Loading...
HomeMy WebLinkAboutPW12-056 - Original - Pacific Power Generation - Water Generator Load Testing - 01/18/2012 ecords M agemlen KENO Document W ASHINOTOM ANIIIIIIIIIII IF- CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Pacific Power Generation Vendor Number: 159487 JD Edwards Number 9 i Contract Number: This is assigned by City Clerk's Office Project Name: Water Generator Load Testing 3 Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 1/18/2012 Termination Date: 3/30/2012 Contract Renewal Notice (Days): 0 Number of days required notice for termination or renewal or amendment Contract Manager: Kevin Swinford Department: Public Works Operations a i Detail: (i.e. address, location, parcel number, tax id, etc.): 13 separate locations for Water Generators S•Public\Records Management\Forms\ContractCover\adcc7832 1 11/08 KENT W AS MINGTON { GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE between the City of Kent and Pacific Power Generation THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Pacific Power Generation organized under the laws of the State of Washington, located and doing business at 5808 South 196t" Street Kent, WA 98032, Randy Lukkasson 253-736-5042 (hereinafter the "Vendor"). AGREEMENT I. DESCRIPTION OF WORK. Vendor shall provide the following goods and materials and/or perform the following services for the City: Perform load tests on 13 city-owned generators to their full rated capacity for no less than two continuous hours. These generators are a combination of remote fixed and portable-type generators located inside and outside the Kent city limits. Provide a detailed report for each unit tested and recommended corrections (if applicable) Attached as Exhibit "A". Vendor acknowledges and understands that it is not the City's exclusive provider of these goods, materials, or services and that the City maintains its unqualified right to obtain these goods, materials, and services through other sources. II. TIME OF COMPLETION. Upon the effective date of this Agreement, Vendor shall complete the work and provide all goods, materials, and services by Friday, March 30t" 2012. III. COMPENSATION. The City shall pay the Vendor an amount not to exceed $6405.80, including applicable Washington State Sales Tax, for the goods, materials, and services contemplated in this Agreement. The City shall pay the Vendor the following amounts according to the following schedule: GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 1 (Under$10,000.00, including WSST) Payment in full after work is completed. If the City objects to all or any portion of an invoice, it shall notify Vendor and reserves the option to only pay that portion of the invoice not in dispute. In that event, the parties will immediately make every effort to settle the disputed portion. A. Defective or Unauthorized Work. The City reserves its right to withhold payment from Vendor for any defective or unauthorized goods, materials or services. If Vendor is unable, for any reason, to complete any part of this Agreement, the City may obtain the goods, materials or services from other sources, and Vendor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Agreement price specified above. The City further reserves its right to deduct these additional costs incurred to complete this Agreement with other sources, from any and all amounts due or to become due the Vendor. B. Final Payment: Waiver of Claims. VENDOR'S ACCEPTANCE OF FINAL PAYMENT SHALL CONSTITUTE A WAIVER OF CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY VENDOR AS UNSETTLED AT THE TIME REQUEST FOR FINAL PAYMENT IS MADE. IV. PREVAILING WAGES. Vendor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Vendor shall pay prevailing wages in effect on the date the bid is accepted or executed by Vendor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. V. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Vendor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Vendor maintains and pays for its own place of business from which Vendor's services under this Agreement will be performed. C. The Vendor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Vendor's services, or the Vendor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 2 (Under$10,000.00, including WSST) x D. The Vendor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. E. The Vendor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Vendor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Vendor maintains a set of books dedicated to the expenses and earnings of its business. VI. TERMINATION. Either party may terminate this Agreement, with or without cause, upon providing the other party thirty (30) days written notice at its address set forth on the signature block of this Agreement. 1 VII. CHANGES. The City may issue a written change order for any change in the goods, materials or services to be provided during the performance of this Agreement. If the Vendor determines, for any reason, that a change order is necessary, Vendor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XIV(D), within fourteen (14) calendar days of the date Vendor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Vendor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Vendor on all equitable adjustments. However, if the parties are unable to agree, the City will determine the equitable adjustment as it deems appropriate. The Vendor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Vendor fails to require a change order within the time allowed, the Vendor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Vendor disagrees with the equitable adjustment, the Vendor must complete the change order work; however, the Vendor may elect to protest the adjustment as provided in subsections A through E of Section VII, Claims, below. The Vendor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Vendor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. a VIII. CLAIMS. If the Vendor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Vendor may file a claim as provided in this section. The Vendor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Vendor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Vendor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. I GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 3 (Under$10,000,00, Including WSST) At a minimum, a Vendor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Vendor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Vendor is asserting a schedule change or disruption. B. Records. The Vendor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Vendor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Vendor's Duty to Complete Protested Work. In spite of any claim, the Vendor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Vendor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Vendor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. VENDOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR VENDOR'S ABILITY TO FILE THAT SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. This Agreement is subject to all warranty provisions established under the Uniform Commercial Code, Title 62A, Revised Code of Washington. Vendor warrants goods are merchantable, are fit for the particular purpose for which they were obtained, and will perform in accordance with their specifications and Vendor's representations to City. The Vendor GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 4 (Under$10,000.00, including WSST) shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any part of the goods are repaired, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Vendor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Vendor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Vendor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Vendor, its sub-contractors, or any person acting on behalf of the Vendor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Vendor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Vendor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Vendor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. The City's inspection or acceptance of any of Vendor's work when completed shall not be grounds to avoid any of these covenants of indemnification. