Loading...
HomeMy WebLinkAboutPK12-145 - Original - All Around Fence Company - Lake Fenwick Park Railing Project - 06/13/2012 O Records MarfagemeW- ., KENT Document WASHINGTON is CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: All Around Fence Vendor Number: JD Edwards Number Contract Number: Pk N75 This is assigned by City Clerk's Office Project Name: Lake Fenwick Park Railing Project Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 6/13/2012 Termination Date: 7/16/2012 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Quientin Poll (tp) Department: Parks Operations Detail: (i.e. address, location, parcel number, tax id, etc.): S Publlc\Records Ma nagement\Forms\ContractCover\adcc7832 1 11/08 -.000,0"�. KENT WASHINGTCN PUBLIC WORKS AGREEMENT between City of Kent and All-Around Fence Co. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and All-Around fence Co organized under the laws of the State of Washington, located and doing business at P.O Box 1029 Ravensdale, Wa 98051-8101 Phone # 252-863-4895 (hereinafter the contractor). I. DESCRIPTION OF WORK. The parties agree as follows: Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: Repair and replace approximently100 feet of top rail measuring 1 5/8 schedule 40 iron pipe. Replace 6 stair treads, replace three support posts to stair structure using the same construction standards/hardware when stairs were originally built. Repair or replace any chain link damage and secure. See pictures attached for details that will be fixed and or replaced. Contractor shall remove construction debris from premise and clean work area to existing condition Work will be completed 30 days from the date established when letter to proceed is signed. As described in the scope of services attached and incorporated as Exhibit A herein. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I within 30 days of the contract being executed. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Six thousand two hundred fifty two dollars and forty five cents Waslungton state sales Tax included. Applicable Washington State Retail Sales Tax on this contract shall be governed by WAC 458-20-171 and its related rules for the work contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this Agreement. A. No Performance Bond. Because this contract, including applicable sales tax, is less than $25,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue and the State Department of Labor & Industries and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. PUBLIC WORKS AGREEMENT- I (Roadway/Pedestrian Path- Under$10K and No Performance Bond) B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor- Employer Relationship will be created by this Agreement and that the Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a"Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage PUBLIC WORKS AGREEMENT-2 (Roadway/Pedestrian Path- Under$10K and No Performance Bond) rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. PUBLIC WORKS AGREEMENT-3 (Roadway/Pedestrian Path- Under$IOK and No Performance Bond) At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Dutv to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one- year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In PUBLIC WORKS AGREEMENT-4 (Roadway/Pedestrian Path- Under$IOK and No Performance Bond) the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not. by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. PUBLIC WORKS AGREEMENT-5 (Roadway/Pedestrian Path- Under$1 aK and No Performance Bond) XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assigrnment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. PUBLIC WORKS AGREEMENT-6 (Roadway/Pedestrian Path- Under$10K and No Performance Bond) H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. IN WITNESS,the parties below execute this Agreement,which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By: fill v , By: (signature) (signature Print Name: Ron Daglev Pit Nam . 