Loading...
HomeMy WebLinkAboutPW11-237 - Original - Maple Crest Electric, Inc. - 72nd Avenue Dataloggers - 09/07/2011 Records Ma- -�7n -'- e m ej KENT Document WASHINGTON CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Maple Crest Electric, Inc. Vendor Number: ]D Edwards Number Contract Number: 'p(1 I I -937 This is assigned by City Clerk's Office Project Name: 72nd Ave. Dataloggers Description: ❑ Interlocal Agreement ❑ Change Order ❑ Amendment ® Contract ❑ Other: Contract Effective Date: 9/7/11 Termination Date: 3/31/12 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Matt Knox Department: Engineering Detail: (i.e. address, location, parcel number, tax id, etc.): Reconnect thrower enclosure so that the dataloggers sensors can be repaired and functionality restored. S:Public\RecordsManagement\Forms\COntractCOver\adcc7832 1 11/08 of KENT Was +iHc,ro x PUBLIC WORKS AGREEMENT between City of Kent and Maple Crest Electric, Inc. THIS AGREEMENT is made by and between the City of Kent, a Washington municipal corporation (hereinafter the "City"), and Maple Crest Electric, Inc. organized under the laws of the State of Washington, located and doing business at 21628 84"' Ave. S./PO Box 1165, Kent, WA 98035, Phone: (253) 872-4712/Fax: (253) 872-6564, Contact: Al Atchley (hereinafter the "Contractor"). AGREEMENT The parties agree as follows: I. DESCRIPTION OF WORK. Contractor shall perform the following services for the City in accordance with the following described plans and/or specifications: The Contractor shall reconnect the 72nd Ave. power enclosure so that the dataloggers sensors can be repaired and functionality restored. For a description, see the Contractor's June 1, 2011 quote which is attached as Exhibit A and incorporated by this reference. Contractor further represents that the services furnished under this Agreement will be performed in accordance with generally accepted professional practices within the Puget Sound region in effect at the time such services are performed. II. TIME OF COMPLETION. The parties agree that work will begin on the tasks described in Section I above immediately upon execution of this Agreement. Upon the effective date of this Agreement, Contractor shall complete the work described in Section I by March 31, 2012. III. COMPENSATION. The City shall pay the Contractor a total amount not to exceed Three Thousand, Eighteen Dollars and ninety two cents ($3,018.92), including any applicable Washington State Sales Tax, for the work and services contemplated in this Agreement. The City shall pay the Contractor fifty percent (50%) of the Contract amount upon completion and acceptance of the work by the City, and the remainder upon fulfillment of the conditions listed below and throughout this Agreement. PUBLIC WORKS AGREEMENT - 1 (Under$10K and No Performance Bond) • A. No Payment and Performance Bond. Because this contract, including applicable sales tax, is less than $25,000, and pursuant to Chapter 39.08 RCW, the Contractor, in lieu of providing the City a payment and performance bond, has elected to have the owner retain the final fifty percent (50%) of the Contract amount for a period of sixty (60) days after the date of final acceptance, or until receipt of all necessary releases from the State Department of Revenue, the State Department of Labor & Industries, and the State Employment Security Department, and until settlement of any liens filed under Chapter 60.28 RCW, whichever is later. B. Defective or Unauthorized Work. The City reserves its right to withhold payment from Contractor for any defective or unauthorized work. Defective or unauthorized work includes, without limitation: work and materials that do not conform to the requirements of this Agreement; and extra work and materials furnished without the City's written approval. If Contractor is unable, for any reason, to satisfactorily complete any portion of the work, the City may complete the work by contract or otherwise, and Contractor shall be liable to the City for any additional costs incurred by the City. "Additional costs" shall mean all reasonable costs, including legal costs and attorney fees, incurred by the City beyond the maximum Contract price specified above. The City further reserves its right to deduct the cost to complete the Contract work, including any Additional Costs, from any and all amounts due or to become due the Contractor. C. Final Payment: Waiver of Claims. THE CONTRACTOR'S ACCEPTANCE OF FINAL PAYMENT (EXCLUDING WITHHELD RETAINAGE) SHALL CONSTITUTE A WAIVER OF CONTRACTOR'S CLAIMS, EXCEPT THOSE PREVIOUSLY AND PROPERLY MADE AND IDENTIFIED BY CONTRACTOR AS UNSETTLED AT THE TIME FINAL PAYMENT IS MADE AND ACCEPTED. IV. INDEPENDENT CONTRACTOR. The parties intend that an Independent Contractor-Employer Relationship will be created by this Agreement. By their execution of this Agreement, and in accordance with Ch. 51.08 RCW, the parties make the following representations: A. The Contractor has the ability to control and direct the performance and details of its work, the City being interested only in the results obtained under this Agreement. B. The Contractor maintains and pays for its own place of business from which Contractor's services under this Agreement will be performed. C. The Contractor has an established and independent business that is eligible for a business deduction for federal income tax purposes that existed before the City retained Contractor's services and is a service other than that furnished by the City, or the Contractor is engaged in an independently established trade, occupation, profession, or business of the same nature as that involved under this Agreement. D. The Contractor is responsible for filing as they become due all necessary tax documents with appropriate federal and state agencies, including the Internal Revenue Service and the state Department of Revenue. PUBLIC WORKS AGREEMENT - 2 (Under$I OK and No Performance Bond) E. The Contractor has registered its business and established an account with the state Department of Revenue and other state agencies as may be required by Contractor's business, and has obtained a Unified Business Identifier (UBI) number from the State of Washington. F. The Contractor has a valid contractor registration pursuant to Ch. 18.27 RCW or an electrical contractor license pursuant to Ch. 19.28 RCW. G. The Contractor maintains a set of books dedicated to the expenses and earnings of its business. V. TERMINATION. The City may terminate this Agreement for good cause. "Good cause" shall include, without limitation, any one or more of the following events: A. The Contractor's refusal or failure to supply a sufficient number of properly skilled workers or proper materials for completion of the Contract work. B. The Contractor's failure to complete the work within the time specified in this Agreement. C. The Contractor's failure to make full and prompt payment to subcontractors or for material or labor. D. The Contractor's persistent disregard of federal, state or local laws, rules or regulations. E. The Contractor's filing for bankruptcy or becoming adjudged bankrupt. F. The Contractor's breach of any portion of this Agreement. If the City terminates this Agreement for good cause, the Contractor shall not receive any further money due under this Agreement until the Contract work is completed. After termination, the City may take possession of all records and data within the Contractor's possession pertaining to this project which may be used by the City without restriction. VI. PREVAILING WAGES. Contractor shall file a "Statement of Intent to Pay Prevailing Wages," with the State of Washington Department of Labor & Industries prior to commencing the Contract work. Contractor shall pay prevailing wages in effect on the date the bid is accepted or executed by Contractor, and comply with Chapter 39.12 of the Revised Code of Washington, as well as any other applicable prevailing wage rate provisions. The latest prevailing wage rate revision issued by the Department of Labor and Industries is attached. VII. CHANGES. The City may issue a written change order for any change in the Contract work during the performance of this Agreement. If the Contractor determines, for any reason, that a change order is necessary, Contractor must submit a written change order request to the person listed in the notice provision section of this Agreement, section XV(D), within fourteen (14) calendar days of the date Contractor knew or should have known of the facts and events giving rise to the requested change. If the City determines that the change increases or decreases the Contractor's costs or time for performance, the City will make an equitable adjustment. The City will attempt, in good faith, to reach agreement with the Contractor on all equitable adjustments. However, if the parties are unable to agree, the City PUBLIC WORKS AGREEMENT - 3 (Under$10K and No Performance Bond) will determine the equitable adjustment as it deems appropriate. The Contractor shall proceed with the change order work upon receiving either a written change order from the City or an oral order from the City before actually receiving the written change order. If the Contractor fails to require a change order within the time specified in this paragraph, the Contractor waives its right to make any claim or submit subsequent change order requests for that portion of the contract work. If the Contractor disagrees with the equitable adjustment, the Contractor must complete the change order work; however, the Contractor may elect to protest the adjustment as provided in subsections A through E of Section VIII, Claims, below. The Contractor accepts all requirements of a change order by: (1) endorsing it, (2) writing a separate acceptance, or (3) not protesting in the way this section provides. A change order that is accepted by Contractor as provided in this section shall constitute full payment and final settlement of all claims for contract time and for direct, indirect and consequential costs, including costs of delays related to any work, either covered or affected by the change. VIII. CLAIMS. If the Contractor disagrees with anything required by a change order, another written order, or an oral order from the City, including any direction, instruction, interpretation, or determination by the City, the Contractor may file a claim as provided in this section. The Contractor shall give written notice to the City of all claims within fourteen (14) calendar days of the occurrence of the events giving rise to the claims, or within fourteen (14) calendar days of the date the Contractor knew or should have known of the facts or events giving rise to the claim, whichever occurs first . Any claim for damages, additional payment for any reason, or extension of time, whether under this Agreement or otherwise, shall be conclusively deemed to have been waived by the Contractor unless a timely written claim is made in strict accordance with the applicable provisions of this Agreement. At a minimum, a Contractor's written claim shall include the information set forth in subsections A, items 1 through 5 below. FAILURE TO PROVIDE A COMPLETE, WRITTEN NOTIFICATION OF CLAIM WITHIN THE TIME ALLOWED SHALL BE AN ABSOLUTE WAIVER OF ANY CLAIMS ARISING IN ANY WAY FROM THE FACTS OR EVENTS SURROUNDING THAT CLAIM OR CAUSED BY THAT DELAY. A. Notice of Claim. Provide a signed written notice of claim that provides the following information: 1. The date of the