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE VENDOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Vendor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Vendor's part, then Vendor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Vendor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Vendor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit 2 attached and incorporated by this reference. XIV. WORK PERFORMED AT VENDOR'S RISK. Vendor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 5 (Under$10,000.00, including WSST) in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Vendor's own risk, and Vendor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Vendor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 6 (Under$10,000.00, including WSST) i I H. Compliance with Laws. The Vendor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Vendor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. I. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall be ome effective on the last date entered below. VENDOR: CITY OF KENT: By: By: zi (signature) (signature) Print Name: Print Name: David A. Brock Its: .Sekl�`� .so-/e3 Its: ublic Works Operations Manager (tale) /� <p/Z DATE: DATE: NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: VENDOR: CITY OF KENT: Randy Lukkasson Mr. Kevin Swinford, Water Facilities Supervisor [Pacific Power Generation Public Works Operations 5808 South 196th St] City of Kent [Kent, WA 98032 220 Fourth Avenue South Kent, WA 98032 253-736-5042 (telephone) 253-395-2408 (facsimile) (253) [856-5600 (telephone) (253) [856-6600 (facsimile) [In this field,you may enter the eledromc flepath where the contract has been saved] 7 3 S GOODS & SERVICES AGREEMENT FOR ORDINARY MAINTENANCE - 7 (Under$10,000.00, Including WSST) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. Dated this oZ,r day of V,&" A44 , 20-LL. By: AG j l� �c /e�oQ G ve N-e�tA� For: P GA/ Title: ��2/� C -e- Date: a r EEO COMPLIANCE DOCUMENTS - 1 of 3 3 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public I Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 of 3 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as that was entered into on the (date), between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this day of 120 By: For: Title: Date: EEO COMPLIANCE DOCUMENTS - 3 of 3 PUBLIC WORKS Tim Laporte, Director 400 Phone 253-856-5500 • Fax 253-856-6500 KENT WASHINGTON OPERATIONS DIVISION Don Millett, Manager Phone 253-856-5600 Fax 253-856-6600 Mailing Address 220 Fourth Avenue South Kent, WA 98032-5895 Location Address 5821 South 2401h 2012 Generator Load Testing Project Location Work shall be performed within and out of Kent City proper Generator locations will vary from the west hill of Kent east to the Maple Valley/Black Diamond area i Scope of Work Electrically load test a combination of 13 (thirteen) remote fixed and portable generators to their full i rated capacity for no less than 2 (two) continuous hours To Include The Following • Provide all labor and equipment plus transportation for the complete load testing of each generator listed within the spread sheet provided by the City of Kent • Provide a separate detailed report to include unit model number and location for ; each unit tested and any recommendations or corrections (if applicable) Not to Include Any required repairs or parts to any unit unless agreed upon by both parties involved If agreed upon between both parties the contractor will bill at their field labor rate plus parts or material mark up over and above contract amount An individual purchase order will be issued to contractor for each unit that requires repair EX >� 1 SIT A Pacific Power Generation 5808 South 196" Street 253-395-9077 Kent WA 98032 253-395-2408/fax GENERATOR PREVENTATIVE MAINTENANCE AGREEMENT CITY OF KENT WATER DIVISION DATE 12/7/11 ATTN KEVIN SWINFORD PHONE 253 856-5613 220 FOURTH AVE SOUTH FAx KENT,WA 98032 CELL 253 740-6590 E-MAIL KSWINFORD@KENTWA GOV QUANTITY DESCRIPTION ANNUAL COST Perform 2 hour load bank test on your 13 generators listed below $5850 00 Ste address 1 Clark Spring -24875 Kent Kangley Rd 45KW 2 Kent Springs Plateau—28600 216th Ave SE 65KW 3 Garrnson well -9615 S218th St 12KW 4 O'Brien well—22132 88'h Ave S 60KW 5 Pump stn#3- 25000 Lake Fenwick Rd 125KW 6 Pump stn#4—25601 Reith Rd 7 5KW 7 Pump stn#5—23825 98'"Ave S 45OKW 8 Pump stri—3301 S 2641" 12KW 9 3 5 Tank—28502 124"Ave SE 12KW 10 Guiberson—700E Guiberson i I 11 SSP POD#3—12020 SE 288'St 17KW 12 Portable—Varies Site 350KW 13 Portable—Varies Site 25KW To accept this P/M agreement for a (2)year period,guaranteeing the above per year pricing,please initial here Prices effective for 90 days Sales tax, if applicable,is additional Unless other wise noted,services are quoted to complete during normal business hours Terms Net 30 days/1 5%on past due balance All deliveries are contingent upon strikes,accidents and delays beyond our control Title ownership to remain in Pacific Power Generation until purchase price is paid in full In case a default be made in payments on account,such payments shall be considered as liquidated damages for freight and other charges All contracts and agreements are subject to the written approval of an executive officer PACIFIC POWER GENERATION By: By. Wandy fu Casson 12/7/11 Date Date Randy Lukkasson (253)736-5042-rlukkasson@pacificpowergen com Power Generation Service Sales Phone Number E-mail Title Purchase Order#(if required) Contact for Service Phone# EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non- owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. a Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 2. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. EXHIBIT B (Continued ) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. AL ® D/20M/1 IDDIVYYY) C ,./ CERTIFICATE OF LIABILITY INSURANCE 42011 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DDES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the pohcy(Ies) must be endorsed. If SUBROGATION IS WAIVED,subject CD the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to LITe certificate holder In lieu of such endorsement(s). PRODUCER CONTACT Deb Herbert NAME FAX Golsan Scruggs PHOAIC,NNo.E (503)244-0297 No (AIC (503)244-0298 E-Mac ADDRESS dherbert@golsanscruggs.com 7320 3W Bunziker St, Suite 320 PRODUCER 00005B08 Portland OR 97223 INSURERS)AFFORDING COVERAGE NAIC# INSURED INSURERA Travelers Property Casualty Co 25674 Pacific Power Products Company LLC INSURERBSt Paul Fire & Marine Insurance & per Named Insureds attached INSURER 600 South 56th Place INSURER INSURER E Ridgefield WA 98642 INSURER COVERAGES _ CERTIFICATE NUMBER: REVISION NUMBER THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR TYPE OF INSURANCE ADDL SUB" POLICY EFF POLICY EXP LIMITS LTR IN SO WVD POLICYNUMBER MM/DDfYYYY MMIDDIYYYY GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 DAMAGE TORENTED 300,000 X COMMERCIAL GENERAL LIABILITY PREMISES Ea occurrence $ A CLAIMS-MADE OCCUR X 6304157N912 5/1/2011 5/1/2012 MED EXP(Any one person) $ 10,000 X Blkt Add'1 Insured PERSONAL&ADV INJURY $ 1,000,000 X Blkt Waiver Of Stlbro GENERAL AGGREGATE $ 2,000,000 GENT AGGREGATE LIMIT APPLIES PER PRODUCTS-COMPCP AGG S 2,000,000 POLICY rX JECT LOC WA StopGap/Empl Liab S 1,000,000 AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT S 1,000,000 (Ea acetlent) X ANY AUTO BODILY I NJURY(Per person) $ A ALL OWNED AUTOS 8104157N912 5/1/2011 5/l/2012 , BODILY I NJURY(Per accident) $ SCHEDULED AUTOS PROPERTY DAMAGE HIRED AUTOS (Per accident) $ NON-OWNED AUTOS Blanket Additional Insured $ X Blkt Add'i Insured&Wamer of Subro I $ X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 20,000,000 EXCESSLIAB CLAIMS-MADE AGGREGATE $ 20,000,000 DEDUCTIBLE $ A X RETENTION $ Nil 6P4157N912 5/1/2011 5/1/2012 $ WORKERS COMPENSATION IWC STATU- OTH- AND EMPLOYERS'LIABILITY YIN Y LIMITS ER -_ ANY PROPRIETOR/PARTNER/EXECUTIVE E L EACH ACCIDENT $ OFFICER/MEMBER EXC,-UDED7 N/A (Mandatory in NH) E L DISEASE-EA EMPLOYE $ If yes,describe under DESCRIPTION OF OPERATIONS below E L DISEASE-POLICY LIMIT $ B Marine/Ship Repairer Liab OL08400711 /l/2011 5/1/2012 Occurrence l Aggregate $114 / $2M 8 Excess Marine Liab OX08400202 5/l/2011 5/1/2012 Occurrence/Aggregate $9M / $9M DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Attach ACORD 101,Additional Remarks Schedule,if more space is required) The City of Kent, WA is included as an Additional Insured as required by written contract or agreement as respects all operations of the Named Insured subject to policy terms, conditions & exclusions. Coverage is Primary & Non-Contributory. Form CGD246 attached. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City Of Kent ACCORDANCE WITH THE POLICY PROVISIONS 220 Fourth Ave S Kent, WA 98032-5838 AUTHORIZED REPRESENTATIVE Kenneth Golsan/PLUM ACORD 25(2009109) ©1988-2009 ACORD CORPORATION. All rights reserved INS025(200909) The ACORD name and logo are registered marks of ACORD Additional Named Insureds Other Named Insureds Southwest Products Corporation ttt Pacific Power Generation i NorthTrends `111 Pacific Power Products Holdings Inc (fna•NMT Diesel Pacific Detroit Realty Inc Pacific Dietroit Diesel Allison Cc & All Subsidiaries Perkins-Pacific Pacific Truck Center Pacific Power Products Management LLC Cascade Turf Pacific Golf & Turf OFAPPINF(02/2007) COPYRIGHT 2007,AMS SERVICES INC Page 1 of 2 Named Insured: Pacific Power Products Co LLC Policy No: 6304157N912 CG D2 46 08 05 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY BLANKET ADDITIONAL INSURED (CONTRACTORS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART 1. WHO IS AN INSURED — (Section II) is amended to include any person or organization that you agree in a `written contract requiring insurance"to include as an additional insured on this Coverage Part, but- a) Only with respect to liability for"bodily injury", "property damage"or"personal injury'; and b) If, and only to the extent that, the injury or damage is caused by acts or omissions of you or your subcontractor in the performance of "your work" to which the "written contract requiring insurance" applies The person or organization does not qualify as an additional insured with respect to the independent acts or omissions of such person or organization 2. The insurance provided to the additional insured by this endorsement is limited as follows: a) In the event that the Limits of Insurance of this Coverage Part shown in the Declarations exceed the limits of liability required by the "written contract requiring insurance", the insurance provided to the additional insured shall be limited to the limits of liability required by that "written contract requiring insurance" This endorsement shall not increase the limits of insurance described in Section Ili—Limits Of Insurance b) The insurance provided to the additional insured does not apply to "bodily injury", "property damage" or "personal injury" arising out of the rendering of, or failure to render, any professional architectural, engineering or surveying services, including. 1. The preparing, approving, or fading to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders or change orders, or the preparing, approving, or fading to prepare or approve, drawings and specifications, and il. Supervisory, inspection, architectural or engineering activities c) The insurance provided to the additional insured does not apply to "bodily injury" or"property damage" caused by "your work" and included in the "products-completed operations hazard" unless the "written contract requiring insurance" specifically requires you to provide such coverage for that additional insured, and then the insurance provided to the additional insured applies only to such "bodily injury" or "property damage" that occurs before the end of the period of time for which the "written contract requiring insurance" requires you to provide such coverage or the end of the policy period, whichever is earlier. 3. The insurance provided to the additional insured by this endorsement is excess over any valid and collectible "other insurance", whether primary, excess, contingent or on any other basis,that is available to the additional insured for a loss we cover under this endorsement However, if the "written contract requiring insurance" specifically requires that this insurance apply on a primary basis or a primary and non-contributory basis, this insurance is primary to "other insurance" available to the additional insured which covers that person or organization as a named insured for such loss, and we will not share with that "other insurance" But the Insurance provided to the additional insured by this endorsement still is excess over any valid and collectible "other insurance", whether primary, excess, contingent or on any other basis,that is available to the additional insured when that person or organization is an additional insured under such "other insurance" 4. As a condition of coverage provided to the additional insured by this endorsement* a) The additional insured must give us written notice as soon as practicable of an "occurrence"or an offense which may result in a claim To the extent possible, such notice should include: 1. How, when and where the"occurrence"or offense took place, ii. The names and addresses of any injured persons and witnesses, and Page 2 of 2 Ill. The nature and location of any injury or damage ansing out of the"occurrence"or offense. b) If a claim is made or"suit" is brought against the additional insured,the additional insured must: L Immediately record the specifics of the claim or"suit"and the date received, and fi. Notify us as soon as practicable The additional insured must see to it that we receive written notice of the clahn or "suit" as soon as practicable c) The additional insured must immediately send us copies of all legal papers received in connection with the claim or"suit", cooperate with us in the investigation or settlement of the claim or defense against the "suit", and otherwise comply with all policy conditions d) The additional insured must tender the defense and indemnity of any claim or "suit" to any provider of "other insurance" which would cover the additional insured for a loss we cover under this endorsement However, this condition does not affect whether the insurance provided to the additional insured by this endorsement is primary to "other insurance" available to the additional insured which covers that person or organization as a named insured as described in paragraph 3. above 5. The following definition is added to SECTION V.