Loading...
HomeMy WebLinkAboutPK07-177 - Change Order - #4 - Mike Werlech Construction - Russell Rd Maintence Facility Roof & Wall Improvements - 02/20/2009 iit(I i— � " i �i(€(�I�) FjF . Records M age m e I,} II KENT {ialiCi�iI�CI Document 1- � ucJ����v(� 77 v tr i ail t�i�'i 11 Pt#T II � (� r s CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed. If you have questions, please contact City Clerk's Office. Vendor Name: Mike Werlech, Const. Vendor Number: 91668 JD Edwards Number Contract Number: This is assigned by City Clerk's Office Project Name: Russell Road Maintenance Facility Roof & Wall Description: ❑ Interlocal Agreement ® Change Order ❑ Amendment ❑ Contract ❑ Other: Contract Effective Date: 6/27/2008 Termination Date: 2/15/2009 Contract Renewal Notice (Days): 30 Number of days required notice for termination or renewal or amendment Contract Manager: Charlie Lindsey Department: Parks/Facilities Detail: (i.e. address, location, parcel number, tax id, etc.): 5821 S 240th Kent --- ---- - - ----- ----- - -- - -- - ----- S:Publlc\RecordsManagement\Forms\ContractCover\adcc7832 11/08 � KENT CHANGE ORDER NO. 4 NAME OF CONTRACTOR: Mike Werlech. Const. ("Contractor") CONTRACT NAME & PROJECT NUMBER:Russell Road Maintenance Facility Roof & Wall Improvements ORIGINAL CONTRACT DATE: June 27, 2007 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Provide an ice and water shield over the roof sheathing over the interior spaces of the Radio Shop, the Truck Garage and the Water Shop. $ 9,880.00 Redo interior Water Shop $15,675.00 Add more sleepers on roof at installation area $ 1,508.00 Materials to repair dry rot $66,000.00 Labor to repair dry rot $71,344.00 2. The contract amount and time for.performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $429,066.00 (including applicable alternates and WSST) Net Change by Previous Change Orders $278,397.41 (incl. applicable WSST) Current Contract Amount $707,463.41 (incl. Previous Change Orders) Current Change Order $164,407.00 Applicable WSST Tax on this Change $ 14,796.63 Order Revised Contract Sum $886,667.04 CHANGE ORDER - 1 OF 3 Original Time for Completion October 8, 2007 (insert date) Revised Time for Completion under July 5, 2008 prior Change Orders (insert date) Days Required (t) for this Change 225 calendar days Order Revised Time for Completion February 15, 2009 (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: ' (signature) j % (sl natur ) Print Name I l A "� c, '' Ppint,ddmi . � Its 24< irS _ram' Its, (title) le) DATE: DATE: d CHANGE ORDER - 2 OF 3 APPROVED AS TO FORM: (applicable if Mayor's signature required) eta K nt La partment Wedechchaneeore4shed row I CHANGE ORDER 3 OF 3 CITY OF KENT, WASHINGTON KT Contract Change Proposal PROJECT: Russell Road Maintenance Facility DATE: December 29,2008 Roof&Wall Improvements CHANGE PROPOSAL NO: 4 revised O: Contractor In connection with your Contract with the City of Kent please furnish your proposal for performing the changes outlined as following: At Building A provide an ice&water shield over the roof sheathing over the interior spaces u. of the Radio Shop, the Truck Garage,the Garage, and the Water Shop. This area is approximately 5200 sf. to- TECHNICAL REPRESENTATIVE:WAGNER ARCHITECT BY: Greg�pi§rs DATE: 12/29/08 O: Owner's Project Representative e propose to perform all changes described in the above request for a total DDITIO DEDUCTION