Contractor's claim; 2. The nature and circumstances that caused the claim; 3. The provisions in this Agreement that support the claim; 4. The estimated dollar cost, if any, of the claimed work and how that estimate was determined; and 5. An analysis of the progress schedule showing the schedule change or disruption if the Contractor is asserting a schedule change or disruption. B. Records. The Contractor shall keep complete records of extra costs and time incurred as a result of the asserted events giving rise to the claim. The City shall have access to any of the Contractor's records needed for evaluating the protest. The City will evaluate all claims, provided the procedures in this section are followed. If the City determines that a claim is valid, the City will adjust payment PUBLIC WORKS AGREEMENT - 4 (Under$10K and No Performance Bond) t for work or time by an equitable adjustment. No adjustment will be made for an invalid protest. C. Contractor's Duty to Complete Protested Work. In spite of any claim, the Contractor shall proceed promptly to provide the goods, materials and services required by the City under this Agreement. D. Failure to Protest Constitutes Waiver. By not protesting as this section provides, the Contractor also waives any additional entitlement and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). E. Failure to Follow Procedures Constitutes Waiver. By failing to follow the procedures of this section, the Contractor completely waives any claims for protested work and accepts from the City any written or oral order (including directions, instructions, interpretations, and determination). IX. LIMITATION OF ACTIONS. CONTRACTOR MUST, IN ANY EVENT, FILE ANY LAWSUIT ARISING FROM OR CONNECTED WITH THIS AGREEMENT WITHIN 120 CALENDAR DAYS FROM THE DATE THE CONTRACT WORK IS COMPLETE OR CONTRACTOR'S ABILITY TO FILE THAT CLAIM OR SUIT SHALL BE FOREVER BARRED. THIS SECTION FURTHER LIMITS ANY APPLICABLE STATUTORY LIMITATIONS PERIOD. X. WARRANTY. Upon acceptance of the contract work, Contractor must provide the City a one-year warranty bond in a form and amount acceptable to the City. The Contractor shall correct all defects in workmanship and materials within one (1) year from the date of the City's acceptance of the Contract work. In the event any parts are repaired or replaced, only original replacement parts shall be used—rebuilt or used parts will not be acceptable. When defects are corrected, the warranty for that portion of the work shall extend for one (1) year from the date such correction is completed and accepted by the City. The Contractor shall begin to correct any defects within seven (7) calendar days of its receipt of notice from the City of the defect. If the Contractor does not accomplish the corrections within a reasonable time as determined by the City, the City may complete the corrections and the Contractor shall pay all costs incurred by the City in order to accomplish the correction. XI. DISCRIMINATION. In the hiring of employees for the performance of work under this Agreement or any sub-contract, the Contractor, its sub-contractors, or any person acting on behalf of the Contractor or sub-contractor shall not, by reason of race, religion, color, sex, age, sexual orientation, national origin, or the presence of any sensory, mental, or physical disability, discriminate against any person who is qualified and available to perform the work to which the employment relates. Contractor shall execute the attached City of Kent Equal Employment Opportunity Policy Declaration, Comply with City Administrative Policy 1.2, and upon completion of the contract work, file the attached Compliance Statement. XII. INDEMNIFICATION. Contractor shall defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from any and all claims, injuries, damages, losses or suits, including all legal costs and attorney fees, arising out of or in connection with the Contractor's performance of this Agreement, except for that portion of the injuries and damages caused by the City's negligence. PUBLIC WORKS AGREEMENT - 5 (Under$1OK and No Performance Bond) The City's inspection or acceptance of any of Contractor's work when completed shall not be grounds to avoid any of these covenants of indemnification. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, agents and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractor's negligence. IT IS FURTHER SPECIFICALLY AND EXPRESSLY UNDERSTOOD THAT THE INDEMNIFICATION PROVIDED HEREIN CONSTITUTES THE CONTRACTOR'S WAIVER OF IMMUNITY UNDER INDUSTRIAL INSURANCE, TITLE 51 RCW, SOLELY FOR THE PURPOSES OF THIS INDEMNIFICATION. THE PARTIES FURTHER ACKNOWLEDGE THAT THEY HAVE MUTUALLY NEGOTIATED THIS WAIVER. In the event Contractor refuses tender of defense in any suit or any claim, if that tender was made pursuant to this indemnification clause, and if that refusal is subsequently determined by a court having jurisdiction (or other agreed tribunal) to have been a wrongful refusal on the Contractor's part, then Contractor shall pay all the City's costs for defense, including all reasonable expert witness fees and reasonable attorneys' fees, plus the City's legal costs and fees incurred because there was a wrongful refusal on the Contractor's part. The provisions of this section shall survive the expiration or termination of this Agreement. XIII. INSURANCE. The Contractor shall procure and maintain for the duration of the Agreement, insurance of the types and in the amounts described in Exhibit B attached and incorporated by this reference. XIV. WORK PERFORMED AT CONTRACTOR'S RISK. Contractor shall take all necessary precautions and shall be responsible for the safety of its employees, agents, and subcontractors in the performance of the contract work and shall utilize all protection necessary for that purpose. All work shall be done at Contractor's own risk, and Contractor shall be responsible for any loss of or damage to materials, tools, or other articles used or held for use in connection with the work. XV. MISCELLANEOUS PROVISIONS. A. Recyclable Materials. Pursuant to Chapter 3.80 of the Kent City Code, the City requires its contractors and consultants to use recycled and recyclable products whenever practicable. A price preference may be available for any designated recycled product. B. Non-Waiver of Breach. The failure of the City to insist upon strict performance of any of the covenants and agreements contained in this Agreement, or to exercise any option conferred by this Agreement in one or more instances shall not be construed to be a waiver or relinquishment of those covenants, agreements or options, and the same shall be and remain in full force and effect. C. Resolution of Disputes and Governing Law. This Agreement shall be governed by and construed in accordance with the laws of the State of Washington. If the parties are unable to settle any dispute, difference or claim arising from the parties' performance of this Agreement, the exclusive means of resolving that dispute, difference or claim, shall only be by PUBLIC WORKS AGREEMENT - 6 (Under$10K and No Performance Bond) e filing suit exclusively under the venue, rules and jurisdiction of the King County Superior Court, King County, Washington, unless the parties agree in writing to an alternative dispute resolution process. In any claim or lawsuit for damages arising from the parties' performance of this Agreement, each party shall pay all its legal costs and attorney's fees incurred in defending or bringing such claim or lawsuit, including all appeals, in addition to any other recovery or award provided by law; provided, however, nothing in this paragraph shall be construed to limit the City's right to indemnification under Section XII of this Agreement. D. Written Notice. All communications regarding this Agreement shall be sent to the parties at the addresses listed on the signature page of the Agreement, unless notified to the contrary. Any written notice hereunder shall become effective three (3) business days after the date of mailing by registered or certified mail, and shall be deemed sufficiently given if sent to the addressee at the address stated in this Agreement or such other address as may be hereafter specified in writing. E. Assignment. Any assignment of this Agreement by either party without the written consent of the non-assigning party shall be void. If the non-assigning party gives its consent to any assignment, the terms of this Agreement shall continue in full force and effect and no further assignment shall be made without additional written consent. F. Modification. No waiver, alteration, or modification of any of the provisions of this Agreement shall be binding unless in writing and signed by a duly authorized representative of the City and Contractor. G. Entire Agreement. The written provisions and terms of this Agreement, together with any Exhibits attached hereto, shall supersede all prior verbal statements of any officer or other representative of the City, and such statements shall not be effective or be construed as entering into or forming a part of or altering in any manner this Agreement. All of the above documents are hereby made a part of this Agreement. However, should any language in any of the Exhibits to this Agreement conflict with any language contained in this Agreement, the terms of this Agreement shall prevail. H. Compliance with Laws. The Contractor agrees to comply with all federal, state, and municipal laws, rules, and regulations that are now effective or in the future become applicable to Contractor's business, equipment, and personnel engaged in operations covered by this Agreement or accruing out of the performance of those operations. PUBLIC WORKS AGREEMENT - 7 (Under$10K and No Performance Bond) I. Counterparts. This Agreement may be executed in any number of counterparts, each of which shall constitute an original, and all of which will together constitute this one Agreement. IN WITNESS, the parties below execute this Agreement, which shall become effective on the last date entered below. CONTRACTOR: CITY OF KENT: By: el By: (srgnatur // 11 (signature) Print Name: Print Name: Michael Mactutis Its pf-251d&ey ' Its: Environmental Engineering Manager (title) DATE: 9' 6- It DATE: NOTICES TO BE SENT TO: NOTICES TO BE SENT TO: CONTRACTOR: CITY OF KENT: Al Atchley Timothy 1. LaPorte, P.E. Maple Crest Electric, Inc. City of Kent PO Box 1165 220 Fourth Avenue South Kent, WA 98035 Kent, WA 98032 (253) 872-4712 (telephone) (253) 856-5500 (telephone) (253) 872-6564 (facsimile) (253) 856-6500 (facsimile) Maple C rest Eec-7 O/Kn z PUBLIC WORKS AGREEMENT - 8 (Under$10K and No Performance Bond) DECLARATION CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY POLICY The City of Kent is committed to conform to Federal and State laws regarding equal opportunity. As such all contractors, subcontractors and suppliers who perform work with relation to this Agreement shall comply with the regulations of the City's equal employment opportunity policies. The following questions specifically identify the requirements the City deems necessary for any contractor, subcontractor or supplier on this specific Agreement to adhere to. An affirmative response is required on all of the following questions for this Agreement to be valid and binding. If any contractor, subcontractor or supplier willfully misrepresents themselves with regard to the directives outlines, it will be considered a breach of contract and it will be at the City's sole determination regarding suspension or termination for all or part of the Agreement; The questions are as follows: 1. I have read the attached City of Kent administrative policy number 1.2. 