HomeMy WebLinkAboutPK10-082 - Change Order - #1 - Clements Brothers, Inc. - Turnkey Park Improvements - 04/19/2010 ed 405Z.. Records Man, Bement KENT Document WASHINGTON s A. CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: C 1 -e wL-e v J S E I S 1 n c Vendor Number: l q 2 JD Edwards Number Contract Number: ?K��'� 8L-2, This is assigned by City Clerk's Office �+ r Project Name: TuA- ����� ` a �IL 1 �Yr�� '� �S Cv'-1 Description: ❑ Interlocal Agreement Change Order El Amendment ❑ Contract P 9 ❑ Other: Contract Effective Date: �,? `u— to Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager- 6 'Department: P6 V K S Detail: (i.e. address, location, parcel number, tax id, etc.): S Public\RecordsManagement\Farms\ContractCover\adcc7832 1 11/08 r KENT WASHINGTON CHANGE ORDER NO. 1 NAME OF CONTRACTOR: CLEMENTS BROTHERS INC. ("Contractor") CONTRACT NAME: Turnkey Park Improvements ORIGINAL CONTRACT DATE: March 16, 2010 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Deletion of 2" overlay and water connection on 100th Ave SE while adding additional clearing and seeding as well as removal of large maple tree and stump at Turnkey Park in Kent, Washington as described in the contractor's RFP's #1 and 2 dated April 6 and April 9, 2010 attached and incorporated as Exhibit A. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $196,520.75 (including applicable alternates and WSST) Net Change by Previous Change Orders $N/A (incl. applicable WSST) Current Contract Amount $196,520.75 (incl. Previous Change Orders) Current Change Order ($ 5,726.00) Applicable WSST Tax on this Change ($ 543.97) Order Revised Contract Sum $190,250.78 CHANGE ORDER - 1 OF 3 Original Time for Completion October 1, 2010 (insert date) Revised Time for Completion under NA prior Change Orders (insert date) Days Required (t) for this Change 0 calendar days Order Revised Time for Completion October 1, 2010 (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRA • CITY OF KENT: By: By: sr�natu ).� (signature) Print Name: /.'�. J� a4wle*& rint Na Suzette Cooke Its Its Mayor (title) DATE: ci12/lQb DATE: CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) Ke t Law Department Turnkey Park Improvements COk1-CLEMENTS BROTHERS INC -4.9-10 CHANGE ORDER - 3 OF 3 °°° °°° CLEMENTS BROS, INC. P.O. Box 7964 Bonney Lake, WA 98391 ° o ° (253) 852-0373 FAX: (253) 862-3268 ° ° ° ° ° ° 416/2010 CITY OF KENT, PARKS 220 4TH AVE S KENT, WA 98032-5895 a4tn: BRIAN LEVENHAGEN re: TURNKEY PARK RFP#1 DELETE 2" OVERLAY AND WATER LINE CONNECTION ON 100TH AVE SE DIRECT COSTS MTRL COSTS CRUSHED ROCK 10 TONS 15 /TON 150 WATER MTRLS 443 ROMAC SADDLES 48 CORP STOP VALVES 70 POLY PIPE 33 METER SETTER 292 TOTAL MATERIAL COSTS= (593) LABORIEQUIP EXCAVATOR W/OPER 0 5 DAY 1,400 MAY 700 12 YD DUMP W/OPER 0 5 DAY 1,375 /DAY 688 LABORER#1 0 5 DAY 500 /DAY 250 ASPHALT DUMP FEE 5 TON 5 /TON 25 TOTAL LABOR/EQUIP= (1,663) SUBCONTRACTOR COSTS PUGET PAVING SEE QUOTE 7,225 GRINDING EST MINIMUM 3,000 ADD'L OVERLAY WEST OF CL FOR WATER LINE 3,800 TRAFFIC CONTROL EST 1,500 TOTAL SUBCONTRACTOR COSTS = (16,626) SUMMARY TOTAL MATERIAL DEDUCT= (593) TOTAL LABOR/EQUIP DEDUCT= (1,663) TOTAL SUBCONTRACT DEDUCT= (15,525) FINAL COST RFP#1 ¢ (17,781) TOTAL RFP#1= (I 7,781)(TAX NOT INCLUDED) TIM J LEMENTS, PRIES d­70 COMMERCIAL GENERAL CONTRACTORS 03/10/2010 (14:47 2534745677 �-y PUGET PAVING PAGE 01/01 R JGET PAVING&CONSTRUCTION,INC. ' IF 17 2t3TN AVE. S. COMA,WA 913499 PROPOSAL & one: (263)474-5616 CONTRACT csimile: 263)474.5677 oala 3WO1D bmimTo is Bros.Inc. Phan 253-652-0373 Fax I 7,i3-f°a.6Z— 20 $treat 12111, 224th Ave.E cob rlama TumM Park city,siats,400 zip Bon ,WA SM91 Job Locatlar Ken WA We hereby submit specifications and e5ftaft for: Pave approxmately 6390 square feet "thick class D(porous)asphalt at above referenced project.Crushed rock Installation by others. I Lump sun price:$16500.0D Fine grading(grader+roller,operated i crew.