Loading...
HomeMy WebLinkAboutPW12-125 - Original - Skycorp Ltd. - Meyers House Demolition & Cleanup - 05/04/2012 Records NV.n, " emKENT x Document WASHINGTON CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Skycorp Ltd. Vendor Number: JD Edwards Number Contract Number: I a, � of This is assigned by City Clerk's Office Project Name: Myers House Demolition Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: S- IV- /A Contract Effective Date: Date of the Mayor's signatureTermination Date: 5/22/12 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Nick Horn Department: Engineering Detail: (i.e. address, location, parcel number, tax id, etc.): Remove asbestos material, and demolish and remove the-house, garage and barn which are located at 25906 116th Avenue SE. S.Publlc\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08 9 r KENT YVTS IINGTON PUBLIC WORKS AGREEMENT between City of Kent and Skycorp Ltd. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Skycorp Ltd. organized under the laws of the State of Washington, located and doing business at 526 N. West Ave., Suite 11, Arlington, WA 98223, Phone: (360) 926-8989/Fax: (360) 926-8987, Contact: Skyler Waldal (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall remove asbestos material, and demolish and remove the house, garage and barn which are located at 25906 116th Avenue SE. For a description, see the Contractor's Scope of Work which is attached as Exhibit A and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, the Contractor shall complete the work described in Section I by May 22, 2012. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Twenty Two Thousand, Three Hundred Thirty Eight Dollars ($22,338.00), including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this Agreement. A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $35,000, and pursuant to Chapter 39.08 PUBLIC WORKS AGREEMENT - 1 (Over$1OK, under$35K, and No Performance Bond) } RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contra ctor-Em to er Relationship will be created b this Agreement. B their execution of this P Y P Y 9 Y Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. PUBLIC WORKS AGREEMENT - 2 (Over$10K, under$35K, and No Performance Bond) E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. - TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed PUBLIC WORKS AGREEMENT - 3 (Over$1OK, under$35K, and No Performance Bond) with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an PUBLIC WORKS AGREEMENT - 4 (Over$10K, under$35K, and No Performance Bond) a a invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. PUBLIC WORKS AGREEMENT - 5 (Over$10K, under$35K, and No Performance Bond) The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. r The provisions of this section shall survive the expiration o termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by PUBLIC WORKS AGREEMENT - 6 (Over$I OK, under$35K, and No Performance Bond) filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. PUBLIC WORKS AGREEMENT - 7 (Over$10K, under $35K, and No Performance Bond) I. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By:_ By: (signature) (signature) Print Name: -SKIOCAl tyAtay-1 Print ame)iJette Cooke Its R-cs:A.v A Its a or (title) DATE: 1/30�/Z DATE: NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Skyler Waldal Timothy J. LaPorte, P.E. Skycorp Ltd. City of Kent 526 N. West Ave., Suite 11 220 Fourth Avenue South Arlington, WA 98223 Kent, WA 98032 (360) 926-8989 (telephone) (253) 856-5500 (telephone) 360 926-8987 facsimile (253) 856-6500 (facsimile) APPROVED AS TO FORM: 1� Kek Law Department Skycmp-Myers Demo rev/H= PUBLIC WORKS AGREEMENT - 8 (Over $10K, under$35K, and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. Dated this 30 day of &r , 20 By: For: u(op—rp Title: wcs�dua F Date: 41301/Z EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating 9 commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 i CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Skvcorn. Ltd. Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as 25906 116th Ave. SE Demolition that was entered into on the May 4. 2012, between the firm I represent and the City of Kent. I declare that I compiled fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this day of �tn�t , 201 z- . By: , For: [Ove' Lip. Title: Ykeoe.4 - Date: -:5W, 2G1 Z EEO COMPLIANCE DOCUMENTS - 1 EXHIBIT A SKYCORP, LTD. ' 526 N West Ave Suite#11,Arlington,WA 98223 Ph: (360)926-8989 Fax: (360)926-8987 Attn:Nick Horn City of Kent 400 West Gowe Kent,WA 98032 1 Re: 25906 Ile Ave SE,Kent WA,98030 house Removal i SMORP,LTD.Is pleased to provide the following revised proposal accordhg to the e-malted scope from City of Kent on February 3rd,2012 and phone conversation on April 17,2012 and April 23,2012 for your consideration: SKYCORP,LTD.will remove asbestos material per survey perJT Environmental and demolish,remove ! and dispose of three(3)structures for the amount of: Mobilization$900.00 House,Garage,Barn and Asbestos on survey$19,500.00 Exclusions: • W.S.S.T • Traffic Control Should there be anything that is not listed in this scope of work or encountered in performing the said work a change order proposal will be submitted to you. Should you have any questions concerning this proposal please feel free to contact us at anytime. Thank you, SKYCO P, D. S er Idai President Contract Total; $20,400.00 1,938.00 $22,338.00 { k www.skycorpltd.com EXHIBIT B INSURANCE REQUIREMENTS FOR CONSTRUCTION PROJECTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors and personal injury and advertising injury. The City shall be named as an insured under the Contactor's Commercial General Liability insurance policy with respect to the work performed for the City. 3. Excess Liability insurance covering both the Commercial General Liability and Automobile policies. 4. Pollution Legal Liability insurance covering losses caused by pollution conditions that arise from the operations of the Contractor. The Pollution Legal Liability insurance shall be written in an amount of at least $1,000,000 per loss, with an annual aggregate of at least $1,000,000. Coverage may be written on a claims-made basis. 5. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. EXHIBIT B (Continued) B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single it for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. �1V 3. written with limits no less than $1,000,000 Fence in oth the CGL and Auto Li o icies cited above. C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. EXHIBIT B (Continued) D. Contractor's Insurance For Other Losses The Contractor shall assume full responsibility for all loss or damage from any cause whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or contractors as well as to any temporary structures, scaffolding and protective fences. E. Waiver of Subrogation The Contractor and the City waive all rights against each other any of their Subcontractors, Sub-subcontractors, agents and employees, each of the other, for damages caused by fire or other perils to the extend covered by Builders Risk insurance or other property insurance obtained pursuant to the Insurance Requirements Section of this Contract or other property insurance applicable to the work. The policies shall provide such waivers by endorsement or otherwise. F. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. G. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the Automobile Liability and Commercial General Liability insurance of the Contractor before commencement of the work. H. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. Page 1 of 15 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 4/2/2012 County Trade Job Classification Wage Holiday Overtime Note King Asbestos Abatement Workers Journey Level $40.03 5D 1 H King Boilermakers Journey Level $60.24 5N 1C King Brick Mason Brick And Block Finisher $41.41 5A 1 M King Brick Mason Journey Level $48.27 5A 1M King Brick Mason Pointer-Caulker-Cleaner $48.27 5A 1M King Building Service Employees Janitor $19.52 5S 2F King Building Service Employees Traveling Waxer/shampooer $19.931 5S 2F King Building Service Employees Window Cleaner (Scaffold) $23.94 5S 2F King Building Service Employees Window Cleaner(non-scaffold) $23.08 5S 2F King Cabinet Makers (In Shops Journey Level $22 74 1 King Carpenters Acoustical Worker $48.63 5D 1M King Carpenters Bridge, Dock And Wharf Carpenters $48.47 5A 1M King Carpenters Carpenter $48.47 5D 1M King Carpenters Creosoted Material $48.57 5D 1M King Carpenters Floor Finisher $48 60 5D 1M King Carpenters Floor Layer $48.60 5D 1M King Carpenters Floor Sander $48.60 5D 1M King Carpenters Sawfiler $48.60 5D 1M King Carpenters Shingler $48.60 5D 1M King Carpenters Stationary Power Saw Operator $48.60 5D 1M King Carpenters Stationary Woodworking Tools $48.60 5D 1M King Cement Masons Journey Level $49.15 7A 1M King Divers Et Tenders Diver $100.28 5D 1M 8A King Divers Et Tenders Diver On Standby $56.68 5D 1M King Divers Ft Tenders Diver Tender $52.23 5D 1M King Divers & Tenders Surface Rcv 8 Rov Operator $52.23 5D 1M King Divers Et Tenders Surface Rcv 8t Rov Operator Tender $48.67 5A 1 B King Dredge Workers Assistant Engineer $49.57 5D 1T 8L King Dredge Workers Assistant Mate(deckhand) $49.06 5D 1T 8L King Dredge Workers Engineer Welder $49.621 5D 1T 8L King Dredge Workers Leverman, Hydraulic $51.191 5D 1T 8L King Dredge Workers Imaintenance $49.061 5D 1T 8L rttps•//fortress.wa.gov/lni/wagelookup/prvWagelookup aspx 4/2/2012 Page 2 of 15 King Dredge Workers Mates And Boatmen $49.57 5D 1T 8L King Dredge Workers Oiler $49.19 5D 1T 8L King Drywall Applicator Journey Level $48.47 5D 1M King Drywall Tapers Journey Level $48.79 5P 1 E King Electrical Fixture Maintenance Journey Level $25.34 5L 1 E Workers King Electricians - Inside Cable Splicer $61.93 7C 2W King Electricians - Inside Cable Splicer (tunnel) $66.55 7C 2W King Electricians - Inside Certified Welder $59.83 7C 2W King Electricians - Inside Certified Welder (tunnel) $64.23 7C 2W King Electricians_ Inside Construction Stock Person $31.83 7C 2W King Electricians - Inside Journey Level $57.72 7C 2W King Electricians - Inside Journey Level (tunnel) $61.93 7C 2W King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians -Powerline Construction Cable Splicer $64.95 5A 4A King Electricians - Powerline Construction Certified Line Welder $59.37 5A 4A King Electricians - Powerline Construction Groundperson $42.16 5A 4A King Electricians - Powerline Construction Head Groundperson $44.50 5A 4A King Electricians - Powerline Construction Heavy Line Equipment Operator $59.37 5A 4A King Electricians - Powerline Construction Jackhammer Operator $44.50 5A 4A King Electricians - Powerline Construction Journey Level Lineperson $59.37 5A 4A King Electricians -_Powerline Construction Line Equipment Operator $49.95 5A 4A King Electricians _Powerhne_C_onst_ruction Pole Sprayer $59.37 5A 4A King Electricians_-_Powerline Construction Powderperson $44.50 5A 4A King Electronic Technicians Journey Level $31.00 1 King Elevator_Constructors Mechanic $75.24 7D 4A King Elevator Constructors Mechanic In Charge $82.00 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory Work $14.15 56 2K Products Only King Fence Erectors Fence Erector $15.18 1 King flaggers Journey Level $33.93 7A 2Y King Glaziers Journey Level $50.91 7L 1y King Heat Et Frost Insulators And Asbestos Journeyman $55.68 5.1 is Workers King Heating Equipment Mechanics Journey Level $67.82 7F 1 E King Hod Carriers 8 Mason Tenders Journey Level $41.28 7A 2Y King Industrial Engine And Machine Journey Level $15 65 1 Mechanics King Industrial Power Vacuum Cleaner Journey Level $9.24 1 King Inland Boatmen Boat Operator $51.95 56 1K King Inland Boatmen Cook $48.62 5B 1K King Inland Boatmen Deckhand $48.62 5B 1K King Inland Boatmen Deckhand Engineer $49.60 5B 1K King Inland Boatmen Launch Operator $50.80 5B 1K King Inland Boatmen Mate $50.80 56 1K King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer Operator $31.49 1 Sewer Et Water Systems By Remote ittps //fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/2/2012 Page 3 of 15 Control King Inspection/Cleaning/Sealing Of Grout Truck Operator $11.48 1 Sewer Et Water Systems By Remote Control King Inspection/Cl_eaning/Sealing Of Head Operator $24.91 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing_Of Tv Truck Operator $20.45 1 Sewer £x_Water Systems By-Remote Control King Insulation Applicators Journey Level $48.47 5D 1M King Ironworkers Journeyman $58.27 7N 10 King Laborers Air, Gas Or Electric Vibrating Screed $40.031 7A 2Y King Laborers Airtrac Drill Operator $41.281 7A 2Y King Laborers Ballast Regular Machine $40.031 7A 2Y King Laborers Batch Weighman $33.93 7A 2Y King Laborers Brick Pavers $40.03 7A 2Y King Laborers Brush Cutter $40.03 7A 2Y King Laborers Brush Hog Feeder $40.03 7A 2Y King Laborers Burner $40.03 7A 2Y King Laborers Caisson Worker $41.28 7A 2Y King Laborers Carpenter Tender $40.03 7A 2Y King Laborers Caulker $40.03 7A 2Y King Laborers Cement Dumper-paving $40.77 7A 2Y King Laborers Cement Finisher Tender $40.03 7A 2Y King Laborers Change House Or Dry Shack $40.03 7A 2Y King Laborers Chipping Gun (under 30 Lbs.) $40.03 7A 2Y King Laborers Chipping Gun(30 Lbs. And Over) $40.77 7A 2Y King Laborers Choker Setter $40.03 7A 2Y King Laborers Chuck Tender $40.03 7A 2Y King Laborers Clary Power Spreader $40.77 7A 2Y King Laborers Clean-up Laborer $40.03 7A 2Y King Laborers Concrete Dumper/chute Operator $40.77 7A 2Y King Laborers Concrete Form Stripper $40.03 7A 2Y King Laborers Concrete Placement Crew $40.77 7A 2Y King Laborers Concrete Saw Operator/core Driller $40.77 7A 2Y King Laborers Crusher Feeder $33.93 7A 2Y King Laborers Curing Laborer $40.03 7A 2Y King Laborers Demolition: Wrecking 8t Moving $40.03 7A 2Y (incl. Charred Material) King Laborers Ditch Digger $40.03 7A 2Y King Laborers Diver $41.28 7A 2Y King Laborers Drill Operator (hydraulic,diamond) $40.77 7A 2Y King Laborers Dry Stack Walls $40 03 7A 2Y King Laborers Dump Person $40.03 7A 2Y King Laborers Epoxy Technician 1 $40.031 7A 2Y ittps://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/2/2012 Page 4 of 15 King Laborers Erosion Control Worker $40.03 7A 2Y King Laborers Falter Et Bucker Chain Saw $40.77 7A 2Y King Laborers Fine Graders $40.03 7A 2Y King Laborers Firewatch $33.93 7A 2Y King Laborers Form Setter $40.03 7A 2Y King Laborers Gabian Basket Builders $40.03 7A 2Y King Laborers General Laborer $40.03 7A 2Y King Laborers Grade Checker Et Transit Person $41.28 7A 2Y King Laborers Grinders $40.03 7A 2Y King Laborers Grout Machine Tender $40.03 7A 2Y King Laborers Groutmen (pressure)including Post $40.77 7A 2Y s Tension Beams King Laborers Guardrail Erector $40.03 7A 2Y King Laborers Hazardous Waste Worker (level A) $41.28 7A 2Y King Laborers Hazardous Waste Worker (level B) $40.77 7A 2Y King Laborers Hazardous Waste Worker (level C) $40.03 7A 2Y King Laborers High Scaler $41 28 7A 2Y King Laborers Jackhammer $40.77 7A 2Y King Laborers Laserbea m Operator $40.77 7A 2Y King Laborers Maintenance Person $40.03 7A 2Y King Laborers Manhole Builder-mudman $40.77 7A 2Y s King Laborers Material Yard Person $40.03 7A 2Y King Laborers Motorman-dinky Locomotive $40.77 7A 2Y King Laborers Nozzleman (concrete Pump, Green $40.77 7A 2Y Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gumte, Shotcrete, Water Bla King Laborers Pavement Breaker $40.77 7A 2Y King Laborers Pilot Car $33.93 7A 2Y King Laborers Pipe Layer Lead $41.28 7A 2Y King Laborers Pipe Layer/tailor $40.77 7A 2Y King Laborers Pipe Pot Tender $40.77 7A 2Y King Laborers Pipe Reliner $40.77 7A 2Y King Laborers Pipe Wrapper $40.77 7A 2Y King Laborers Pot Tender $40.03 7A 2Y King Laborers Powderman $41.28 7A 2Y King Laborers Powderman's Helper $40.03 7A 2Y King Laborers Power Jacks $40.77 7A 2Y King Laborers Railroad Spike Puller - Power $40.77 7A 2Y King Laborers Raker - Asphalt $41.28 7A 2Y King Laborers Re-timberman $41.28 7A 2Y King Laborers Remote Equipment Operator $40.77 7A 2Y King Laborers Rigger/signal Person $40.77j 7A 2Y King Laborers Rip Rap Person $40.03 7A 2Y King Laborers Rivet Buster $40.77 7A 2Y King Laborers Rodder $40.77 7A 2Y King Laborers Scaffold Erector $40.03 7A 2Y ttps://fortress.wa gov/lni/wagelookup/prvWagelookup.aspx 4/2/2012 Page 5 of 15 King Laborers Scale Person $40.03 7A 2Y King Laborers Sloper (over 20") $40.77 7A 2Y King Laborers Sloper Sprayer $40.03 7A 2Y King Laborers Spreader (concrete) $40.77 7A 2Y King Laborers Stake Hopper $40.03 7A 2Y King Laborers Stock Piler $40.031 7A 2Y King Laborers Tamper Et Similar Electric, Air a Gas $40.77 7A 2Y Operated Tools King Laborers Tamper (multiple Ft Self-propelled) $40.77 7A 2Y King Laborers Timber Person - Sewer (lagger, $40.77 7A 2Y Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $40.031 7A 2Y King Laborers Topper $40.031 7A 2Y King