2. During the time of this Agreement I will not discriminate in employment on the basis of sex, race, color, national origin, age, or the presence of all sensory, mental or physical disability. 3. During the time of this Agreement the prime contractor will provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 4. During the time of the Agreement I, the prime contractor, will actively consider hiring and promotion of women and minorities. 5. Before acceptance of this Agreement, an adherence statement will be signed by me, the Prime Contractor, that the Prime Contractor complied with the requirements as set forth above. By signing below, I agree to fulfill the five requirements referenced above. Dated this 6 day of � '1 , 20 1 For: Title: Date: EEO COMPLIANCE DOCUMENTS - 1 CITY OF KENT ADMINISTRATIVE POLICY NUMBER: 1.2 EFFECTIVE DATE: January 1, 1998 SUBJECT: MINORITY AND WOMEN SUPERSEDES: April 1, 1996 CONTRACTORS APPROVED BY Jim White, Mayor POLICY: Equal employment opportunity requirements for the City of Kent will conform to federal and state laws. All contractors, subcontractors, consultants and suppliers of the City must guarantee equal employment opportunity within their organization and, if holding Agreements with the City amounting to $10,000 or more within any given year, must take the following affirmative steps: 1. Provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer. 2. Actively consider for promotion and advancement available minorities and women. Any contractor, subcontractor, consultant or supplier who willfully disregards the City's nondiscrimination and equal opportunity requirements shall be considered in breach of contract and subject to suspension or termination for all or part of the Agreement. Contract Compliance Officers will be appointed by the Directors of Planning, Parks, and Public Works Departments to assume the following duties for their respective departments. 1. Ensuring that contractors, subcontractors, consultants, and suppliers subject to these regulations are familiar with the regulations and the City's equal employment opportunity policy. 2. Monitoring to assure adherence to federal, state and local laws, policies and guidelines. EEO COMPLIANCE DOCUMENTS - 2 CITY OF KENT EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE STATEMENT This form shall be filled out AFTER COMPLETION of this project by the Contractor awarded the Agreement. I, the undersigned, a duly represented agent of Maple Crest Electric, Inc. Company, hereby acknowledge and declare that the before-mentioned company was the prime contractor for the Agreement known as Mill Creek Diversion Electrical Service Repair that was entered into on the September 7, 2011, between the firm I represent and the City of Kent. I declare that I complied fully with all of the requirements and obligations as outlined in the City of Kent Administrative Policy 1.2 and the Declaration City of Kent Equal Employment Opportunity Policy that was part of the before-mentioned Agreement. Dated this 1 9� day of Q4ffl , 2011. By: (' For: e Title: Saes 24 Date: za- t 9- EEO COMPLIANCE DOCUMENTS - 1 EXHIBIT A c ..,arm, t,r.i J, •.vnal `,I+ra,atr.t June 1,2011 City of Kent 400 West Gowe Kent, Wa 98032 Attn: Matt Knox Gentlemen: We are pleased to quote$ 2757.00 plus Washington State Sales Tax to supply labor and material for the above project as follows: 1. Remove old meter socket and install a new 200 amp 480 volt 3 phase 4 wire meter base. 2. Install 4 runs of 2/0 aluminum wire from existing disconnect on pole to 125 amp 3 pole breaker in Pump station enclosure. 3. Install 2 - 8 foot ground rods with#6 ground wire. 4. ElectricaI permit. Exclusions: 1. No wiring from load side of 125 amp breaker. If you have any questions or require further information,please do not hesitate to call, (253)872-4712. Very truly yours, Contract Amount: Maple Crest Electric, $2,757.00 26192 Sales Tax $3,018.92 Total Richard Koenen Manager RK/pma 21628 84"Ave So PO Box 1165—Kent,WA 98035 253 872 4712 fax 253 872 6564 Emad maplecresl(amsn com EXHIBIT B INSURANCE REQUIREMENTS FOR SERVICE CONTRACTS Insurance The Contractor shall procure and maintain for the duration of the Agreement, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. A. Minimum Scope of Insurance Contractor shall obtain insurance of the types described below: 1. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. 2. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. 3. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. B. Minimum Amounts of Insurance Contractor shall maintain the following insurance limits: 1. Automobile Liability insurance with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. 2. Commercial General Liability insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. .z v EXHIBIT B (Continued) C. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance: 1. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. 2. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. 3. The City of Kent shall be named as an additional insured on all policies (except Professional Liability) as respects work performed by or on behalf of the contractor and a copy of the endorsement naming the City as additional insured shall be attached to the Certificate of Insurance. The City reserves the right to receive a certified copy of all required insurance policies. The Contractor's Commercial General Liability insurance shall also contain a clause stating that coverage shall apply separately to each insured against whom claim is made or suit is brought, except with respects to the limits of the insurer's liability. D. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than ANII. E. Verification of Coverage Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. F. Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the same insurance requirements as stated herein for the Contractor. Client# 86978 MAPLCRES •ACORDTM CERTIFICATE OF LIABILITY INSURANCE D81 MM)DD;YY) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT.If the certificate holder Is an ADDITIONAL INSURED,the policy(ies)must be endorsed If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s) PRODUCER NAME Cindy Otto Propel Insurance PHONE 800 499-0933 FAX 866.577 1326 A/C No E. WC,No Tacoma Commercial Insurance aL leo ro elinsurance.com 1201 Pacific Ave, Suite 1000 APRODUCER DDRESS @P P CUSTOMERID# Tacoma, WA 98402 INSURER(S)AFFORDING COVERAGE NAIC# INSURED INSURERA Federated Mutual Ins Company Maple Crest Electric Inc INSURERS P O. Box 1165 INSURER C Kent,WA 98035 INSURER D INSURER E INSURER F COVERAGES CERTIFICATE NUMBER* REVISION NUMBER THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR kDDL UBR POLICY EFF POLICY EXP I TYPE OF INSURANCE NSR D POLICY NUMBER MMMDi (MWDDNYYYi LIMITS A GENERAL LIABILITY X 9242265 04/04/2011 0410412012 EACHOCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE ORE cur PREMISES Eaoccunence $100,000 CLAIMS-MADE 51 OCCUR - MED EXP(Any one person) $ JFCT X PD Ded:1,000 PERSONAL&ADV INJURY $1,000,000 GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS-COMPlOP AGG s2'000,000 POLICY PRO LOC $ A AUTOMOBILE LIABILITY X 9242265 04104/2011 04/04/201 COMBINES accident) INGLE LIMIT $1 000 000 X ANY AUTO BODILY INJURY(Per person) $ ALL OWNED AUTOS BODILY INJURY(Per accident) $ SCHEDULEDAUTOS PROPERTY DAMAGE $ X HIRED AUTOS (Per accident) X NON-OWNEDAUTOS $ X, Drive Other Car $ A X�UMBRELLA LIAB X OCCUR X 9242266 4/04/2011 0410412012 EACH OCCURRENCE $1,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $1,000,000 DEDUCTIBLE $ RETENTION $ WORKERS COMPENSATION WCSTLA OTH- AND EMPLOYERS'DABIUTY A ANY PROPRIETORIPARTNER/EXECUTIVES] NIA 9242265 04/04/2011 04/04/201 EL EACH ACCIDENT $1,000,000 OFFICERIMEMBER EXCLUDED? (Mandatory in NH) WA STOP GAP EL DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below EL DISEASE-POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS;LOCATIONS 1 VEHICLES(Attach ACORD 101,Additional Remarks Schedule,If more space Is required) RE: Pump Station Electrical The City of Kent is additional insured per the attached endorsement. CERTIFICATE HOLDER CANCELLATION City of Kent SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Attn Matt Knox THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS 400 West Gowe Kent, WA 98032 AUTHORIZED REPRESENTATIVE 01988-2009 ACORD CORPORATION All rights reserved ACORD 25(2009/09) 1 of 1 The ACORD name and logo are registered marks of ACORD #S722146lM675939 KTR00 Why We Are Using the Latest ACORD 25 Certificate of Insurance In September 2009, ACORD revised the ACORD 25 Certificate of Insurance form. One of the major changes was the removal of the cancellation notice provision. For the following reasons, we are unable to issue an older edition of this form, modify the current form, or complete a proprietary form you provide • Notice of cancellation is a policy right, not an unregulated service. No insurer shown on this certificate is able to provide the cancellation notice you desire by endorsement. For example, the insured can cancel immediately, so it would be impossible for the insurer to give you the notice you request. State law also grants the insurer the right to cancel for reasons such as nonpayment with less notice than you require. • For the reason just cited, if our agency was to issue a certificate that provides the cancellation notice you request, we would do so with the full knowledge that it would be impossible to actually give that amount of notice under certain circumstances. As such, the certificate could be alleged to constitute a misrepresentation or fraud which could subject our agency and staff to serious civil and criminal penalties. • If a certificate purports to provide a policy right different from that provided by the policy itself, then the certificate effectively purports to be a policy form. Policy forms must be filed and approved by our state department of insurance. Use of nonfiled policy forms is illegal and could result in legal sanctions distinct from the assertion that the certificate is fraudulent. • Under the ACORD Corporation's licensing agreement, the prior editions of superseded forms can be used for one year from the time the new forms are introduced. Beginning in September 2010, this is another reason we cannot use an older edition of the ACORD 25. Doing so would violate ACORD's licensing agreement and, as a copyrighted document, federal copyright law. • Likewise, we are unable to modify the new certificate to add a notice of cancellation. ACORD forms are designed to be completed, not altered ACORD's Forms Instruction Guide says that a certificate should not be used "To waive rights ..To quote wording from a contract...To quote any wording which amends a policy unless the policy itself has been amended." In addition, our insurance company contracts only allow us to issue unaltered ACORD forms. • We are often asked to issue proprietary certificates provided by the certificate requestor. Again, our insurance company contracts only allow us to issue unaltered ACORD forms. Many proprietary certificates include broad, vague or ambiguous language that may or may not be incompliance with state laws, regulations, and insurance department directives. Therefore, we cannot issue any proprietary certificates. We appreciate your understanding of the legal restrictions