to the Contract sum of: c- O (Washington State Sales Tax not included) d We have attached hereto Cost Estimate Detail Sheets Nos.1,60—022A- 0 CK e foregoing amount covers all direct and indirect costs related to this change and to the effect of the change on C- the remainder of the project. All other provisions remain In full force and effect. e request the completion date be extended XX calendar days because f;t s work. p` j i ,mil BY: DATE CONTRACTOR TO: CITY OF KENT Z We have carefully examined the foregoing proposal and find it to be in order and the cost reasonable. We O 1 therefore recommend its acceptance. 0 Z w U A G QeV, M C tt ITIECt5 BY: DATE: 5 -7 TECHNICAL REPRESENTATIVE The foregoing proposal is accepted and authorizes the performance of the changes specified. This Instrument when signed below, constitutes authority to proceed with the above work. A formal change Order in this amount Z will follow. Billings cannot be honored for this change until issuance of the formal Change Order. O NAUTHORIZED BY: O H Date a I �I � I Russell Road Maintenance FaciliE Jabal Jab#1 86O.029A ° Water Stop Shield Mike Weriecll Construction Inc Ice&Water Shield unit LABOR Qty unit cost laborcost note j Supervision 7 hr MOD 420 Carpenter 65.5 fir 60.O1) 3,930 Administrative _ 5 hr 50.00 250 PM 6 hr 60.00 480 0 hr 0,00 0 0 hr 0.00 0 0 hr 0.00 0 Subtotal Labor cost $5,060 unit MATERIALSIEQUIPMENT Gly Unit cost Ice and avatar sheild 1 Is Z876.00 2 875 i 0 Is 0.00 D 0 Is 0.00 D 0 Is 0100 0 0 Is 0,00 0 i Subtotal Materiallequipment $2,676 SUBCONTRACTS 0 is 0.00 0 0 is 0.00 0 D Is D.BD D 0 Is 0 0 Is 0 Subtotal Subcontractors so Total Direct Casts $7,955 overhead on General Contractors Work 20.0% 1,691 Overhead on Subcontractors Work 20.0% 0 Subtotal $9 646 taxes 8:insurance 1.5% 143 bonds 2.0% 191 TOTAL CHANGE PROPOSAL 9,880 APPROVED BY: DATE: CITY OF KENT, WASHINGTON °ANT Contract Change Proposal PROJECT: Russell Road Maintenance Facility DATE: December 30, 2008 Roof&Wall Improvements CHANGE PROPOSAL NO: 5 revised 0: Contractor n In connection with your Contract with the City of Kent please furnish your proposal for performing the changes outlined as following: At Building A Water Shop provide R-30 roof insulation to replace the existing insulation that u as removed. In order to support the new insulation replace the existing 2 x 6 roof joists with 2 x 10 joists. Option 1 provide a fully taped vinyl facing attached to the bottom of the joists. Option 2 provide new wallboard 1.55 ceiling to replace the existing. The area of the room is approximately 1000 sf. TECHNICAL REPRESENTATIVE:WAGNER ARCHITERTZ BY: Gr Somers DATE: 12130/08 O: Owner's Project Representative e propose to perform all changes described in the above request for a total ADDITIOWDR901MM to the Contract sum of: $ 15,675 (Fifteen Thousand Six Hundred Seventy Five dollars) ii O e have attached hereto Cost Estimate Detail Sheets Nos. 860-033A. 036A revised. O CK The foregoing amount covers all direct and indirect costs related to this change and to the effect of the change on IL he remainder of the project. All other provisions remain in full force and effect. e request the completion date be extended XX calendar days becausVI thA work. n lY BY: �,r�` �.,,�.... DATE i d `cfSf � Y CONTRACTOR "y TO: CITY OF KENT Z. We have carefully examined the foregoing proposal and find it to be in order and the cost reasonable. We 0 therefore recommend its acceptance. 