CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission
to City Clerks Office. All portions are to be completed.
If you have questions, please contact City Clerk's Office.
Vendor Name: Mike Werlech, Const.
Vendor Number: 91668
JD Edwards Number
Contract Number:
This is assigned by City Clerk's Office
Project Name: Russell Road Maintenance Facility Roof & Wall
Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract
❑ Other:
Contract Effective Date: 6/27/2008 Termination Date: 2/15/2009
Contract Renewal Notice (Days): 30
Number of days required notice for termination or renewal or amendment
Contract Manager: Charlie Lindsey Department: Parks/Facilities
Detail: (i.e. address, location, parcel number, tax id, etc.):
5821 S 240th Kent
--- ---- - - ----- ----- - -- - -- - -----
S:Publlc\RecordsManagement\Forms\ContractCover\adcc7832 11/08
� KENT
CHANGE ORDER NO. 4
NAME OF CONTRACTOR: Mike Werlech. Const. ("Contractor")
CONTRACT NAME & PROJECT NUMBER:Russell Road Maintenance Facility Roof & Wall
Improvements
ORIGINAL CONTRACT DATE: June 27, 2007
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified to
add additional work or revise existing work as follows:
In addition to work required under the original Agreement and any
prior Amendments, Contractor shall provide all labor, materials, and
equipment necessary to:
Provide an ice and water shield over the roof sheathing over the
interior spaces of the Radio Shop, the Truck Garage and the Water
Shop. $ 9,880.00
Redo interior Water Shop $15,675.00
Add more sleepers on roof at installation area $ 1,508.00
Materials to repair dry rot $66,000.00
Labor to repair dry rot $71,344.00
2. The contract amount and time for.performance provisions of Section II "Time of
Completion," and Section III, "Compensation," are hereby modified as follows:
Original Contract Sum, $429,066.00
(including applicable alternates and
WSST)
Net Change by Previous Change Orders $278,397.41
(incl. applicable WSST)
Current Contract Amount $707,463.41
(incl. Previous Change Orders)
Current Change Order $164,407.00
Applicable WSST Tax on this Change $ 14,796.63
Order
Revised Contract Sum $886,667.04
CHANGE ORDER - 1 OF 3
Original Time for Completion October 8, 2007
(insert date)
Revised Time for Completion under July 5, 2008
prior Change Orders
(insert date)
Days Required (t) for this Change 225 calendar days
Order
Revised Time for Completion February 15, 2009
(insert date)
In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard
Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this
Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor
agrees to waive any protest it may have regarding this Change Order and acknowledges and
accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or
home office overhead, or lost profits. This Change Order, unless otherwise provided, does not
relieve the Contractor from strict compliance with the guarantee and warranty provisions of the
original contract, particularly those pertaining to substantial completion date.
All acts consistent with the authority of the Agreement, previous Change Orders (if any),
and this Change Order, prior to the effective date of this Change Order, are hereby ratified and
affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change
Order shall be deemed to have applied.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
By: By: '
(signature) j % (sl natur )
Print Name I l A "� c, '' Ppint,ddmi . �
Its 24< irS _ram' Its,
(title) le)
DATE: DATE: d
CHANGE ORDER - 2 OF 3
APPROVED AS TO FORM:
(applicable if Mayor's signature required)
eta
K nt La partment
Wedechchaneeore4shed row
I
CHANGE ORDER 3 OF 3
CITY OF KENT, WASHINGTON KT
Contract Change Proposal
PROJECT: Russell Road Maintenance Facility DATE: December 29,2008
Roof&Wall Improvements CHANGE PROPOSAL NO: 4 revised
O: Contractor
In connection with your Contract with the City of Kent please furnish your proposal for performing the changes
outlined as following: At Building A provide an ice&water shield over the roof sheathing over the interior spaces
u. of the Radio Shop, the Truck Garage,the Garage, and the Water Shop. This area is approximately 5200 sf.