on our ability to fully comply with your request 'Maple Crest Electric Inc FEDERATED INSURANCE COMPANIES THIS ENDORSEMENT CHANGES THE POLICY.PLEASE READ IT CAREFULLY. ADDITIONAL. INSURED BY CONTRACT ENDORSEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART A. Section 11 - Who Is An insured is amended to include as an additional insured any person or organization, other than a joint venture,for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement that such person or organization be added as an additional insured on your policy. Such person or organization is an additional insured only with respect to liability for "bodily injury", "property damage'or"personal and advertising injury"caused, in whole or In part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional Insured. A person's or organizatlon's status as an additional insured under this endorsement ends when your operations for that additional Insured are completed. This additional insurance does not apply to: 1. An employee, association of employees or labor union, except with respect to work performed by or for you for such employee, association of employees or labor union under direct contract between you as contractor and such employee, association of employees or labor union as owners; 2. Any railroad company except with respect to work performed by or for you for such railroad company under direct contract or agreement between you and such railroad company; or 3. Any person or organization whose profession, business or occupation is that of an architect, surveyor or engineer with respect to liability arising out of the preparation or approval of or the failure in preparation or approval of maps, shop drawings, opinions, reports, surveys, field orders, change orders, designs, drawings, specifications or the performance of any other professional services by such person or organization; 4. Any of your Subcontractors,or any partner, after, agent or employee of such Subcontractor. B. The Coverage extended to any additional insured by this endorsement is limited to, and subject to all terms, conditions,and exclusions of the Coverage part to which this endorsement is attached. In addition Coverage shall not exceed the terms and conditions that are required by the terms of the written agreement to add any insured,or to procure insurance. C. In the event that the Limits of Insurance shown in the Declarations exceeds the limits of liability required in a written contract or written agreement for an additional insured, the insurance provided to the additional Insured shall be limited to the limits of liability required by that written contract or written agreement. D. Additional exclusions. The Insurance afforded to any person or organization as an insured under this endorsement does not apply: 1. To "bodily injury", "property damage" or "personal and advertising injury"which occurs prior to the date of your contract with such person or organization; 2. To "bodily injury" or"property damage" included with in the"products/completed operations hazard." 3. To "bodily Injury", "property damage" or "personal and advertising injury" arising out of the sole negligence of any person or organization that would not be an insured except for this endorsement Includes copyrighted material of Insurance Services Office, Inc.with its permission. CG-F-48 (07-09) Policy Number. 9242265 Transaction Effective Date: �me propel 8/10/2011 City of Kent Attn• Matt Knox 400 West Gowe Kent, WA 98032 To whom it may concern: Pursuant to the new 09109 version of the Acord Certificate of Liability form, it is no longer necessary to list entities as Additional Insured in the Description of Operations box. Generally, the Description of Operations is reserved for project names, vehicles, specific equipment or locations. If the additional insured box is checked, you may refer to the additional insured endorsement attached to your certificate which specifies the coverage provided. As the agent, we prefer not to utilize the Description of Operations box as a means for interpreting policy language. As an alternative, we will attach the applicable endorsements from the policy. Please remember the certificate of insurance confers no rights upon the certificate holder. Coverage is always dictated by the policy terms and its respective endorsements as established by the contract that is in place between the Named Insured and the Certificate Holder. Sincerely, Propel Insurance Page 1 of 15 State of Washington Department of Labor & Industries Prevailing Wage Section - Telephone 360-902-5335 PO Box 44540, Olympia, WA 98504-4540 Washington State Prevailing Wage The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe benefits. On public works projects, worker's wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements are provided on the Benefit Code Key. Journey Level Prevailing Wage Rates for the Effective Date: 8/25/2011 County Trade Job Classification Wage Holiday Overtimel Note King Asbestos Abatement Workers Journey Level $40.03 5D 1H King Boilermakers Journey Level $59.69 5N iC King Brick Mason Brick And Block Finisher $40.21 5A iM King Brick Mason Journey Level $47.47 5A 1M King Brick Mason Pointer-Caulker-Cleaner $47.47 5A 1M King Building Service Employees Janitor $18.91 5S 2F King Buildine Service Employees Traveling Waxer/shampooer $19.32 5S 2F King Building Service Employees Window Cleaner(non-scaffold) $22.65 55 2F King Cabinet Makers (In ShoP1 Journey Level $22.74 1 King Carpenters Acoustical Worker $48.63 5D 1M King Carpenters Bridge, Dock And Wharf Carpenters $48.47 5A 1M fling Carpenters Carpenter $48.47 5D 1M King Carpenters Creosoted Material $48.57 5D 1M King Carpenters Floor Finisher $48.60 5D 1M King Carpenters Floor Layer $48.60 5D 1M King Carpenters Floor Sander $48.60 5D 1M (ing Carpenters Sawfiler $48.60 5D 1M (ing Carpenters Shingler $48.60 5D 1M King Carpenters Stationary Power Saw Operator $48.60 5D 1M (ing Carpenters Stationary Woodworking Tools $48.60 5D 1M (ing Cement Masons Journey Level $49.15 7A 1M (ing Divers 8 Tenders Diver $100.28 5D 1M 8A (ing Divers Et Tenders Diver On Standby $56.68 5D 1M (ing Divers Et Tenders Diver Tender $52.23 5D 1M (ing Divers Et Tenders Surface Rcv Et Rov Operator $52.23 5D 1M (ing Divers Et Tenders Surface Rcv 8 Rov Operator Tender $48.67 5A 1 B (ing Dredge Workers Assistant Engineer $49.57 5D 1T 8L (ing Dredge Workers Assistant Mate(deckhand) $49.06 5D 1T 8L King Dredge Workers Engineer Welder $49.62 5D 1T 8L King Dredge Workers Leverman, Hydraulic $51.19 5D 1T 8L King Dredge Workers Maintenance $49.06 5D 1T 8L King Dredge Workers Mates And Boatmen $49.571 5D 1T 8L ttps://fortress.wa gov/lni/wagelookup/prvWagelookup.aspx 8/25/2011 Page 2,of 15 King Dredge Workers Oiler $49.19 5D 1T 8L King Drywall Applicator Journey Level $48.47 5D 1M King Drywall Tapers Journey Level $48.79 5P 1E King Electrical Fixture Maintenance Journey Level $25.34 5L 1 E Workers King Electricians - Inside Cable Splicer $61.93 7C 2W King Electricians - Inside Cable Splicer (tunnel) $66.55 7C 2W King Electricians - Inside Certified Welder $59.83 7C 2W King Electricians - Inside Certified Welder (tunnel) $64.23 7C 2W King Electricians - Inside Construction Stock Person $31.83 7C 2W King Electricians - Inside Journey Level $57.72 7C 2W King Electricians - Inside Journey Level (tunnel) $61.93 7C 2W King Electricians - Motor Shop Craftsman $15.37 1 King Electricians - Motor Shop Journey Level $14.69 1 King Electricians - Powerhne Construction Cable Splicer $63.04 5A 4A King Electricians - Powerline Construction Certified Line Welder $57.61 5A 4A King Electricians - Powerhne Construction Groundperson $41 06 5A 4A King Electricians - Powerline Construction Head Groundperson $43.33 5A 4A King Electricians - Powerline Construction Heavy Line Equipment Operator $57.61 5A 4A King Electricians - Powerline Construction Jackhammer Operator $43.33 5A 4A King Electricians - Powerline Construction Journey Level Lineperson $57.61 5A 4A King Electricians - Powerline Construction Line Equipment Operator $48.64 5A 4A ding Electricians-_Powerline Construction Pole Sprayer $57.61 5A 4A <mg Electricians - Powerhne Construction Powderperson $43.33 5A 4A Ong Electronic Technicians Journey Level $31.00 1 <ing Elevator Constructors Mechanic $67.91 7D 4A (ing Elevator Constructors Mechanic In Charge $73.87 7D 4A (ing Fabricated Precast Concrete All Classifications - In-Factory Work $13.60 5B 2K Products Only (ing Fence Erectors Fence Erector $15.18 1 (ing Flaggers Journey Level $33.93 7A 1H (ing Glaziers Journey Level $50.66 7L 1Y (ing Heat Et Frost Insulators And Asbestos Journeyman $53.44 5J 1S Workers (ing Heating Equipment Mechanics Journey Level $63.27 7F 1E (ing Hod Carriers Et Mason Tenders Journey Level $41.28 7A 1H (ing Industrial Engine And Machine Journey Level $15.65 1 Mechanics (ing Industrial Power Vacuum Cleaner Journey Level $9.24 1 (ing Inland Boatmen Boat Operator $50.72 5B 1K (ing Inland Boatmen Cook $47.54 56 1K :ing Inland Boatmen Deckhand $47.54 5B 1K :ing Inland Boatmen Deckhand Engineer $48.48 5B 1K ;ing Inland Boatmen Launch Operator $49.63 5B 1K ;ing Inland Boatmen Mate $49.63 5B 1K ;ing Inspection/Cleaning/Sealing Of Cleaner Operator, Foamer Operator $31.49 1 Sewer Et Water Systems By Remote Control ttps•//fortress.wa gov/lni/wagelookup/prvWagelookup.aspx 8/25/2011 Page 3 of 15 King Inspection/Cleaning/Sealing Of Grout Truck Operator $11.48 1 Sewer 8. Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Head Operator $24.91 1 Sewer Et Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Technician $19.33 1 Sewer 8 Water Systems By Remote Control King Inspection/Cleaning/Sealing Of Tv Truck Operator $20.45 1 Sewer Et Water Systems By Remote Control King Insulation Applicators Journey Level $48.47 5D 1M King Ironworkers Journeyman $57.52 7N 10 King Laborers Air, Gas Or Electric Vibrating Screed $40 03 7A 1H King Laborers Airtrac Drill Operator $41.28 7A 1H King Laborers Ballast Regular Machine $40.03 7A 1 H King Laborers Batch Weighman $33.93 7A 1H King Laborers Brick Pavers $40.03 7A 1H King Laborers Brush Cutter $40.03 7A 1H King Laborers Brush Hog Feeder $40.031 7A 1H King Laborers Burner $40.03 7A 1H King Laborers Caisson Worker $41.28 7A 1 H King Laborers Carpenter Tender $40.03 7A 1H King Laborers Caulker $40.03 7A 1H King Laborers Cement Dumper-paving $40.77 7A 1H King Laborers Cement Finisher Tender $40.03 7A 1H King Laborers Change House Or Dry Shack $40.03 7A 1H King Laborers Chipping Gun (under 30 Lbs.) $40.03 7A 1H King Laborers Chipping Gun(30 Lbs. And Over) $40.77 7A 1H King Laborers Choker Setter $40.03 7A 1H King Laborers Chuck Tender $40.03 7A 1H King Laborers Clary Power Spreader $40.77 7A 1H King Laborers Clean-up Laborer $40.03 7A 1H King Laborers Compressed Air Worker 0-30 psi $52.08 7A 1H 80 King Laborers Compressed Air Worker 30.01-44.00 $57.08 7A 1H 14 psi King Laborers Compressed Air Worker 44.01-54.00 $60.76 7A 1H psi King Laborers Compressed Air Worker 54.01-60.00 $66.46 7A 1 H 80 psi King Laborers Compressed Air Worker 60.01-64.00 $68.58 7A 1H psi King Laborers Compressed Air Worker 64.01-68.00 $73.68 7A 1H psi King Laborers Compressed Air Worker 68.01-70.00 $75.58 7A 1H 88 psi King Laborers Concrete Dumper/chute Operator $40.77 7A 1H King Laborers Concrete Form Stripper $40.03 7A 1H King Laborers lConcrete Placement Crew $40.77 7A 1H tlpsMortress.wa gov/lni/wagelookup/prvWagelookup aspx 8/25/2011 Page 4,of 15 King Laborers Concrete Saw Operator/core Driller $40.77 7A 1 H King