0 Z w O =� U BY'---- w TECHNICAL REPRESENTATIVE W The foregoing proposal Is accepted and authorizes the performance of the changes specified. This instrument when signed below, constitutes authority to proceed with the above work. A formal change Order in this amount z ill follow. Billings cannot be honored for this change until issuance of the formal Change Order. O NAUTHORIZED BY: O � Date - e Russell Road Maintenance Facili Job# ' 860-033A Mike Werlech Constructlon Inc Garage Doors Building A unit LABOR city unit cost labor cost note Su ervlslon 4.5 hr 60.00 270 Carpenter t hr 60.00 60 Administrative 4 hr 50.00 200 PM ,.; hr 00,00 �800 0 hr 0,00 0 Subtotal labor cost offi$66Q b unit MATERIALSIEOUIPMENT junitcost Doorman Service Co. Y 684.00 684 0 is 0.00 0 0 Is 0.00 0 0 Is 0.00 0 o is o.00 0 Subtata3 MaterlaUequtpmant $684 SUBCONTRACTS 0 Is 0.00 0 0 Is 0.00 0 0 �19 0.00 .0 0 Is 0 0 Is 0 Subtotal Subcontractors so Total Direct Coate Overhead on General Contractors Work 2M% 2- 3 Overhead on Subcontractors Work 20,0% 0 Subtotal 3q¢t7 � taxes&insurance 1.5% —27 bonds 2.0% —86R TOTAL CHANGE PROPOSAL < ji6M— 1 - APPROVED 6Y: DATE: - - 0 Russell Road Maintenance Fail Jab,E 660-036-A REVISED Mike Werlech Construction Inc New R-38 unfaced insulation,Vlsqueen Draywall fire taped Water shop unit LADOR Oty unit 1 cost labor Post note Su ervision/Car enter 121.5 hr 50.00 7,200 Administrative 4 hr 55.00 220 PM B hr 60.00 4B0 0 hr 0.00 0 0 hr 0.00 0 0 hr 0.00 1 D 0 hr 0.00 0 Subtotal Labor cost $7,990 unit MATERIALSIEQUIPMENT Igty unit cost McLendon Hardware 1 I�1 109.00 199 Drvwall 1 Is 1,709.00 Subtotal MatcrlaVaquipment $199 SUBCONTRACTS Firstline Systems 1 Is 1,197.00 1197 JDTElecbkal 1 Is 2,021.00 2.021 0 Is 0.00 1 0 0 Is 0 0 Is 0 Subtotal Subcontractors $3,2t8 Total Direct Costs $11,407 Overhead on General Contractors Work 20.0% 1,635 Overhead an Suboontractors Work 20.0% 644 5ublotal $13,566 taxes&insurance 1.6% 205 bonds 2.07* 274 TOTAL CHANGE PROPOSAL $14,167 ', APPROVED BY: DATE: CITY OF KENT, WASHINGTON !� Contract Change Proposal PROJECT: Russell Road Maintenance Facility DATE: December 29,2008 Roof&Wall Improvements CHANGE PROPOSAL NO: 13 revised O: Contractor Q In connection with your Contract with the City of Kent please furnish your proposal for performing the changes outlined as following: At Building A, at the roof framing, modify details 31A-4 and 1(83.1 to make the following LL revisions: 1Z1. Add a 2 x 4 sleeper between each sleeper required in the contract,so they are at 12"oc above the roof joists. Nail these sleepers into the roof joists with two 16d nails per sleeper at each joist. Extend all sleepers over the top plate and wall sheathing so that the extension matches the depth of the metal siding,but a minimum of 1 ''/d'. Block under the sleepers at the top plate to match the slope of the roof. Nail each sleeper to the top plate with two 16d nails. 2. Install continuous insect screening across the bottom of the sleepers, and install the siding up to the bottom of the sleepers. 3. Blocking at the edges of each roof sheathing panel perpendicular to the sleepers is no longer required.. 4. Hold the insulation in the roof cavity to below the sleepers so there is an unrestricted 1 ''/z" of air flow. 5. Confirm or provide a vapor barrier is below the insulation with an ASTM of E96. As an alternate,paint the ceiling below each enclosed joist space with a vapor barrier paint with an ASTM of E96. 