to-
TECHNICAL REPRESENTATIVE:WAGNER ARCHITECT BY: Greg�pi§rs DATE: 12/29/08
O: Owner's Project Representative
e propose to perform all changes described in the above request for a total DDITIO DEDUCTION to the
Contract sum of:
c-
O (Washington State Sales Tax not included)
d We have attached hereto Cost Estimate Detail Sheets Nos.1,60—022A-
0
CK e foregoing amount covers all direct and indirect costs related to this change and to the effect of the change on
C- the remainder of the project. All other provisions remain In full force and effect.
e request the completion date be extended XX calendar days because f;t s work.
p` j
i ,mil BY: DATE
CONTRACTOR
TO: CITY OF KENT
Z We have carefully examined the foregoing proposal and find it to be in order and the cost reasonable. We
O 1 therefore recommend its acceptance.
0
Z
w
U A G QeV, M C tt ITIECt5 BY: DATE: 5 -7
TECHNICAL REPRESENTATIVE
The foregoing proposal is accepted and authorizes the performance of the changes specified. This Instrument
when signed below, constitutes authority to proceed with the above work. A formal change Order in this amount
Z will follow. Billings cannot be honored for this change until issuance of the formal Change Order.
O
NAUTHORIZED BY:
O
H Date
a
I
�I
� I
Russell Road Maintenance FaciliE Jabal Jab#1 86O.029A
° Water Stop Shield
Mike Weriecll Construction Inc Ice&Water Shield
unit
LABOR Qty unit cost laborcost note j
Supervision 7 hr MOD 420
Carpenter 65.5 fir 60.O1) 3,930
Administrative _ 5 hr 50.00 250
PM 6 hr 60.00 480
0 hr 0,00 0
0 hr 0.00 0
0 hr 0.00 0
Subtotal Labor cost $5,060
unit
MATERIALSIEQUIPMENT Gly Unit cost
Ice and avatar sheild 1 Is Z876.00 2 875 i
0 Is 0.00 D
0 Is 0.00 D
0 Is 0100 0
0 Is 0,00 0
i
Subtotal Materiallequipment $2,676
SUBCONTRACTS
0 is 0.00 0
0 is 0.00 0
D Is D.BD D
0 Is 0
0 Is 0
Subtotal Subcontractors so
Total Direct Casts $7,955
overhead on General Contractors Work 20.0% 1,691
Overhead on Subcontractors Work 20.0% 0
Subtotal $9 646
taxes 8:insurance 1.5% 143
bonds 2.0% 191
TOTAL CHANGE PROPOSAL 9,880
APPROVED BY: DATE:
CITY OF KENT, WASHINGTON °ANT
Contract Change Proposal
PROJECT: Russell Road Maintenance Facility DATE: December 30, 2008
Roof&Wall Improvements CHANGE PROPOSAL NO: 5 revised
0: Contractor
n In connection with your Contract with the City of Kent please furnish your proposal for performing the changes
outlined as following: At Building A Water Shop provide R-30 roof insulation to replace the existing insulation that
u as removed. In order to support the new insulation replace the existing 2 x 6 roof joists with 2 x 10 joists.
Option 1 provide a fully taped vinyl facing attached to the bottom of the joists. Option 2 provide new wallboard
1.55 ceiling to replace the existing. The area of the room is approximately 1000 sf.
TECHNICAL REPRESENTATIVE:WAGNER ARCHITERTZ BY: Gr Somers DATE: 12130/08
O: Owner's Project Representative
e propose to perform all changes described in the above request for a total ADDITIOWDR901MM to the
Contract sum of:
$ 15,675 (Fifteen Thousand Six Hundred Seventy Five dollars)
ii
O e have attached hereto Cost Estimate Detail Sheets Nos. 860-033A. 036A revised.
