
SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY
Q HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE
FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY AND CHRISTMAS
DAY (8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE
FOLLOWING MONDAY IF ANY OF THE LISTED HOLIDAYS FALLS ON A SA TURDAY,THE PRECEDING FRIDAY
SHALL BE A REGULAR WORK DAY
NOTE CODES
8 A IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS,THE FOLLOWING DEPTH PREMIUMS APPLY TO
DEPTHS OF FIFTY FEET OR MORE
OVER 50'TO 100'-$2 00 PER FOOT FOR EACH FOOT OVER 50 FEET
OVER 100'TO 150'-$3 00 PER FOOT FOR EACH FOOT OVER 100 FEET
OVER 150'TO 220'-$4 00 PER FOOT FOR EACH FOOT OVER 150 FEET
OVER 220'-S5 00 PER FOOT FOR EACH FOO P OVER 220 FEET
C. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS,THE FOLLOWING DEPTH PREMIUMS APPLY TO
DEPTHS OF FIFTY FEET OR MORE
OVER 50'TO 100'-$I 00 PER FOOT FOR EACH FOOT OVER 50 FEET
OVER 100'TO 150'-$1 50 PER FOOT FOR EACH FOOT OVER 100 FEET
OVER 150'TO 200'-$2 00 PER FOOT FOR EACH FOOT OVER 150 FEET
OVER 200'-DIVERS MAY NAME THEIR OWN PRICE
D WORKERS WORKING WITH SUPPLIED AIR ON HAZMAT PROJECTS RECEIVE AN ADDITIONAL$I 00 PER HOUR
L WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A $0 75,
LEVEL B $0 50,AND LEVEL C $025
M WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS LEVELS A & B
$1 00,LEVELS C&D $0 50
N WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS -LEVEL A $1 00,
LEVEL B $0 75,LEVEL C $0 50,AND LEVEL D $0 25
P WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - CLASS A SUIT.
$2 00,CLASS B SUIT $1 50, CLASS C SUIT $1 00,AND CLASS D SUIT$0 50
Q. THE HIGHEST PRESSURE REGISTERED ON THE GAUGE FOR AN ACCUMULATED TIME OF MORE THAN FIFTEEN
(15)MINUTES DURING THE SHIFT SHALL BE USED IN DETERMINING THE SCALE PAID
s
REQUEST FOR MAYOR'S SIGNATURE
• Please Fill to All Applicable Boxes
KENT W AS NINGTON This form must he printed on cherry paper
Routing Information (ALL REQUESTS MUST FIRST BE ROUTED THROUGH THE LAW DEPARTMENT)
Originator Kevin Swinford Phone (Originator) 5613
Date Sent 7/26/12 Date Required 8/2/12
Return Signed Document to Nancy Yoshitake CONTRACT TERMINATION DATE: 10/31/12
VENDOR NAME: J Bozeat&Associates, LLC DATE OF COUNCIL APPROVAL: n/a
Brief Explanation of Document.
The attached agreement is for J Bozeat&Associates to provide and install three Auma valve actuators at Pump
Station 5
Kevin spoke with Chris Hills and Chris has waived the auto liability requirements for this contract
All Contracts Must Be Routed Through the Law Department
(Thu Aiea to be Completed By the Law Department)
Received RECENEED
Approval of Law Dept JUL 2 6 2012 �t •}�
Law Dept Comments
ENT LAW DEED
Date Forwarded to Mavor
I I ---
Shaded Areas to Be Completed by Administration Staff
Received: juL zc
Of Ken
Recommendations & Comments: 1Ce Of the
r i
Disposition
Date Returned•
Iage5870_templatebase 2/07