6. This is shown in the attached sketch CP13-8-A4. TECHNICAL REPRESENTATIVE: WAGNER ARCHITECTS Yi Gre o rs DATE; 12/29/08 O: Owner's Project Representative e propose to perform all changes described in the above request for a tota ADDITIO EDUCTION to the Contract sum of: $ owes THoL4SA-nit7 (Washington State Sales Tax not included) a We have attached hereto Cost Estimate Detail Sheets Nos. f260— 0 5A O The foregoing amount covers all direct and indirect costs related to this change and to the effect of the change on the remainder of the project. All other provisions remain in full force and effect. e request the completion date be extended XX calendar days becausepf t1brs work. L E BY DATE: { .�} rl C7 CONTRACTOR TO: CITY OF KENT Z We have carefully examined the foregoing proposal and find it to be in order and the cost reasonable. We O therefore recommend its acceptance. Q � I z w /7 0 WAG J DATE: TECHNICAL REPRESENTATIV CITY OF KENT WASHINGTON Contract Change Proposal The foregoing proposal is accepted and authorizes the performance of the changes specified. This instrument when signed below, constitutes authority to proceed with the above work. A formal change Order in this amount ill follow. Billings cannot be honored for this change until issuance of the formal Change Order. O N AUTHORIZED BY: O Date a e - Russel!Road Maintenance Fac1l' lob N 860-035A r- Mike Werlech Construction Inc Add more sleepier-on roof atlnstalation areas unit LABOR My unit coat labor met note Supervision 5 hr MOD 300 Carpenter 0.0 hr 80.00 0 Administrative 5 hr 60.00 250 0 hr 0.00 0 0 hr 0.00 0 0 hr 0.00 0 0 hr 0.00 0 Subtotal Labor cost - S65D unit MATERIALSIEQUIPMENT unit cost 2x4xi6 171 ea 5.60 058 0 is 0.00 0 0 Is 0.00 0 0 is 0.00 0 0 Is 0.00 0 0 Is 0.00 0 Subtotal Materialtequipment $358 SUBCONTRACTS _ 0 Is 0,00 0 0 Is 0.00 0 0 Is 0.00 0 0 is 0 0 is 1 0 Subtotal Subcontractors $0 Total Direct Costs $1,508 Overhead on General Contractors Work 20.0% 0 Overhead on Subcontractors Work 20.0% 0 Subtotal $11S08 taxes&insurance 1.5% 0 bonds 2.0%1 1 1 0 TOTAL CHANGE PROPOSAL $1,608 APPROVED BY.- DATE, CITY OF KENT, WASHINGTON ° T Contract Change Proposal PROJECT: Russell Road Maintenance Facility DATE: December 30, 2008 Roof&Wall Improvements CHANGE PROPOSAL NO: 15 revised O:Contractor n In connection with your Contract with the City of Kent please furnish your proposal for performing the changes outlined as following: (200) 2X6 Roof Joists @$300 ea. L (2) 3 1/8" X 19 Y='Glu-Lam beams @$3000 ea. _ TECHNICAL REPRESENTATIVE: WAGNER ARCHITECT BY: re omers DATE: 12/3oi08 O: Owner's Project Representative e propose to perform all changes described in the above request for a total ADDITIOW111906FOR99N to the Contract sum of: —t $ 66,000(Sixty Six Thousand dollars) c( co (Washington State Sales Tax not included) � We have attached hereto Cost Estimate Detail Sheets Nos. O X The foregoing amount covers ail direct and Indirect costs related to this change and to the effect of the change on C- the remainder of the project. All other provisions remain in full force and effect. e request the completion date be extended XX calendar days because of this work. BY: `✓ DATE: I )3 / 0ly CONTRACTOR TO: CITY OF KENT Z We have carefully examined the foregoing proposal and find it to be in order and the cost reasonable. We O therefore recommend its acceptance. 