Laborers Crusher Feeder $33.93 7A 1H King Laborers Cunng Laborer $40.03 7A 1H King Laborers Demolition: Wrecking 8t Moving $40.03 7A 1H (incl. Charred Material) King Laborers Ditch Digger $40.03 7A 1H King Laborers Diver $41.28 7A 1H King Laborers Drill Operator (hydraulic,diamond) $40.77 7A iH King Laborers Dry Stack Walls $40.03 7A 1H King Laborers Dump Person $40.03 7A 1H King Laborers Epoxy Technician $40.03 7A 1H King Laborers Erosion Control Worker $40.031 7A 1H King Laborers Fatter Et Bucker Chain Saw $40.771 7A 1H King Laborers Fine Graders $40.03 7A 1H King Laborers Firewatch $33.93 7A 1H King Laborers Form Setter $40.03 7A 1H King Laborers Gabian Basket Builders $40.03 7A 1H King Laborers General Laborer $40.03 7A 1 H King Laborers Grade Checker 8t Transit Person $41.28 7A 1 H King Laborers Grinders $40.03 7A 1H King Laborers Grout Machine Tender $40.03 7A 1H King Laborers Groutmen (pressure)including Post $40.77 7A 1H Tension Beams King Laborers Guardrail Erector $40.03 7A 1H King Laborers Hazardous Waste Worker (level A) $41.28 7A 1H King Laborers Hazardous Waste Worker (level B) $40.77 7A 1H King Laborers Hazardous Waste Worker (level C) $40.03 7A 1H King Laborers High Scaler $41.28 7A 1H King Laborers Jackhammer $40.77 7A 1H King Laborers Laserbeam Operator $40.77 7A 1H King Laborers Maintenance Person $40.03 7A 1H King Laborers Manhole Builder-mudman $40.77 7A 1H King Laborers Material Yard Person $40.03 7A 1H King Laborers Miner $41.28 7A 1H Ong Laborers Motorman-dinky Locomotive $40.77 7A 1H King Laborers Nozzleman (concrete Pump, Green $40.77 7A 1H Cutter When Using Combination Of High Pressure Air Et Water On Concrete 8t Rock, Sandblast, Gumte, Shotcrete, Water Bla Ling Laborers Pavement Breaker $40 77 7A 1H ling Laborers Pilot Car $33.93 7A 1H (ing Laborers Pipe Layer Lead $41.28 7A 1H ang Laborers Pipe Layer/tailor $40.77 7A 1H ,ing Laborers Pipe Pot Tender $40.77 7A 1H :ing Laborers Pipe Reliner $40.77 7A 1H ;ing Laborers Pipe Wrapper $40.77 7A 1H :ing Laborers Pot Tender $40 03 7A 1H tips•//fortress.wa.govAni/wagelookup/prvWagelookup.aspx 8/25/2011 Page 5 of 15 King Laborers Powderman $41.281 7A 1H King Laborers Powderman's Helper $40.031 7A 1H King Laborers Power Jacks $40.771 7A 1H King Laborers Railroad Spike Puller - Power $40.77 7A 1H King Laborers Raker - Asphalt $41.28 7A 1H King Laborers Re-timberman $41.28 7A 1H King Laborers Remote Equipment Operator $40.77 7A 1H King Laborers Rigger/signal Person $40.77 7A 1H King Laborers Rip Rap Person $40.03 7A 1H King Laborers Rivet Buster $40.77 7A 1H King Laborers Rodder $40.77 7A 1H King Laborers Scaffold Erector $40.03 7A 1H King Laborers Scale Person $40.03 7A 1H King Laborers Sloper (over 20") $40.77 7A 1H King Laborers Sloper Sprayer $40.03 7A 1H King Laborers Spreader (concrete) $40.77 7A 1H King Laborers Stake Hopper $40.D3 7A 1H King Laborers Stock Piler $40.03 7A 1H King Laborers Tamper It Similar Electric, Air 8 Gas $40.77 7A 1H Operated Tools King Laborers Tamper (multiple 8: Self-propelled) $40.77 7A 1H King Laborers Timber Person - Sewer (lagger, $40.77 7A 1H Shorer Et Cribber) King Laborers Toolroom Person (at Jobsite) $40.03 7A 1H King Laborers Topper $40.03 7A 1H King Laborers Track Laborer $40.03 7A 1H King Laborers Track Liner (power) $40.771 7A 1H King Laborers Truck Spotter $40.031 7A 1H King Laborers Tugger Operator $40.771 7A 1H King Laborers Tunnel Work-Guage and Lock Tender $41.38 7A 1H 4Q King Laborers Tunnel Work-Miner $41.38 7A 1H 84 King Laborers Vibrator $40.77 7A 1H King Laborers Vinyl Seamer $40.03 7A 1H King Laborers Watchman $30.84 7A 1H King Laborers Welder $40.77 7A 1H (ing Laborers Well Point Laborer $40.77 7A 1H (ing Laborers Window Washer/cleaner $30.84 7A 1H (ing Laborers - Underground_Sewer tt General Laborer 8 Topman $40.03 7A 1H Water (ing Laborers - Underground Sewer Et Pipe Layer $40.77 7A 1H Water (ing Landscape Construction Irrigation Or Lawn Sprinkler $13.56 1 Installers (ing Landscape Construction Landscape Equipment Operators Or $28.17 1 Truck Drivers (ing Landscape Construction Landscaping or Planting Laborers $17.87 1 (ing Lathers Journey Level $48.74 5D 1H (ing Marble Setters Journey Level $47.47 5A 1M Ups•//fortress.wa gov/lni/wagelookup/prvWagelookup.aspx 8/25/2011 Page 6 of 15 King Metal Fabrication (In Shop) Fitter $15.861 1 King Metal Fabrication (In Shop) Laborer $9.78 1 King Metal Fabrication (In Shop) Machine Operator $13.04 1 King Metal Fabrication (In Shop) Painter $11.10 1 King Metal Fabrication (In Shop) Welder $15.48 1 King Millwright Journey Level $49.47 5D 1M King Modular Buildings Cabinet Assembly $11.56 1 King Modular Buildings Electrician $11.56 1 King Modular Buildings Equipment Maintenance $11.56 1 King Modular Buildings Plumber $11.56 1 King Modular Buildings Production Worker $9.40 1 King Modular Buildings Tool Maintenance $11.56 1 King Modular Buildings Utility Person $11.56 1 King Modular Buildings Welder $11.56 1 King Painters Journey Level $34.87 6Z 2B King Pile Driver Journey Level $48.67 5A 1M King Plasterers Journey Level $46.63 AQ 1R King Playground It Park E ui ment Journey Level $8.67 1 Installers King Plumbers Et Pipefitters Journey Level $70.84 6Z 1 G King Power Equipment Operators Asphalt Plant Operators $50.39 7A 1T 8P King Power_E_quipment Operators Assistant Engineer $47.12 7A 1T 8P King Power Equipment_Operators Barrier Machine (zipper) $49.901 7A 1T 8P King Power Equipment Operators Batch Plant Operator, Concrete $49.90 7A 1T 8P King Power Equipment Operators Bobcat $47.12 7A 1T 8P King Power Equipment_Operators Brokk - Remote Demolition $47.12 7A 1T 8P Equipment King Power Equipment Operators Brooms $47 12 7A 1T 8P King Power Equipment Operators Bump Cutter $49.901 7A 1T 8P King Power Equipment Operators Cableways $50.39 7A 1T 8P King Power Equi pmeint Operators Chipper $49.90 7A 1T 8P King Power Equipment Operators Compressor $47.12 7A 1T 8P King Power Equipment Operators Concrete Pump: Truck Mount With $50.39 7A 1T 8P Boom Attachment Over 42 M King Power Equipment Operators Concrete Finish Machine -laser $47.12 7A 1T 8P Screed King Power Equipment Operators Concrete Pump - Mounted Or Trailer $49.48 7A 1T 8P High Pressure Line Pump, Pump High Pressure. King Power Equipment Operators Concrete Pump: Truck Mount With $49.90 7A 1T 8P Boom Attachment Up To 42m King Power Equipment Operators Conveyors $49.48 7A 1T 8P fling Power Equipment Operators Cranes: 20 Tons Through 44 Tons $49.90 7A 1T 8P With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons Sing Power Equipment Operators Cranes: 100 Tons Through 199 Tons, $50.94 7A 1T 8P or 150' of boom (including lib with attachments); Overhead, bridge type, 100 tons and over; Tower ttps://fortress.wa.govAni/wagelookup/prvWagelookup.aspx 8/25/2011 Page 7 of 15 crane up to 175' in height, base to boom. King Power Equipment Operators Cranes: 200 Tons To 300 Tons, Or $51.51 7A 1T 8P 250' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: 45 Tons Through 99 Tons, $50.39 7A 1T 813 Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators Cranes: A-frame - 10 Tons And Under $47.12 7A 1T 8P King Power Equipment Operators Cranes: Friction 100 Tons Through $51.51 7A 1T 8P 199 Tons King Power E ui ment Operators Cranes: Friction Over 200 Tons $52.07 7A 1T 8P King Power Equipment Operators Cranes: Over 300 Tons Or 300' Of $52.07 7A 1T 8P Boom (including Jib With Attachments) King Power Equipment Operators Cranes: Through 19 Tons With $49.48 7A 1T 8P Attachments A-frame Over 10 Tons King Power E ui ment Operators Crusher $49.90 7A 1T 8P King Power Equipment Operators Deck Engineer/deck Winches $49.90 7A 1T 813 (power) King Power Equipment Operators Derricks, On Building Work $50.39 7A 1T 8P King Power Equipment Operators Dozer Quad 9, HD 41, D10 and Over $50.39 7A 1T 8P King Power_Equipment Operators Dozers D-9 Et Under $49.48 7A 1T 8P King Power Equipment Operators Drill Oilers: Auger Type, Truck Or $49.48 7A 1T 8P Crane Mount King Power Equipment Operators Drilling Machine $49.90 7A 1T 8P fling Power Equipment Operators Elevator And Man-lift: Permanent $47.12 7A 1T 8P And Shaft Type (ing Power Equipment Operators Finishing Machine, Bidwell And $49.90 7A 1T 8P Gamaco Et Similar Equipment (ing Power Equipment Operators Forklift: 3000 Lbs And Over With $49.48 7A 1T 8P Attachments (ing Power Equipment Operators Forklifts: Under 3000 Lbs. With $47.12 7A IT 813 Attachments (ing Power Equipment Operators Grade Engineer: Using Blue Prints, $49.90 7A 1T 8P Cut Sheets, Etc (ing Power Equipment Operators Gradechecker/stakeman $47.12 7A 13 8P (ing Power Equipment Operators Guardrail Punch/Auger $49.90 7A 1T 8P (ing Power Equipment Operators Hard Tail End Dump Articulating Off- $50.39 7A 1T 8P Road Equipment 45 Yards. Et Over (ing Power Equipment Operators Hard Tail End Dump Articulating Off- $49.90 7A 1T 81) road Equipment Under 45 Yards ,ing Power Equipment Operators Horizontal/directional Drill Locator $49.48 7A 1T 81) ,ing Power Equipment Operators Horizontal/directional Drill Operator $49.90 7A 1T 8P :ing Power E ui ment Operators Hydralifts/boom Trucks Over 10 $49.48 7A 1T 8P Tons .ing Power Equipment Operators Hydralifts/boom Trucks, 10 Tons And $47.12 7A 1T 81) Under ing Power Equipment Operators Loader, Overhead 8 Yards. Et Over $50.94 7A 1T 8P ing Power Equipment Operators Loader, Overhead, 6 Yards. But Not $50.39 7A 1T 8P Including 8 Yards ing Power Equipment Operators Loaders, Overhead Under 6 Yards $49.90 7A 1T 81) tps•//fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 8/25/2011 Page 8 of 15 King Power Equipment Operators Loaders, Plant Feed $49.901 7A 1T 8P King Power Equipment Operators Loaders: Elevating Type Belt $49.48 7A I 8P King Power Equipment Operators Locomotives, All $49.90 7A 1T 8P King Power Equipment Operators Material Transfer Device $49 90 7A 1T 8P King Power Equipment Operators Mechanics, All (leadmen - $0.50 Per $50 94 7A 1T 8P Hour Over Mechanic) King Power Equipment Operators Mixers: Asphalt Plant $49.90 7A 1T 8P King Power Equipment Operators Motor Patrol Grader - Non-finishing $49.48 7A 1T 8P King Power Equipment Operators Motor Patrol Graders, Finishing $50.39 7A 1T 8P King Power Equipment Operators Mucking Machine, Mole, Tunnel Drill, $50.39 7A 1T 8P Boring, Road Header And/or Shield King Power Equipment Operators Oil Distributors, Blower Distribution $47.12 7A 1T 8P Et Mulch Seeding Operator King Power Equipment Operators Outside Hoists (elevators And $49.48 7A 1T 8P Manlifts), Air Tuggers,strato King Power Equipment Operators Overhead, Bridge Type: 45 Tons $50.39 7A 1T 8P Through 99 Tons King Power Eq ui pment Operators Pavement Breaker $47.12 7A 1T 8P King Power Equipment Operators Pile Driver (other Than Crane Mount) $49.90 7A 1T 8P King Power Equipment Operators Plant Oiter - Asphalt, Crusher $49.48 7A 1T 8P King Power Equipment Operators Posthole Digger, Mechanical $47.12 7A 1T 8P King Power Equipment Operators Power Plant $47.12 7A 1T 8P King Power Equipment Operators Pumps - Water $47.12 7A 1T 8P King Power Equipment Operators Quick Tower - No Cab, Under 100 $47.12 7A 1T 8P Feet In Height Based To Boom King Power Equipment Operators Remote Control Operator On Rubber $50.39 7A 1T 8P Tired Earth Moving Equipment King Power Eggipment_Operators Rigger And Bellman $47.12 7A 1T 8P King Power Equipment Operators Rollagon $50.391 7A 1T 8P King Power Equipment Operators Roller, Other Than Plant Mix $47.12 7A 1T 8P King Power Equipment Operators Roller, Plant Mix Or Multi-hft $49.48 7A 1T 8P Materials King Power Equipment