HomeMy WebLinkAboutPW09-033 - Amendment - David Lanning - S 212th St UPRR Grade Separation - 12/14/2009 e c o r d s M �� gem6k
KENT �
WASHINGTON Document
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: David Lanning
Vendor Number:
JD Edwards Number
Contract Number: P(J09- 033
This is assigned by City Clerk's Office
Project Name: S. 212th St. UPRR Grade Separation
Description: ❑ Interlocal Agreement ❑ Change Order 0 Amendment ❑ Contract
❑ Other:
Contract Effective Date: 12/14/09 Termination Date: 12/31/10
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Mark Madfai Department: Engineering
Detail: (i.e. address, location, parcel number, tax id, etc.):
Extend the time of completion an additional�eear so consultant can complete the cost
estimate.
S.Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08
KENT
WASHINGTON
AMENDMENT NO. 2
NAME OF CONSULTANT OR VENDOR: David Lanning
CONTRACT NAME & PROJECT NUMBER:S. 212th Street UPRR Grade Separation Overcrossing
ORIGINAL AGREEMENT DATE: January 22, 2009
This Amendment is made between the City and the above-referenced Consultant or
Vendor and amends the original Agreement and all prior Amendments. All other provisions of
the original Agreement or prior Amendments not inconsistent with this Amendment shall remain
in full force and effect. For valuable consideration and by mutual consent of the parties,
Consultant or Vendor's work is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, the Consultant or Vendor shall:
No change is necessary to the scope of work, however an
amendment is needed to extend the time of completion to
December 31, 2010 to allow the Consultant to complete the
cost estimate.
2. The contract amount and time for performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are modified as follows:
Original Contract Sum, $5,730.25
including applicable WSST
Net Change by Previous Amendments $0
including applicable WSST
Current Contract Amount $5,730.25
including all previous amendments
Current Amendment Sum $0
Applicable WSST Tax on this $0
Amendment
Revised Contract Sum $5,730.25
AMENDMENT - 1 OF 2
s i
Original Time for Completion 3/31/09
(Insert date)
Revised Time for Completion under 12/31/09
prior Amendments
(Insert date)
Add'I Days Required (f) for this 365 calendar days
Amendment
Revised Time for Completion 12/31/10
(insert date)
The Consultant or Vendor accepts all requirements of this Amendment by signing below,
by its signature waives any protest or claim it may have regarding this Amendment, and
acknowledges and accepts that this Amendment constitutes full payment and final settlement of
all claims of any kind or nature arising from or connected with any work either covered or
affected by this Amendment, including, without limitation, claims related to contract time,
contract acceleration, onsite or home office overhead, or lost profits. This Amendment, unless
otherwise provided, does not relieve the Consultant or Vendor from strict compliance with the
guarantee and warranty provisions of the original Agreement.
All acts consistent with the authority of the Agreement, previous Amendments (if any),
and this Amendment, prior to the effective date of this Amendment, are hereby ratified and
affirmed, and the terms of the Agreement, previous Amendments (if any), and this Amendment
shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this Amendment, which is binding on the parties of this contract.
IN WITNESS, the parties below have executed this Amendment, which will
become effective on the last date written below.
CONSULTANT/VENDOR: CITY OF KENT:
r 2 By: By:
(signature) (signature)
Print Name: PAZID kL6 Print Name: Timothy J. LaPorte, P.E.
Its n c,I ip Its Public Works Director
(title) (trt )
DATE: DATE: Z
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
Kent Law Department
Lannmg-2121"UPRR Amd 2/Madfai
AMENDMENT - 2 OF 2
s ti
Yoshitake, Nancy
From: Chris Mandick[chns mandick hfgt@statefarm corn]
Sent: Thursday, May 21, 2009 3 54 PM
To: Yoshitake, Nancy
Subject: Lammng
S0001APCA70 AUTO POLICY STATUS AGT:2604 PAGE 1
HOUSEHOLD KEY: (LANNING 916498042) H PHONE: (253) 631-0525
LANNING, DAVID & MAVIS M MUTL 256 8596-B08-47L IRG: 19 LRG: 04
23029 164TH AVE SE TERR: 054
KENT WA 98042-3703 98 LEXUS ES 300 CLASS:6B3050H000
4DR ACC FREE: AUG-08-86
VIN: JT8BF28G6W0135740 BIRTH: AUG-18-36
STATUS:PAID DUE DATE: TERM DATE: TOT PREM: 302.11
AMT DUE: 0.00 OXD:AUG-08-86 COV DATE:JUL-02-07 PREY PREM: 309.69
A 100 /300 /50 140.14 Rl 80% /1000 12.00
P1 28.72 UU1 25 /50 /50 25.56
D100 35.14
G1000 56.35
H 4.20
AUTO-PF1(3) FIRE-PF2(1)
LIFE-NONE HLTH-NONE
AMT PAID: 302.11 DATE PAID: FEB-27-09 SFPP-NONE 1-PENDING
CRI 1615, REPLACED CRI 1598, AGE 72, GRP 08/08/96, 2 -CHANGES 4-LTR CREATE
MCD 60.05, AFD 10YR $75.05, VSD 20% 7.17, 5-FIC 6-ARQ
ODM 300 08-98, MLD 17% $53.31 HOMEOWNERS. 7-APP 8-PAYMENTS
9-MSTR REC 10-LOSS REPRT
P-PRINT POLICIES 0-PREV SCREEN PRESS ACCEPT OR A PF KEY
i