0 Z w 1 w A N Q C EC BY: L DATE: I O/� 'TECHNICAL REPRESENTATIVE The foregoing proposal is accepted and authorizes the performance of the changes specified. This instrument when signed below, constitutes authority to proceed with the above work. A formal change Order in this amount Z ill follow. Billings cannot be honored for this change until issuance of the formal Change Order,. O NAUTHORIZED BY: F s Date a e CITY OF KENT, WASHINGTON T Contract Change Proposal PROJECT: Russell Road Maintenance Facility DATE: December 29,2008 Roof&Wall Improvements CHANGE PROPOSAL NO, 16 O:Contractor In connection with your Contract with the City of Kent please furnish your proposal for performing the changes outlined as following: Roof and wall framing repairs to Building A due to rot repair Including: L" South wall studs &plates, Sheetrock replacement, Beams, and Soffit. W TECHNICAL REPRESENTATIVE:WAGNER ARCHITE S BY: Gre Somers DATE: 12/29/08 O: Owner's Project Representative e propose to perform all changes described in the above request for a total ADDITIONfDEDUCTION to the Contract sum of: —� $71,344(Seventy One Thousand Three Hundred Forty Four dollars) C (Washington State Sales Tax not included) a e have attached hereto Cost Estimate Detail Sheets Nos. 860-005A, 006A, 008A, 025A, 027A, 030A, 031A, p 032A. 0- he foregoing amount covers all direct and Indirect costs related to this change and to the effect of the change on the remainder of the project. All other provisions remain in full force and effect. e request the completion date be extended XX calendar days beo f this work. f BY: ! DATE: C NTRACTOR TO: CITY OF KENT Z We have carefully examined the foregoing proposal and find it to be in order and the cost reasonable. We O therefore recommend its acceptance. d I r7 Z LU v N —CtUTEC=Xf BY: DATE: TECHNICAL REPRESENTATIVE The foregoing proposal is accepted and authorizes the performance of the changes specified. This instrument when signed below, constitutes authority to proceed with the above work. A formal change Order in this amount Z III follow. Billings cannot be honored for this change until issuance of the formal Change Order. O AUTHORIZED BY: Date Russell Road Maintenance Facil' Job# 880-OOSA Mike Werlech Construction Inc Replace Rotted Studs,Add A-34 Clips @ new/reframe unit LABOR Qty unit cost labor cost note Carpenter 1325 hr 60,00 7,950 Supervision 76 hr 60.00 4,550 PM 8 hr 60,00 480 Administration 6 hr 50,00 400 hr 0.00 0 hr 0.00 0 hr 0.00 a hr 0.00 0 subtotal Labor cost $13,390 unit MATERIALS/EQUIPMENT qty unit cast Alki Lumbdr 1 Is 1.400,00 1,400 Is 0.00 0 Is 0.00 a Is 0.00 0 Subtotal Materfal/equipment $1,400 - i SUBCONTRACTS _ 0 Is 0.00 0 0 Is 0.00 a Cl is 0.00 0 j 0 Is 0 0 is 0 Subtotal Subcontractors $0 Total Direct Costs $14,790 Overhead on General Contractors Work 20.0% 2,95E Overhead an Subcontraotors Work 20.0% 0 Subtotal $17,748 taxes&insurance 1.50/0 266 bonds 2.00/6 355 TOTAL CHARGE PROPOSAL $18,369 APPROVED BY: DATE: e . Russell Road Maintenance Facil' dab 11 880-005A Mike Werlech Construction !nc Exploring For Rot unit LABOR City unit cost labor cost note Supervision 4.6 hr 60.00 270 Carpentry 19.0 hr 60.00 1,140 Adminisbetiva 4.0 hr 60.00 2001 PM 8.0 hr 60.00 48D hr 0.00 0 hr 0.00 0 hr �0.00 0 Subtotal Labor cost $2.090 unit MATERIALSIEQUIPMENT unit cost 0 Is 0.00 0 