—DEFINITIONS. "Written contract requiring insurance" means that part of any written contract or agreement under which you are required to include a person or organization as an additional insured on this Coverage Part, provided that the "bodily injury" and "property damage" occurs and the "personal injury" is caused by an offense committed a. After the signing and execution of the contractor agreement by you; b. While that part of the contract or agreement is in effect, and c. Before the end of the policy period. CG D2 48 08 05 i Privacy I Legal Notices 02008 The Travelers Companies,Inc. < Page 1of17 i State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 12/21/2011 County Trade Job Classification Wage Holiday Overtime Note' King Asbestos Abatement Workers Journey Level $40.03 5D 1 H King Boilermakers Journey Level $57.99 5N 1C King Brick Mason Brick And Block Finisher $41.01 5A 1M King Brick Mason Journey Level $47.87 5A 1M King Brick Mason Pointer-Caulker-Cleaner $47.87 5A 1M King Building Service Emcees Janitor $18.91 5S 2F King Building Service Employees Traveling Waxer/shampooer $19.32 5S 2F King Building Service Employees Window Cleaner(non-scaffold) $22 65 5S 2F King Cabinet Makers (In Shop) Journey Level $22 74 1 King Carpenters Acoustical Worker $48.63 5D 1M ;King Carpenters Bridge, Dock And Wharf $48.47 5A 1M ! Carpenters i King Carpenters Carpenter $48.47 5D 1M King Carpenters Creosoted Material $48.57 5D 1M King Carpenters Floor Finisher $48.60 5D 1M ; King Carpenters Floor Layer $48.60 5D 1M King Carpenters Floor Sander $48.60 5D 1M King Carpenters Sawfiler $48.60 5D 1M King Carpenters Shingler $48.60 5D 1M King Carpenters Stationary Power Saw Operator $48.60 5D 1M King Carpenters Stationary Woodworking Tools $48.60 5D 1M King Cement Masons Journey Level $49.15 7A 1M King Divers Et Tenders Diver $100.28 5D 1M 8A King Divers Et Tenders Diver On Standby $56.68 5D 1M King Divers 8 Tenders Diver Tender $52.23 5D 1M King Divers Et Tenders Surface Rcv Et Rov Operator $52 23 5D 1M King Divers Et Tenders Surface Rcv Et Rov Operator $48.67 5A 1 B Tender https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 2 of 17 King Dredge Workers Assistant Engineer $49.57 5D 1T 8L King Dredge Workers Assistant Mate(deckhand) $49.06 5D 1T 8L King Dredge Workers Engineer Welder $49.62 5D 1T 8L King Dredge Workers Leverman, Hydraulic $51.19 5D 1T 8L King Dredge Workers Maintenance $49.06 5D 1T 8L King Dredge Workers Mates And Boatmen $49.57 5D 1T 8L King Dred e Workers Oiler $49.19 5D 1T 8L King mall Ap h�cator Journey Level $48.47 5D 1M King Drywall Tapers Journey Level $48.79 5P 1E King Electrical Fixture Maintenance Journey Level $25.34 5L 1E Workers King Electricians - Inside Cable Splicer $61.93 7C 2W King Electricians - Inside Cable Splicer (tunnel) $66.55 7C 2W King Electricians - Inside Certified Welder $59.83 7C 2W King Electricians - Inside Certified Welder (tunnel) $64.23 7C 2W King Electricians - Inside Construction Stock Person $31.83 7C 2W King Electricians - Inside Journey Level $57.72 7C 2W King Electricians - Inside Journey Level (tunnel) $61.93 7C 2W King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerline Cable Splicer $63.04 5A 4A Construction King Electricians - Powerline Certified Line Welder $57.61 5A 4A Construction King Electricians - Powerline Groundperson $41.06 5A 4A Construction King Electricians - Powerline Head Groundperson $43.33 5A E4A Construction King Electricians - Powerline Heavy Line Equipment $57.61 5AConstruction Operator King Electricians - Powerline Jackhammer Operator $43.33 5A Construction King Electricians_Powerline Journey Level Lineperson $57.61 5A 4A Construction King Electricians - Powerline Line Equipment Operator [464 5A 4A Construction King Electricians - Powerline Pole Sprayer 5A 4A Construction King Electricians - Powerline Powderperson 5A 4A Construction King Electronic Technicians Journey Level 1 King Elevator Constructors Mechanic $72.011 7D 4A King Elevator Constructors Mechanic In Charge $78.13 7D 4A King Fabricated Precast Concrete All Classifications - In-Factory $13.85 5B 2K Products Work Only King Fence Erectors Fence Erector $15 18 1 King Flaggers liourney Level $33.93 7A 2Y f https://fortress.wa.gov/Ini/wagelookup/prvWagelookup.aspx 12/21/2011 Page 3 of 17 King Glaziers Journey Level $50.911 7L iY King Heat Et Frost Insulators And Journeyman $55.68 5J is Asbestos Workers King Heating Equipment Mechanics Journey Level $67.82 7F 1E " King Hod Carriers Et Mason Tenders Journey Level $41.28 7A 2Y King Industrial Engine And Machine Journey Level $15.65 1 Mechanics King Industrial Power Vacuum Journey Level $9.24 1 Cleaner King Inland Boatmen Boat Operator $51.95 5B 1K King Inland Boatmen Cook $48.62 5B 1K King Inland Boatmen Deckhand $48.62 5B 1K King Inland Boatmen Deckhand Engineer $49.60 5B 1K King Inland Boatmen Launch Operator $50.80 5B 1K King Inland Boatmen Mate $50.80 5B 1K King Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer $31.49 1 Sewer Et Water Systems By Operator Remote Control I King Inspection/Cleaninq/Sealing Of Grout Truck Operator $11.48 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Head Operator $24.91 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 Sewer Et Water Systems By s Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 Sewer Et Water Systems By " Remote Control King Insulation Applicators Journey Level $48.67 5D 1M King Ironworkers Journeyman $57.52 7N 10 King Laborers Air, Gas Or Electric Vibrating $40.03 7A 2Y Screed King Laborers Airtrac Drill Operator $41.28 7A 2Y King Laborers Ballast Regular Machine $40.031 7A 2Y King Laborers Batch Weighman $33.93 7A 2Y j King Laborers Brick Pavers $40.03 7A 2Y 'King Laborers Brush Cutter $40.03 7A 2Y King Laborers Brush Hog Feeder $40.03 7A 2Y King Laborers Burner $40.03 7A 2Y King Laborers Caisson Worker $41.28 7A 2Y King Laborers Carpenter Tender $40.03 7A 2Y King Laborers Caulker $40.03 7A 2Y +King Laborers Cement Dumper-paving $40.77 7A 2Y ; King Laborers Cement Finisher Tender $40.03 7A 2Y King Laborers Change House Or Dry Shack $40.03 7A 2Y a https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 4of17 King Laborers Chipping Gun (under 30 Lbs.) $40.031 7A 2Y King Laborers Chipping Gun(30 Lbs. And $40.77 7A 2Y Over) King Laborers Choker Setter $40.03 7A 2Y King Laborers Chuck Tender $40.03 7A 2Y King Laborers Clary Power Spreader $40.77 7A 2Y King Laborers Clean-up Laborer $40.031 7A 2Y King Laborers Compressed Air Worker 0-30 $52.08 7A 2Y 8Q psi King Laborers Compressed Air Worker 30.01- $57.08 7A 2Y 8 44.00 psi King Laborers Compressed Air Worker 44.01- $60.76 7A 2Y 8Q 54.00 psi King Laborers Compressed Air Worker 54.01- $66.46 7A 2Y 8Q 60.00 psi King Laborers Compressed Air Worker 60.01- $68.58 7A 2Y 8Q 64.00 psi ? King Laborers Compressed Air Worker 64.01- $73.68 7A 2Y 8Q 68.00 psi King Laborers Compressed Air Worker 68.01- $75.58 7A 2Y 8Q 70.00 psi King Laborers Concrete Dumper/chute $40.77 7A 2Y Operator King Laborers Concrete Form Stripper $40.031 7A 2Y King Laborers Concrete Placement Crew $40.771 7A 2Y King Laborers Concrete Saw Operator/core $40.77 7A 2Y Driller King Laborers Crusher Feeder $33.93 7A 2Y King Laborers Curing Laborer $40.03 7A 2Y King Laborers Demolition: Wrecking & Moving $40.03 7A 2Y (incl. Charred Material) King Laborers Ditch Digger $40.031 7A 2Y King Laborers