Operators Roto-mill, Roto-grinder $49.90 7A 1T 8P King Power Equipment Operators Saws - Concrete $49.48 7A 1T 8P King Power Equipment Operators Scraper, Self Propelled Under 45 $49.90 7A iT 8P Yards King Power Equipment Operators Scrapers - Concrete Et Carry All $49.48 7A 1T 8P King Power Equipment Operators Scrapers, Self-propelled: 45 Yards $50.39 7A 1T 8P And Over King Power Equipment Operators Service Engineers - Equipment $49.481 7A 1T 8P King Power Equipment Operators Shotcrete/gunite Equipment $47.12 7A 1T 8P King Power Equipment Operators Shovel , Excavator, Backhoe, $49.48 7A 1T 8P Tractors Under 15 Metric Tons. King Power Equipment Operators Shovel, Excavator, Backhoe: Over 30 $50.39 7A 1T 8P Metric Tons To 50 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes, $49.90 7A 1T 8P Tractors: 15 To 30 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: Over $50.94 7A 1T 8P 50 Metric Tons To 90 Metric Tons King Power Equipment Operators Shovel, Excavator, Backhoes: Over $51.51 7A 1T 8P ttps://fortress.wa.gov/lni/wagelookup/prvWagelookup aspx 8/25/2011 r Page 9 of 15 90 Metric Tons King Power Equipment Operators Slipform Pavers $50.39 7A 1T 8P King Power Equ ment Operators Spreader, Topsider Et Screedman $50.39 7A 1T 813 King Power E ui merit Operators Subgrader Trimmer $49.90 7A 1T 8P King Power Equipment Operators Tower Bucket Elevators $49.48 7A 1T 8P King Power Equipment Operators Tower Crane Over 175'in Height, $51.51 7A 1T 8P Base To Boom King Power Equipment Operators Tower Crane Up To 175' In Height $50.94 7A 1T 8P Base To Boom King Power Equipmen_t_Operators Transporters, All Track Or Truck $50.39 7A 1T 8P Type King Power Equipment Operators Trenching Machines $49.48 7A 1T 8P King Power Equipment Operators Truck Crane Oiler/driver - 100 Tons $49.90 7A 1T 8P And Over King Power Equipment Operators Truck Crane Oder/dnver Under 100 $49.48 7A 1T 8P Tons King Power Equipment Operators Truck Mount Portable Conveyor $49.90 7A 1T 8P King Power Equipment Operators Welder $50.39 7A 1T 8P King Power Equipment Operators Wheel Tractors, Farmall Type $47.12 7A 1T 8P King Power Equipment Operators Yo Yo Pay Dozer $49'90 7A 1T 8P King Power Equipment Operators- Asphalt Plant Operators $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Assistant Engineer $47.1 77A 1T 8P Underground Sewer Et Water King Power Equipment_Operators- Barrier Machine (zipper) $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Batch Plant Operator, Concrete $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Bobcat $47.12 7A 1T 8P Underground Sewer Et Water fling Power Equipment Operators- Brokk - Remote Demolition $47.12 7A 1T 8P Underground Sewer Et Water Equipment <ing Power Equipment Operators- Brooms $47.12 7A 1T 813 Underground Sewer_8t Water <ing Power Equipment_Operators- Bump Cutter $49.90 7A 1T 8P Underground Sewer Et Water <ing Power Equipment Operators- Cableways $50.39 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Chipper $49.90 7A 1T 8P Underground Sewer E3 Water (ing Power Equipment Operators- Compressor $47.12 7A 1T 8P Underground Sewer Et Water Ling Power Equipment Operators- Concrete Pump: Truck Mount With $50.39 7A 1T 8P Underground Sewer Et Water Boom Attachment Over 42 M (ing Power Equipment Operators- Concrete Finish Machine -laser $47.12 7A 1T 8P Underground Sewer Et Water Screed (ing Power Equipment Operators- Concrete Pump - Mounted Or Trailer $49.48 7A 1T 8P Underground Sewer Et Water High Pressure Line Pump, Pump High Pressure. (ing Power Equipment Operators- Concrete Pump: Truck Mount With $49.90 7A 1T 8P Underground_Sewer Et Water Boom Attachment Up To 42m (ing Power Equipment Operators_ Conveyors $49.48 7A 1T 813 ttps://fortress.wa.gov/ini/wagelookup/prvWagelookup.aspx 8/25/2011 Page 10,of 15 Underground Sewer 8 Water King Power Equipment Operators- Cranes: 20 Tons Through 44 Tons $49.90 7A 1T 8P Underground Sewer 8L Water With Attachments Overhead, Bridge Type Crane: 20 Tons Through 44 Tons King Power Equipment Operators- Cranes: 200 Tons To 300 Tons, Or $51.51 7A 1T 8P Underground Sewer Et Water 250' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: 45 Tons Through 99 Tons, $50.39 7A 1T 8P Underground Sewer 8t Water Under 150' Of Boom (including Jib With Attachments) King Power Equipment Operators- Cranes: A-frame - 10 Tons And Under $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Friction 100 Tons Through $51.51 7A 1T 8P Underground Sewer Et Water 199 Tons King Power Equipment Operators- Cranes: Friction Over 200 Tons $52.07 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Cranes: Over 300 Tons Or 300' Of $52.07 7A 1T 8P Underground Sewer Et Water Boom (including Jib With Attachments) King Power EquuVment Operators- Cranes: Through 19 Tons With $49.48 7A 1T 8P Underground Sewer 8t Water Attachments A-frame Over 10 Tons King Power Equipment Operators- Crusher $49.90 7A 1T 8P Underground Sewer if Water King Power Equipment Operators- Deck Engineer/deck Winches $49.90 7A 1T 8P Underground Sewer 8t Water (power) King Power Equipment Operators- Derricks, On Building Work $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Dozer Quad 9, HD 41, D10 and Over $50.39 7A 1T 8P Underground Sewer_Et Water King Power Equipment Operators. Dozers D-9 8: Under $49.48 7A 1T 8P Underground Sewer 8: Water <ing Power Equipment Operators- Drill Oilers: Auger Type, Truck Or $49.48 7A 1T 8P Underground Sewer 8L Water Crane Mount (ing Power Equipment Operators- Drilling Machine $49.90 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Elevator And Man-lift: Permanent $47.12 7A 1T 8P Underground Sewer ft Water And Shaft Type (ing Power Equipment Operators- Finishing Machine, Bidwell And $49.90 7A 1T 8P Underground Sewer Et Water Gamaco 8t Similar Equipment (ing Power Equipment Operators- Forklift: 3000 Lbs And Over With $49.48 7A 1T 8P Underground Sewer 8t Water Attachments (ing Power Equipment Operators- Forklifts: Under 3000 Lbs. With $47.12 7A 1T 8P Underground Sewer 8t Water Attachments (ing Power Equipment Operators- Grade Engineer: Using Blue Prints, $49.90 7A 1T 8P Underground Sewer 8t Water Cut Sheets, Etc (ing Power Equipment Operators- Gradechecker/stakeman $47.12 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators Guardrail Punch/Auger $49.90 7A 1T 8P Underground Sewer 8t Water 'ing Power Equipment Operators_ Hard Tail End Dump Articulating Off- $50.39 7A 1T 8P Underground Sewer Et Water Road Equipment 45 Yards. 8L Over (ing Power Equipment Operators Hard Tail End Dump Articulating Off- $49.90 7A 1T 8P Underground Sewer Et Water road Equipment Under 45 Yards ttps://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 8/25/2011 Page 11 of 15 King Power Equipment Operators- Horizontal/directional Drill Locator $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Horizontal/directional Drill Operator $49.90 7A 1T 8P Underground Sewer Et Water King Power_Equipment Operators_ Hydralifts/boom Trucks Over 10 $49.48 7A iT 8P Underground Sewer Et Water Tons King Power Equipment Operators- Hydralifts/boom Trucks, 10 Tons And $47.12 7A 1T 8P Underground Sewer Et Water Under King Power Equipment (aerators- Loader, Overhead 8 Yards. lit Over $50.94 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Loader, Overhead, 6 Yards. But Not $50.39 7A 1T 8P Underground Sewer Et Water Including 8 Yards King Power Equipment Operators- Loaders, Overhead Under 6 Yards $49.90 7A 1T 8P Underground Sewer Et Water King Power_Equipment Operators- Loaders, Plant Feed $49.90 7A 11 8P Underground Sewer Et Water King Power Equipment Operators Loaders: Elevating Type Belt $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Locomotives, All $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Material Transfer Device $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Mechanics, All (leadmen - $0.50 Per $50.94 7A 1T 8P Underground Sewer Et Water Hour Over Mechanic) King Power Equipment Operators= Mixers: Asphalt Plant $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Grader - Non-finishing $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Motor Patrol Graders, Finishing $50.39 7A 1T 8P Underground Sewer Et Water <ing Power Equipment Operators- Mucking Machine, Mole, Tunnel Drill, $50.39 7A 1T 8P Underground Sewer Et Water Boring, Road Header And/or Shield (ing Power Equipment Operators- Oil Distributors, Blower Distribution $47.12 7A 1T 8P Underground Sewer Et Water Et Mulch Seeding Operator (ing Power Equipment Operators- Outside Hoists (elevators And $49.48 7A 1T 8P Underground Sewer Et Water Manlifts), Air Tuggers,strato (ing Power Equipment Operators- Overhead, Bridge Type: 45 Tons $50.39 7A 1T 8P Underground Sewer 8t Water Through 99 Tons (ing Power Equipment Operators- Pavement Breaker $47.12 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Pile Driver (other Than Crane Mount) $49.90 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Plant Oiler - Asphalt, Crusher $49.48 7A 1T 8P Underground Sewer Et Water (ing Power-Equipment Operators- Posthole Digger, Mechanical $47.12 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators_ Power Plant $47.12 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Pumps - Water $47.12 7A 1T 8P Underground Sewer 8t Water .ing Power Equipment Operators- Quick Tower - No Cab, Under 100 $47.12 7A 1T 8P Underground Sewer Et Water Feet In Height Based To Boom (ing Power Equipment Operators- Remote Control Operator On Rubber $50.39 7A 1T 8P Ups://fortress wa.gov/lni/wagelookup/prvWagelookup.aspx 8/25/2011 Page 12,of 15 Underground Sewer Et Water Tired Earth Moving Equipment King Power Equipment Operators- Rigger And Bellman $47.12 7A 1T 8P Underground Sewer 8t Water King Power Equipment Operators- Rollagon $50.39 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Other Than Plant Mix $47.12 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Roller, Plant Mix Or Multi-lift $49.48 7A 1T 8P Underground Sewer Et Water Materials King Power Equipment Operators- Roto-mill, Roto-grinder $49.90 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Saws - Concrete $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Scraper, Self Propelled Under 45 $49.90 7A 1T 8P Underground_Sewer Et Water Yards King Power Equipment Operators- Scrapers - Concrete Et Carry All $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Scrapers, Self-propelled: 45 Yards $50.39 7A 1T 8P Underground Sewer Et Water And Over King Power Equipment Operators- Service Engineers - Equipment $49.48 7A 1T 8P Underground Sewer Et Water King Power Equipment Operators- Shotcrete/gunite Equipment $47.12 7A 1T 8P Undereround Sewer Et Water King Power Equipment Operators- Shovel , Excavator, Backhoe, $49.48 7A 1T 8P Underground Sewer Et Water Tractors Under 15 Metric Tons. King Power Equipment Operators- Shovel, Excavator, Backhoe: Over 30 $50.39 7A 1T 8P Underground Sewer Et Water Metric Tons To 50 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes, $49.90 7A 1T 8P Underground Sewer Et Water Tractors: 15 To 30 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: Over $50.94 7A 1T 8P Underground Sewer Et Water 50 Metric Tons To 90 Metric Tons King Power Equipment Operators- Shovel, Excavator, Backhoes: Over $51.51 7A 1T 8P Underground Sewer Et Water 90 Metric Tons King Power Equipment Operators- Slipform Pavers $50.39 7A 1T 8P Underground Sewer-Et-Water (ing Power_Equipment Operators- Spreader, Topsider Et Screedman $50.39 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Subgrader Trimmer $49.90 7A 1T 8P Underground Sewer Et Water (ing PowerEquIp ent Operators- Tower Bucket Elevators $49.48 7A 1T 8P Underground Sewer Et Water (ing Power Equipment Operators- Tower Crane Over 175'in Height, $51.51 7A 1T 8P Underground Sewer Et Water Base To Boom (ing Power Equipment Operators- Tower Crane Up To 175' In Height $50.94 7A 1T 8P Underground Sewer 8t Water Base To Boom (ing Power_Equipment Operators- Transporters, All Track Or Truck $50.39 7A 1T 8P Underground Sewer Et Water Type (ing Power Equipment Operators- Trenching Machines $49.48 7A 1T 8P Underground Sewer 8t Water (ing Power Equipment Operators Truck Crane Oiler/driver - 100 Tons $49.90 7A 1T 8P Underground Sewer Et Water And Over (ing Power Equipment Operators- Truck Crane Oiler/driver Under 100 $49.48 7A 1T 8P Underground Sewer Et Water Tons ttps://fortress.wa.gov/lni/wagelookup/prvWagelookup aspx 8/25/2011 Page 13 of 15 King Power Equipment Operators- Truck Mount Portable Conveyor $49.90 7A 1T 81 Underground Sewer Et Water King Power Equipment Operators- Welder $50.39 7A 1T 8P Underground Sewer £t Water King Power Equipment-Operators- Wheel Tractors, Farmall Type $47.12 7A 1T 8P Underground Sewer Ft Water King Power Equipment Operators- Yo Yo Pay Dozer $49.90 7A 1T 8P Underground Sewer Et Water King Power Line Clearance Tree Trimmers Journey Level In Charge $41.04 5A 4A King Power Line Clearance Tree Trimmers Spray Person $38.98 5A 4A King Power Line Clearance Tree Trimmers Tree Equipment Operator $41.04 5A 4A King Power Line Clearance Tree Trimmers Tree Trimmer $36.75 5A 4A King Power Line Clearance Tree Trimmers Tree Trimmer Groundperson $27.801 5A 4A King Refrigeration Et Air Conditioning Journey Level $67.56 6Z 1G Mechanics King Residential Brick Mason Journey Level $47.47 5A . 