O
CK The foregoing amount covers all direct and indirect costs related to this change and to the effect of the change on
IL he remainder of the project. All other provisions remain in full force and effect.
e request the completion date be extended XX calendar days becausVI thA work.
n lY BY: �,r�` �.,,�.... DATE i d `cfSf
� Y
CONTRACTOR "y
TO: CITY OF KENT
Z. We have carefully examined the foregoing proposal and find it to be in order and the cost reasonable. We
0 therefore recommend its acceptance.
0
Z
w
O =�
U BY'----
w TECHNICAL REPRESENTATIVE
W
The foregoing proposal Is accepted and authorizes the performance of the changes specified. This instrument
when signed below, constitutes authority to proceed with the above work. A formal change Order in this amount
z ill follow. Billings cannot be honored for this change until issuance of the formal Change Order.
O
NAUTHORIZED BY:
O
� Date
- e
Russell Road Maintenance Facili Job# ' 860-033A
Mike Werlech Constructlon Inc Garage Doors Building A
unit
LABOR city unit cost labor cost note
Su ervlslon 4.5 hr 60.00 270
Carpenter t hr 60.00 60
Administrative 4 hr 50.00 200
PM ,.; hr 00,00 �800
0 hr 0,00 0
Subtotal labor cost offi$66Q b
unit
MATERIALSIEOUIPMENT junitcost
Doorman Service Co. Y 684.00 684
0 is 0.00 0
0 Is 0.00 0
0 Is 0.00 0
o is o.00 0
Subtata3 MaterlaUequtpmant $684
SUBCONTRACTS
0 Is 0.00 0
0 Is 0.00 0
0 �19 0.00 .0
0 Is 0
0 Is 0
Subtotal Subcontractors so
Total Direct Coate
Overhead on General Contractors Work 2M% 2- 3
Overhead on Subcontractors Work 20,0% 0
Subtotal 3q¢t7 �
taxes&insurance 1.5% —27
bonds 2.0% —86R
TOTAL CHANGE PROPOSAL < ji6M— 1 -
APPROVED 6Y: DATE:
- - 0
Russell Road Maintenance Fail Jab,E 660-036-A REVISED
Mike Werlech Construction Inc New R-38 unfaced insulation,Vlsqueen Draywall fire taped
Water shop
unit
LADOR Oty unit 1 cost labor Post note
Su ervision/Car enter 121.5 hr 50.00 7,200
Administrative 4 hr 55.00 220
PM B hr 60.00 4B0
0 hr 0.00 0
0 hr 0.00 0
0 hr 0.00 1 D
0 hr 0.00 0
Subtotal Labor cost $7,990
unit
MATERIALSIEQUIPMENT Igty unit cost
McLendon Hardware 1 I�1 109.00 199
Drvwall 1 Is 1,709.00
Subtotal MatcrlaVaquipment $199
SUBCONTRACTS
Firstline Systems 1 Is 1,197.00 1197
JDTElecbkal 1 Is 2,021.00 2.021
0 Is 0.00 1 0
0 Is 0
0 Is 0
Subtotal Subcontractors $3,2t8
Total Direct Costs $11,407
Overhead on General Contractors Work 20.0% 1,635
Overhead an Suboontractors Work 20.0% 644
5ublotal $13,566
taxes&insurance 1.6% 205
bonds 2.07* 274
TOTAL CHANGE PROPOSAL $14,167 ',
APPROVED BY: DATE:
CITY OF KENT, WASHINGTON !�
Contract Change Proposal
PROJECT: Russell Road Maintenance Facility DATE: December 29,2008
Roof&Wall Improvements CHANGE PROPOSAL NO: 13 revised
O: Contractor
Q In connection with your Contract with the City of Kent please furnish your proposal for performing the changes
outlined as following: At Building A, at the roof framing, modify details 31A-4 and 1(83.1 to make the following
LL revisions:
1Z1. Add a 2 x 4 sleeper between each sleeper required in the contract,so they are at 12"oc above the roof
joists. Nail these sleepers into the roof joists with two 16d nails per sleeper at each joist.
