RE: Settlement between City of Kent and Rreef
S. 228th St./BNSF Grade Separation Project and driveway closure;
RREEF property onS. 228th St.
Dear M Iund�4i9
When countersigned by an authorized RREEF representative, this letter will serve as a written
settlement agreement between the City of Kent and RREEF ("the Parties") as to site
modifications agreed to by the Parties related to the City of Kent's proposed closure of a
driveway from S. 228th Street into the RREEF property in connection with the City's proposed
construction of an overpass over the nearby BNSF tracks across S. 228th Street. A drawing
showing the site and the driveway to be closed (location #3 shown on the drawing) is attached
as Exhibit 1 to this Agreement.
The City of Kent agrees to the following in order to better accommodate trucks entering the
RREEF property through two existing driveway locations on 83rd Ave. S.:
Pursuant to a plan proposed by RREEF and prepared by Lance Mueller & Associates (copy
attached) for RREEF, there exist four areas where improvements/modifications will be made.
Three areas are within the site and the fourth is the existing southerly driveway on 83rd Avenue
S., all as shown on Exhibit 1 to this Agreement. Specific site modifications proposed for each of
the "improvement locations are depicted on Exhibit 1 and are described in further detail on the
spreadsheet attached as Exhibit 2 to this Agreement.
The City agrees to provide a left turn pocket northerly on 83rd Avenue S. to the existing
southerly driveway on 83rd Avenue S.
The City agrees to perform, at its expense, all of the proposed changes at the existing southerly
driveway off of 83rd Avenue S. and improvement area number 3 as shown on Exhibit 1 and as
In described in exhibit 4.
The City agrees to compensate RREEF for the costs of work at the two other "internal"
4-3
improvement areas shown on Exhibit 1, in the lump sum amount of $4,060.00.
U
3
MAYOR SUZETTE COOKE City of Kent Public Works Department
Larry R. Blanchard, Public Works Director
The City agrees to compensate RREEF for the costs of landscaping the berm that will be
disturbed as part of the City's road construction and at the new driveway that City is
constructing on 83rd Ave. S. which will become the main entrance to the site. The
compensation will be in the amount of $41,109.35 including tax as estimated on the proposals
from Signature Landscaping attached as Exhibit 3. This makes the total compensation to
RREEF $45,169.35.
By executing this Agreement, RREEF accepts the payment and work to be performed and made
by the City as full compensation for any and all claims that RREEF might otherwise assert in
connection with the City's project and driveway closure.
Sincerely, Authorized RREEF Representative
Mark Howlett, P.E. = f 3
Engineering Manager !!
Enclosures (4):
Exhibit 1 - Sheet SS-1 - Truck Turning Radius Study
Exhibit 2 - Cost Estimate
Exhibit 3 - Landscape Services Proposal
Exhibit 4 - Installation of Additional Items
cc: Tim LaPorte, P.E., Deputy Public Works Director
I
_____ -- -- �- _ _-_-gym- I __--�--�— —�• _'—`.�
—
Ni
tI ---
- _'
-------
" A
I I
' L
° -- -- - - --; ISi
w -�- --� --4
i gIle
el,—
le
g
'EBrd Atl6.SOUTH
\ wa
TRUCK TURNING RADIUS STUDY sho study
t `•°°• "°°"°" ` ""°°'""' Kent 228 Business Park
NK%K WR W W=
i uc uecaiocf• sum.a,,w"asua•a°a aaa aau
RREEF S. 228th Industrial Complex
Cost estimate for improvements to better accommodate truck traffic from the north driveway
Exhibit 2
Location 1
Item Unit Cost
Remove/replace C-curbing $ 200.00
New subgrade and paving $ 700.00
Irrigation modifications $ 300.00
Landscaping $ 250.00
Total $ 1,450.00
Location 2
Remove/replace C-curbing $ 200.00
New subgrade and paving $ 700.00
Irrigation modifications $ 300.00
Landscaping $ 250.00
Total $ 1,450.00
Subtotal $ 2,900.00
Engineering/ Allied Costs @ 30% $ 870.00
Contingency 10% $ 290.00
Landscaping $ 41,109.35
Grand Total $ 45,169.35
Exhibit 3
EXHIBIT 3 <
f'R OG RF.w St VG ; RH.=x Y CC Er, I COt,4 tom:I T'7 E G',
customer Proposal
ACCOUNT NAME: Kent228 DATE: 5/1/2008
JOB CONTACT: Gregg Backlund WRITTEN BY: JLK
MGMT COMPANY RREEF JOB NUMBER:
PHONE NUMBER (206)484-5937
Site Address: 8010 S.228th Kent WA Billing Address: 12720 Gateway Drive,
Suite 200
Project Description: South ex-entrance landscape.Install fill soil to new grade,install topsoil,
transplanting, lantin and barking.