$225,00 per hour Tack coat and overlay off-site street rk measuring approximately 3465 square feet,include joint sealmrit.Grinding, traffic control,permitting by others. Lump sum price:;7225.00 d g C;`1 1JA.1 1, (tdtrV Price includes two mobilizations. Sales tax,if appiiCeWe Is riot included in rite Lum Sum General Provislonw. 1. Puget paving&Cvrishudton,ift shall not b 5 labte for damage t0 or breakage of any known underground or abovaporald fatality awsirt Ihatwhich ie"to negligence on the part Of PU021 Paving&Conattudion,inu. 2. Soil slediaatlon,it bxyiaded in oofl OL+raft applied rat rates speaifrod byte manbfadmW Puget P &cwwwww,,lam win not bs respwMe for any subsequent grog of etas weed,momieg glory,deep meted terns or perennials Which rave not reached maturity Prior toappl Mion. 3. Puget Paving&CD=Wdion,Inc.carrot he realmsble for cub grade fatifee. 14, AN Material is guerardwid to be as apedAed. All work to be competed in a workmw0w nwmw acaovtong to standard praclkes. Any etwascas or devlaburn hone above apBmm am rwowM extra o"w m be executed ory upon wnthm own.and wm become an Mrs charge over and shwa ttne estimate. agrearnew cmengent upon sum.eooi w*,or waww delays beyond our control.This Proposal shoe serve notice of our Inrehk to le I property raaprDYad upod anould payment heat be received in As upon eeanplation Purchase agmereent in case any disagreemem arises relating to 1 0 periarnance or Mfg canlrmt I prorates to MOM to bind"erblaOM to seidd arty dispdtas, costs nor whuwy ammawn EgnLne wO apMt tretween P and mntrading Dm4r des)• uthorized Si nature I Gunnar f3ehrin Note: This price may be withdral n by us if not accepted within 30 aiW& aymentto be made as fdlot% Terms:Net Due uM completion.Finarme charge of 1.5%pA month on all mt due balwoss. .caxptanca: The above Mom apacillwtiona a ld contlaiats rare satisfaday oral are hereby sxepted. You are auUtbrixed to do the es spediled. Payment vA be made as o mad above. Date of Acceptance: Signature 109 MIN.(70'MIN.) 1D0'MIN (70'MIN.) 50' SlY SO'(3S'MIN.) SW(35'MIN.) CURB 35'MIN. A (3S'MIN. J I TRENCH CURB ASPHALT OVERLAY ASPHALT A RILL LANE WIDTH(TYP.) OVERLAY TRENCH EDGE OF PAVEMEN7 LANE LINES 100'MIN.(70'MIN.) /Al 5 ' CURB 2'MIN. 2'MIN. (3 5'MIN.) TRENCH ASPHALT OVERLAY CURB EDGE OF PAVEMENT LULL LANE WIDTH(TYP.) PLAN VIEW o THOROUGHLY TACK o w ALL EDGES I 2 GRIND AND OVERLAY "' w o ¢ FULL LANE WIDTH(IYP.) lu L SEE STANDARD PLAN 6-64 OR 6-65 NOTES: 1. THIS STANDARD APPLIES TO ALL CUTS TO ARTERIAL STREETS. SECTION A-A TRENCH SEE STANDARD SEE SECTION 6.16.DIMENSIONS IN PARENTHESIS APPLIES TO PLAN 6-65 OR 6-63 ALL OTHER STREETS. 2. OVERLAY AREA MAY BE MODIFIED BY THE ENGINEER ON OLDER PAVEMENT DEPENDING ON CONDITIONS OR SCHEDULED CONSTRUCTION/MAINTENANCE. �> NOTE:THIS PLAN IS NOT LEGAL ENGINffRING DOCUMENT BUT 3. ADJUST ALL UTILITY CASTING TO FINISH y`l pp WA3q�y AN ELECTRONIC DUPLICATE.THE ORIGINAL,SIGNED BY THE GRADE AND RESTORE CHANNELIZATION ��•" �. ` c ENGINEER AND APPROVED FOR PUBLICATION IS KEPT ON FILE AT AND LOOP DETECTORS. i 0 THE CITY OF KENT.A COPY MAY BE OBTAINED UPON REQUEST. 