Extend all sleepers over the top plate and wall sheathing so that the extension matches the depth of the
metal siding,but a minimum of 1 ''/d'. Block under the sleepers at the top plate to match the slope of the
roof. Nail each sleeper to the top plate with two 16d nails.
2. Install continuous insect screening across the bottom of the sleepers, and install the siding up to the
bottom of the sleepers.
3. Blocking at the edges of each roof sheathing panel perpendicular to the sleepers is no longer required..
4. Hold the insulation in the roof cavity to below the sleepers so there is an unrestricted 1 ''/z" of air flow.
5. Confirm or provide a vapor barrier is below the insulation with an ASTM of E96. As an alternate,paint the
ceiling below each enclosed joist space with a vapor barrier paint with an ASTM of E96.
6. This is shown in the attached sketch CP13-8-A4.
TECHNICAL REPRESENTATIVE: WAGNER ARCHITECTS Yi Gre o rs DATE; 12/29/08
O: Owner's Project Representative
e propose to perform all changes described in the above request for a tota ADDITIO EDUCTION to the
Contract sum of:
$ owes THoL4SA-nit7
(Washington State Sales Tax not included)
a We have attached hereto Cost Estimate Detail Sheets Nos. f260— 0 5A
O
The foregoing amount covers all direct and indirect costs related to this change and to the effect of the change on
the remainder of the project. All other provisions remain in full force and effect.
e request the completion date be extended XX calendar days becausepf t1brs work.
L E BY DATE: { .�} rl C7
CONTRACTOR
TO: CITY OF KENT
Z We have carefully examined the foregoing proposal and find it to be in order and the cost reasonable. We
O therefore recommend its acceptance.
Q
� I
z
w
/7
0 WAG J DATE:
TECHNICAL REPRESENTATIV
CITY OF KENT WASHINGTON
Contract Change Proposal
The foregoing proposal is accepted and authorizes the performance of the changes specified. This instrument
when signed below, constitutes authority to proceed with the above work. A formal change Order in this amount
ill follow. Billings cannot be honored for this change until issuance of the formal Change Order.
O
N AUTHORIZED BY:
O
Date
a
e -
Russel!Road Maintenance Fac1l' lob N 860-035A
r-
Mike Werlech Construction Inc Add more sleepier-on roof atlnstalation areas
unit
LABOR My unit coat labor met note
Supervision 5 hr MOD 300
Carpenter 0.0 hr 80.00 0
Administrative 5 hr 60.00 250
0 hr 0.00 0
0 hr 0.00 0
0 hr 0.00 0
0 hr 0.00 0
Subtotal Labor cost - S65D
unit
MATERIALSIEQUIPMENT unit cost
2x4xi6 171 ea 5.60 058
0 is 0.00 0
0 Is 0.00 0
0 is 0.00 0
0 Is 0.00 0
0 Is 0.00 0
Subtotal Materialtequipment $358
SUBCONTRACTS _
0 Is 0,00 0
0 Is 0.00 0
0 Is 0.00 0
0 is 0
0 is 1 0
Subtotal Subcontractors $0
Total Direct Costs $1,508
Overhead on General Contractors Work 20.0% 0
Overhead on Subcontractors Work 20.0% 0
Subtotal $11S08
taxes&insurance 1.5% 0
bonds 2.0%1 1 1 0
TOTAL CHANGE PROPOSAL $1,608
APPROVED BY.- DATE,
CITY OF KENT, WASHINGTON ° T
Contract Change Proposal
PROJECT: Russell Road Maintenance Facility DATE: December 30, 2008
Roof&Wall Improvements CHANGE PROPOSAL NO: 15 revised
O:Contractor
n In connection with your Contract with the City of Kent please furnish your proposal for performing the changes
outlined as following:
(200) 2X6 Roof Joists @$300 ea.
L (2) 3 1/8" X 19 Y='Glu-Lam beams @$3000 ea.
