HomeMy WebLinkAboutPW08-077 - Other - GeoEngineers, Inc - Letter of Authorization - S. 288th St. Grade Separation at BNSF Railway - 03/03/2009 Records Matng,agemen KENO Document W A9HINGTON meµ. CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: GeoEngineers, Inc. Vendor Number: ]D Edwards Number Contract Number: Po ©i?- 077 This is assigned by City Clerk's Office Project Name: S. 228th St. Grade Separation at BNSF Railway Description: ❑ Interlocal Agreement ❑ Change Order ® Amendment ❑ Contract ❑ Other: Contract Effective Date: 3/3/09 Termination Date: 3/13/09 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Mark Madfai Department: Engineering Detail: (i.e. address, location, parcel number, tax id, etc.): GeoEngineers has hired a GPS Survey subconsultant to perform work related to the non- destructive investigation/inspection of the fill material within the confines of a mechanically stabilized earth embankment, east of the BNSF railroad tracks on S. 228th Street. - -_-- ----- s Public\RecordsManagement\Forms\ContractCover\adcc7832 1 11/08 PUBLIC WORKS DEPARTMENT Larry R Blanchard Public Works Director 220 4`" Avenue South Kent, WA 98032 KEN T Fax. 253-856-6500 WASHINGTON PHONE, 253-856-5500 March 3rd, 2009 RE: South 228th Street Grade Separation at BNSF Railway Local Agency Agreement Number 5632 Federal Aid Number: DEMO-1216 (001) Kent Project Number: 07-3023 LETTER OF AUTHORIZATION This letter authorizes specific changes to Local Agency Agreement Number 5632 between the City of Kent (The AGENCY) and Geo Engineers. This authorization will be followed up by a Supplement to the original agreement in accordance with Chapter 31.4.42 of Local Agency Guidelines (April 2008). Geo Engineers, the CONSULTANT, is hereby authorized to hire Global Geophysics, an expert in the field of non-invasive underground investigations, to perform work related to the non-destructive investigation/inspection of the fill material within the confines of a mechanically stabilized earth embankment, east of the Burlington Northern Santa Fe Railroad tracks on South 228tb Street, Kent, WA. The specifics of this additional work are outlined in the attached SCOPE OF WORK. THE PROJECT: South 228th Street Grade Separation at BNSF Railway is a bridge and road project that is in progress and approximately 500/o complete A 10 inch water main was left in service under approximately 20 feet of fill material at the east embankment/bridge approach in order to provide additional fire flow for adjacent businesses. NEED FOR ADDITIONAL WORK: On Thursday, February 12, 2009, the 10 inch cast iron water main ruptured approximately 10 feet under the built-up, mechanically stabilized earth wall for the bridge approach ramp to the new railroad over-crossing. As a result of the water main break, approximately ten cubic yards of sand and other fill material was displaced. The CONSULTANT used the methods available to them in the original contract in an attempt to determine if the area behind the wall and above the water main break was still structurally sound. The results were inconclusive. Global Geophysics possesses a unique, ground penetrating radar system with which they can non-destructively, electronically investigate underground soils to identify voids or other buried anomalies in order to determine the stability of the material under investigation. BENEFIT: Non-destructive, ground penetrating radar will allow the CONSULTANT to do 3 an evaluation of the underlying material without having to dismantle a 20 foot high Y Y earth and concrete block wall system. Such a dismantling would add significant time and cost to the project and would not be in the best interest of the public. 