Vendor Name: Engineering Economics Inc.
Vendor Number: 34553
ID Edwards Number
Contract Number: 12K11-
This is assigned by City Clerk's Office
Project Name: Corrections Facility Boiler Replacement
Description: ❑ Interlocal Agreement ❑ Change Order ® Amendment ❑ Contract
❑ Other:
//-�'
Contract Effective Date: 12/2010 Termination Date: 3/2011
Contract Renewal Notice (Days): 120
Number of days required notice for termination or renewal or amendment
Contract Manager: Charlie Lindsey Department: Parks/Facilities
Detail: (i.e. address, location, parcel number, tax id, etc.):
1230 S. Central Kent Wa. 98030
:
5 Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08
I
KENT ;
WASHINGTON
l
AMENDMENT NO. 1
NAME OF CONSULTANT OR VENDOR: Engineering Economics Inc
CONTRACT NAME & PROJECT NUMBER:Kent Corrections Boiler Replacement and Heating Sys
ORIGINAL AGREEMENT DATE: December 10, 2010
This Amendment is made between the City and the above-referenced Consultant or
Vendor and amends the original Agreement and all prior Amendments. All other provisions of
the original Agreement or prior Amendments not inconsistent with this Amendment shall remain
in full force and effect. For valuable consideration and by mutual consent of the parties,
Consultant or Vendor's work is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, the Consultant or Vendor shall:
Revise and relocate the initial boiler system design to
accommodate structural concerns from the original boiler
location due to lack of documentation of the existing building's
structural systems. Structural engineering was provided under
a separate contract.
Revise the project bid documents to allow the project to be re-
bid incorporating value engineering items to bring the project
cost closer to the projected budget. Design and bidding support
services included revising the design drawings to accommodate
the installation of the boilers in the original location in an
exterior configuration.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are modified as follows:
Original Contract Sum, $19,200
including applicable WSST
Net Change by Previous Amendments $0
including applicable WSST
Current Contract Amount $19,200
including all previous amendments
Current Amendment Sum $10,000 i
Applicable WSST Tax on this $
Amendment
Revised Contract Sum $29,200
AMENDMENT - 1 OF 2
3
Original Time for Completion 3/10/2011
(insert date)
Revised Time for Completion under 0
prior Amendments
(insert date)
Add'I Days Required (t) for this 160 calendar days
Amendment
Revised Time for Completion 9/29/2011
(insert date)
The Consultant or Vendor accepts all requirements of this Amendment by signing below,
by its signature waives any protest or claim it may have regarding this Amendment, and
acknowledges and accepts that this Amendment constitutes full payment and final settlement of
all claims of any kind or nature arising from or connected with any work either covered or
affected by this Amendment, including, without limitation, claims related to contract time,
contract acceleration, onsite or home office overhead, or lost profits. This Amendment, unless
otherwise provided, does not relieve the Consultant or Vendor from strict compliance with the
guarantee and warranty provisions of the original Agreement.
All acts consistent with the authority of the Agreement, previous Amendments (if any),
and this Amendment, prior to the effective date of this Amendment, are hereby ratified and
affirmed, and the terms of the Agreement, previous Amendments (if any), and this Amendment a
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this Amendment, which is binding on the parties of this contract.
IN WITNESS, the parties below have executed this Amendment, which will
become effective on the last date written below.
CONSULTANT/VENDOR: CITY OF KENT:
By: By:
(signature) (signature}}
Print Name: r�.4 h),r1�c,ls P int m2,e. 4-M o �—
Its L"� I s
� ' (`title) 6l (title)DATE: 1 L\s�LI DATE: !/
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kert Law Department
change orderieeicorrectionboiler
AMENDMENT - 2 OF 2
Enguicei ing Econoinics lne
1201 Westem Avenue,Suite 325
Seattle.Washington 06101
telephone 2066221001 ;
facsimile 206 622 5747
Authorization of Engineering Services
Date: July 12, 2011 (Revised 10-24-11)
Project: City of Kent Corrections Facility
Boiler Replacement and Heating System Upgrades
Project No: 03-10531
Client: City of Kent From: Jeff Nichols i Dana Thomas
Contact: Alex Ackley Engineering Economics Inc
E-mail: aackley@kentwa.gov (206) 622-1001
Subject: Engineering Services
Description of Engineering Services:
• Revise and relocate the initial boiler system design to accommodate structural concerns
from the original boiler location due to lack of documentation of the existing building's
structural systems. Structural engineering was provided under a separate contract
Design revisions included expanding the boiler and piping layout to allow for service
access, coordination of boiler enclosure and components with the Structural Engineer,
and modifications to the existing facility's dry sprinkler system to serve the new boiler
enclosure to accommodate City of Kent requirements.
• Revise the project bid documents to allow the project to be re-bid incorporating value
engineering items to bring the project cost closer to the projected budget Design and
bidding support services included revising the design drawings to accommodate the
installation of the boilers in the original location in an exterior configuration Coordination
of the revised mechanical configuration with the Structural Engineer, attending a pre-bid
contractor walk thru, responding to contractors bid questions and issuing addendums as
appropriate, attending bid opening assisting the Owner on evaluation of the bids.
Total Services Fee:
$10,000
Approval
City of Kent 1 Jeft ichols
REQUEST FOR MAYOR'S SIGNATURE
KENT Please Fill in All Applicable Boxes
a
Routing Information (ALL REQUESTS MUST FIRST BE ROUTED THROUGH THE`LAW DEPARTMENT)
Cw Reviewed by Parks Director
Originator: Alex Ackley Phone (Originator): 508
Date Sent: 11/7/2011 Date Required: 11/10/2011
Return Signed Document to: Rosalie CONTRACT TERMINATION DATE: 9/2011
VENDOR NAME: Engineering Economics DATE OF COUNCIL APPROVAL: N/A
Brief Explanation of Document: This is Amendment 1 to revise and relocate the initial boiler
system design to accommodate structural concerns from the original boiler location due to lack
of documentation of the existing buildings' structural systems. Structural engineering was
provided under a separate contract.
Revise the project bid documents to allow the project to be rebid incorporating value
engineering items Lto bring the project cost closer to the
ccf projected budget.
OV t��vtil b IDS c aye..L I to oVe..�' �v-�4.t� G,c..v_S c✓-5 4-i � ��1GG1"
l.�ll ���5 ancQ Yc- dcSc`}h� .
C�wa r ACA - , W-1 k T��s a,�e,r�Rw�..�' �� kc�V�a ��v. tti.L
R Through w Department
All Contracts Must Be Routed Th oug The La p
(This area to be completed by the Law Department)
Received:
Approval of Law Dept.: RECEIVED
Law Dept. Comments: NOV 0 S 2011 u
SCENT LAW DE
Date Forwarded to Mayor: 1('l(l
Shaded Areas To Be Completed By Administration Staff
a
Received:
Recommendations and Comments: ( `41
Disposition:
CIT}'0�Kph;i
Date Returned:
t
,
i