_ TECHNICAL REPRESENTATIVE: WAGNER ARCHITECT BY: re omers DATE: 12/3oi08
O: Owner's Project Representative
e propose to perform all changes described in the above request for a total ADDITIOW111906FOR99N to the
Contract sum of:
—t $ 66,000(Sixty Six Thousand dollars)
c(
co (Washington State Sales Tax not included)
� We have attached hereto Cost Estimate Detail Sheets Nos.
O
X The foregoing amount covers ail direct and Indirect costs related to this change and to the effect of the change on
C- the remainder of the project. All other provisions remain in full force and effect.
e request the completion date be extended XX calendar days because of this work.
BY: `✓ DATE: I )3 / 0ly
CONTRACTOR
TO: CITY OF KENT
Z We have carefully examined the foregoing proposal and find it to be in order and the cost reasonable. We
O therefore recommend its acceptance.
0
Z
w
1
w
A N Q C EC BY: L DATE: I O/�
'TECHNICAL REPRESENTATIVE
The foregoing proposal is accepted and authorizes the performance of the changes specified. This instrument
when signed below, constitutes authority to proceed with the above work. A formal change Order in this amount
Z ill follow. Billings cannot be honored for this change until issuance of the formal Change Order,.
O
NAUTHORIZED BY:
F
s
Date
a
e
CITY OF KENT, WASHINGTON T
Contract Change Proposal
PROJECT: Russell Road Maintenance Facility DATE: December 29,2008
Roof&Wall Improvements CHANGE PROPOSAL NO, 16
O:Contractor
In connection with your Contract with the City of Kent please furnish your proposal for performing the changes
outlined as following: Roof and wall framing repairs to Building A due to rot repair Including:
L" South wall studs &plates, Sheetrock replacement, Beams, and Soffit.
W
TECHNICAL REPRESENTATIVE:WAGNER ARCHITE S BY: Gre Somers DATE: 12/29/08
O: Owner's Project Representative
e propose to perform all changes described in the above request for a total ADDITIONfDEDUCTION to the
Contract sum of:
—� $71,344(Seventy One Thousand Three Hundred Forty Four dollars)
C (Washington State Sales Tax not included)
a e have attached hereto Cost Estimate Detail Sheets Nos. 860-005A, 006A, 008A, 025A, 027A, 030A, 031A,
p 032A.
0- he foregoing amount covers all direct and Indirect costs related to this change and to the effect of the change on
the remainder of the project. All other provisions remain in full force and effect.
e request the completion date be extended XX calendar days beo f this work. f
BY: ! DATE:
C NTRACTOR
TO: CITY OF KENT
Z We have carefully examined the foregoing proposal and find it to be in order and the cost reasonable. We
O therefore recommend its acceptance.
d I
r7
Z
LU
v N —CtUTEC=Xf BY: DATE:
TECHNICAL REPRESENTATIVE
The foregoing proposal is accepted and authorizes the performance of the changes specified. This instrument
when signed below, constitutes authority to proceed with the above work. A formal change Order in this amount
Z III follow. Billings cannot be honored for this change until issuance of the formal Change Order.
O
AUTHORIZED BY:
Date
Russell Road Maintenance Facil' Job# 880-OOSA
Mike Werlech Construction Inc Replace Rotted Studs,Add A-34 Clips @ new/reframe
unit
LABOR Qty unit cost labor cost note
Carpenter 1325 hr 60,00 7,950
Supervision 76 hr 60.00 4,550
PM 8 hr 60,00 480
Administration 6 hr 50,00 400
hr 0.00 0
hr 0.00 0
hr 0.00 a
hr 0.00 0
subtotal Labor cost $13,390
unit
MATERIALS/EQUIPMENT qty unit cast
Alki Lumbdr 1 Is 1.400,00 1,400
Is 0.00 0
Is 0.00 a
Is 0.00 0
Subtotal Materfal/equipment $1,400 -
i
SUBCONTRACTS _
0 Is 0.00 0
0 Is 0.00 a
Cl is 0.00 0 j
0 Is 0
0 is 0
Subtotal Subcontractors $0
Total Direct Costs $14,790
Overhead on General Contractors Work 20.0% 2,95E
Overhead an Subcontraotors Work 20.0% 0
Subtotal $17,748
taxes&insurance 1.50/0 266
bonds 2.00/6 355
TOTAL CHARGE PROPOSAL $18,369
APPROVED BY: DATE:
e .