Diver $41.281 7A 2Y King Laborers Drill Operator $40 77 7A 2Y (hydraulic,diamond) King Laborers Dry Stack Walls $40.031 7A 2Y King Laborers Dump Person $40.031 7A 2Y King Laborers Epoxy Technician $40.03 7A 2Y King Laborers Erosion Control Worker $40.03 7A 2Y King Laborers Faller it Bucker Chain Saw $40.77 7A 2Y King Laborers Fine Graders $40.03 7A 2Y King Laborers Fuewatch $33.93 7A 2Y King Laborers Form Setter $40.03 7A 2Y King Laborers Gabian Basket Builders $40.031 7A 2Y King Laborers General Laborer $40.03 7A 2Y King Laborers Grade Checker Ft Transit $41.28 7A 2Y Person https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 5of17 King Laborers Grinders $40.03 7A 2Y King Laborers Grout Machine Tender $40.03 7A 2Y King Laborers Groutmen (pressure)including $40.77 7A 2Y Post Tension Beams King Laborers Guardrail Erector $40.03 7A 2Y King Laborers Hazardous Waste Worker (level $41.28 7A 2Y A) King Laborers Hazardous Waste Worker (level $40.77 7A 2Y B) King Laborers Hazardous Waste Worker (level $40.03 7A 2Y C) King Laborers High Scaler $41.28 7A 2Y King Laborers Jackhammer $40.771 7A 2Y King Laborers Laserbea m Operator $40.77 7A 2Y King Laborers Maintenance Person $40.03 7A 2Y King Laborers Manhole Builder-mudman $40.77 7A 2Y King Laborers Material Yard Person $40.03 7A 2Y King Laborers Miner $41.28 7A 2Y King Laborers Motorman-dinky Locomotive $40.771 7A 2Y King Laborers Nozzleman (concrete Pump, $40.77 7A 2Y Green Cutter When Using Combination Of High Pressure Air Et Water On Concrete Et Rock, Sandblast, Gunite, Shotcrete, Water Bla King Laborers Pavement Breaker $40.77 7A 2Y King Laborers Pilot Car $33.93 7A 2Y King Laborers Pipe Layer Lead $41.28 7A 2Y King Laborers Pipe Layer/tailor $40.77 7A 2Y i King Laborers Pipe Pot Tender $40.77 7A 2Y King Laborers Pipe Rehner $40.77 7A 2Y King Laborers Pipe Wrapper $40.77 7A 2Y King Laborers Pot Tender $40.03 7A 2Y King Laborers Powderman $41.28 7A 2Y King Laborers Powderman's Helper $40.03 7A 2Y King Laborers Power Jacks $40.77 7A 2Y King Laborers Railroad Spike Puller - Power $40.77 7A 2Y King Laborers Raker - Asphalt $41.28 7A 2Y King Laborers Re-timberman $41.28 7A 2Y King Laborers Remote Equipment Operator $40.77 7A 2Y King Laborers Rigger/signal Person $40.77 7A 2Y King Laborers Rip Rap Person $40.03 7A 2Y King Laborers Rivet Buster $40.77 7A 2Y King Laborers Rodder $40.77 7A 2Y King Laborers Scaffold Erector $40.03 7A 2Y King Laborers Scale Person $40.03 7A 2Y https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 6of17 King Laborers Sloper (over 20") $40.771 7A 2Y King Laborers Sloper Sprayer $40.031 7A 2Y King Laborers Spreader (concrete) $40.771 7A 2Y King Laborers Stake Hopper $40.031 7A 2Y King Laborers Stock Pder $40.031 7A 2Y King Laborers Tamper Et Similar Electric, Air $40.77 7A 2Y Et Gas Operated Tools King Laborers Tamper (multiple Et Self- $40.77 7A 2Y propelled) King Laborers Timber Person - Sewer (lagger, $40.77 7A 2Y Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $40.03 7A 2Y King Laborers Topper $40.03 7A 2Y King Laborers Track Laborer $40.03 7A 2Y King Laborers Track Liner (power) $40.771 7A 2Y King Laborers Truck Spotter $40.031 7A 2Y King Laborers Tugger Operator $40.771 7A 2Y King Laborers Tunnel Work-Guage and Lock $41.38 7A 2Y 8Q Tender King Laborers Tunnel Work-Miner $41.381 7A 2Y King Laborers Vibrator $40.771 7A 2Y King Laborers Vinyl Seamer $40.03 7A 2Y King Laborers Watchman $30.84 7A 2Y King Laborers Welder $40.77 7A 2Y King Laborers Well Point Laborer $40.77 7A 2Y King Laborers Window Washer/cleaner $30.84 7A 2Y King Laborers - Underground Sewer General Laborer Et Topman $40.03 7A 2Y Et Water King Laborers - Underground Sewer Pipe Layer $40.77 7A 2Y Et Water King Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers King Landscape Construction Landscape Equipment $28.17 1 Operators Or Truck Drivers King Landscape Construction Landscaping or Planting $17.87 1 Laborers King Lathers Journey Level $48.74 5D 1 H King Marble Setters Journey Level $47.87 5A 1M King Metal Fabrication (In Shop) Fitter $15.86 1 King Metal Fabrication fin Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shop) Painter $11.10 1 King Metal Fabrication (In Shop) Welder $15.48 1 King Millwrieht Journey Level $49.47 5D 1M King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 7 of 17 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $35.70 6Z 2B King Pile Driver Journey Level $48.67 5A 1M King Plasterers Journey Level $46.63 7Q 1R King Playground Et Park Equipment Journey Level $8.67 1 Installers King Plumbers Et Pipefitters Journey Level $70.84 6Z 1G King Power Equipment Operators Asphalt Plant Operators $50.39 7A 1T 8P JKing Power Equipment Operators Assistant Engineer $47.12 7A 1T 8P King Power Equipment Operators Barrier Machine (zipper) $49.901 7A 1T 8P King Power Equipment Operators Batch Plant Operator, $49.90 7A 1T 8P Concrete King Power Equipment Operators Bobcat $47.12 7A 1T 8P King Power Equipment Operators Brokk - Remote Demolition $47.12 7A 1T 8P Equipment King Power Equi pment Operators Brooms $47.12 7A 1T 8P , ,King Power Equipment Operators Bump Cutter $49.90 7A 1T 8P King Power Equipment Operators Cableways $50.39 7A 1T 8P { King Power Equui ment Operators Chipper $49.90 7A 1T 8P s King Power Equipment Operators Compressor $47.12 7A 1T 8P jKing Power Equipment Operators Concrete Pump: Truck Mount $50.39 7A 1T 8P With Boom Attachment Over € 42 M King Power Equipment Operators Concrete Finish Machine -laser $47.12 7A 1T 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or $49.48 7A 1T 8P ` Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount $49.90 7A 1T 8P With Boom Attachment Up To 42m King Power Equipment Operators Conveyors $49.48 7A 1T 8P King Power Equipment Operators Cranes: 20 Tons Through 44 $49.90 7A 1T 8P Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators Cranes: 100 Tons Through 199 $50.94 7A 1T 8P Tons, or 150' of boom (including jib with attachments); Overhead, bridge type, 100 tons and over; Tower crane up to 175' in height, base to boom. https://fortress.wa.gov/Inl/wagelookup/prvWagelookup.aspx 12/21/2011 Page 8of17 King Power Equipment Operators Cranes: 200 Tons To 300 Tons, $51.51 7A 1T 8P Or 250' Of Boom (including Jib With Attachments) ; King Power Equipment Operators Cranes: 45 Tons Through 99 $50.39 7A 1T 8P Tons, Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And $47.12 7A 1T 8P Under King Power Equipment Operators Cranes: Friction 100 Tons $51.51 7A 1T 8P Through 199 Tons King Power Equipment Operators Cranes: Friction Over 200 Tons $52.07 7A 1T 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' $52.07 7A 1T 8P j Of Boom (including Jib With € Attachments) King Power Equipment Operators Cranes: Through 19 Tons With $49.48 7A 1T 8P Attachments A-frame Over 10 Tons King Power Equipment Operators Crusher $49.90 7A 1T 8P King Power Equipment Operators Deck Engineer/deck Winches $49.90 7A 1T 8P (power) King Power Equipment Operators Derricks, On Building Work $50.39 7A 1T 8P King _Power Equipment Operators Dozer Quad 9, HD 41, D10 and $50.39 7A 1T 8P ' Over King Power Equipment Operators Dozers D-9 Et Under $49.48 7A 1T 8P King Power E ui ment Operators Drill Oilers: Auger Type, Truck $49.48 7A 1T 8P Or Crane Mount King Power Equipment Operators Drilling Machine $49.90 7A 1T 8P King Power Equipment Operators Elevator And Man-lift: $47.12 7A 1T 8P Permanent And Shaft Type King Power Equipment Operators Finishing Machine, Bidwell And $49.90 7A 1T 8P Gamaco 8 Similar Equipment King Power Equipment Operators Forklift: 3000 