3 3 MAYOR SUZETTE COOKE City of Kent Public Works Department COST: The investigative costs are based upon pre-established, hourly rates and would be on a time and material basis (See attached). There will be additional costs to the CONSULTANT for oversight of Global Geophysic's work and professional evaluation and recommendations based upon the results of the findings. Total Estimated Cost: $12,749.37 -- broken down as follows: CONSULTANT: $8,934.37 and Global Geophysics: $3,815.00. The CONSULTANT's rates are the same as the original contract. ADDITIONAL TIME: This field investigation work for the CONSULTANT is anticipated to take eight (8) working days, including time with which to evaluate the information, formulate their recommendations and provide a written report to the AGENCY. START DATE: March 4, 2009; END DATE: March 13, 2009 NECESSITY FOR THIS AUTHORIZATION OUTSIDE OF THE NORMAL SUPPLEMENTAL AGREEMENT PROCESS: Time is of the essence. Currently this investigative work is occurring simultaneously with a contract-imposed settlement period for the earth and concrete block wall. When that period expires the contractor will want full and unrestricted access to the area under investigation. The ability to proceed quickly with this investigative and evaluation work has the potential to save significant project time and money. THE AGREEMENT: All other provisions of the original contract between the AGENCY and the CONSULTANT are in effect. Respectfully, Approved Project Engineer 3 3 0 `j Date Approved Director of Public Works D3 0-6)q Date Attachment: CONSULTANT SCOPE OF WORK AND FEE SCHEDULES GEOENGINEERS / March 3,2009 City of Kent Public Works Department 220 4th Avenue South Kent, Washington 98032 Attention: Peter Tenerelli Subject Supplemental Scope and Fee Estimate South 228th Street BNSF Railroad Overcrossing Kent, Washington File No 0410-146-01 INTRODUCTION We present our Scope and Fee Estimate for supplemental geotechnical construction monitoring and geophysical testing services for the South 228`i' Street Overcrossing project. The purpose of the supplemental services and testing is to further investigate the potential for voids to exist in the vicinity of a buried water line beneath the east approach embankment after the line ruptured on February 12, 2009 The services will be provided under Local Agency Agreement Number 5632 between the City of Kent and GeoEngineers SCOPE OF SERVICES Our services will include additional consultation, attending meetings, and performing geophysical testing using ground penetrating radar(GPR)to check for presence of voids. 1. Perform GPR testing of the wall face and along the toe of the wall in the vicinity of the line break 2. Prepare a written report of our findings and conclusions including recommendations for repair as necessary and appropriate. GPR testing is scheduled for Wednesday. March 4, 2009 Evaluation of the results and preparation of our report should be complete by March 13,2009. Earth Science+Technology i t Ot 5 Fawcett Ave tekphane 253 383 4940 Suits 200 faesimde 253 383 4923 Taooma,WA 90402 websde www goaenginearo corn l City of Kent Public Works Department March 3, 2009 Page 2 I We appreciate the opportunity of submitting this supplemental scope and fee estimate and look forward to working with you on this project Please call with questions or if you require additional information. Respectfully submitted, GeoEngineers, Inc ±Garry quires,PE,LG,LEG Principal I GHS gb TACO 1010410146\011trnals\041014601 ScopeSupplement.doe Attachments: Subconsultant Fee Determination—Summary Sheet Houis Summary Sheet Global Geophysics March 2, 2009 Proposal Disclaimer Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only a copy of the original document The original document is stored by GeoFngmeers, Inc and will serve as the official document or record 1 I Fite No 0410-146.01 CiEOENGINEENS� Subconsultant Fee Determination-Summary Sheet Project Nat South 228th Street Overcrossing Start Date Client Name Task Description: End Date Subconsultant Fee Determination Subconsultant: Project# Classification Man Hours Dollars Rate Principal 4 x $56 73 = $226 92 Senior Engineer 16 x $40 24 = $643 84 Project Engineer 54 x $30 05 = $1,622 70 Technician x $27 75 = $0 00 Support Staff x $29 32 = $0 00 