4. ON PRINCIPAL AND MINOR ARTERIALS j - 1-3 CI CHOONCOMM �KENT THE OVERLAY LENGTH MAYBE MODIFIED ARTMOff TO 15W(MIN.) q 2"493 ASPHALT OVERLAY FOR j6k� �FGiSTER����,�4 [�N'j` ROADWAY TRENCH REPAIR 5. UTILITY PATCHES WITHIN 7S'OF EACH TONAL ���� �4��IY�T�M OTHER SHALL BE TREATED AND REPAIRED oEacrm ow+ Norte su�wm AS ONE PATCH. owww SCALE PLM °'EWE' °'� - 6-66 APPRDM Caniamhar"7C1f1Q 04/09/10 06:25AN CLEMENTSBROSI 2538623268 p.06 Qoo 000 CLEMENTS BROS, INC. P.O. Box 7964 Bonney Lake, WA 98391 `t �, (253) 852-0373 FAX: (253) 862-3268 0 0 0 D O O MEMO DATE: 4/9/10 TO: CITY OF KENT, PARKS re: TURNKEY PARK I attn: BRIAN LEVENHAGEN RFP##1 SUPPLEMENT GRINDING PER CONVERSATIONS WITH GUNNER @ PUGET PAVING ON BID DAY,THE AMOUNT OF GRINDING ON 100"H AVE SE WOULD MEET THE MINIMUM CHARGE OF$39000. 100T" AVE SE OVERLAY WEST OF CENTERLINE (WATERLINE PATCHING) PUGET PAVING QUOTED THE PROJECT EAST OF CENTERLINE BY SF PRICE. $7,225/3465 SF=$2.09/SF TOTAL AMOUNT OVERLAY WEST OF CENTERLINE $2.09/SF X 1,815 SF=$3,800 THANKS AGAIN, TIM J. CLEMENTS (253)6064014 MOBILE COMMERCIAL GENERAL CONTRACTORS 104/09i10 06:25AM CLEMENTSBROSI 2538623268 p.04 °° CLEMENTS BRCS, INC. °° P(25) 8 29037364 oFAX: (253)nney Lake, WA 1 62-3268 ° °° ° ° O O ° 4/9/2010 CITY OF KENT, PARKS 220 4TH AVE S KENT, WA 98032-5895 attn: BRIAN re: TURNKEY PARK RFP#2 (ALT) • AWL CLEARING/SEEDING CLEAR&GRUB AREAS TO RECEIVE HYDROSEED HAUL AND DUMP SALVAGED TOPSOIL OVER GRUBBED AREAS ROUGH AND FINE GRADING BY OTHERS HYDROSEED DIRECT COSTS MTRL COSTS ADD'L TREE WASTE DUMP FEE 6 LOADS 475 ILOAD 2,850 TOTAL MATERIAL COSTS= 2,860 LABOR/EQUIP EXCAVATOR W/OPER 2.5 DAY 1,400 /DAY 3,500 TOTAL LABORIEQUIP= 3,500 TOTAL DIRECT COSTS = 6,350 OH&P (15% ) = 953 FINAL DIRECT COSTS = 7,303 COMMERCIAL GENERAL CONTRACTORS 04/09/10 06:25AM CLEMEHTSBROSI 2538623268 P.05 < r SUBCONTRACTOR COSTS HYDROSEEDING (LAWN MIX) APPROX 25.000 SF 2,500 (DOES NOT INCLUDE TEMP IRRIGATION) TOTAL SUBCONTRACTOR COSTS = 2,500 OH&P(10%) = 250 FINAL SUBCONTRACTOR COSTS= 2,750 SUMMARY FINAL DIRECT COSTS s 7,303 FINAL SUBCONTRACTOR COSTS= 2,750 ADD'L PERF BOND= 3% 302 ADD'L LIAR INSURANCE= 2% 201 FINAL COST RFP#2= 10,565 �I TOTAL RFP#2 = 109555 (ALL PRICES TAX NOT INCLUDED) ADD 1,500 REMOVE LARGE MAPLE TREE&STUMP TOTAL RFP#2 = 12,055 Z. e �� TIM 4.CLEMENTS,P ES I RFP#1 (17,781) RFP#2 12,055 I BALANCE (5,726) i REQUEST FOR MAYOR'S SIGNATURE Please fill in all applicable boxes I. T Routing Information (ALL REQUESTS MUST FIRST BE ROUTED THROUGH THE LAW DEPARTMENT) T t(s Originator: Brian Levenha en Phone: 5116 �l 1 Date Sent: 4/ /2010 Date Required: 4/23/2010 Return Signed Document to: Tony Donati CONTRACT TERMINATION DATE: 10/1/10 VENDOR NAME: Clements Brothers, Inc. DATE OF COUNCIL APPROVAL: 3/16/10 Brief Explanation of Document: This is a change order for the Turnkey Park Expansion Project. The change order consists of a credit back to the city for street overlaying that is no longer necessary for the project. It also includes additional clearing, grading, and tree removal work that was not in the original contract Clearing of these additional areas was determined to be vital to the project so that sitelines would be expanded into the existing park. This change order results in an approximately $6,000 credit back to the city. All Contracts Must Be Routed Through The Law Department (This area to be completed by the Law Department) t I;i F Received Approval of Law Dept rat x Z(!i� (Yqq 1 i1i Law Dept Comments vItf KeriT Date Forwarded to Mayor Shaded Areas To Be Completed By Administration Staff Received: Recommendations and Comments: Disposition:ll /g ld /�C�Gc v /�2/�Z L Date Returned C CLEF,K