HomeMy WebLinkAboutIT06-315 - Other - Tiburon, Inc. - Enhanced Proposal to Move System to New Servers - 12/21/2007 Records M-a---nt-. ---a- ge' m' en-- t '-
KENTd
WAS H ING TON
Document I
r ,
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All Y
portions are to be completed, if you have questions, please contact City Clerks Office.
Vendor Name: 1by f 0^ Vendor Number: Z-9
1 JD Edwards Number
Contract Number: 3
This Is assigned by Deputy City Clerk
Description:
i
Detail:
�n�.G.-�c ,'^V,� �n• d s�� � �� T`���r4-- � l�c�,., �ar�,r cr s
Project Name: �bJru^ Sec�t ai �►t
ao 7 k
Contract Effective Date: t z/ S/D Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: �E\''^ CA'e nr•cr��S Department: �T
Abstract: \\
� t�+�vr. Str�lar �ovti � rapv�F\ ,
S Pubhc\RecordsManogement\Forms\contractcover\ADCL7832 07/02
TUR rtbUfOR.Inc
� fr2J^ r+aer�a�y�Gi„� taa3
$ ta 4GJ
0A
i
October 5,2007
Ms. Kim Clements
City of Kent
220 Fourth Ave., South
Kent, WA 98032-5895 1
,
Subject. Enhancement Proposal (EP)-233045• Move System to New Servers
Reference. Master Support Agreement between the City of Kent and CompuDyne—Public Safety&
Justice,Inc.,dated September 9, 2005 t
Dear Ms Clements:
Tiburon, Inc. is pleased to present the City of Kent with this Enhancement Proposal to move the City's
existing RMS,CMS,TIPS and Prop Room system to new servers
Scope Descnption
Steps to include the move for TIPS/PropRoom are:
1
■ Move applications and web services to new server.
■ Move data to new server- including photos and databases.
■ Assumption that all IP address will remain the same.
■ Test RMS-TIPS connection and functionality.
■ Test PropRoom connection to RMS database.
■ All work to be done remotely
■ Assumption is PCAnywhere be installed and available for remote connection
■ Assumption is that both old and new servers will be available for transfers of data
Steps included in the move of RMS/CMS:
■ Configure Web, GUI, Server, ODBC on servers, and standard interfaces (not state).
■ Client is responsible for setting up ODBC connection on all workstations
■ Assumption is PCAnywhere be installed and available for remote connection
■ Assumption is that both old and new servers will be available for transfers.
Price Description
1) Firm Fixed Price: $30,340
2) The Tiburon Annual Maintenance amount will not increase.
3) This quote does not include taxes levied by any government agency for technical services. Taxes for
technical services,if applicable,are the responsibility of the Client.
I
i7Lr r(, C,.4tIPANY
h
Ms Kim Clements
City of Kent
Enhancement Proposal(EP)-233045• Move to New Servers
October 5,2007
Page 2 of 3
i
Tiburon Responsibilities
1) Prepare internal design documents.
2) Modify the application per the"Scope Description."
3) Install the modified code in the client's test environment.
4) Correct any discrepancies in operation,based on the"Scope Description,"post client testing.
9
5) Install the modified code in the client's production environment.
Client Responsibilities
1) Designate a person to be the principal point of contact for all technical questions and administrative
arrangements relating to this Enhancement Proposal
2) Provide VPN access to Tiburon development personnel.
3) Test the code for conformance with the"Scope Description." 3
Completion Criteria
This work will be considered complete ten(10)business days after Tiburon has provided the Client with
written notification that the enhancement is ready for testing in the test system, or the enhancement has
been placed into production,whichever comes first. If Client does not confirm completion with a sign off
letter presented by the Tiburon project manager within ten(10)business days of submittal of such letter,
or otherwise notifies Tiburon in writing why completion sign-off has not been provided any final
invoice(s) will be issued and will be payable in accordance with the payment terms of this Enhancement
Proposal.
Terms and Conditions
1) This work will be scheduled to commence at a mutually agreeable date after Enhancement Proposal
acceptance
2) Payment Schedule:
• 50% Upon Tiburon receipt of the signed acceptance of the Enhancement Proposal
• 50% Upon achievement of the Completion Criteria
3) Travel or on-site time is not included in this Enhancement Proposal.
4) Training is not included in this Enhancement Proposal.
5) Documentation is not included in this Enhancement Proposal.
Ms Kim Clements
City of Kent
Enhancement Proposal(EP)-233045: Move to New Servers
October 5,2007
Page 3 of 3
6) The terms and conditions of this Enhancement Proposal and the Agreement referenced herein prevail
regardless of any conflicting or additional terms on any Purchase Order or other correspondence
Any contingencies or additional terms obtained on any Purchase Order are not binding upon Tiburon.
All Purchase Orders are subject to approval and acceptance by Tiburon
7) This fixed price Enhancement Proposal is valid unless modified by Tiburon in writing prior to Client
acceptance of this Enhancement Proposal, otherwise,this Enhancement Proposal will expire on {
December 31,2007.
8) By the Client's acceptance of this Enhancement Proposal in the signature blocks provided below,the
Client is authorizing Tiburon to proceed with the work described herein and confirms funding will be
obligated Any requisite contractual documents required by the Client's purchasing procedures are
the responsibility of the Client
Upon review and acceptance of this Enhancement Proposal,please sign below and return the signed copy
of the Enhancement Proposal to Loren Hopper in Tiburon's Pleasanton office Or,you can fax a copy of
this letter to Loren at 510-217-6466 If you have any questions or require further information,please
contact me at your convenience
Smceiely, i
Kim Anderson
Account Manager
By this signature,the City of Kent accepts EP-233045.
:4Z,
tur Date
1
1
6 UXs41
Printed Name/Title