1M King Residential Carpenters Journey Level $28.20 1 King Residential Cement Masons Journey Level $22.64 1 King Residential Drywall Applicators Journey Level $38.081 5D 1M King Residential Drywall Tapers Journey Level $48.791 5P 1 E King Residential Electricians Journey Level $30.33 1 King Residential Glaziers Journey Level $34.54 7L 1H King Residential Insulation Applicators Journey Level $26.28 1 King Residential Laborers Journey Level $23.03 1 King Residential Marble Setters Journey Level $24.09 1 King Residential Painters Journey Level $24.461 1 King Residential Plumbers Et Pipefitters Journey Level $34.69 1 King Residential Refrigeration Et Air Journey Level $67.56 6Z 1G Conditioning Mechanics King Residential_Sheet Metal Workers Journey Level $37.35 7F 111 King Residential Soft Floor Layers Journey Level $41.56 5A 2Z King Residential Sprinkler Fitters (Fire Journey Level $40.81 5C 211 Protection) King Residential Stone Masons Journey Level $47.47 5A 1M King Residential Terrazzo Workers Journey Level $46.93 5A 1M King Residential Terrazzo/Tile Finishers Journey Level $21.46 1 King Residential Tile Setters Journey Level $25.171 1 King Roofers Journey Level $41.901 5A 111 King Roofers Using Irritable Bituminous Materials $44.90 5A 1R King Sheet Metal Workers Journey Level $63.27 7F 1 E King Shipbuilding Et Ship Repair Boilermaker $33.26 7M 1H King Shipbuilding Et Ship Repair Carpenter $34.99 70 1B King Shipbuilding Et Ship Repair Electrician $34.90 70 1B (ing Shipbuilding Et Ship Repair Heat 8 Frost Insulator $53.44 5.1 15 Ong Shipbuilding 8 Ship Repair Laborer $33.62 70 1B (ing Shipbuilding Et Ship Repair Machinist $34.62 70 1B Ung Shipbuilding Et Ship Repair Operator $37.04 70 1B Ong Shipbuilding Et Ship Repair Painter $34.64 70 1B ttps•//fortress.wa.gov/lni/wagelookuplprvWagelookup.aspx 8/25/2011 Page 14-of 15 King Shipbuilding Et Ship Repair Pipefitter $34.64 70 1B King Shipbuilding Et Ship Repair Rigger $34.67 70 1 B King Shipbuilding Et Ship Repair Sandblaster $33.62 70 1B King Shipbuilding Et Ship Repair Sheet Metal $34.59 70 1B King Shipbuilding Et Ship Repair Shipfitter $34.67 70 1 B King Shipbuilding 8 Ship Repair Trucker $34.49 70 1B King Shipbuilding Et Ship Repair Warehouse $34.55 70 1B King Shipbuilding Et Ship Repair Welder/burner $34.67 70 1B King Sign Makers Et Installers (Electrical) Sign Installer $22.92 1 King Sign Makers Et Installers (Electricall Sign Maker $21.36 1 King Sign Makers Et Installers (Non- Sign Installer $27 28 1 Electrical) King Sign Makers Et Installers (Non- Sign Maker $33.25 1 Electrical) King Soft Floor Layers Journey Level $41.56 5A 2Z King Solar Controls For Windows Journey Level $12.44 1 King Sprinkler Fitters (Fire Protection) Journey Level $68.79 5C 1X King Stage Rigging Mechanics (Non Journey Level $13.23 1 Structural) King Stone Masons Journey Level $47.47 5A 1M King Street And Parking Lot Sweeper Journey Level $19.09 1 Workers King Surveyors Assistant Construction Site Surveyor $49.48 7A 1T 8P King Surveyors Chainman $48.96 7A 1T 8P King Surveyors Construction Site Surveyor $50.39 7A 1T 8P King Telecommunication Technicians Journey Level $22.76 1 King Telephone Line Construction - Cable Splicer $32 27 5A 2B Outside King Telephone Line Construction_ Hole Digger/Ground Person $18.10 5A 2B Outside King Telephone Line_Construction- Installer (Repairer) $30.94 5A 2B Outside King _Telephone Line Construction - Special Aparatus Installer 1 $32.27 5A 2B Outside King Telephone Line Construction - Special Apparatus Installer II $31.62 5A 213 Outside (ing Telephone Line Construction - Telephone Equipment Operator $32.27 5A 2B Outside (Heavy) (ing Telephone Line Construction - Telephone Equipment Operator $30.02 5A 2B 0utside (Light) (ing Telephone Line Construction_- Telephone Lineperson $30.02 5A 2B Outside (ing Telephone Line Construction - Television Groundperson $17.18 5A 2B Outside Ong Telephone Line Construction - Television Lineperson/Installer $22.73 5A 2B Outside (ing Telephone Line Construction - Television System Technician $27.09 5A 2B Outside (ing Telephone Line Construction - Television Technician $24.35 5A 2B Outside (ing Telephone Line Construction- Tree Trimmer $30.02 5A 26 ttps://fortress.wa.gov/lni/wagelookup/prvWagelookup aspx 8/25/2011 ,. Page 15 of 15 Outside King Terrazzo Workers Journey Level $46.93 5A 1M King Tile Setters Journey Level $21.65 1 King Tile, Marble 8 Terrazzo Finishers Finisher $40.76 5A 1B King Traffic Control Stripers Journey Level $39.40 7A 1K King Truck Drivers Asphalt Mix Over 16 Yards (W. WA- $46.47 5D 1T 8L Joint Council 28) King Truck Drivers Asphalt Mix To 16 Yards (W.WA-Joint $45.63 5D 1T 8L Council 28) King Truck Drivers Dump Truck £t Trailer $46.47 5D 1T 8L King Truck Drivers Dump Truck (W.WA-Joint Council 28) $45.63 5D 1T 8L King Truck-Drivers Other Trucks (W. WA-Joint Council $46.47 5D 1T 8L 28) King Truck Drivers Transit Mixer $23.45 1 King Well Drillers Et Irrigation Pump Irrigation Pump Installer $17.71 1 Installers King Well Drillers 8 Irrigation Pump Oiler $12.97 1 Installers King Well Drillers 8 Irrigation Pump Well Driller $18.00 1 Installers ttps•//fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx 8/25/2011 BENEFIT CODE KEY-EFFECTIVE 03-03-2011 THRU 08-31-2011 *x*rts»s»srt»»xx»»*x*»»s»ss*****x»*+rt+s+*+xwsw»+s+s+*+ww*w++s****s+s+s+*+sw»»*+*+*+*rtsw*w»+*+***+*w*txssws»»»srtt»srtswartxx» OVERTIME CODES OVERTIME CALCULATIONS ARE BASED ON THE HOURLY RATE ACTUALLY PAID TO THE WORKER ON PUBLIC WORKS PROJECTS,THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE HOURLY RATE OF THE COST OF FRINGE BENEFITS ACTUALLY PROVIDED FOR THE WORKER. 1 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE, C THE FIRST TWO (2) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN(10)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER OVERTIME HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE D. THE FIRST TWO(2) HOURS BEFORE OR AFTER A FIVE-EIGHT(8)HOUR WORKWEEK DAY OR A FOUR-TEN (10) HOUR WORKWEEK DAY AND THE FIRST EIGHT (8) HOURS WORKED THE NEXT DAY AFTER EITHER WORKWEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL ADDITIONAL HOURS WORKED AND ALL WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE E. THE FIRST TWO (2) HOURS AFTER EIGHT(8)REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE F THE FIRST TWO (2) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN(10)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE G THE FIRST TEN(10)HOURS WORKED ON SATURDAYS AND THE FIRST TEN(10)HOURS WORKED ON A FIFTH CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE H. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (I2) HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE I. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID AT ONE AND DOUBLE THE HOURLY RATE OF WAGE J THE FIRST TWO (2) HOURS AFTER EIGHT(8) REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TEN(10)HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED OVER TEN (10) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE K. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE L ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE M ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE N ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) SHALL BE PAID AT ONE AND ONE-HALF I TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE BENEFIT CODE KEY-EFFECTIVE 03-03-2011 THRU 08-31-2011 -2- O. THE FIRST TEN (10) HOURS WORKED ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS, HOLIDAYS AND AFTER TWELVE(12)HOURS, MONDAY THROUGH FRIDAY,AND AFTER TEN (10) HOURS ON SATURDAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE P. ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF CIRCUMSTANCES WARRANT) AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE 1. Q. THE FIRST TWO(2)HOURS AFTER EIGHT(8)REGULAR HOURS MONDAY THROUGH FRIDAY AND UP TO TEN (10)HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OFTEN (10)HOURS PER DAY MONDAY THROLGH SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON CHRIS]MAS DAY SHALL BE PAID AT TWO AND ONE- HALF TIMES THE HOURLY RATE OF WAGE R ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE S THE FIRST TWO (2)HOURS AFTER EIGHT(8)REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS AND ALL OTHER OVERTIME HOURS WORKED, EXCEPT LABOR DAY, SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE T WORK PERFORMED IN EXCESS OF EIGHT (8) HOURS OF STRAIGHT TIME PER DAY, OR TEN (10) HOURS OF STRAIGHT TIME PER DAY WHEN FOUR TEN(10)HOUR SHIFTS ARE ESTABLISHED, OR FORTY (40)HOURS OF STRAIGHT TIME PER WEEK,MONDAY THROUGH FRIDAY,OR OU ISIDE THE NORMAL SHIFT,AND ALL WORK ON SATURDAYS SHALL BE PAID AT TIME AND ONE-HALF THE STRAIGHT TIME RATE HOURS WORKED OVER TWELVE HOURS(12)IN A SINGLE SHIFT AND ALL WORK PERFORMED AFTER 6 00 PM SATURDAY TO 6 00 AM MONDAY AND HOLIDAYS SHALL BE PAID AT DOUBLE THE STRAIGHT TIME RATE OF PAY THE EMPLOYER SHALL HAVE THE SOLE DISCRETION TO ASSIGN OVERTIME WORK TO EMPLOYEES PRIMARY CONSIDERATION FOR OVERTIME WORK SHALL BE GIVEN TO EMPLOYEES REGULARLY ASSIGNED TO THE WORK TO BE PERFORMED ON OVERTIME SITUATIONS AFTER AN EMPLOYEE HAS WORKED EIGHT(8)HOURS AT AN APPLICABLE OVERTIME RATE, ALL ADDITIONAL HOURS SHALL BE AT THE APPLICABLE OVERTIME RATE UNTIL SUCH TIME AS THE EMPLOYEE HAS HAD A BREAK OF EIGHT(8)HOURS OR MORE U. