Loading...
HomeMy WebLinkAboutPK11-024 - Amendment - #1 - Engineering Economics, Inc. - Corrections Facility Boiler Replacement - 11/13/2011 -_ Records Managemen';;� NIZ � KENT Document WASHIXGTOH _ RP Vp CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Engineering Economics Inc. Vendor Number: 34553 ID Edwards Number Contract Number: 12K11- This is assigned by City Clerk's Office Project Name: Corrections Facility Boiler Replacement Description: ❑ Interlocal Agreement ❑ Change Order ® Amendment ❑ Contract ❑ Other: //-�' Contract Effective Date: 12/2010 Termination Date: 3/2011 Contract Renewal Notice (Days): 120 Number of days required notice for termination or renewal or amendment Contract Manager: Charlie Lindsey Department: Parks/Facilities Detail: (i.e. address, location, parcel number, tax id, etc.): 1230 S. Central Kent Wa. 98030 : 5 Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08 I KENT ; WASHINGTON l AMENDMENT NO. 1 NAME OF CONSULTANT OR VENDOR: Engineering Economics Inc CONTRACT NAME & PROJECT NUMBER:Kent Corrections Boiler Replacement and Heating Sys ORIGINAL AGREEMENT DATE: December 10, 2010 This Amendment is made between the City and the above-referenced Consultant or Vendor and amends the original Agreement and all prior Amendments. All other provisions of the original Agreement or prior Amendments not inconsistent with this Amendment shall remain in full force and effect. For valuable consideration and by mutual consent of the parties, Consultant or Vendor's work is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, the Consultant or Vendor shall: Revise and relocate the initial boiler system design to accommodate structural concerns from the original boiler location due to lack of documentation of the existing building's structural systems. Structural engineering was provided under a separate contract. Revise the project bid documents to allow the project to be re- bid incorporating value engineering items to bring the project cost closer to the projected budget. Design and bidding support services included revising the design drawings to accommodate the installation of the boilers in the original location in an exterior configuration. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are modified as follows: Original Contract Sum, $19,200 including applicable WSST Net Change by Previous Amendments $0 including applicable WSST Current Contract Amount $19,200 including all previous amendments Current Amendment Sum $10,000 i Applicable WSST Tax on this $ Amendment Revised Contract Sum $29,200 AMENDMENT - 1 OF 2 3 Original Time for Completion 3/10/2011 (insert date) Revised Time for Completion under 0 prior Amendments (insert date) Add'I Days Required (t) for this 160 calendar days Amendment Revised Time for Completion 9/29/2011 (insert date) The Consultant or Vendor accepts all requirements of this Amendment by signing below, by its signature waives any protest or claim it may have regarding this Amendment, and acknowledges and accepts that this Amendment constitutes full payment and final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Amendment, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Amendment, unless otherwise provided, does not relieve the Consultant or Vendor from strict compliance with the guarantee and warranty provisions of the original Agreement. All acts consistent with the authority of the Agreement, previous Amendments (if any), and this Amendment, prior to the effective date of this Amendment, are hereby ratified and affirmed, and the terms of the Agreement, previous Amendments (if any), and this Amendment a shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this Amendment, which is binding on the parties of this contract. IN WITNESS, the parties below have executed this Amendment, which will become effective on the last date written below. CONSULTANT/VENDOR: CITY OF KENT: By: By: (signature) (signature}} Print Name: r�.4 h),r1�c,ls P int m2,e. 4-M o �— Its L"� I s � ' (`title) 6l (title)DATE: 1 L\s�LI DATE: !/ APPROVED AS TO FORM: (applicable if Mayor's signature required) Kert Law Department change orderieeicorrectionboiler AMENDMENT - 2 OF 2 Enguicei ing Econoinics lne 1201 Westem Avenue,Suite 325 Seattle.Washington 06101 telephone 2066221001 ; facsimile 206 622 5747 Authorization of Engineering Services Date: July 12, 2011 (Revised 10-24-11) Project: City of Kent Corrections Facility Boiler Replacement and Heating System Upgrades Project No: 03-10531 Client: City of Kent From: Jeff Nichols i Dana Thomas Contact: Alex Ackley Engineering Economics Inc E-mail: aackley@kentwa.gov (206) 622-1001 Subject: Engineering Services Description of Engineering Services: • Revise and relocate the initial boiler system design to accommodate structural concerns from the original boiler location due to lack of documentation of the existing building's structural systems. Structural engineering was provided under a separate contract Design revisions included expanding the boiler and piping layout to allow for service access, coordination of boiler enclosure and components with the Structural Engineer, and modifications to the existing facility's dry sprinkler system to serve the new boiler enclosure to accommodate City of Kent requirements. • Revise the project bid documents to allow the project to be re-bid incorporating value engineering items to bring the project cost closer to the projected budget Design and bidding support services included revising the design drawings to accommodate the installation of the boilers in the original location in an exterior configuration Coordination of the revised mechanical configuration with the Structural Engineer, attending a pre-bid contractor walk thru, responding to contractors bid questions and issuing addendums as appropriate, attending bid opening assisting the Owner on evaluation of the bids. Total Services Fee: $10,000 Approval City of Kent 1 Jeft ichols REQUEST FOR MAYOR'S SIGNATURE KENT Please Fill in All Applicable Boxes a Routing Information (ALL REQUESTS MUST FIRST BE ROUTED THROUGH THE`LAW DEPARTMENT) Cw Reviewed by Parks Director Originator: Alex Ackley Phone (Originator): 508 Date Sent: 11/7/2011 Date Required: 11/10/2011 Return Signed Document to: Rosalie CONTRACT TERMINATION DATE: 9/2011 VENDOR NAME: Engineering Economics DATE OF COUNCIL APPROVAL: N/A Brief Explanation of Document: This is Amendment 1 to revise and relocate the initial boiler system design to accommodate structural concerns from the original boiler location due to lack of documentation of the existing buildings' structural systems. Structural engineering was provided under a separate contract. Revise the project bid documents to allow the project to be rebid incorporating value engineering items Lto bring the project cost closer to the ccf projected budget. OV t��vtil b IDS c aye..L I to oVe..�' �v-�4.t� G,c..v_S c✓-5 4-i � ��1GG1" l.�ll ���5 ancQ Yc- dcSc`}h� . C�wa r ACA - , W-1 k T��s a,�e,r�Rw�..�' �� kc�V�a ��v. tti.L R Through w Department All Contracts Must Be Routed Th oug The La p (This area to be completed by the Law Department) Received: Approval of Law Dept.: RECEIVED Law Dept. Comments: NOV 0 S 2011 u SCENT LAW DE Date Forwarded to Mayor: 1('l(l Shaded Areas To Be Completed By Administration Staff a Received: Recommendations and Comments: ( `41 Disposition: CIT}'0�Kph;i Date Returned: t , i