0 Is O.DO 0 0 is 0,00 0 0 Is 0.Do D 0 Is 0.00 0 0 Is 0.00 0 Subtotal Material/equipment $Q SUBCONTRACTS 0 Is 0.00 0 0 Is 0.00 Q D Is 0,00 tl 0 Is 0 0 Ils 1 0 Subtotal Subcontractors $0 Total Direct Costs $2,090 Overhead an General Contracinrs Work 20.0%1 1 418 Overhead on Subcontractors Work 20.0% 0 Subtotal $2,808 taxes 8 insurance 1.5% 88 bonds 2.0% 60 TOTAL CHANGE PROPOSAL $2,698 APPROVED BY; DATE: s Russell Road Maintenance Faci it dab 41 860.00SA r Mike Werlech Construction Inc Temporary Plywood unit LABOR Oty unit cost labor cost note Carpenter 150.0 hr 60.00 9,000 Suparvisicn 13.0 hr 60.00 780 PM 8.0 hr 6D.00 400 Administralion 5.0 hr 60.00 250 hr 0.00 D hr 0.00 0 hr 0.D0 0 o hr 0.00 0 Subtotal Labor cost $10,510 unit MATERIALS/EQUIPMENT unit cost Alkt Lumber 1 Is 470.00 470 0 Is 0.00 0 0 Is 0.00 D 0 is 0.00 0 Subtotal MateriaUaciuipment $470 SUBCONTRACTS 0 Is 0.06 0 0 Is 0.00 0 0 Is 0.00 0 0 Is 0 0 Is 0 Subtotal Subcontractors $0 Total Direct Costs $10,900 Overhead on General Contractors Wads 20.0% 2,196 - Overhead on Subcontractors Work 20.0%1 1 1 D Subtotal $13,176 _ taxes&insurance 1.5% 198 bonds 2,D% 254 TOTAL CHANGE PROPOSAL $13,637 APPROVED BY., DATE: � e Russell Road Maintenance Faciil Job# 880-025A Mike Wedech GonstrucSon !nc — Soffit Replacement ',.... unit LABOR Qty unit cost labor cost note Supervision/Carpenter 130.5 hr 60,00 7,830 Project Manager 8 hr 60.00 480 Administrative 6 hr 50.00 300 hr 0.00 0 hr 0.00 0 Subtotal Labor cost $8,610 unit MATERIALS/EQUIPMENT qty unit cost Alld Lumber 1 is 250.00 260 Staging Rental 1 Is 400.00 400 0 Is 0.00 0 Subtotal Material/equipment $650 SUBCONTRACTS 0 Is 0,00 0 0 Is 0.00 0 0 is 0.00 0 0 Is 0 0 Is o Subtotal Subcontractors $0 Total Direct Costs $9,260 Overhead on General Contractors Work 20.0% 1.852 Overhead on Subcontractors Work 20.0"% 0 Subtotal $11,112 taxes&insurance 116% 167 bonds 2.0% 222 TOTAL CHANGE PROPOSAL 11,s01 APPROVED BY: DATE: i Russell Road Maintenance Facit' Jab# 860.027A Mike Werlech Construction Jnc Bldg A Replace Beams/Oelaminated Main Suport beams East& West unit LABOR Qtv unit cost labor cost note Supervision/Catpenter 126.0 1 hr 60.00 7,660 Project Manager 8 hr 60.00 480 Administrative 4 hr 50,00 20,D 0 hr 0.00 0 0 hr 0.00 0 Subtotal Labor cost $8,240 unit MATERIALSIEOUIPMENT city unit cost AM Lumber 1 Is 25.00 26 _ Scafoling 1 is 400.00 400 0 Is 0.00 0 0 Is 0.00 0 0 Is 0.00 0 Subtotal MateriaVegnipmant $425 SUBCONTRACTS 0 Is 0.00 0 0 Is 0.00 0 0 Is 0.00 0 0 Is 0 0 Is 0 Subtotal Subcontractors $0 Total Direct Costs $8,668 Overhead on General Contractors Work 20,0% 1,733 Overhead on Subcontractors Woi&'' 20.0% - 0 Subtotal $10,398 taxes&Insurance 115% 156 bonds 2.0% 208 TOTAL CHANGE PROPOSAL $10,762 APPROVED BY: DATE: - 0 Russell Road MaIntenan I Job Y 860-030A Mike Werlech Construction Inc Conduit in Exterior Wall unit LABOR Qty unit cost laboroost note Suparvlsion 7 hr 60.00 42D Carpenter 18 hr 50.00 1,080 Administrative 4 hr 50,00 200 0 hr 0.00 0 0 hr 0.00 0 o hr 0.00 0 0 hr 0.00 0 Subtotal Labor cost $1,700 unit MATERIALS/EQUIPMENT v unit cost 0 s 0.00 0 0 Is O.0o 0 0 Is O.00 0 0 Is 0.00 0 O Is U0 0 0 to 0.00 0 Subtotal Material/equipment $0 SUBCONTRACTS � 0 Is 0,00 0 D Its 0.00 0 0 is 0.00 0 0 Is 0 C Is 0 Subtotal Subcontractors $O Total Direct Costs $1,700 0 Overhead on General Contractors Work 20.0% 340 Overhead on Subcontractors Work -20.0% 0 _ Subtotal $2,040 