6arimLze S� Its: C')k/j -c e— Its: Ste&* 12) ;e ee,foAC r JJ (Title) (Title) to DATE: /7 /I L DATE: Q TCZ NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Ron Dagley, All-Around fence co Scott Swanson P.O box 1029. City of Kent Ravensdale.WA 98051-8101 220 Fourth Avenue South Kent, WA 98032 PH; (253) 863-4895 Fax;(253) 863-0704 (252) 856-5125 (telephone) (253) 856-6120 (facsimile) PUBLIC WORKS AGREEMENT-7 (Roadway/Pedestrian Path- Under$1OK and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. --r-- iZ 9 Dated this day of , � UZ6 For: Title: Date: / Z EEO COMPLIANCE DOCUMENTS- I CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws,policies and guidelines. EEO COMPLIANCE DOCUMENTS-2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date) between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this day of , 200_ By: For: Title: Date: EEO COMPLIANCE DOCUMENTS-3 EXHIBIT B INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 1185. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Worker's Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $1,000,000 general aggregate and a $1,000,000 products-completed operation aggregate limit. Exhibit B (Continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability, Commercial General Liability and Builders Risk insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. D. Contractor's Insurance For Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. E. Waiver of Subrogation The Contractor and the City waive all rights against each other any of their Subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. F. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. G. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. Before any exposure to loss may occur, the Contractor shall file with the City a copy of the Builders Risk insurance policy Exhibit B (Continued) that includes all applicable conditions, exclusions, definitions, terms and endorsements related to this project. H. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. Client#;85581 ALLAROU3 ACORD. CERTIFICATE OF LIABILITY INSURANCE DATE 3r1zr2D2120DfYYY� 1z THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT.If the certificate holder Is an ADDITIONAL INSURED,the pollcy(Ies)must be endorsed If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this Certificate does not confer rights to the certificate holder In lieu of such endorsements) NTACT PRODUCER N E Bell-Anderson Ins•Renton G!L pA"c Ne Eel 425 291.520D A c No 4252915100 600 SW 39th Street,Suite 200 E MAIL AOOREss Renton,WA 98057 INSURE 9 AFFORDING COVERAGE NAICV 425 291-5200 WSURERA The Ohio Casualty Insurance Co INSURED a13URER e All Around Fenc4 Co INSUI—I PO BOX 1029 INSURER I Ravensdale,WA 98051 INSURER E INSURER F COVERAGES CERTIFICATE NUMBER, REVISION NUMBER. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REOUIREMENT, TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY EE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL 7HE TERMS, �q EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS MR TYPE OF INSURANCE ADIDL SUBIMRR POLICY NUMBER MMj01C EF MO�DICDY P LIMITS A GENERALLIAeIUTY X X SKS54924037 1210112011121011201 EAACMHp,GOCCURRENCE $1000000 X COMMERCIALGENEPALLLASKnY �RFA11SE3�ENTEO $1 ODD 000 CLAIMS MADE F XI OCCUR MEDEXP An one ram $15000 PERSONAL BADV INJURY S1 000 000 GENERAL AGGREGATE s2,000,000 GEMLAGGREGATE LIMIT APPLIES PER PRODUCTS-COMPICP AGO 12 000,000 POLICY X pRa F7 LOC 17 MI !IAUTOAOBlELeIL AS54924037 2l0112011 A 1,000,000 JAUT A1J1'AUT0BODILY INJURY(Per person) S O NED SCHEDULED BODILYINJURY(Per acadenl) S IRED AUTOS X NON-OWNEDPBO QERa DAMAGE SAUTOSrive OtIn Car $ A X UMeRELLALAB X OCCUR US054924037 210112011 12/61/201 EACH OCCURRENCE s2 000 000 EXCESS LIAR CLAIMS-MADE AGGREGATE 32 000 000 DEC) I XI RETENTION31100010 $ WORKERS COMPENSATION BKS54924037 1210112011 121011201 WCSTATU• CTH- AHD EMPLOYERS'LIABLI Y TCRYLIMIIS ER- A ANY PROPRIETOR/PARTNER/O(ECUTIVE YIN (WA Stop Gap) E L EACH ACCIDENT $1 000 000 OFFICERIMEMBER EXCLUDED? N NIA s (Mandabryln NH) EL DISEASE-EAEMPLCYEE $1 00O 000 If as,deacMe under DESCRIPTION OF OPERATIONS below EL DISEASE-POLICY LIMB 1$1 OOO 000 7T DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES(Altach ACORD 101,Additional Remake Schedule,It mote apace Is requited) RE:Kent Memorial Park,Kent WA City of Kent Is an additional Insured for general liability and auto liability, but only if required by written contract or written agreement per General Liability Master Pak Blanket Additional insured provision