HomeMy WebLinkAboutPW11-146 - Change Order - #2 - McClure and Sons, Inc. - Guiberson Corrosion Control Facility - 02/24/2011 R e c o r d S N em
I-Z
WCENT Document
WwsnIwerox
4
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: C%'-AYew
i
Vendor Number: 3S (o i
JD Edwards Number
Contract Number:
This is assigned by City Clerk's Office
Project Name-
Description: ❑ Fnteriocal Agreement
)<
Change Order ❑ Amendment ❑ Contract
ElOther: II 11
Contract Effective Date:2 ii5`2\ I Termination Date:
Contract Renewal Notice (Days): 452 �lorkirict�l a�/g
i
Number of days required notice for termination or renewal or amendment
Contract Manager: Department: t�N�l�� �Io� (cSir►Krino�
Detail; (i.e. address, location, parcel number, tax id, etc.):
S Pubhc\RecordsMa nag ement\Forms\Contra ctCove r\adcc7632 1 11/08
ORIGINAL
• ununu�mx,R,croxs
KENT
Wp5NINGTON SEP 26 2011
CHANGE ORDER RECEIVED
Date: September 9, 2011 Change Order No.: 2
i
City Project Name: Guiberson Corrosion Facility41
Project Number: 10-3029
SEP 2 8 2011
Contractor: McClure and Sons, Inc.
Original Contract Date: February 15, 2011 ENGINEERNG Dr
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement which outlines the Description of Work, is hereby
modified as follows:
Provide all labor, materials;-and equipment necessaryto:-
02-001: Re-grade northwest corner of site. Reason: Grade elevation on
adjacent City property was in conflict with grade required by
engineering plans. Cost for this work shall be 1 LS of $250.00 (9.5%
sales tax).
2. The contract amount and time for performance provisions of Section II
"Compensation," and Section III, "Time for Completion," are hereby modified as
follows:
Original Contract Sum, $ 937,432.79
Including applicable alternates and
WSST.
Net Change by Previous Change Orders $ 7,117.50
(incl. applicable WSST)
Current Contract Amount $ 944,550.29
(rnd. Previous Change Orders)
Current Change Order $ 250.00
Applicable WSST Tax on this Change $ 23.75
Order
5
Revised Contract Sum $ 944,824.04
- 1 -
ORIGINAL
a
Original Time for Completion 450 Working days
Revised Time for Completion under -0- Working days
prior Change Orders
Days Required t for this Change Order 2 Working days
Revised Time for Completion 452 Working days
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, the Contractor accepts all requirements of this Change Order by signing below.
Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest or claim
it may have regarding this Change Order and acknowledges and accepts that this Change Order
constitutes full payment and final settlement of all claims of any kind or nature arising from or
connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, contract acceleration, onsite or home office overhead,
or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor
from strict compliance with the guarantee and warranty provisions of the original contract,
particularly those pertaining to substantial completion date.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will ad3ust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above. M
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
1L.
CONTRACT Y OFKENT:
By: By:
(si �tur ) (signature)
Print Name: L`�r /�/G-(`�u4 t Print Name: Timothy J. LaPorte
Its Its Public Works Director
q (Title) /Title)
DATE: ! Z�o— �� DATE: _
-2-