Total Hours 74 Total DSC = $2,493 46 %Increase %of Work Escalation for'O9 5 50 = $62 34 Escalated Total $62.34 Overhead(OH Cost--including Salary Additives) OH Rate x DSC of 214 83% x $2,555 80 = $5,490.63 Fixed Fee(FF) li FF Rate x DSC of 30 00% x $2,555 80 = $766.74 Reimbursables Itemized Quantity Units Rate Mileage 240 each @ $0 505 = $121 20 GPR Testing 1 each @ $3,815 00 = $3,815 00 Reimbursables Total $3,936.20 Grand Total $12,749.37 Prepared 8y Garry Squires Date March 3,2009 000000TAC0 010410146i011Finais\041014601 Supplement SummeryandHoursSheet xls CITY OF KENT ENGINEERING DEPARTMENT SUPPLEMENTAL GEOTECHNICAL CONSTRUCTION MONITORING SERVICES SOUTH 228TH STREET, BNSF RAILROAD OVERCROSSING KENT, WASHINGTON FILE NO 0410-146-01 HOURS SUMMARY SHEET GeoEngineers Labor Hours Senior Project Support Total Labor Principal Engineer Engineer Technician Staff Hours South 228th Street Overcrossin Geotechnical/Materials Engineering Water Line Break Consultation 2 16 50 68 Meetings 2 4 6 GRAND TOTAL 4 16 54 0 0 74 TACO 0\0410146\01\Finals\041014601SuppiementSummaryandHoursSheet As 000000Fe1e No 0410-146-01 March 3,2009 OOOOOOGWENGINEER Global Geophysics 16651 Wldte Mountain Road SE Monroe,WA 98272 Tel 425-8904321 Fax 360-805-0259 March 2, 2009 Our ref. 093-0228.000 GeoEngineers 1101 South Fawcett Ave, Suite 200 Tacoma, Washington 98402 ATTENTION- Mr Gara Squires RE: PROPOSAL FOR VOID LOCATING BEHIND A BRICK WALL AT S228TH STREET RAILROAD OVERCROSSING,CITY OF KENT, WA In response to your emails, we have prepared this brief description of geophysical methods and cost estimate for the proposed work at S228 Street Railroad Overcrossmg, City of Kent, Washington. The objectives of the study are to assist in evaluating the conditions of fill materials behind the brick wall after a water pipe broke The pipe line runs parallel to the wall and approximately 15 ft below the ground surface outside the wall SCOPE OF WORK We propose to use ground penetrating radar for this study. 200 MHZ, 500 MHz, and 900 MHz antennas will be used for different penetration and resolution Three horizontal lines (100 ft length, 4-5 ft apart and parallel to the ground surface) on the wall and three vertical transects (10-20 ft length) will be surveyed to evaluate the integrity of the fill materials behind the wall at the place where the water pipe broke METHODOLOGY,INSTRUMENTATION AND FIELD PROCEDURES The GPR method uses electromagnetic pulses, emitted at regular intervals by an antenna to map subsurface features The electromagnetic pulses are reflected where changes in electrical properties of materials occur such as changes in lithology or where voids are present The reflected electromagnetic energy is received by an antenna, converted into an electrical signal, and recorded on the GPR unit The data is recorded and viewed in real time on a graphical display that depicts a continuous profile or cross-section image of the subsurface directly beneath the path of the antenna. The depth of penetration of the GPR signal varies according to antenna frequency and the conductivity of the subsurface material. The depth of subsurface penetration decreases with an increase in the frequency of the antenna and an increase in soil conductivity. ; Global Geophysics GeoEngineers March 2,2009 Mr.Garry Squires 2 093-0228.000 The data at this site will be collected using Geophysical Survey Systems, Inc. (GSSI) SIR 2000 GPR system with antennas having a center frequency of 200 MHz, 500 MHz and 900 MHz. DELIVERABLES Deliverables will include a brief letter report describing the instrumentation and field procedures. GPR transects with interpretations will be presented COST The estimated costs of the survey are $3815.00, which includes mob/demob, car and equipment rental,field surveys, data processing and reporting. LIMITATIONS OF THE GEOPHYSICAL METHODS Global Geophysics's services are conducted in a manner consistent with the level of care and skill ordinarily exercised by other members of