Laborers Track Laborer $40.03 7A 2Y King Laborers Track Liner (power) $40.77 7A 2Y King Laborers Truck Spotter $40.03 7A 2Y King Laborers Tugger Operator $40.77 7A 2Y King Laborers Tunnel Work-Compressed Air Worker $52.08 7A 2Y 8Q 0-30 psi King Laborers Tunnel Work-Compressed Air Worker $57.08 7A 2Y 8Q 30.01-44.00 psi King Laborers Tunnel Work-Compressed Air Worker $60.76 7A 2Y 8Q 44.01-54.00 psi King Laborers Tunnel Work-Compressed Air Worker $66.46 7A 2Y 8Q 54.01-60.00 psi King Laborers Tunnel Work-Compressed Air Worker $68.58 7A 2Y 8Q 60.01-64.00 psi King Laborers Tunnel Work-Compressed Air Worker $73.68 7A 2Y 8Q 64.01-68.00 psi King Laborers Tunnel Work-Compressed Air Worker $75.58 7A 2Y 8Q 68.01-70.00 psi King Laborers Tunnel Work-Guage and Lock Tender $41.38 7A 2Y 8Q King Laborers Tunnel Work-Miner $41.38 7A 2Y 8Q King Laborers Vibrator $40.77 7A 2Y King Laborers Vinyl Seamer $40.03 7A 2Y King Laborers Watchman $30.84 7A 2Y King Laborers Welder $40.77 7A 2Y King Laborers Well Point Laborer $40.77 7A 2Y King Laborers Window Washer/cleaner $30.84 7A 2Y King Laborers - Underground Sewer Et General Laborer Et Topman $40.03 7A 2Y Water King Laborers - Underground Sewer 8t Pipe Layer $40.77 7A 2Y Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment Operators Or $28.17 1 Truck Drivers King Landscape Construction Landscaping or Planting Laborers $17.87 1 King Lathers Journey Level $48.74 5D 1H King Marble Setters Journey Level $48.27 5A 1M ittps://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/2/2012 Page 6uf15 , " King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (In Shops Machine Operator $13.04 1 King Metal Fabrication (In Shop) Painter $11.10 1 King Metal Fabrication (In Shops Welder $15.48 1 King Millwright Journey Level $49.47 5D 1M King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11 56 1 King Modular Buildings Production Worker $9.40 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $35.72 6Z 2B King Pile Driver Journey Level $48.67 5A 1M King Plasterers Journey Level $46.88 7Q 1 R King Playground Et Park Equipment Journey Level $9.04 1 Installers King Plumbers Ft Pipefitters Journey Level $70.84 6Z 1G King Power Equipment Operators Asphalt Plant Operators $50.391 7A 1T 8P King Power E ui ment Operators Assistant Engineer $47.12 7A 1T 8P King Power Equipment Operators Barrier Machine (zipper) $49.90 7A 1T 8P King Power Equipment Operators Batch Plant Operator, Concrete $49.90 7A 1T 8P King Power Equipment Operators Bobcat $47.12 7A 1T 8P King Power Equipment Operators Brokk - Remote Demolition $47.12 7A 1T 8P Equipment King Power Equipment_Operators Brooms $47.121 7A 1T 8P King Power Equipment Operators Bump Cutter $49.901 7A 1T 8P King Power Equipment Operators Cableways $50.39 7A 1T 8P King Power Equipment Operators Chipper $49.90 7A 1T 8P King Power Equipment Operators Compressor $47.12 7A 1T 8P King Power Equipment Operators Concrete Pump: Truck Mount With $50.39 7A 1T 8P Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $47.12 7A 1T 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or Trailer $49.48 7A 1T 8P High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount With $49.90 7A 1T 8P Boom Attachment Up To 42m King Power Equipment Operators Conveyors $49.48 7A 1T 8P King Power Equipment Operators Cranes: 20 Tons Through 44 Tons $49.90 7A 1T 8P With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators Cranes: 100 Tons Through 199 Tons, $50.94 7A 1T 8P or 150' of boom (including jib with attachments); Overhead, bridge type, 100 tons and over; Tower ittps.Hfortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/2/2012 Page 7 of 15 crane up to 175'in height, base to boom. King Power Equipment Operators Cranes: 200 Tons To 300 Tons, Or $51.51 7A 1T 8P 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 Tons, $50.39 7A 1T 8P Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And Under $47.12 7A IT 8P King Power Equipment Operators Cranes: Friction 100 Tons Through $51.51 7A 1T 8P 199 Tons King Power E ui ment Operators Cranes: Friction Over 200 Tons $52.07 7A 1T 8P King Power Equipment Operators Cranes. Over 300 Tons Or 300'Of $52.07 7A 1T 813 Boom (including Jib With Attachments) King Power Equipment Operators Cranes: Through 19 Tons With $49.48 7A 1T 8P Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $49.90 7A 1T 8P King Power Equipment Operators Deck Engineer/deck Winches $49.90 7A 1T 8P (power) King Power Equipment Operators Derricks, On Building Work $50.39 7A 1T 8P King Power Equipment Operators Dozer Quad 9, HD 41, D10 and Over $50.39 7A 1T 8P King Power Equipment Operators Dozers D-9 It Under $49.48 7A 1T 8P King Power_Equipment Operators Drill Oilers: Auger Type, Truck Or $49.48 7A 1T 8P Crane Mount King Power Equi ment Operators Drilling Machine $49.90 7A 1T 8P King Power Equipment Operators Elevator And Man-lift: Permanent $47.12 7A 1T 8P And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $49.90 7A 1T 8P Gamaco Et Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over With $49.48 7A 1T 813 Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $47.12 7A 1T 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue Prints, $49.90 7A 1T 8P Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $47.12 7A 1T 8P King Power Equipment Operators Guardrail Punch/Auger $49.901 7A 1T 8P King Power Equipment Operators Hard Tail End Dump Articulating Off- $50.39 7A 1T 8P Road Equipment 45 Yards. i:t Over King Power E uipment Operators Hard Tail End Dump Articulating Off- $49.90 7A 1T 8P road Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill Locator $49.48 7A 1T 8P King Power Equipment 0 erp ators Horizontal/directional Drill Operator $49.90 7A 1T 8P King Power Equipment Operators Hydralifts/boom Trucks Over 10 $49.48 7A 1T 8P Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 Tons And $47.12 7A 1T 8P Under King Power Equipment Operators Loader, Overhead 8 Yards. 8t Over $50.94 7A 1T 8P King Power Equipment Operator s Loader, Overhead, 6 Yards. But Not $50.39 7A 1T 8P Including 8 Yards King P-wer Equipment Operators Loaders, Overhead Under 6 Yards $49.90 7A 1T 8P tttps://fortress wa.gov/lni/wagelookup/prvWagelookup.aspx 4/2/2012 Page 8 ref 15 King Power Equipment Operators Loaders, Plant Feed $49.90 7A 1T 8P King Power Equipment Operators Loaders: Elevating Type Belt $49.48 7A 1T 8P King Power Equiipment Operators Locomotives, All $49.90 7A 1T 8P King Power Equipment Operators Material Transfer Device $49.90 7A 1T 8P King Power Equipment Operators Mechanics, All (leadmen - $0.50 Per $50.94 7A 1T 8P Hour Over Mechanic) King Power Equipment Operators Mixers: Asphalt Plant $49.90 7A 1T 8P King Power Equipment Operators Motor Patrol Grader - Non-finishing $49.48 7A 1T 8P King Power Equipment Operators Motor Patrol Graders, Finishing $50.39 7A 1T 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel Drill, $50.39 7A 1T 8P Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower Distribution $47.12 7A 1T 8P Et Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $49.48 7A 1T 8P Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type- 45 Tons $50.39 7A 1T 8P Through 99 Tons King Power Equipment Operators Pavement Breaker $47.12 7A 1T 8P King Power Equipment Operators Pile Driver (other Than Crane Mount) $49.901 7A 1T 8P King Power Equipment Operators Plant Oiler - Asphalt, Crusher $49.48 7A 1T 8P King Power Equipment Operators Posthole Digger, Mechanical $47.12 7A 1T 8P King Power Equipment Operators Power Plant $47.12 7A 1T 8P King Power Equipment Operators Pumps - Water $47.12 7A 1T 8P King Power Equipment Operators Quick Tower - No Cab, Under 100 $47.12 7A 1T 8P Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On Rubber $50.39 7A 1T 8P Tired Earth Moving Equipment King Power Equipment Operators Rigger And Bellman $47.12 7A 1T 8P King Power Equipment Operators Rollagon $50.39 7A 1T 8P King Power Equipment Operators Roller, Other Than Plant Mix $47.12 7A 1T 8P King Power_Equipment_Operators Roller, Plant Mix Or Multi-lift $49.48 7A 1T 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $49.901 7A 1T 8P King Power Equipment Operators Saws - Concrete $49.48 7A 1T 8P King Power Equipment Operators Scraper, Self Propelled Under 45 $49.90 7A 1T 8P Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $49.48 7A 1T 8P King Power Equipment Operators Scrapers, Self-propelled: 45 Yards $50.39 7A 1T 8P And Over King Power Equipment Operators Service Engineers - Equipment $49.48 7A 1T 8P <ing Power Equipment Operators Shotcrete/gunite Equipment $47.12 7A 1T 8P <ing Power Equipment Operators Shovel , Excavator, Backhoe, $49.48 7A 1T 8P Tractors Under 15 Metric Tons. <ing Rower _Equipme_n_t Operators Shovel, Excavator, Backhoe: Over 30 $50.39 7A 1T 8P Metric Tons To 50 Metric Tons <ing Power Equipment Operators Shovel, Excavator, Backhoes, $49.90 7A 1T 8P Tractors: 15 To 30 Metric Tons <ing Power Equipment Operators Shovel, Excavator, Backhoes: Over $50 94 7A 1T 8P 50 Metric Tons To 90 Metric Tons <ing Power Equipment Operators Shovel, Excavator, Backhoes Over $51.51 7A 1T 8P ittps://fortress wa.gov/lni/wagelookup/prvWagelookup aspx 4/2/2012 Page 9 of 15 90 Metric Tons King Power Equipment Operators Slipform Pavers $50.39 7A 1T 8P King Power Equipment Operators Spreader, Topsider It Screedman $50.39 7A 11 8P King Power Equipment Operators Subgrader Trimmer $49.90 7A 1T 8P King Power Equipment Operators Tower Bucket Elevators $49.48 7A 1T 8P King Power Equipment Operators Tower Crane Over 175'in Height, $51.51 7A 1T 8P Base To Boom 1 King Power Equipment Operators Tower Crane Up To 175' In Height $50.94 7A 1T 8P Base To Boom King Power Equipment Operators Transporters, All Track Or Truck $50.39 7A 1T 8R Type King Power Equipment Operators Trenching Machines $49.48 7A 1T 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 Tons $49.90 7A 1T 8P And Over King Power Equipment Operators Truck Crane Oiler/driver Under 100 $49.48 7A 1T 8P Tons King Power Equipment Operators Truck Mount Portable Conveyor $49.90 7A 1T 8P King Power E ui ment Operators Welder $50.39 7A 1T 8P King Power Equipment Operators Wheel Tractors, FarmalL Type $47.12 7A 1T 8P King Power Equipment Operators Yo Yo Pay Dozer $49.90 7A 1T 8P King Power Equipment Operators- Asphalt Plant Operators $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $47.12 7A 1T 8P Underground_Sewer_$ Water King Power Equipment Operators_ Barrier Machine (zipper) $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, Concrete $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Bobcat $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $47.12 7A 1T 8P Underground Sewer Et Water Equipment (ing Power Equipment Operators- Brooms $47 12 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Bump Cutter $49.90 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Cableways $50.39 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Chipper $49.90 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Compressor $47.12 7A 1T 8P Underground Sewer 8t Water (ing Power Equipment Operators- Concrete Pump: Truck Mount With $50.39 7A 1T 8P Underground Sewer Et Water Boom Attachment Over 42 M (ing Power-Equipment Operators Concrete Finish Machine -laser $47.12 7A 1T 8P Underground Sewer Et Water Screed (ing Power Equipment Operators_ Concrete Pump - Mounted Or Trailer $49.48 7A 1T 8P Underground Sewer Et Water High Pressure Line Pump, Pump High Pressure. (ing Power Equipment Operators- Concrete Pump: Truck Mount With $49.90 7A 1T BP Underground Sewer Et Water Boom Attachment Up To 42m (ing Power Equipment Operators- Conveyors $49.48 7A iT 8P ttps.//fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/2/2012 Page 10 of 15 , Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 Tons $49.90 7A 1T 8P Underground Sewer Et Water With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, Or $51.51 7A 1T 8P Underground Sewer 8t Water 250' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 Tons, $50.39 7A 1T 8P Underground Sewer Et Water Under 150' Of Boom (including Jib With Attachments) ° King Power Equipment Operators_ Cranes: A-frame - 10 Tons And Under $47.12 7A 1T 8P Underground Sewer 8t Water King Power Equipment Operators- Cranes: Friction 100 Tons Through $51.51 7A 1T 8P Underground Sewer Et Water 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $52.07 7A 1T 8P Underground Sewer Ft Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300'Of $52.07 7A 1T 8P Underground Sewer Et Water Boom (including Jib With Attachments) King Power_Equipment Operators_ Cranes: Through 19 Tons With $49.48 7A 1T 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $49.90 7A 1T 8P Underground Sewer Ft Water King Power Equipment Operators- Deck Engineer/deck Winches $49.90 7A 1T 8P Underground Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Dozer Quad 9, HD 41, D10 and Over $50.39 7A 1T 8P Underground Sewer Et Water King Power EquipmentOperators Dozers D-9 Et Under $49.48 7A 1T 8P Underground Sewer Ft Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck Or $49.48 7A 1T 8P Underground Sewer Et Water Crane Mount King Power Equipment Operators- Drilling Machine $49.90 7A 1T 8P Underground Sewer Ft Water King Power Equipment Operators- Elevator And Man-lift: Permanent $47.12 7A 1T 8P Underground Sewer Et Water And Shaft Type King Power Equipment aerators- Finishing Machine, Bidwell And $49.90 7A 1T 8P Underground Sewer_Et_Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over With $49.48 7A 1T 8P Underground Sewer Et Water Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $47.12 7A 1T 8P Underground Sewer Et Water Attachments King Power Equipment Operators- Grade Engineer: Using Blue Prints, $49.90 7A 1T 8P Underground Sewer Et Water Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch/Auger $49.90 7A 1T 8P Underground Sewer Et Water King Power Egui ment_Operato_rs_ Hard Tail End Dump Articulating Off- $50.39 7A 1T 8P Underground Sewer Et Water Road Equipment 45 Yards. 8t Over King Power Equipment Operators- Hard Tail End Dump Articulating Off- $49.90 7A 1T 8P Underground Sewer Ft Water road Equipment Under 45 Yards ittps•//fortress.wa.gov/lni/wagelookup/prvWagelookup aspx 4/2/2012 Page 11 of 15 King Power Equipment Operators- Horizontal/directional Drill Locator $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Horizontal/directional Drill Operator $49.90 7A 1T 8P Underground Sewer & Water King Power Equipment Operators- Hydralifts/boom Trucks Over 10 $49.48 7A 1T 8P Underground Sewer Et Water Tons w King Power Equipment Operators- Hydralifts/boom Trucks, 10 Tons And $47.12 7A 1T 8P Underground Sewer Et Water Under King Power Equipment Operators- Loader, Overhead 8 Yards. Et Over $50.94 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Loader, Overhead, 6 Yards. But Not $50 39 ZA 1T 8P Underground Sewer Et Water Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 Yards $49.90 7A 1T 813 Unclprg nd Sewer a Water King Power Equipment Operators- Loaders, Plant Feed $49.90 7A 1T 8P Underground Sewer 8t Water i King Power Equipment Operators- Loaders: Elevating Type Belt $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $49.90 7A 1T 813 Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $0.50 Per $50 94 7A 1T 8P Underground_Sewer Et Water Hour Over Mechanic) King Po wer_Equipment_Operators_ Mixers: Asphalt Plant $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Grader - Non-finishing $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Graders, Finishing $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel Drill, $50.39 7A 1T 8P Underground Sewer Et Water Boring, Road Header And/or Shield King Power E ui ment Operators- Oil Distributors, Blower Distribution $47.12 7A 1T 8P Underground_Sewer Et Water Et Mulch Seeding Operator King Power Equipment-Operators- Outside Hoists (elevators And $49.48 7A 1T 8P Underground Sewer Et Water Manlifts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type: 45 Tons $50.39 7A 1T 8P Underground Sewer Et Water Through 99 Tons King Power Equipment Operators- Pavement Breaker $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Pile Driver (other Than Crane Mount) $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $49.48 7A 1T 8P Underground_Sewer Et Water King Power Equipment Operators- Posthole Digger, Mechanical $47.12 7A 1T 8P Underground Sewer Et Water 4 King Power Equipment Operators- Power Plant $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under 100 $47.12 7A 1T 8P Underground Sewer Et Water Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On Rubber $50.39 7A 1T 8P ittps•//fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/2/2012 Page 12-d 15 , " Underground Sewer & Water Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $47.12 7A 1T 8P Underground Sewer 8t Water King Power Equipment Operators- Rollagon $50.39 7A 1T 8P Underground_Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $49.48 7A 1T 8P Underground Sewer Ex