Lbs And Over $49.48 7A 1T 8P With Attachments King Power Equipment Operators Forklifts: Under 3000 Lbs. With $47.12 7A 1T 8P Attachments King Power Equipment Operators Grade Engineer: Using Blue $49.90 7A 1T 8P Prints, Cut Sheets, Etc King Power Equipment Operators Gradechecker/stakeman $47.121 7A 1T 8P King Power Equipment Operators Guardrail Punch/Auger $49.90 7A 1T 8P King Power Equipment Operators Hard Tail End Dump $50.39 7A 1T 8P Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators Hard Tail End Dump $49.90 7A 1T 8P Articulating Off-road g Equipment Under 45 Yards King Power Equipment Operators Horizontal/directional Drill $49.48 7A 1T 8P Locator King Power EcLulpment Operators Horizontal/directional Drill $49.90 7A 1T 8P Operator https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 9of17 3i IKing Power Equipment Operators Hydralifts/boom Trucks Over $49.48 7A 1T 8P 10 Tons King Power Equipment Operators Hydralifts/boom Trucks, 10 $47.12 7A 1T 8P Tons And Under ; King Power Equipment Operators Loader, Overhead 8 Yards. Et $50.94 7A 1T 8P Over King Power Equipment Operators Loader, Overhead, 6 Yards. But $50.39 7A 1T 8P 1 Not Including 8 Yards King Power Equipment Operators Loaders, Overhead Under 6 $49.90 7A 1T 8P Yards King Power Equipment Operators Loaders, Plant Feed $49.90 7A 1T 8P King Power Equipment Operators Loaders: Elevating Type Belt $49.48 7A 1T 8P 'King Power Equipment Operators Locomotives, All $49.90 7A 1T 8P King Power E ui ment Operators Material Transfer Device $49.901 7A 1T 8P King Power Equipment Operators Mechanics, All (leadmen - $50.94 7A 1T 8P $0.50 Per Hour Over Mechanic) King Power Equipment Operators Mixers: Asphalt Plant $49.90 7A 1T 8P j King Power Equipment Operators Motor Patrol Grader - Non- $49.48 7A 1T 8P finishing King Power Equipment Operators Motor Patrol Graders, Finishing $50.39 7A 1T 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel $50.39 7A 1T 8P Drill, Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower $47.12 7A 1T 8P Distribution 8 Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $49.48 7A 1T 8P Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type: 45 $50.39 7A 1T 8P Tons Through 99 Tons King Power Equipment Operators Pavement Breaker $47.12 7A 1T 8P , King Power Equipment Operators Pile Driver (other Than Crane $49.90 7A 1T 8P Mount) King Power Equipment Operators Plant Oiler - Asphalt, Crusher $49.48 7A 1T 8P King Power Equipment Operators Posthote Digger, Mechanical $47.12 7A 1T 8P ;King Power Equipment Operators Power Plant $47.12 7A 1T 8P King Power Equipment Operators Pumps - Water $47.12 7A 1T 8P King Power Equipment Operators Quick Tower - No Cab, Under $47.12 7A 1T 8P ' 100 Feet In Height Based To Boom j King Power Equipment Operators Remote Control Operator On $50.39 7A 1T 8P Rubber Tired Earth Moving Equipment King Power Equipment Operators Rigger And Bellman $47.12 7A 1T 8P King Power Equipment Operators Rollagon $50.39 7A 1T 8P King Power Equipment Operators Roller, Other Than Plant Mix $47.12 7A 1T 81) King Power Equipment Operators Roller, Plant Mix Or Multi-lift $49.48 7A 1T 8P Materials https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 10 of 17 King Power E ment Operators Roto-mill, Rota-grinder $49.901 7A 1T I 8P King Power Equipment Operators Saws - Concrete $49.48 7A 1T 8P King Power Equipment Operators Scraper, Self Propelled Under $49.90 7A 1T 8P i 45 Yards King Power Equipment Operators Scrapers - Concrete 8t Carry All $49.48 7A 1T 8P ' King Power Equipment Operators Scrapers, Self-propelled: 45 $50.39 7A 1T 8P Yards And Over King Power Equipment Operators Service Engineers - Equipment $49.48 7A 1T 8P King Power Equipment Operators Shotcrete/gunite Equipment $47.12 7A 1T 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $49.48 7A 1T 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: $50.39 7A 1T 8P i Over 30 Metric Tons To 50 j Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $49.90 7A 1T 8P I Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $50.94 7A 1T 8P Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: $51.51 7A 1T 8P Over 90 Metric Tons King Power Equipment Operators Slipform Pavers $50.39 7A 1T 8P King Power Equipment Operators Spreader, Topsider Et $50 39 7A 1T 8P Screedman King Power Equipment Operators Subgrader Trimmer $49.90 7A 1T 8P ' King Power Equipment Operators Tower Bucket Elevators $49.48 7A 1T 8P King Power Equipment Operators Tower Crane Over 175'in $51.51 7A 1T 8P Height, Base To Boom King Power Equipment Operators Tower Crane Up To 175' In $50.94 7A 1T 81? Height Base To Boom King Power Equipment Operators Transporters, All Track Or $50 39 7A 1T 8P # Truck Type King Power Equipment Operators Trenching Machines $49.48 7A 1T 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 $49 90 7A 1T 813 Tons And Over King Power Equipment Operators Truck Crane Oiler/driver Under $49.48 7A 1T 8P 100 Tons King Power Equipment Operators Truck Mount Portable Conveyor $49.90 7A 1T 8P King Power Equipment Operators Welder $50.39 7A 1T 8P King Power Equipment Operators Wheel Tractors, Farman Type $47.12 7A 1T 8P King Power Equipment Operators Yo Yo Pay Dozer $49.90 7A 1T 813 King Power Equipment Operators- Asphalt Plant Operators $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Barrier Machine (zipper) $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, $49.90 7A 1T 8P https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 11 of 17 Underground Sewer Et Water Concrete King Power Equipment Operators- Bobcat $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Brokk - Remote Demolition $47.12 7A 1T 8P , Underground Sewer Et Water Equipment King Power Equipment Operators- Brooms $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Bump Cutter $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Cableways $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Chipper $49.90 7A 1T 8P ' Underground Sewer Et Water King Power Equipment Operators- Compressor $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Concrete Pump: Truck Mount $50.39 7A 1T 8P Underground Sewer Et Water With Boom Attachment Over 42 M King Power Equipment Operators- Concrete Finish Machine -laser $47.12 7A 1T 8P Underground Sewer Et Water Screed King Power Equipment Operators- Concrete Pump - Mounted Or $49.48 7A 1T 8P Underground Sewer Et Water Trailer High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators- Concrete Pump: Truck Mount $49.90 7A 1T 8P Underground Sewer Et Water With Boom Attachment Up To ; I 42m King Power Equipment Operators- Conveyors $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: 20 Tons Through 44 $49.90 7A 1T 8P { Underground Sewer Et Water Tons With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, $51.51 7A 1T 8P Underground Sewer Et Water Or 250' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 $50.39 7A 1T 8P Underground Sewer Et Water Tons, Under 150' Of Boom (including Jib With Attachments) i King Power Equipment Operators- Cranes: A-frame - 10 Tons And $47.12 7A 1T 8P Underground Sewer Et Water Under King Power Equipment Operators- Cranes: Friction 100 Tons $51.51 7A 1T 8P Underground Sewer Et Water Through 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $52.07 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' $52.07 7A 1T 8P Underground Sewer Et Water Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: Through 19 Tons With $49.48 7A 1T 8P Underground Sewer Et Water Attachments A-frame Over 10 Tons https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 12 of 17 `King