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE V ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS(EXCEPT THANKSGIVING DAY AND CHRISTMAS DAY) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON THANKSGIVING DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE W ALL HOURS WORKED ON SATURDAYS AND SUNDAYS (EXCEPT MAKE-UP DAYS DUE TO CONDITIONS BEYOND THE CONTROL OF THE EMPLOYER)) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE X THE FIRST FOUR(4)HOURS AFTER EIGHT(8)REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST TWELVE (12) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED OVER TWELVE (12) HOURS MONDAY THROUGH SATURDAY, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE WHEN HOLIDAY FALLS ON SATURDAY OR SUNDAY, THE DAY BEFORE SATURDAY, FRIDAY, AND THE DAY AFTER SUNDAY,MONDAY, SHALL BE CONSIDERED THE HOLIDAY AND ALL WORK PERFORMED SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE Y. ALL HOURS WORKED OUTSIDE THE HOURS OF 5 00 AM AND 5 00 PM(OR SUCH OTHER HOURS AS MAY BE AGREED UPON BY ANY EMPLOYER AND THE EMPLOYEE)AND ALL HOURS WORKED IN EXCESS OF EIGHT(8) HOURS PER DAY (10 HOURS PER DAY FOR A 4 X 10 WORKWEEK) AND ON SATURDAYS AND HOLIDAYS (EXCEPT LABOR DAY)SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE (EXCEPT FOR EMPLOYEES WHO ARE ABSENT FROM WORK WITHOUT PRIOR APROVAL ON A SCHEDULED WORKDAY DURING THE WORKWEEK SHALL BE PAID AT THE STRAIGHT-TIME RATE UNTIL THEY HAVE WORKED 8 HOURS IN A DAY (10 IN A 4 X 10 WORKWEEK) OR 40 HOURS DURING THAT WORKWEEK) ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND LABOR DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE BENEFIT CODE KEY-EFFECTIVE 03-03-2011 THRU 08-31-2011 -3- 1 Z ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID THE STRAIGHT TIME RATE OF PAY IN ADDITION TO HOLIDAY PAY 2 ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE B ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE C. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE F THE FIRST EIGHT(8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE G. ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE INCLUDING HOLIDAY PAY H ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. K. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDAY PAY 0 ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE P. THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF EIGHT 8) HOURS ON SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE 2 R ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS AND ALL HOURS WORKED OVER SIXTY (60) IN ONE WEEK SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE S ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOLBLE THE HOURLY RATE OF WAGE, EXCEPT THE DAY AFTER THANKSGIVING, THE DAY AFTER CHRISTMAS AND A FLOATING HOLIDAY,WHICH SHALL BE PAID AT THE STRAIGHT TIME RATE IF WORKED,IN ADDITION TO HOLIDAY PAY U ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED OVER 12 HOURS IN A DAY, OR ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE W THE FIRST TWO (2) HOURS AFTER EIGHT(8)REGULAR HOURS MONDAY THROUGH FRIDAY AND THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER HOURS WORKED MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ON A FOUR-DAY,TEN- HOUR WEEKLY SCHEDULE,EITHER MONDAY THRU THURSDAY OR TUESDAY T14RU FRIDAY SCHEDULE,ALL HOURS WORKED AFTER TEN SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE THE FIRST EIGHT(8) HOURS WORKED ON THE FIFTH DAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL OTHER HOURS WORKED ON THE FIFTH,SIXTH,AND SEVENTH DAYS AND ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE Z ALL HOURS WORKED MONDAY THROUGH FRIDAY BETWEEN THE HOURS OF 6 00 P M AND 6:00 A M. AND ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, EXCEPT FOR COMMERCIAL, OCCUPIED BUILDINGS WHERE FLOOR COVERING WORK CANNOT BE PERFORMED IN THE REGULAR DAYTIME HOURS DUE TO OCCUPANCY FOR SUCH OCCUPIED, COMMERCIAL BUILDINGS,THE EMPLOYEE MAY AGREE TO WORK BETWEEN THE HOURS OF 6 00 PM TO 6 00 AM MONDAY THROUGH SATURDAY MORNING AT 6 00 AM AT AN OVERTIME PAY RATE OF 10%OVER THE STRAIGHT TIME RATE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE BENEFIT CODE KEY-EFFECTIVE 03-03-2011 THRU 08-31-2011 -4- 4. ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE A ALL HOURS WORKED IN EXCESS OF EIGHT(8)HOURS PER DAY OR FORTY(40)HOURS PER WEEK SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE B ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED MONDAY THROUGH SATURDAY OVER TWELVE (12) HOURS AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE HOLIDAY CODES 5 A HOLIDAYS• NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7) B. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY,THE DAY BEFORE CHRISTMAS,AND CHRISTMAS DAY(8) C, HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, 'MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) D. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) H. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,THANKSGIVING DAY,THE DAY AFTER THANKSGIVINiG DAY,AND CHRISTMAS(6) I. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY(6) J. HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY,CHRISTMAS EVE DAY,AND CHRISTMAS DAY(7) K. HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS,AND CHRISTMAS DAY(9) L. HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) N HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS'DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(9) P HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AND SATURDAY AFTER THANKSGIVING DAY,THE DAY BEFORE CHRISTMAS,AND CHRISTMAS DAY (9) IF A HOLIDAY FALLS ON SUNDAY,THE FOLLOWING MONDAY SHALL BE CONSIDERED AS A HOLIDAY R. PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,DAY AFTER THANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7 1/2) 5 S. PAID HOLIDAYS NEW YEAR'S DAY,PRESIDENTS'DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY, THANKSGIVING DAY,AND CHRISTMAS DAY(7) T PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND THE DAY BEFORE OR AFTER CHRISTMAS(9) V PAID HOLIDAYS SIX(6)PAID HOLIDAYS, BENEFIT CODE KEY-EFFECTIVE 03-03-2011 THRU 08-31-2011 -5- Z HOLIDAYS- NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) 6 A PAID HOLIDAYS-NEW YEAR'S DAY,PRESIDENTS'DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY, THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) E PAID HOLIDAYS NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY,DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY,AND A HALF-DAY ON CHRISTMAS EVE DAY (9 1/2), F PAID HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY,LABOR DAY,VETERANS' DAY,THANKSGIVING DAY,THE DAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(11) G PAID HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY,CHRISTMAS DAY,AND CHRISTMAS EVE DAY(11) H PAID HOLIDAYS NEW YEAR'S DAY,NEW YEAR'S EVE DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER CHRISTMAS,AND A FLOATING HOLIDAY(10) I PAID HOLIDAYS- NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7) 6. Q PAID HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY,INDEPENDENCE DAY,LABOR DAY,VETERANS DAY,THANKSGIVING DAY,THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY(8) UNPAID HOLIDAY PRESIDENTS'DAY T PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY,AND CHRISTMAS DAY(9) Z HOLIDAYS NEW YEAR'S DAY,MEMORIAL DAY, INDEPENDENCE DAY,LABOR DAY,THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7) IF A HOLIDAY FALLS ON SATURDAY, THE PRECEDING FRIDAY SHALL BE CONSIDERED AS THE HOLIDAY IF A HOLIDAY FALLS ON SUNDAY, THE FOLLOWING MONDAY SHALL BE CONSIDERED AS THE HOLIDAY 7. A. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY IF ANY OF THE LISTED HOLIDAYS FALLS ON A SATURDAY,THE PRECEDING FRIDAY SHALL BE A REGULAR WORK DAY B HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY C HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,THANKSGIVING DAY,THE FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON JHE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY D. PAID HOLIDAYS' NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8) UNPAID HOLIDAYS PRESIDENT'S DAY ANY PAID HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY PAID HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY E HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY BENEFIT CODE KEY-EFFECTIVE 03-03-2011 THRU 08-31-2011 -6- F. HOLIDAYS. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY AND CHRISTMAS DAY(8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY G HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY(6) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY H HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY AND CHRISTMAS DAY (9) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY I HOLIDAYS NEW YEAR'S DAY, PRESIDENT'S DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS DAY AND CHRISTMAS DAY (9) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY J HOLIDAYS NEW YEAR'S DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY(6) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY K. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, THE FRIDAY AND SATURDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY L HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, LABOR DAY, INDEPENDENCE DAY, THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY,AND CHRISTMAS DAY(7) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY 7 M PAID HOLIDAYS NEW YEAR'S DAY, THE DAY AFTER OR BEFORE NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND THE DAY AFTER OR BEFORE CHRISTMAS DAY 10) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY. ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY N HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY WHEN CHRISTMAS FALLS ON A SATURDAY,THE PRECEDING FRIDAY SHALL BE OBSERVED AS A HOLIDAY O PAID HOLIDAYS NEW YEAR'S DAY, THE DAY AFTER OR BEFORE NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY AFTER OR BEFORE CHRISTMAS DAY, AND THE EMPLOYEES BIRTHDAY 11) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY ANY HOLIDAY WHICH FALLS ON A SATURDAY SHALL BE OBSERVED AS A HOLIDAY ON THE PRECEDING FRIDAY P HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY,AND CHRISTMAS DAY(7) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY Q. HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY AND CHRISTMAS DAY (8) ANY HOLIDAY WHICH FALLS ON A SUNDAY SHALL BE OBSERVED AS A HOLIDAY ON THE FOLLOWING MONDAY IF ANY OF THE LISTED HOLIDAYS FALLS ON A SATURDAY, THE PRECEDING FRIDAY SHALL BE A REGULAR WORK DAY BENEFIT CODE KEY-EFFECTIVE 03-03-2011 THRU 08-31-2011 -7- NOTE CODES 8 A IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS,THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE OVER 50'TO 100'-$2 00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100'TO 150'-$3 00 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150'TO 220'-$4 00 PER FOOT FOR EACH FOOT OVER 150 FEET OVER 220'-$5 00 PER FOOT FOR EACH FOOT OVER 220 FEET C. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS,THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE OVER 50'TO 100'-$1 00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100'TO 150'-$1 50 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 150'TO 200'-$2 00 PER FOOT FOR EACH FOOT OVER 150 FEET OVER 200'-DIVERS MAY NAME THEIR OWN PRICE D. WORKERS WORKING WITH SUPPLIED AIR ON HAZMAT PROJECTS RECEIVE AN ADDITIONAL$1 00 PER HOUR L. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS-LEVEL A $0 75, LEVEL B $0 50,AND LEVEL C $0 25 M. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS. LEVELS A&B: $1 00,LEVELS C&D $0 50 N WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS-LEVEL A $1.00, LEVEL B $0 75,LEVEL C $0 50,AND LEVEL D $0 25 8 P WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS -CLASS A SUIT $2 00,CLASS B SUIT $1 50, CLASS C SUIT $1 00,AND CLASS D SUIT$0 50 Q THE HIGHEST PRESSURE REGISTERED ON THE GAUGE FOR AN ACCUMULATED TIME OF MORE THAN FIFTEEN(15)MINUTES DURING THE SHIFT SHALL BE USED IN DETERMINING THE SCALE PAID