Russell Road Maintenance Facil' dab 11 880-005A
Mike Werlech Construction !nc Exploring For Rot
unit
LABOR City unit cost labor cost note
Supervision 4.6 hr 60.00 270
Carpentry 19.0 hr 60.00 1,140
Adminisbetiva 4.0 hr 60.00 2001
PM 8.0 hr 60.00 48D
hr 0.00 0
hr 0.00 0
hr �0.00 0
Subtotal Labor cost $2.090
unit
MATERIALSIEQUIPMENT unit cost
0 Is 0.00 0
0 Is O.DO 0
0 is 0,00 0
0 Is 0.Do D
0 Is 0.00 0
0 Is 0.00 0
Subtotal Material/equipment $Q
SUBCONTRACTS
0 Is 0.00 0
0 Is 0.00 Q
D Is 0,00 tl
0 Is 0
0 Ils 1 0
Subtotal Subcontractors $0
Total Direct Costs $2,090
Overhead an General Contracinrs Work 20.0%1 1 418
Overhead on Subcontractors Work 20.0% 0
Subtotal $2,808
taxes 8 insurance 1.5% 88
bonds 2.0% 60
TOTAL CHANGE PROPOSAL $2,698
APPROVED BY; DATE:
s
Russell Road Maintenance Faci it dab 41 860.00SA
r
Mike Werlech Construction Inc Temporary Plywood
unit
LABOR Oty unit cost labor cost note
Carpenter 150.0 hr 60.00 9,000
Suparvisicn 13.0 hr 60.00 780
PM 8.0 hr 6D.00 400
Administralion 5.0 hr 60.00 250
hr 0.00 D
hr 0.00 0
hr 0.D0 0
o hr 0.00 0
Subtotal Labor cost $10,510
unit
MATERIALS/EQUIPMENT unit cost
Alkt Lumber 1 Is 470.00 470
0 Is 0.00 0
0 Is 0.00 D
0 is 0.00 0
Subtotal MateriaUaciuipment $470
SUBCONTRACTS
0 Is 0.06 0
0 Is 0.00 0
0 Is 0.00 0
0 Is 0
0 Is 0
Subtotal Subcontractors $0
Total Direct Costs $10,900
Overhead on General Contractors Wads 20.0% 2,196 -
Overhead on Subcontractors Work 20.0%1 1 1 D
Subtotal $13,176
_ taxes&insurance 1.5% 198
bonds 2,D% 254
TOTAL CHANGE PROPOSAL $13,637
APPROVED BY., DATE:
� e
Russell Road Maintenance Faciil Job# 880-025A
Mike Wedech GonstrucSon !nc — Soffit Replacement
',.... unit
LABOR Qty unit cost labor cost note
Supervision/Carpenter 130.5 hr 60,00 7,830
Project Manager 8 hr 60.00 480
Administrative 6 hr 50.00 300
hr 0.00 0
hr 0.00 0
Subtotal Labor cost $8,610
unit
MATERIALS/EQUIPMENT qty unit cost
Alld Lumber 1 is 250.00 260
Staging Rental 1 Is 400.00 400
0 Is 0.00 0
Subtotal Material/equipment $650
SUBCONTRACTS
0 Is 0,00 0
0 Is 0.00 0
0 is 0.00 0
0 Is 0
0 Is o
Subtotal Subcontractors $0
Total Direct Costs $9,260
Overhead on General Contractors Work 20.0% 1.852
Overhead on Subcontractors Work 20.0"% 0
Subtotal $11,112
taxes&insurance 116% 167
bonds 2.0% 222
TOTAL CHANGE PROPOSAL 11,s01
APPROVED BY: DATE:
i
Russell Road Maintenance Facit' Jab# 860.027A
Mike Werlech Construction Jnc Bldg A Replace Beams/Oelaminated Main Suport