Power Equipment Operators- Crusher $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Deck Engineer/deck Winches $49.90 7A 1T 8P Undueround Sewer Et Water (power) King Power Equipment Operators- Derricks, On Building Work $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Dozer Quad 9, HD 41, D10 and $50.39 7A 1T 8P Underground Sewer Et Water Over King Power Equipment Operators- Dozers D-9 Et Under $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Drill Oilers: Auger Type, Truck $49.48 7A 1T 8P Underground Sewer Et Water Or Crane Mount King Power Equipment Operators- Drilling Machine $49.90 7A 1T 8P Underground Sewer Et Water {King Power Equipment Operators- Elevator And Man-lift: $47.12 7A 1T 8P Underground Sewer Et Water Permanent And Shaft Type King Power Equipment Operators- Finishing Machine, Bidwell And $49.90 7A 1T 8P Underground Sewer Et Water Gamaco Et Similar Equipment King Power Equipment Operators- Forklift: 3000 Lbs And Over $49.48 7A 1T 8P Underground Sewer Et Water With Attachments King Power Equipment Operators- Forklifts: Under 3000 Lbs. With $47.12 7A 1T 8P Underground Sewer Et Water Attachments King Power Equipment Operators- Grade Engineer: Using Blue $49.90 7A 1T 8P Underground Sewer Et Water Prints, Cut Sheets, Etc King Power Equipment Operators- Gradechecker/stakeman $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Guardrail Punch/Auger $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Hard Tail End Dump $50.39 7A 1T 8P Underground Sewer Et Water Articulating Off- Road Equipment 45 Yards. Et Over King Power Equipment Operators- Hard Tail End Dump $49.90 7A 1T 8P Underground Sewer Et Water Articulating Off-road Equipment Under 45 Yards King Power Equipment Operators- Horizontal/directional Drill $49.48 7A 1T 8P Underground Sewer Et Water Locator King Power Equipment Operators- Horizontal/directional Drill $49.90 7A 1T 8P Underground Sewer Et Water Operator King Power Equipment ment Operators- Hydralifts/boom Trucks Over $49.48 7A 1T 8P Underground Sewer Et Water 10 Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 $47.12 7A 1T 8P Underground Sewer Et Water Tons And Under King Power Equipment Operators- Loader, Overhead 8 Yards. 8t $50.94 7A 1T 8P Underground Sewer a Water Over `King Power Equipment Operators- Loader, Overhead, 6 Yards. But $50.39 7A 1T 8P Underground Sewer Et Water Not Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 $49.90 7A 1T 8P Underground Sewer Et Water Yards King Power Equipment Operators- Loaders, Plant Feed $49.90 7A 1T 8P Underground Sewer Et Water https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 13of1/ lKing Power Equ pment Operators- Loaders: Elevating Type Belt $49.48 7A 1T 81P Underground Sewer 8t Water King Power Equipment Operators- Locomotives, All $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $50.94 7A 1T 8P Underground Sewer Et Water $0.50 Per Hour Over Mechanic) King Power Equipment Operators- Mixers: Asphalt Plant $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Grader - Non- $49.48 7A 1T 8P Underground Sewer Et Water finishing King Power Equipment Operators- Motor Patrol Graders, Finishing $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Mucking Machine, Mole, Tunnel $50.39 7A 1T 8P Underground Sewer Et Water Drill, Boring, Road Header And/or Shield 3 King Power Equipment Operators- Oil Distributors, Blower $47.12 7A 1T 8P Underground Sewer Et Water Distribution Et Mulch Seeding Operator King Power Equipment Operators- Outside Hoists (elevators And $49.48 7A 1T 8P s Underground Sewer Et Water Manhfts), Air Tuggers,strato King Power Equipment Operators- Overhead, Bridge Type: 45 $50.39 7A 1T 8P Underground Sewer Et Water Tons Through 99 Tons King Power Equipment Operators- Pavement Breaker $47.12 7A 1T 8P Underground Sewer Et Water ; King Power Equipment Operators- Pile Driver (other Than Crane $49.90 7A 1T 8P Underground Sewer Et Water Mount) King Power Equipment Operators- Plant Oiler - Asphalt, Crusher $49.48 7A 1T 8P Underground Sewer Et Water j King Power Equipment Operators- Posthole Digger, Mechanical $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Power Plant $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Pumps - Water $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Quick Tower - No Cab, Under $47.12 7A 1T 8P ! Underground Sewer Et Water 100 Feet In Height Based To Boom King Power Equipment Operators- Remote Control Operator On $50.39 7A 1T 8P Underground Sewer Et Water Rubber Tired Earth Moving Equipment j King Power Equipment Operators- Rigger And Bellman $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Rollagon $50.39 7A 1T 8P ; Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $49.48 7A 1T 8P Underground Sewer a Water Materials https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 14 of 17 King Power Equipment Operators- Roto-mill, Roto-grinder $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $49 48 7A 1T 8P a Underground Sewer Et Water PKing Power Equipment Operators- Scraper, Self Propelled Under $49.90 7A 1T 8P Underground Sewer Et Water 45 Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 $50.39 7A 1T 8P Underground Sewer Et Water Yards And Over King Power Equipment Operators- Service Engineers - Equipment $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gumte Equipment $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $49.48 7A 1T 8P Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: $50.39 7A 1T 8P Underground Sewer Et Water Over 30 Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $49.90 7A 1T 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $50.94 7A 1T 8P Underground Sewer Et Water Over 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: $51.51 7A 1T 8P , Underground Sewer Et Water Over 90 Metric Tons King Power Equipment Operators- SUpform Pavers $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Spreader, Topsider Et $50.39 7A 1T 8P Underground Sewer Et Water Screedman "King Power Equipment Operators- Subgrader Trimmer $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Tower Bucket Elevators $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Tower Crane Over 175'm $51.51 7A 1T 8P Underground Sewer Et Water Height, Base To Boom King Power Equipment Operators- Tower Crane Up To 175' In $50.94 7A 1T 8P Underground Sewer Et Water Height Base To Boom King Power Equipment Operators- Transporters, All Track Or $50.39 7A 1T 8P Underground Sewer Et Water Truck Type King Power Equipment Operators- Trenching Machines $49.48 7A 1T 8P Underground Sewer Et Water I ' King Power Equipment Operators- Truck Crane Oiler/driver - 100 $49.90 7A 1T 8P Underground Sewer Et Water Tons And Over King Power Equipment Operators- Truck Crane Oiler/driver Under $49 48 7A 1T 8P Underground Sewer Et Water 100 Tons King Power Equipment Operators- Truck Mount Portable Conveyor $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Welder $50.39 7A 1T 8P Underground Sewer Et Water https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 15of17 King Power Equipment Operators- Wheel Tractors, Farman Type $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Yo Yo Pay Dozer $49.90 7A 1T 8P Underground Sewer Et Water King Power Line Clearance Tree Journey Level In Charge $41.95 5A 4A Trimmers I King Power Line Clearance Tree Spray Person $39.83 5A 4A Trimmers King Power Line Clearance Tree Tree Equipment Operator $40.36 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer $37.53 5A 4A Trimmers King Power Line Clearance Tree Tree Trimmer Groundperson $28.35 5A 4A Trimmers King