Water Materials King Power Equipment Operators- Roto-mill, Rota-grinder $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under 45 $49.90 7A 1T 8P Underground Sewer & Water Yards King Power Equipment Operators_ Scrapers - Concrete Et Carry All $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 Yards $50.39 7A 1T 8P Underground Sewer Et Water And Over King Power Equipment Operators- Service Engineers - Equipment $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $47.12 7A 1T 8P Underground Sewer & Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $49.48 7A 1T 8P Underground Sewer 8t Water Tractors Under 15 Metric Tons. King Power Equipment Opera_t_ors- Shovel, Excavator, Backhoe Over 30 $50.39 7A 1T 8P Underground Sewer Et Water Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $49.90 7A 1T 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: Over $50.94 7A 1T 8P Underground Sewer Et Water 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: Over $51.51 7A 1T 8P Underground Sewer ft Water 90 Metric Tons King Power Equipment Operators- Slipform Pavers $50.39 7A 1T 8P Underground Sewer & Water King Power-Equipment Operators Spreader, Topsider 8t Screedman $50.39 7A 1T 8P Underground Sewer & Water King Power Equipment Operators- Subgrader Trimmer $49.90 7A 1T 8P Underground Sewer & Water King Power Equipment Operators- Tower Bucket Elevators $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'in Height, $51.51 7A 1T 81) Underground Sewer & Water Base To Boom King Power E uipment Operators- Tower Crane Up To 175' In Height $50.94 7A 1T 8P Underground Sewer & Water Base To Boom King Power Equipment Operators- Transporters, All Track Or Truck $50.39 7A 1T 8P Underground Sewer & Water Type King Power Equipment Operators- Trenching Machines $49.48 7A 1T 8P Underground Sewer & Water King Power Equipment Operators- Truck Crane Oiler/driver - 100 Tons $49.90 7A 1T 8P Underground Sewer & Water And Over King Power Equipment Operators- Truck Crane Oiler/driver Under 100 $49.48 7A 1T 8P Underground Sewer & Water Tons tttps://fortress.wa.gov/lni/wagelookup/prvWagelookup aspx 4/2/2012 Page 13 of 15 King Power Equipment Operators- Truck Mount Portable Conveyor $49.90 7A 1T 8P Underground Sewer 8t Water King Power E ui ment Operators- Welder $50.39 7A 1T 8P Underground Sewer_8t Water King Power Equipment Operators- Wheel Tractors, Farman Type $47.12 7A 1T 8P Underground Sewer a Water King Power Equipment Operators- Yo Yo Pay Dozer $49.90 7A 1T 8P Underground Sewer Et Water King Power Line Clearance Tree Trimmers Journey Level In Charge $42.91 5A 4A King Power Line Clearance Tree Trimmers Spray Person $40.73 5A 4A King Power Line Clearance Tree Trimmers Tree Equipment Operator $41.29 5A 4A King Power Line Clearance Tree Trimmers Tree Trimmer $38.38 5A 4A King Power Line Clearance Tree Trimmers Tree Trimmer Groundperson $28.95 5A 4A King Refrigeration Et Air Conditioning Journey Level $69.96 6Z 115 Mechanics King Residential Brick Mason Journey Level $48.27 5A 1M King Residential Carpenters Journey Level $28 20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $38.08 5D 1M King Residential Drywall Tapers Journey Level $48.79 5P 1 E King Residential Electricians JOURNEY LEVEL $30.44 1 King Residential Glaziers Journey Level $34.601 7L 1H King Residential Insulation Applicators Journey Level $26.28 1 King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Pipefitters Journey Level $34.69 1 King Residential Refrigeration Et Air Journey Level $69.96 6Z 1G Conditioning Mechanics j King Resi-dential Sheet_Metal Workers Journey Level (Field or Shop) $40.04 7F 111 King Residential Soft Floor Layers Journey Level $41.95 5A 2Z King Residential Sprinkler Fitters (Fire Journey Level $41.31 5C 211 ; Protection) King Residential Stone Masons Journey Level $48.27 5A 1M King Residential Terrazzo Workers Journey Level $43.93 5A 1M King Residential Terrazzo/Tile Finishers Journey Level $21.461 1 King Residential Tile Setters Journey Level $25.17 1 King Roofers Journey Level $43.65 5A 111 King Roofers Using Irritable Bituminous Materials $46.65 5A 111 King Sheet Metal Workers Journey Level (Field or Shop) $67.82 7F 1 E King Shipbuilding Et Ship Repair Boilermaker $35.83 7M 1H King Shipbuilding Et Ship Repair Carpenter $36.62 70 3B King Shipbuilding Et Ship Repair Electrician $36.23 70 3B King Shipbuilding Et Ship Repair Heat Et Frost Insulator $55.68 5J 1S King Shipbuilding Et Ship Repair Laborer $34.82 70 3B King Shipbuilding Et Ship Repair Machinist $36 19 70 36 King Shipbuilding Et Ship Repair Operator $38.58 70 3B King Shi building Et Ship Repair Painter $36.21 70 3B ittps*//fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 4/2/2012 Page 14 6f 15 , King Shipbuilding 8 Ship Repair Pipefitter $36.16 70 3B King Shipbuilding £t Ship Repair Rigger $36.16 70 3B King Shipbuilding £t Ship Repair Sandblaster $35.17 70 36 King Shipbuilding £t Ship Repair Sheet Metal $36.14 70 3B King Shipbuilding £t Ship Repair Shipfitter $36.16 70 3B King Shipbuilding £t Ship Repair Trucker $36.00 70 313 King Shipbuilding 8t Ship Repair Warehouse $36.06 70 36 King Shipbuilding £t Ship Repair Welder/Burner $36.16 70 3B King Sign Makers 8t Installers (_Electrical) Sign Installer $22.92 1 King Sign Makers Et Installers (Electrical) Sign Maker $21.36 1 King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electricatj King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electrical) King Soft Floor Lavers Journey Level $41.95 5A 2Z King Solar-Controls For Windows Journey Level $12.441 1 King Sprinkler Fitters (Fire Protection) Journey Level $68.79 5C 1X King Stage-Rigging Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Joumey Level $48.27 5A 1M King Street And Parking Lot Sweeper Journey Level $19.09 1 Workers King Surveyors Assistant Construction Site Surveyor $49.48 7A 1T 8P King Surveyors Chamman $48.96 7A 1T 8P King Surveyors Construction Site Surveyor $50.39 7A 1T 8P King Telecommunication Technicians Journey Level $22.76 1 King Telephone Line Construction - Cable Splicer $34.20 5A 2B Outside King Telephone Line Construction - Hole Digger/Ground Person $18.72 5A 2B Outside King Telephone Line Construction_ Installer (Repairer) $32.78 5A 2B Outside King Telephone Line Construction - Special Aparatus Installer 1 $34.20 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer 11 $33.51 5A 2B Outside King Telephone Line Construction - Telephone Equipment Operator $34.21 5A 2B Outside (Heavy) King Telephone Line Construction - Telephone Equipment Operator $31.81 5A 2B Outside (Light) King Tet_ephone Line Construction - Telephone Lineperson $31.81 5A 2B Outside King Telephone Line Construction - Television Groundperson $18.16 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $24.09 5A 213 Outside King Telephone Line Construction - Television System Technician $28.72 5A 2B Outside King Telephone Line Construction - Television Technician $25.81 5A 26 Outside King Telephone Line Construction_ Tree Trimmer 1 $31.82 5A 213 ittps://fortress.wa gov/lni/wagelookup/prvWagelookup.aspx 4/2/2012 Page 15 of 15 Outside King Terrazzo Workers Journey Level $43.93 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble 8 Terrazzo Finishers Finisher $37.76 5A 113 King Traffic Control Stripers Journey Level $40.73 7A 1 K King Truck Drivers Asphalt Mix Over 16 Yards (W. WA- $46.97 5D 3A 8L Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. WA- $46.13 5D 3A 8L Joint Council 28) King Truck Drivers Dump Truck Et Trailer $46.97 5D 3A 8L King Truck Drivers Dump Truck (W. WA-Joint Council $46.13 5D 3A 8L 28) King Truck Drivers Other Trucks (W. WA-Joint Council $46.97 51) 3A 8L 28) King Truck Drivers Transit Mixer $23.45 1 King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers fi Irrigation Pump Oiler $12.97 1 Installers King Well Drillers £t Irrigation Pump Well Driller $18.00 1 Installers ittps.//fortress.wa.gov/lni/wagelookup/prvWagelookup aspx 4/2/2012 i BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012 OVERFIME CODES OVERTIME CALCULATIONS ARE BASED ON THE IIOURLY RATE ACTUALLY PAID TO FHE WORKER. ON PUBLIC WORKS PROJECTS,THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE HOURLY RATE OF THE COST OF FRINGE BENEFITS ACTUALLY PROVIDED FOR THE WORKER. 