beams East& West
unit
LABOR Qtv unit cost labor cost note
Supervision/Catpenter 126.0 1 hr 60.00 7,660
Project Manager 8 hr 60.00 480
Administrative 4 hr 50,00 20,D
0 hr 0.00 0
0 hr 0.00 0
Subtotal Labor cost $8,240
unit
MATERIALSIEOUIPMENT city unit cost
AM Lumber 1 Is 25.00 26 _
Scafoling 1 is 400.00 400
0 Is 0.00 0
0 Is 0.00 0
0 Is 0.00 0
Subtotal MateriaVegnipmant $425
SUBCONTRACTS
0 Is 0.00 0
0 Is 0.00 0
0 Is 0.00 0
0 Is 0
0 Is 0
Subtotal Subcontractors $0
Total Direct Costs $8,668
Overhead on General Contractors Work 20,0% 1,733
Overhead on Subcontractors Woi&'' 20.0% - 0
Subtotal $10,398
taxes&Insurance 115% 156
bonds 2.0% 208
TOTAL CHANGE PROPOSAL $10,762
APPROVED BY: DATE:
- 0
Russell Road MaIntenan I Job Y 860-030A
Mike Werlech Construction Inc Conduit in Exterior Wall
unit
LABOR Qty unit cost laboroost note
Suparvlsion 7 hr 60.00 42D
Carpenter 18 hr 50.00 1,080
Administrative 4 hr 50,00 200
0 hr 0.00 0
0 hr 0.00 0
o hr 0.00 0
0 hr 0.00 0
Subtotal Labor cost $1,700
unit
MATERIALS/EQUIPMENT v unit cost
0 s 0.00 0
0 Is O.0o 0
0 Is O.00 0
0 Is 0.00 0
O Is U0 0
0 to 0.00 0
Subtotal Material/equipment $0
SUBCONTRACTS
� 0 Is 0,00 0
D Its 0.00 0
0 is 0.00 0
0 Is 0
C Is 0
Subtotal Subcontractors $O
Total Direct Costs $1,700
0
Overhead on General Contractors Work 20.0% 340
Overhead on Subcontractors Work -20.0% 0 _
Subtotal $2,040
taxes&Insurance 1.5% 31
bonds 2,0% 41
TOTAL CHANGE PROPOSAL $2,111
APPROVED BY: DATE:
Russell Road Maintenance Facility Job# 860.031A
B-
Mike Werlech Construction Inc Replace Drain Fittings
unit
LABOR Oty unit cost laborcost note
Supervision hr 60.00
Carpenter 8 hr 60.00 480
Adminisha8ve 2 hr 50.00 100
0 hr 0,00 0
0 hr 0.00 0
Subtotal Labor cost $500
unit
MATERIALSlEQUIPMENT Cltv unit cost
0 Is 0.00 0
0 Is 0.00 0
❑ is 0.00 0
0 is 0.00 0
0 Is 0.00 0
i
Subtotal Materiallequipment $0
SUBCONTRACTS
0 is 0.00 0
0 Is 0.00 0
0 Is 0.00 0
0 _Is ❑
0 Is 0
Subtotal Subcontractors $❑
Total Direct Costs $580
Overhead on General Contractors Work 20.0% 116
Overhead on Subcontractors Work 20,0% 0
Subtotal $696
taxes&insurance 1.5% 10
bonds 2.0% 14
TO AL CHANGE PROPOSAL 720
APPROVED BY: DATE:
e
Russell Road Maintenance Faclfi Job 8 660.032A
sm Ed �. 11
Mike Werlech Construction Inc Ext W1 Bldg -S. Wall Sheetrock
unit
LABOR i City unit cost labor cost note
Supervislon 19.0 hr 60.00 1,140
Ca enter • 104.6 hr 60.00 6,270