Refrigeration Et Air Journey Level $69.96 6Z 1G I Conditioning Mechanics I King Residential Brick Mason Journey Level $47.871 5A 1M King Residential Carpenters Journey Level $28.20 1 I King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $38.08 5D 1M King Residential Drywall Tapers Journey Level $48.79 5P 1E King Residential Electricians Journey Level $30.33 1 King Residential Glaziers Journey Level $34.60 7L 1H King Residential Insulation Journey Level $26.28 1 Applicators King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.46 1 King Residential Plumbers Et Journey Level $34.69 1 Pip efitters King Residential Refrigeration Et Air Journey Level $69.96 6Z 1G s Conditiomng Mechanics 1 King Residential Sheet Metal Journey Level (Field or Shop) $40.04 7F 111 Workers King Residential Soft Floor Layers Journey Level $41.951 5A 2Z King Residential Sprinkler Fitters Journey Level $41.31 5C 2R (Fire Protection) King Residential Stone Masons Journey Level $47.87 5A 1M King Residential Terrazzo Workers Journey Level $43.93 5A 1M 1 King Residential Terrazzo/Tile Journey Level $21.46 1 Finishers King Residential Tile Setters Journey Level $25.171 1 King Roofers Journey Level $43.65 5A 111 King Roofers Using Irritable Bituminous $46.65 5A 111 Materials King Sheet Metal Workers Journey Level (Field or Shop) $67.82 7F 1 E King Shipbuilding Et Ship Repair Boilermaker $34.13 7M 1H https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 16 of 17 King Shipbuilding Et Ship Repair Carpenter $34.991 70 1B B King Shipbuilding Et Ship Repair Electrician $34.901 70 1B 3 King Shipbuilding Et Ship Repair Heat Et Frost Insulator $55 68 5J 15 King Shipbuilding Et Ship Repair Laborer $33.62 70 1B King Shipbuilding Et Ship Repair Machinist $34.62 70 1B King Shipbuilding Et Ship Repair Operator $37.04 70 1B King Shipbuilding Et Ship Repair Painter $36.21 70 1B King Shipbuilding Et Ship Repair Pipefitter $34.64 70 1B King Shipbuilding Et Ship Repair Rigger $34.67 70 1B King Shipbuilding Et Ship Repair Sandblaster $33.62 70 1B King Shipbuilding Et Ship Repair Sheet Metal $34.59 70 1B King Shipbuilding Et Ship Repair Shipfrtter $34.67 70 1B King Shipbuilding Et Ship Repair Trucker $34.491 70 1B King Shipbuilding Et Ship Repair Warehouse $34.551 70 1B i King Shipbuilding Et Ship Repair Welder/burner $34.67 70 113 King Sien Makers Et Installers Sign Installer $22.92 1 (Electrical) King Sian Makers Et Installers Sign Maker $21.36 1 (Electrical) King Sign Makers Et Installers (Non- Sign Installer $27.28 1 Electrical King Sien Makers Et Installers (Non. Sign Maker $33.25 1 Electrical King Soft Floor Layers Journey Level $41.95 5A 2Z King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Journey Level $68.79 5C 1X Protection) King Stage Rieeine Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Journey Level $47.87 5A 1M King Street And Parking Lot Journey Level $19.09 1 Sweeper Workers King Surveyors Assistant Construction Site $49 48 7A 1T 8P Surveyor King Surveyors Chainman $48.961 7A 1T 8P King Surveyors Construction Site Surveyor $50.391 7Af2B 1T 8P King Telecommunication Journey Level $22.76 1 Technicians King Telephone Line Construction - Cable Splicer $34.20 5A Outside King Telephone Line Construction - Hole Digger/Ground Person $18.72 5A 2B Outside 'King Telephone Line Construction - Installer (Repairer) $32.78 5A 2B Outside =King Telephone Line Construction - Special Aparatus Installer 1 $34.20 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $33.51 5A 2B https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 17of17 F Outside { King Telephone Line Construction - Telephone Equipment Operator $34.21 5A 2B Outside (Heavy) P King Telephone Line Construction - Telephone Equipment Operator $31.81 5A 2B Outside (Light) King Telephone Line Construction - Telephone Lineperson $31.81 5A 2B 9 Outside King Telephone Line Construction - Television Groundperson $18.16 5A 2B Outside King Telephone Line Construction - Television Lineperson/Installer $24.09 5A 2B Outside King Telephone Line Construction - Television System Technician $28.72 5A 2B Outside King Telephone Line Construction - Television Technician $25.81 5A 2B Outside King Telephone Line Construction - Tree Trimmer $31.82 5A 2B Outside King Terrazzo Workers Journey Level $43.93 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble £t Terrazzo Finisher $37.76 5A 1B Finishers King Traffic Control Stripers Journey Level $39.90 7A 1K I King Truck Drivers Asphalt Mix Over 16 Yards (W. $46.72 5D 3A 8L I WA-Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W. $45.88 5D 3A 8L WA-Joint Council 28) King Truck Drivers Dump Truck 8t Trailer $46.72 5D 3A 8L i King Truck Drivers Dump Truck (W. WA-Joint $45.88 5D 3A 8L Council 28) King Truck Drivers Other Trucks (W. WA-Joint $46.72 5D 3A 8L Council 28) King Truck Drivers Transit Mixer $23.45 1 King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 d Installers King Well Drillers Et Irrigation Pump Oder $12.97 1 Installers King Well Drillers Et Irrigation Pump Wet[ Driller $18.00 1 Installers a https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 12/21/2011 Page 1 of 2 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Statement of Intent to Pay Prevailing Wage Document Received Date Intent Id Affidavit Id Status Approved On 1 /1 71201 2 1/17/2012 497283 Company Details PACIFIC POWER PRODUCTS COMPANY UBI# 602886195 600 S 56TH PLACE Reg# PACIFPP9161Z a RIDGEFIELD, WA 98642 E-mail jjoyce@pac-power.com 360-887-7400 Industrial Insurance Account Id 483,926-08 I i Filed By Joyce,Jason ' i Prime Contractor If Company Name PACIFIC POWER PRODUCTS COMPANY Contractor Registration No. PACIFPP9161 Z WA UBI Number 602886195 �! Phone Number 360-887-7400 ;s s ' Project Information Awarding Agency KENT, CITY OF F 220 - 4TH AVE S KENT, WA- 98032-5895 Awarding Agency Contact Kristin Lykken Awarding Agency Contact Phone Number 253-856-5650 Contract Number Water Div Gen Load Testing Project Name 2012 Generator Load Testing 1, Bid due date 12/11 /2011 I (�Award Date 1/9/2012 ` Project Site Address or Directions ------------ -__--___—- ____----------------------------- ---__- ------____-----_-_______.---- f Intent Details Does your company intend to hire subcontractors to perform all No work? https://secureaccess.wa.gov/lni/pwiaNiewIntent.aspx 1/17/2012 Page 2 of 2 Does your company intend to hire any subcontractors? No i Will your company have employees perform work on this project? Yes Do you intend to use any apprentices? (apprentices are No Econsidered employees.) Will this project utilize American Recovery and Reinvestment Act No (ARRA) funds? Specifically, will this project utilize any weathenzation or energy No efficiency upgrade funds (ARRA or otherwise)? How many owner/operators performing work on the project own 0 30% or more of the company? What is the estimated contract amount? Or is this a time and $5,850.00 materials estimate? i Expected project start date (MM-DD-YYY`n 1/27/2012 F In what county (or counties)will the project be done? King In what city (or nearest city)will the project be done? Kent journey Level Wages � County Trade Occupation ��- � Wage Fringe #Workers I King Industrial Engine And Machine Journey Level Ll .65 $0 00 1 Mechanics O Show/Hide Existing Notes ' i s -- On 1/1712012 We do not know the fringe benefit amounts as of now since our mechanics have different benefit selections and we do not know at this time which mechanic will perform the work. Our wage+Fb's exceed the prevailing wage amount. https:Hsecureaccess.wa.gov/lni/pwia/Viewlntent.aspx 1/17/2012