CG88101009&CA8810 0110.Waiver of Transfer of Rights of Recovery Against Others per General Liability Master Pack CG8810 1009&CA8810 0110 General Liability coverage provided to the Certificate (See Attached Descriptions) CERTIFICATE HOLDER CANCELLATION City of Kent SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Y THE EXPIRATION DATE' THERECF, NOTICE WILL BE DELIVERED IN 220 4th Ave S ACCORDANCE WITH THE POLICY PROVISIONS Kent,WA 98032 AUTHORIZED REPRESENTATIVE 01988.2010 ACORD CORPORATION.All rights reserved e ACORD 25(201 DIOS) 1 of 2 The ACORD name and logo era registered marks of ACORD #S3733731M359709 PLJ I I t�timp d y 1,too N flu to _ •� &� <<o� L_ � 4i +� e M 4 iry� i 41P wl- Im, -71 q7 MT mill A w Mon oil" Iff, 'Ire 11% Is 1 SAME:1 0 4 p9etFq: 3)'H 4 f) #� 1 y, fi � 3elr b i - 2 i $d q E e E�� i u� �=� �.��f ,•_a= '� �� it - x �.�` � c`a �?- �� 3; if n tT` 3i iits fto + OWN ' c �, �. a �; �� �F �,., � �� yz � � i�, a„ i `�f#���`� ��' y 1 y� OY � `.n �� < � *l a 1 w`e i � � ! ;;j�� I � z � ' a .t r Ls� ,. Mf'rs- - s*. � t u _ Y,l,a 9 _ �ULd � _ � #mot' �k�' j i. I , I''_ �5u�-�E L ,.s� * �,: - 9 tg gG f`y � �� �Sx#39a �i 3Y � _ � �`,`p X � y rt Ik fr x — G — _ $.t ..� �F _ � ry�� �µh,�y t� � � � �� � & � Y w ��� ^dry �liV � 4c s �� �x >� � 3 } — � �' � ��'j'i t a ��'�� ^- _ �. _ a'°' _ ' � �� {.'e .�' 2 ,� _ `° _ �_ ` -�` _ _ s �,r _ '.-,�iF�n� '_�� ,��q °e '�fir. _u' ." -_ ,.x �.r _ h x�;r �.�i �n,�t � " '� �� t y �,, e" � � ee �� �� _ �� - �� - ,=s3 _ F' e� �$3 � - � _ ��s.. - e �'3 vs � ,a �y� '� _ � ��� � r" $ �_ "3 � {{tee% � �r X4Sj� � ..f .�. � �aF U 3 1 .ryna - i ka a1°a 9,Y4' � T�•}, pi' Yt �..s..4 W AN : .°Rr'y"„� $ ,. rvq, F-if slam ... iF 'f+ywx +� R. ii 3 S 5 S� yv � M c A e _`A u� _ yry9• F• `t�,�D � e _ k MINN kr�' e4 u � x40V- i Mr � r a - � V, S �i '=' - c soh_ c[ i .�•'A'a4;,`K, •^a,",wx, �' Ht;j .r. .:_,.'a, i F'�^��k^'�� �`',t' .. �'�'..es.� i=Y��'x�, �.�T'•£n-*.��,'�.; ��"�is: _s cv� ^",�' ._L'X.� <F .Ts >• t �3�s 49Y���t' i;''},`„ c%'4. }x�� � .xss g �PL �'�;v:;`_ �Ea N,j& .a•, �.. 15 II a�r ILI x � F `} 1 r tt xu� IV ,1 y •,p _ ems„ �• �- � �sE t s h�»z i� ✓ k i Ir; I yp �f � Z o �Lr`✓A � k -.�r�T p z� x - y r� 4 & 4 TAli 000 e, svq b g�1 kt p� C _ 9••_ ai £� } 1 P t 4 Niiv ^2' ,C', x"�. t _•g4M `4 ��.+� L'a � xw'� [ .�` � .. � .q 1i'o� 'z3 a `tel vx,. •R, tt v �f �', ,.. �. x"{. •_• k �,�?'yt n � �'^ �� ��' 's �t K rasp�!,.`t.�. j` `r=5,y„ y. $� #4;�s�;k�i µfA Y,,,.. ' tom":+"•' a�,r i s r ay`a ro,54 v. �*P.c`�i;•d u � xy :n � a P` r a i'=� W- li Ax aw 00, Y4, , :m�"' „✓ �v� d3/ 3__ 3{ ,$)$y`�v z �j[i -:ice" S.1 Vj `a 4sw t ! IINii a mY "� l Fr, _ a 3 }e^Fat�v bun �y j��E x• xv •iS: -^six^ F" .�`�.*,i p h 4T Nil q % A ¢'F' ��yy isrv m'll i`Yj`.Pse 00, law a ji _ .yk..t Ede v h.Y F3 W{ TWA S' { r ' s - 9''dY( - k � n� 5<£ t or <L yS ul F _ % W 3z`: ti �;aRouy Alt-Around Fence Co. Estimate Date. Licensed • Bonded • Insured -PO Box 1029• Ravensdale,WA 98051-8101 Estimate Time. 3 C) Ph (253)863-4895 • Fax (253)863-0704 FENCE CO. Email Barr ndfencewa.c com _. PROPOSAL / CONTRACT www.alfaroundfencewa.com License No ALLARFC085BA Customer: `� © t— 'rP�'1 4 j` C I -QY1w�L,� Start Date, Contact Name- Build Date. Phone #1. 7 C-i 7g2Z_`(sn Email- Phone #2 Fax#- Billing Address City Zip Site Address City. Zip Directionst— Underground Utilities: 1-800-424-5555 Footage: Heights >� POSTS Terminal LV Line `�-_� (� �h.�•L ' { 1'L _'�U ' Gate. Material Specs Too Rail too Middle Rail Bottom Rail, Tension Wire ❑Standard EstateI YEAR CLIARANTEE on Workmanship & Materials ❑Full Panel NOTES V t yvt Office Use Only ❑Picture Frame M/D ❑Kirkland 1(03 ❑Lattice Top y hr LLtz f'�c: S MID/U GATES Walk Gal THIS CONTRACT IS SUBJECT TO THE TERMS AND CONDITIONS PRINTED ON THE REVERSE SIDE AND WHICH Single Drive ARE MADE A PART HEREOF BY THIS REFERENCE Double Drive 41 Hillside WE PROPOSE hereby of ur ish m and labor-complete in accordance with the above specifications, for the Roll Gate sum of � o 00 Price t—t�— Authorized by t Sales ❑CLEARING Signature Total TEAR-OUT The prices, specifications, and conditions are satisfactory and are hereby accepted. These prices subject to company audit before installation el HAUL-AWAY NOTE This proposal may be withdrawn by us if not accepted within days