taxes&Insurance 1.5% 31 bonds 2,0% 41 TOTAL CHANGE PROPOSAL $2,111 APPROVED BY: DATE: Russell Road Maintenance Facility Job# 860.031A B- Mike Werlech Construction Inc Replace Drain Fittings unit LABOR Oty unit cost laborcost note Supervision hr 60.00 Carpenter 8 hr 60.00 480 Adminisha8ve 2 hr 50.00 100 0 hr 0,00 0 0 hr 0.00 0 Subtotal Labor cost $500 unit MATERIALSlEQUIPMENT Cltv unit cost 0 Is 0.00 0 0 Is 0.00 0 ❑ is 0.00 0 0 is 0.00 0 0 Is 0.00 0 i Subtotal Materiallequipment $0 SUBCONTRACTS 0 is 0.00 0 0 Is 0.00 0 0 Is 0.00 0 0 _Is ❑ 0 Is 0 Subtotal Subcontractors $❑ Total Direct Costs $580 Overhead on General Contractors Work 20.0% 116 Overhead on Subcontractors Work 20,0% 0 Subtotal $696 taxes&insurance 1.5% 10 bonds 2.0% 14 TO AL CHANGE PROPOSAL 720 APPROVED BY: DATE: e Russell Road Maintenance Faclfi Job 8 660.032A sm Ed �. 11 Mike Werlech Construction Inc Ext W1 Bldg -S. Wall Sheetrock unit LABOR i City unit cost labor cost note Supervislon 19.0 hr 60.00 1,140 Ca enter • 104.6 hr 60.00 6,270 Administrative 6.0 hr 50.00 400 PM 16 hr 60.00 960 0 hr 0.00 0 Subtotal Labor cost $8,770 unit MATERIALS/EQUIPMENT city unit cost _ Alki Lumber 1 Is 52,00 52 McLendon Hardware 1 Is 310,00 310 Drywall 618x 4xI 2 sheets 13. ea '18.95 248 0 Is 0.00 0 0 In 0.00 0 Subtotal Materlalloquipment $608 SUBCONTRACTS ' 0 Is 0.00' 0 0 Is 0.00 0 0 Ila 1 0.00 0 0 Ils 1 0 6 is 0 Subtotal Subcontractors s0 Total Direct Costs $9,378 Overhead on General Contractors Workl 20.0%1 1.876 Overhead on Subcontractors Work 20,0% 0 .._-.—..__..._ Subtotal $11,254 taxes&Insurance 1.5% 169 bonds 2.0% 225 TOTAL CHANGE PROPOSAL " $11,648 APPROVED BY: DATE: C y C ' � m ' o V o J J Q Q £ N c o N o 0 0 0 o a � T N a O ❑ p a Z M tp N N N N N N N M O I^i W LU N a C3 N d 2> > 2 d > v v 2 R p > > a> >Q o> >0 >0 >0 o> >a o> > > > > o a 1 Z ¢ o o 0 0 0 0 0 = m N N N N N N N N N N N N N N N yp U T � 0 0 e a 0 0 o o 0 0 0 0 o N Ov E a o o v M f9 N N m T N O] FA 9 N T a m Q o 0 0 O o 0 0 0 0 0 0 W N O O O O O M O O W F5! fA yy, fA e9 � N N N R m oo a OU o 0 0 0 0 0 0 0 0 0 0 0 o d U -o2 a s w m m N p o 0 0 0 o m 0 0 0 OO N cJ N ' Q F9 f9 f9 fA t9 FA b9 69 fR fA !9 f9 FA fA L .0 L L u U U U U rr 0 O fll O fn Q ❑ LL LL LL `2 V W N N N N N 0 D N N a Z N Z J O a ¢ m r L U o l0 N W c ¢ N 8 9 m �p N 3 d y E c O W lO W N 'O N N N 3 m IOL d N U D > D S w O m ¢ ¢ ¢ m a, rn _ 2i n -ap D D O V d p y ry a 0 N C2 < N m u ¢ ¢ REQUEST FOR MAYOR'S SIGNATURE KENT Please Fill in All Applicable Boxes S J Routing Information (ALL REQUESTS MUST FIRST BE ROUTED THROUGH THE LAW DEPARTMENT)� Ori inator: Charlie Lindsey Phone (Originator): 5081 Date Sent: 02/17/2009 Date Required: 02/23/2009 Return Signed Document to: Rosalie CONTRACT TERMINATION DATE: 2/15/2009 VENDOR NAME: Mike Werlech, Const. DATE OF COUNCIL APPROVAL: 2/2/2009 Brief Explanation of Document: This is Change Order 4 for the damage repair at Russell Road Maintenance Facility Roof & Wall. These were items that were not included in the contract but needed to be repaired. I All Contracts Must Be Routed Through The Law Department (This area to be completed by the Law Department) Received: Approval of Law Dept.: Law Dept. Comments; Date Forwarded to Mayor: °Y,' Shaded Areas T_u_Oe�-C9f�apletgd_p_p$_ - stration Staff (� l5 C r U lS t Received: I �» ti in r-I, Recommendations and Comments: CITY OFKENI CITY CLERK l �_ Disposition: G/Za/G7/QPe / CT ' Date Returned: i I