1 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY (40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE C THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN(10)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER OVERTIME HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. D THE FIRST TWO(2)HOURS BEFORE OR AFTER A FIVE-EIGHT(8)HOUR WORKWEEK DAY OR A FOUR-TEN(10) HOUR WORKWEEK DAY AND THE FIRST EIGHT (8) HOURS WORKED THE NEXT DAY AFTER EITHER WORKWEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL ADDITIONAL HOURS WORKED AND ALL WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE E. THE FIRST TWO (2) HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT(8)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY,AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE F. THE FIRST TWO (2)HOURS AFTER EIGHT (8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN(10)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE G THE FIRST TEN(10) HOURS WORKED ON SATURDAYS AND THE FIRST TEN(10)HOURS WORKED ON A FIFTH CALENDAR WEEKDAY IN A FOUR-TEN HOUR SCHEDULE,SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OFTEN(10)HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE H ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (12)HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE I. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID AT ONE AND DOUBLE THE HOURLY RATE OF WAGE J THE FIRST TWO (2) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN(10)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-FIALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED OVER TEN (10) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE K ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE L. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE M ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL,BE PAID AT DOUBLE THE HOURLY RATE OF WAGE N ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012 -2- 1. O THE FIRST TEN (10) HOURS WORKED ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS,HOLIDAYS AND AFTER TWELVE (12)HOURS, MONDAY THROUGH FRIDAY, AND AFTER TEN (10) HOURS ON SATURDAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE P. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF CIRCUMSTANCES WARRANT) AND SUNDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE Q. THE FIRST TWO (2) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND UP TO TEN (10)IIOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND ONE- HALF TIMES THE HOURLY RATE OF WAGE R. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE S. THE FIRST TWO (2) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT(8)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF LIMES THE HOURLY RATE OF WAGE ALL YOURS WORKED ON HOLIDAYS AND ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE T WORK PERFORMED IN EXCESS OF EIGHT (8) HOURS OF STRAIGHT TIME PER DAY, OR TEN (10) HOURS OF STRAIGHT TIME PER DAY WHEN FOUR TEN (10) HOUR SHIFTS ARE ESTABLISHED, OR FORTY(40)HOURS OF STRAIGHT TIME PER WEEK,MONDAY THROUGH FRIDAY,OR OUTSIDE THE NORMAL SHIFT,AND ALL WORK ON SATURDAYS SHALL BE PAID AT TIME AND ONE-HALF THE STRAIGHT TIME RATE HOURS WORKED OVER TWELVE HOURS (12)IN A SINGLE SHIFT AND ALL WORK PERFORMED AFTER 6 00 PM SATURDAY TO 6 00 AM MONDAY AND HOLIDAYS SHALL BE PAID AT DOUBLE THE STRAIGHT TIME RATE OF PAY THE EMPLOYER SHALL HAVE THE SOLE DISCRETION TO ASSIGN OVERTIME WORK TO EMPLOYEES PRIMARY CONSIDERATION FOR OVERTIME WORK SHALL BE GIVEN TO EMPLOYEES REGULARLY ASSIGNED TO THE WORK TO BE PERFORMED ON OVERTIME SITUATIONS AFTER AN EMPLOYEE HAS WORKED EIGHT(8)HOURS AT AN APPLICABLE OVERTIME RATE, ALL ADDITIONAL HOURS SHALL BE AT THE APPLICABLE OVERTIME RATE UNTIL SUCH TIME AS THE EMPLOYEE HAS HAD A BREAK OF EIGHT(8)HOURS OR MORE U. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE V ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS(EXCEPT THANKSGIVING DAY AND CHRISTMAS DAY) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON THANKSGIVING DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE W ALL HOURS WORKED ON SATURDAYS AND SUNDAYS(EXCEPT MAKE-UP DAYS DUE TO CONDITIONS BEYOND THE CONTROL OF THE EMPLOYER)) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALLBE PAID AT DOUBLE THE HOURLY RATE OF WAGE X. THE FIRST FOUR(4)HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TWELVE (12) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED OVER TWELVE (12) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE WHEN HOLIDAY FALLS ON SATURDAY OR SUNDAY, THE DAY BEFORE SATURDAY, FRIDAY, AND THE DAY AFTER SUNDAY, MONDAY, SHALL BE CONSIDERED THE HOLIDAY AND ALL WORK PERFORMED SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE Y ALL HOURS WORKED OUTSIDE THE HOURS OF 5 00 AM AND 5 00 PM (OR SUCH OTHER HOURS AS MAY BE AGREED UPON BY ANY EMPLOYER AND THE EMPLOYEE)AND ALL HOURS WORKED IN EXCESS OF EIGHT(8) HOURS PER DAY (10 HOURS PER DAY FOR A 4 X 10 WORKWEEK) AND ON SATURDAYS AND HOLIDAYS (EXCEPT LABOR DAY)SHALL BE PAID AT ONE AND ONE-HALF TIMES I HE HOURLY RATE OF WAGE (EXCEPT FOR EMPLOYEES WHO ARE ABSENT FROM WORK WITHOUT PRIOR APROVAL ON A SCHEDULED WORKDAY DURING THE WORKWEEK SHALL BE PAID AT THE STRAIGHT-TIME RATE UNTIL THEY HAVE WORKED 8 HOURS IN A DAY(10 IN A 4 X 10 WORKWEEK)OR 40 HOURS DURING THAT WORKWEEK)ALL HOURS WORKED MONDAY THROUGH SATURDAY. OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND LABOR DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012 -3- 1 Z. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID THE STRAIGHT TIME RATE OF PAY IN ADDITION TO HOLIDAY PAY 2. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE C. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE F THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE G ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE INCLUDING HOLIDAY PAY H ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE K ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY O. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE R ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS AND ALL HOURS WORKED OVER SIXTY(60)IN ONE WEEK SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE U ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED OVER 12 HOURS IN A DAY,OR ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE W THE FIRST TWO (2) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT(8)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY,AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ON A FOUR-DAY,TEN-HOUR WEEKLY SCHEDULE,EITHER MONDAY THRU THURSDAY OR TUESDAY THRU FRIDAY SCHEDULE,ALL HOURS WORKED AFTER TEN SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE THE FIRST EIGHT(8)HOURS WORKED ON THE FIFTH DAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER HOURS WORKED ON THE FIFTH,SIXTH,AND SEVENTH DAYS AND ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE Y. ALL HOURS WORKED ON SATURDAYS(EXCEPT FOR MAKE-UP DAYS)SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE Z ALL HOURS WORKED MONDAY THROUGH FRIDAY BETWEEN THE HOURS OF 6 00 P M AND 6 00 A.M.AND ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, EXCEPT FOR COMMERCIAL, OCCUPIED BUILDINGS WHERE FLOOR COVERING WORK CANNOT BE PERFORMED IN THE REGULAR DAYTIME HOURS DUE TO OCCUPANCY FOR SUCH OCCUPIED, COMMERCIAL BUILDINGS,THE EMPLOYEE MAY AGREE TO WORK BETWEEN THE HOURS OF 6 00 PM TO 6 00 AM MONDAY THROUGH SATURDAY MORNING AT 6 00 AM AT AN OVERTIME PAY RATE OF 10%OVER THE STRAIGHT TIME RATE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012 -4- 3. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A WORK PERFORMED IN EXCESS OF EIGHT (8) HOURS OF STRAIGHT TIME PER DAY, OR TEN (10) HOURS OF STRAIGHT TIME PER DAY WHEN FOUR TEN (10) HOUR SHIFTS ARE ESTABLISHED, OR FORTY (40)HOURS OF STRAIGHT TIME PER WEEK, MONDAY THROUGH FRIDAY, OR OUTSIDE THE NORMAL SHIFT, AND ALL WORK ON SATURDAYS SHALL BE PAID AT TIME AND ONE-HALF THE STRAIGHT TIME RATE HOURS WORKED OVER TWELVE HOURS (12)IN A SINGLE SHIFT AND ALL WORK PERFORMED AFTER 6 00 PM SATURDAY TO 6 00 AM MONDAY AND HOLIDAYS SHALL BE PAID AT DOUBLE THE STRAIGHT TIME RATE OF PAY ANY SHIFT STARTING BETWEEN THE HOURS OF 6 00 PM AND MIDNIGHT SHALL RECEIVE AN ADDITIONAL ONE DOLLAR ($1 00)PER HOUR FOR ALL HOURS WORKED THAT SHIFT THE EMPLOYER SHALL HAVE THE SOLE DISCRETION TO ASSIGN OVERTIME WORK TO EMPLOYEES PRIMARY CONSIDERATION FOR OVERTIME WORK SHALL BE GIVEN TO EMPLOYEES REGULARLY ASSIGNED IO THE WORK TO BE PERFORMED ON OVERTIME SITUATIONS AFTER AN EMPLOYEE HAS WORKED EIGHT(8)HOURS AT AN APPLICABLE OVERTIME RATE, ALL ADDITIONAL HOURS SHALL BE AT THE APPLICABLE OVERTIME RATE UNTIL SUCH TIME AS THE EMPLOYEE HAS HAD A BREAK OF EIGHT(8)HOURS OR MORE. B. THE FIRST FOUR(4)HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TWELVE (12) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED OVER TWELVE (12) HOURS MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE TIIE 14OURLY RATE OF WAGE 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY (40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. B ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS)SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. HOLIDAY CODES 5 A HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7) B. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY,THE DAY BEFORE CHRISTMAS,AND CHRISTMAS DAY(8) C HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) D HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8), H HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,THANKSGIVING DAY,THE DAY AFTER THANKSGIVING DAY,AND CHRISTMAS(6) I HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY(6) J. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY, INDEPENDENCE DAY,THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY,CHRISTMAS EVE DAY,AND CHRISTMAS DAY(7) K HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS,AND CHRISTMAS DAY(9) BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012 -5- 5. L HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) N. HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS'DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(9) P HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS,AND CHRISTMAS DAY (9) IF A HOLIDAY FALLS ON SUNDAY,THE FOLLOWING MONDAY SHALL BE CONSIDERED AS A HOLIDAY R. PAID HOLIDAYS NEW YEAR'S DAY, '.MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7 1/2) S PAID HOLIDAYS NEW YEAR'S DAY,PRESIDENTS'DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY, THANKSGIVING DAY,AND CHRISTMAS DAY(7) T PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,THANKSGIVING DAY THE FRIDAY AFTER THANKSGIVING DAY,CHRISTMAS DAY,AND THE DAY BEFORE OR AFTER CHRISTMAS(9) Z HOLIDAYS. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) 6. A. PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY, THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) E PAID HOLIDAYS NEW YEAR'S DAY,DAY BEFORE OR AFTER NEW YEAR'S DAY,PRESIDENTS DAY, MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,DAY AFTER THANKSGIVING DAY,CHRISTMAS DAY,AND A HALF-DAY ON CHRISTMAS EVE DAY (9 1/2) G. PAID HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY,CHRISTMAS DAY,AND CHRISTMAS EVE DAY(11) H. PAID HOLIDAYS- NEW YEAR'S DAY, NEW YEAR'S EVE DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER CHRISTMAS,AND A FLOATING HOLIDAY(10) I PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7) Q PAID HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY, INDEPENDENCE DAY,LABOR DAY,VETERANS DAY,IHANKSGIVING DAY,THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY(8) UNPAID HOLIDAY PRESIDENTS'DAY T PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY,AND CHRISTMAS DAY(9) Z HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7) IF A HOLIDAY FALLS ON SATURDAY,THE PRECEDING FRIDAY SHALL BE CONSIDERED AS THE HOLIDAY IF A HOLIDAY FALLS ON SUNDAY,THE FOLLOWING MONDAY SHALL BE CONSIDERED AS THE HOLIDAY 7 A. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY IF ANY OF THE LISTED HOLIDAYS FALLS ON A SATURDAY,THE PRECEDING FRIDAY SHALL BE A REGULAR WORK DAY, B HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (9) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012 -6- 7 C. HOLIDAYS NEW YEAR'S DAY,MARTIN LUTHER KING JR DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY D. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) UNPAID HOLIDAYS PRESIDENT'S DAY ANY PAID HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY PAID HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY E. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY (7) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY F. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY AND CHRISTMAS DAY (8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY G HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,AND CHRISTMAS DAY (6) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY H. HOLIDAYS NEW YEAR'S DAY,MARTIN LUTHER KING JR.DAY,INDEPENDENCE DAY,MEMORIAL DAY,LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY AND CHRISTMAS DAY(9) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY I HOLIDAYS NEW YEAR'S DAY, PRESIDENT'S DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS DAY AND CHRISTMAS DAY (9) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY J HOLIDAYS NEW YEAR'S DAY,INDEPENDENCE DAY,MEMORIAL DAY,LABOR DAY,THANKSGIVING DAY AND CHRISTMAS DAY (6) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY K HOLIDAYS,NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,THANKSGIVING DAY,THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY L. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,LABOR DAY,INDEPENDENCE DAY,THANKSGIVING DAY,THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY M. PAID HOLIDAYS NEW YEAR'S DAY, THE DAY AFTER OR BEFORE NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND THE DAY AFTER OR BEFORE CHRISTMAS DAY 10) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY N. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY(7) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY WHEN CHRISTMAS FALLS ON A SATURDAY,THE PRECEDING FRIDAY SHALL BE OBSERVED AS A HOLIDAY A BENEFIT CODE KEY-EFFECTIVE 03-02-2012 THRU 08-30-2012 -7- 7. 0 PAID HOLIDAYS NEW YEAR'S DAY, THE DAY AFTER OR BEFORE NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY,CHRISTMAS DAY THE DAY AFTER OR BEFORE CHRISTMAS DAY,AND THE EMPLOYEES BIRTHDAY 11) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON HIE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY. P HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY Q HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY AND CHRISTMAS DAY (8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY IF ANY OF THE LISTED HOLIDAYS FALLS ON A SATURDAY,THE PRECEDING FRIDAY SHALL BE A REGULAR WORK DAY NOTE CODES 8 A. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS,THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE OVER 50'TO 100'-$2 00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100'TO 150'-$3 00 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150'TO 220'-$4 00 PER FOOT FOR EACH FOOT OVER 150 FEET OVER 220'-$5 00 PER FOOT FOR EACH FOOT OVER 220 FEET C IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS,THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE OVER 50'TO 100'-$1 00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100'TO 150'-$1 50 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150'TO 200'-$2 00 PER FOOT FOR EACH FOOT OVER 150 FEET OVER 200'-DIVERS MAY NAME THEIR OWN PRICE D WORKERS WORKING WITH SUPPLIED AIR ON HAZMAT PROJECTS RECEIVE AN ADDITIONAL$1 00 PER HOUR L. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A $0 75, LEVEL B $0 50,AND LEVEL C $0 25 M. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS LEVELS A& B $1 00,LEVELS C&D $0 50 N WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS -LEVEL A: $1.00, LEVEL B $0 75,LEVEL C $0 50,AND LEVEL D $0 25 P WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - CLASS A SUIT $2 00,CLASS B SUIT $1 50, CLASS C SUIT $1,00,AND CLASS D SUIT$0 50 Q THE HIGHEST PRESSURE REGISTERED ON THE GAUGE FOR AN ACCUMULATED TIME OF MORE THAN FIFTEEN (15)MINUTES DURING THE SHIFT SHALL BE USED IN DETERN4INING THE SCALE PAID CERTIFICATE OF LIABILITY INSURANCE DATDIYYYY) 04/0612/06/20,2 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT' If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). RODUCER CONTACT NAME larker,Smith&Feek, Inc PHONE FAX '233 112th Avenue NE c.Exti.425-709-3600 (AC.No 425-709-7460 E-MAIL Iellevue,WA 98004 ADDRESS PRODUCER C STOMER ID 0. INSURERS)AFFORDING COVERAGE NAIC M 1SURED SkyCorp,LTD INSURER Rockhill Insurance Company 526 NW Avenue Suite 11 INSURER B Continental Western Insurance Company Arlington,WA 98223 INSURER C INSURER D INSURER E INSURER F :OVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS SRT TYpE OF INSURANCE ADDLI UBR POLICY EFF POLICY EXP LIMITS TR POLICY NUMBER MM/DDIYYYY MMIODNYYY 4 GENERAL LIABILITY RPKGE00506101 4/42012 4/4/2013 EACH OCCURRENCE $ 1.000,000 x COMMERCIAL GENERAL LIABILITY �X'r PREMISES Ea occurrence $ 50000 J CLAIMS-MADE �i OCCUR I