Administrative 6.0 hr 50.00 400
PM 16 hr 60.00 960
0 hr 0.00 0
Subtotal Labor cost $8,770
unit
MATERIALS/EQUIPMENT city unit cost _
Alki Lumber 1 Is 52,00 52
McLendon Hardware 1 Is 310,00 310
Drywall 618x 4xI 2 sheets 13. ea '18.95 248
0 Is 0.00 0
0 In 0.00 0
Subtotal Materlalloquipment $608
SUBCONTRACTS '
0 Is 0.00' 0
0 Is 0.00 0
0 Ila 1 0.00 0
0 Ils 1 0
6 is 0
Subtotal Subcontractors s0
Total Direct Costs $9,378
Overhead on General Contractors Workl 20.0%1 1.876
Overhead on Subcontractors Work 20,0% 0
.._-.—..__..._ Subtotal $11,254
taxes&Insurance 1.5% 169
bonds 2.0% 225
TOTAL CHANGE PROPOSAL " $11,648
APPROVED BY: DATE:
C y C
' � m
' o V
o J
J
Q Q
£ N c o N o 0 0 0 o a
� T N
a O ❑
p a
Z M tp N N N N N N N M
O I^i
W LU N
a C3 N d 2> > 2 d > v v 2 R
p > > a> >Q o> >0 >0 >0 o> >a o> > > > > o a
1 Z ¢ o o 0 0 0 0 0
= m N N N N N N N N N N N N N N N yp
U T �
0 0 e
a
0 0 o o 0 0 0 0 o N
Ov E
a o o v
M f9 N N m T N O] FA 9 N T
a
m Q o 0 0
O o 0 0 0 0 0 0
W N O O O O O M O O
W F5! fA yy, fA e9 � N N N
R
m oo a
OU o 0 0 0 0 0 0 0 0 0 0 0 o d U -o2 a s
w m m N p o 0 0 0 o m 0 0 0 OO
N cJ N
' Q F9 f9 f9 fA t9 FA b9 69 fR fA !9 f9 FA fA L .0 L L
u U U U U
rr
0
O fll O fn Q ❑ LL LL LL `2 V
W N N N N N 0 D N N a
Z N
Z
J
O a ¢ m r
L
U o l0
N
W c ¢ N 8 9 m
�p N
3 d y E
c O
W lO W N 'O N N N 3 m IOL d N U D > D S
w O m ¢ ¢ ¢
m a, rn _ 2i n -ap D D O
V d p y ry a
0 N C2 < N
m u ¢ ¢
REQUEST FOR MAYOR'S SIGNATURE
KENT Please Fill in All Applicable Boxes S
J
Routing Information (ALL REQUESTS MUST FIRST BE ROUTED THROUGH THE LAW DEPARTMENT)�
Ori inator: Charlie Lindsey Phone (Originator): 5081
Date Sent: 02/17/2009 Date Required: 02/23/2009
Return Signed Document to: Rosalie CONTRACT TERMINATION DATE: 2/15/2009
VENDOR NAME: Mike Werlech, Const. DATE OF COUNCIL APPROVAL: 2/2/2009
Brief Explanation of Document: This is Change Order 4 for the damage repair at Russell Road
Maintenance Facility Roof & Wall. These were items that were not included in the contract but
needed to be repaired.
I
All Contracts Must Be Routed Through The Law Department
(This area to be completed by the Law Department)
Received:
Approval of Law Dept.:
Law Dept. Comments;
Date Forwarded to Mayor: °Y,'
Shaded Areas T_u_Oe�-C9f�apletgd_p_p$_ - stration Staff
(� l5 C r U lS
t
Received: I �» ti in
r-I,
Recommendations and Comments: CITY OFKENI
CITY CLERK l �_
Disposition: G/Za/G7/QPe / CT '
Date Returned:
i
I