the geophysical community currently practicing under similar conditions subject to the time limits and financial and physical constraints applicable to the services. Ground penetrating radar is a remote sensing geophysical method that may not detect subsurface features. Furthermore, it is possible that anomalies on the geophysical data that are interpreted to be of interests may upon intrusive sampling prove to be misinterpreted. AUTHORIZATION Global Geophysics is pleased to present this proposal and we took forward to your favorable response. If you have any questions or require additional information,please contact us at 425-890- 4321. Sincerely, Global Geophysics rr r� John Liu, Ph.D.,R.G. Principal Global Geophysics O N O C N 16 IL N (6 C t6 C O O p O N �O O OD O 4'1 V CO E in in N E A �w rS ri p o 69 O LO ° o in w o E c w M " c u w D L L L 0 D ca w N ac 0 C U CL E ; da co NN o 102 a o 3 (D a 0Mouoi o o D 0 E `»u' in Q ua�ss 64 o F o O o m o 0 o O m o ao m 'o v �n o K to N 0 r 41 N IA da � � � > oH o �, IL U. N a DO o o o O O o cD cD O o O o E v � E v� `�' » o m CDo 0 »'9 » a N L 0 L L O f0 l0 D w f0 N N N 0 d N N 0 cm l39 O N U C N y yNy O c C O y m d c v d O N Mo � N E N N N d > E lLD (0 0 N C F j N U 0 C O � LLJ H d C � a) D L D S a E 9 Q N @ Rid d LL J a. LL ND N D °� > aC7 W U O U) N ¢ LU w D J A Prep Daily Weekly MAGNE TOMETER SYSTEMS Geometries 858 Cs Magnetometer/Gradiometer $ 75.00 $100 00 $ 500 00 UTILITY LOCATORS Radiodetection RD7500 $ 50.00 $ 50.00$ 250.00 Schonstedt MAC-51B Cable/Mag Locator $ 15.00 $ 10.00$ 50 00 ELECTROMAGNETIC SYSTEMS Geonics EM-31 $ 75 00$ 50.00$ 250 00 Geonics EM-61 (1.0 m x 0.5 in coil) $ 75.00 $ 45.00$ 225.00 Geonics FM-61 Hand Held Antenna $ 25 00 $ 25.00$ 125.00 Geonics EM-61 MK 2 (1.0 in x 0.5m coil) $ 75 00 $ 75 00$ 375 00 Jumper Systems Pro 4000 $ 10 00 $ 5.00 $ 25.00 ELECTRICAL RESISTIVITY SYSTEMS AGI SuperSting R8/IP Resistivity System $ 150 00 $ 500.00 $2000.00 Marine Resistivity Cable(50 electrodes@3m) $ 75.00 $ 125.00$ 625 00 AEMC Ground Resistance System (4-pin Wenner) $ 50.00$ 50.00$ 250.00 GROUND PENETRATING RADAR SYSTEMS GSSI SIR 2000 $ 100.00 $ 125.00 $ 625.00 GSSI L5 GHz Antenna $ 50.00 $ 35.00$ 175 00 GSSI 900 MHz Antenna $ 50.00 $ 35.00$ 175 00 GSSI 500 MHz Antenna $ 50.00 $ 35 00$ 175.00 GSSI 400 MHz Antenna $ 50.00 $ 35 00$ 175 00 GSSI 300 MHz.Antenna $ 50.00 $ 35.00$ 175.00 GSSI 200 MHz Antenna $ 50 00 $ 35 00$ 175.00 GSSI 120 MHz Antenna $ 50.00$ 35 00$ 175.00 GSSI 100 MHz Antenna $ 50.00$ 35.00$ 175.00 GSSI 80 MHz Antenna $ 50.00$ 55 00$ 275.00 SEISMIC SYSTEMS Geometries Geode 24 Channel Seismograph $ 125.00$ 100.00$ 500.00 Instantel Blast Mate III Vibration Monitor $ 50.00$ 50.00 $ 250.00 Instantel MiniMate Vibration Monitor $ 50.00$ 50.00 $250.00 Gennann DOC2000 Impact Echo System $ 50.00 $ 50.00$ 250.00 James V-Meter MarkII, Ultrasonic $ 50.00$ 75.00$ 375.00 PISA CHUM Crosshole Some Logging System $ 150.00$ 125 00$ 625.00 SEISMIC RECEIVERS Geophones 30 Hz $ 2.00 $ 1.00$ 5.00 Geophones 14 Hz S 2 00 $ 1.00$ 5.00 Geophones 8 Hz $ 2.00 $ 1.00 $ 5.00 Geophones 4.5 Hz $ 2 00 $ 1.00 $ 5.00 Shear Wave Geophones L-28DH, 14 Hz $ 2.00 $ 1 00 $ 5.00 12 Channel Cable, 5m spacing-NK27 connector, $ 25.00$ 10.00 $ 50.00 12 Channel Cable, 20m spacing-NK27 connector $ 50.00$ 10.00 $ 50.00 Marine 12-Channel Hydrophone Refraction Array $ 50.00 $ 25.00 $ 125.00 GeoStuff BHG borehole geophone $ 75.00 $ 25.00 $ 125.00 GeoStuff BHG-3 borehole geophone wlservo and compass $ 75.00$ 45 00 $225.00 GeoStuff BHG borehole cable(I000ft) $ 50 00 $ 15.00$ 75 00 GLOBAL POSITIONING SYSTEMS Trimble GeoExplorer $ 25 00 $ 50 00$250.00 CSI Max DGPS receiver $ 25.00 $ 50.00 $ 250.00 POWER SUPPLIES Honda Model 3500 (3.5KW) Generator $ 15.00$ 15.00$75.00 Honda Model 3000 EU $ 15.00$ 30.00 $ 150 00 Honda Model 1000 EU, (I KW) Generator $ 15.00 $ 25.00 $ 125.00 Exel 1100W Tue Sine Wave Inverter ne $ 10.00 $ 50.00 COMMUNICATIONS VHF Motorola radios $ 10.00 $ 10.00$ 50.00 Standard VHF Marine $ 10.00 $ 15.00$ 75.00