MED EXP(Any one person) $ 5.00 PERSONAL&ADV INJURY $ 1 000.1 '(GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGG $ POLICY X JE O Loc $2 500 Deductible $ AUTOMOBILE LIABILITY CA2928985 COMBINED SINGLE LIMIT 3 4/4/2012 4l4/2013 $(Es $ 1,000,00x] A0 ALL AUTO 1 ^ - pe 1 BODILY INJURY(Per rson) ALLOWNED AUTOS BODILY INJURY(Per accident) $ SCHEDULED AUTOS PROPERTY DAMAGE HIRED AUTOS (Per III $ NON-OWNED AUTOS $ $ UMBRELLA LIAB OCCUR EACH OCCURRENCE $ EXCESS LIAB CLAIMS-MADE f F_ rEL EGATE $ DEDUCTIBLE I $ RETENTION $ $ WORKERS COMPENSATION RPKGE00506101 4/4/2012 4/4/2013O Y L MT WC �s_,X_i ER AND EMPLOYERS'LIABILITY �— ANY PROPRIETORIPARTNEWEXECUTIVE YIN ..Washington State Stop Gap OFFICER/MEMBER EXCLUDED? NIA F _Employers Liability only ACH ACCIDENT $ 1OOO OOO (Mandatory in NH) ISEASE-EA EMPLOYE $ 1 000 000 If yes describe under ISEASE POLICY LIMIT $ 1 ,000,000 Pollution Liability [- I_' RPKGE00506101 4/4/2012 4/4/2013 $1,000,000 each condition (Occurrence with$2,500 Deductible) ' ^ I $2,000,000 Aggregate ESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (Attach ACORD 101,Additional Remarks Schedule,If mom space is required) ity of Kent is included as Additional Insured for General Liability per the attached Endorsement CG2037 0704,for Auto Liability per Endorsement CW3468 110,and for Pollution Liability per Endorsement RHIC 6227 0708 Cancels and Replaces Previous Certificate :ERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS City of Kent AUTHORIZED REPRESENTATIVE WestGowe Kent, 9803 Kent,WA 98032 01988-2009 ACORD CORPORATION All rights reserved. CORD 25(2009/09) The ACORD name and loon are registered marks of ACORD CA 2928985 - 23 04/D4/11 MAD 05/09/11 ' THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY COMMERCIAL AUTOMOBILE EXPANSION ENDORSEMENT - PLATINUM This endorsement modes insurance provided under the following: BUSINESS AUTO COVERAGE FORM The following provides a broad range of coverage in addition to that provided by the basic policy. In some Instances, a higher limit or broader coverage is available. Should the policy indicate broader coverage or higher limits than provided by this endorsement, the higher limits or broader coverage shall apply- A. BROADENED NAMED INSURED those specified in the written con- The Named Insured shown in the Declarations is tract or agreement, or in this cover- amended to include age form, whichever is less These limits of insurance are inclusive of Any organization, other than a joint venture, over and are not in addition to the Limits which you maintain ownership or majority inter- of Insurance shown in the Declara- est of more than 50%, unless that organization tions is an "insured" under any other automobile pol- (4) This insurance applies on a primary icy or would be an "insured" under such a policy and non-contributory basis if that is but for the exhaustion of its Limit of Insurance, required by the written contract or however, agreement 1. Coverage under this provision is afforded (5) This insurance does not apply only until the 180th day after you acquire or unless the written contract or form the organization or the end of the policy agreement has been executed prior period, whichever is earlier to the "bodily injury" or "property 2. Coverage does not apply to "bodily injury" or damage" property damage' that occurred before you C. ADDITIONAL INSURED -EMPLOYEES acquired or formed the organization. S. ADDITIONAL INSURED BY CONTRACT OR The following is added to the Section II- Liability AGREEMENT Coverage, Paragraph A.1. Who Is An Insured Provision. The following is added to Section II - Liability Any "employee" of yours is an "insured" while us- Coverage, Paragraph A.1. ing a covered "auto" you don't own, hire or borrow d. Any person or organization for whom you in your business or your personal affairs are performing operations if you and such D. EXTENDED COVERAGE - BAIL BONDS person or organization have agreed in writ- ing in a contract or agreement that such Section II - Liability Coverage, Paragraph person or organization be added as an adds- A.2.a.(2) is deleted and replaced by the follow- tional insured on your policy ing (1) Such person or organization is an (2) Up to $3,000 for cost of ball bonds additional insured only with respect (including bonds for related traffic to liability for "bodily injury" or"prop- law violations) required because of erty damage" an "accident" we cover We do not (a) Caused by an"accident", and have to furnish these bonds (b) Resulting from the ownership, E. EXTENDED COVERAGE - LOSS OF EARN- maintenance or use of a cov- ING ered "auto" Section 11 - Liability Coverage, Paragraph (2) A person's or organization's status A.2.a.(4) is deleted and replaced by the follow- as an additional insured exists only ing while you are performing operations (4) All reasonable expenses incurred by for that additional insured the "insured" at our request, includ- (3) Section 11, Paragraph C. Limits of ing actual loss of earning up to $500 Insurance for person or organization a day because of time off from work added as additional insured are CW 34 68 01 10 Includes Copyrighted material of Insurance Services Page 1 of 5 Office,Inc,with its permission POLICY NUMBER COMMERCIAL GENERAL LIABILITY CG 20 37 07 04 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following, COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Or anization s : Location And Description Of Completed Operations Information required to complete this Schedule, if not shown above, will be shown in the Declarations Section If — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for"bodily injury" or"property dam- age" caused, in whole or in part, by "your work" at the location designated and described in the sched- ule of this endorsement performed for that additional insured and included in the "products-completed operations hazard" CG 20 37 07 04 © ISO Properties, Inc, 2004 Page 1 of 1 p THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS This endorsement modifies insurance provided under the following CONTRACTORS POLLUTION LIABILITY COVERAGE PART SCHEDULE Name Of Person or Organization Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement, effected prior to the date your operations for that person o organization commenced, that such person or organization be added as an additional insured on your policy (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement ) (1) All work including materials, parts or A. Section II — Who Is An Insured is amended equipment furnished in connection with to include as an insured the person or such work, on the project (other than organization shown in the Schedule, but only service, maintenance or repairs) to be with respect to liability arising out of your performed by or on behalf of the ongoing operations performed for that insured additional insured(s) at the site of the B. With respect to the insurance afforded to covered operations has been completed, these additional insureds, the following or exclusion is added 2. Exclusions (2) That portion of "your work" out of which the injury or damage arises has been put This insurance does not apply to "bodily to its intended use by any person or injury" or"property damage" occurring after organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project RHIC 6227(07/08) Includes Copyrighted Material of Insurance Services Office, Inc Page 1 of 1 C with its permission REQUEST FOR MAYOR'S SIGNATURE • Please Fill in All Applicable Boxes KEN0N W AS HINGTON This form must be printed on cherry paper Routing Information (ALL REQUESTS MUST FIRST BE ROUTED THROUGH THE LAW DEPARTMENT) Originator- Nick Horn Phone (Originator) 5529 Date Sent 4130/12 Date Required 5/3/12 Return Signed Document to Nancy Yoshitake CONTRACT TERMINATION DATE: 5122/12 VENDOR NAME: Skycorp Ltd DATE OF COUNCIL APPROVAL: n/a Brief Explanation of Document- The attached contract is for Skycorp to remove asbestos material, and demolish and remove the house, garage and barn which are located at 25906 116th Ave SE All Contracts Must Be Routed Through the Law Department (This Area to be Completed By the Law Department) Received Approval of Law Dept: RECEIVED Law Dept. Comments QY 1 2012 KEN T LAW DE ff Date Forwarded to Mayor I t� Y Shaded Areas to Be Completed by Administration Staff Received: j � L9t I� I Recommendations & Comments: J U ;kAY r" L- C' Disposition:, /Z—� ,.,7) Ct:P,� Date Returned: Iage5870_templatebase • 2/07