JOB TASK Materials Qty. Size NOTE
Install fill soil(use onsite fill soil) labor only 60 yrds
install compost Cedar Grove compost 25 yrds
Transplanting Selected plants
Planting Sweet gum 3 2"cal
Douglas fir 3 8'-10,
Wild rose 4 #2
Burning bush 6 #2
Yellow twig dogwood 6 #2
Miscanthus grass 5 #1
Sprea 5 #1
Carex grass 5 #1
Day lily 16 #1
Nandina 5 #2
Barking Medium fine 20 yrd
install dry stream Basalt&cobble 50 In ft
Irrigation 1 zone 1 each
Equipment Dingo 3 day
Bobcat front loader 1 day
CLIENT SIGNATURE:
Subtotal $ 11,315.00
Tax% $ 1,018.35
Total $ 12,333.35
Special Notes:
Payment due upon receipt of invoice.Late payments subject to a 1.5%per month fee.
+� � t AN[3SCAPE SEFibICS INO
. tlllllYi[Itlltf�lJtftit�r. •i r
Customer Proposal
ACCOUNT NAME: Kent 228 DATE: 5/1/2008
JOB CONTACT: Gregg Backlund WRITTEN BY: JLK
MGMT COMPANY RREEF JOB NUMBER:
PHONE NUMBER (206)484-5937
Site Address: 8010 S.228th Kent WA Billing Address: 12720 Gateway Drive,
Suite 200
Project Description: East entrance.Transplanting,install soil,planting and barking.
JOB TASK Materials -Qty. Size NOTE
Transplanting Selected plants
Install compost Cedar Grove compost 15 yrds
Install dry stream Basalt&cobble 70 In ft
Planting
Sweet gum 2 2"cal Burning bush 15 #2
Miscanthus grass 10 #1
Sprea 11 #1
Carex grass 13 #1
Day lily 11 #1
Indian hawthorn 15 #5
Crimson pygmy barberry 13 #5
Barking Medium fine 15 yrds
Reconfigure irrigation 1 zone 1 each
CLIENT SIGNATURE:
Subtotal $ 9,450.00
Tax% $ 850.50
Total $ 10,300.50
Special Notes:
Payment due upon receipt of invoice.Late payments subject to a 1.5%per month fee.
P 12 C}G FtF�SI V'fc ( R1-=f'Et:T E!'� ( 4CS h1=.TIT'i kr 4�
Customer Proposal
DATE: 5/1/2008
ACCOUNT NAME: Kent 228 WRITTEN BY: JLK
JOB CONTACT: Gregg Backlund JOB NUMBER:
MGMT COMPANY RREEF
PHONE NUMBER (206)494-5937
Site Address: 8010 S.228th Kent WA Billing Address: 12720 Gateway Drive,
Suite 200
Project Description: East perimeter Cut out new planting beds,install irrigation,plant and bark.
JOB TASK
Matertals Q Size NOTE
4 each
Cut out new beds 15 yrd
Install compost Cedar Grove compost
Install irrigation 2 zones 2 each
Planting Burning bush 24 #2
Rock rose 24 #5
Raphiolepsis 24 #5
Spirea 24 #1
Crimson pygmy barberry 28 #5
Day lily 28 #1
Wild rose 11 #2
Yellow twig dogwood 9 #2
Nandina 9 #2
Barkig Medium fine 10 yrd
CLIENT SIGNATURE:
Subtotal $ 16,950.00
Tax% $ 1,525.50
Total $ 18,475.50
Special Notes:
Payment due upon receipt of invoice.Late payments subject to a 1.5%per month fee.
°
IN-
D
mm- O � c m
a z -mi
o G) o cn G)
m n
ao m -
o r
O
m
O
O
0
C°O
go
°
DO
0
O
v w0 DK D D
m D X n z
D = G) —ZI D O
z
D
z = v U) °0 c) .
z m O G) z
m N z C D o0
co
03
m
v z v
_ w
2 D
Z C
C
�+ t
m
X
cn
X Z
' z
Cb `� z 0
b
co m
0 0,cn
cn
m �
m
.� _c n
----------------------
tag
,-n Z- Dili
//�q���� fib.
0 0.0
. '31 '
z s
CD
mr.
G) G
N
O v
h GO) b =
"o `� p p
N
-------------------•-- i 0 �/.����r�
m
X
/ .N+
cQ
X m N
En N
� mO n (L1
m G)
m �
CN
A N
N A
� I I
0
U
0
m
v 9 z
< Z
z Eu m
G) ` coo
yz
Z(f)
a
mm
-4 r
o
v vi
� oz z
Z .(
C
N
a T.
g
m $
z �
2 �
W �
O �
N
W
00 m U
Nz
>
I ,gym' F- a z
i rm; zLLI
Lu
\/ Q v- �� N
a �
;"
O O
g
o
Z
Z
LJJ cd
$ ibm
LLI
o a
� a
w� � e
�y pcn
In
�. Q
N �"� •�~• mow-•i N J
O � o
m m i
�,� •• � � �a 0
8 b
(D o E)
5 s't
1 1
c�
<o co y
W 7 D ° e W o tt O
co ° <o p,a 1
m ° O
m 1 O 1
cn O 1
1 . /
1 1
i �
00
D
1 eo odd ope OD OD D I ti
W Po
°°dap
I OD � OD G,�cdO pQ 1
W oD
0
1 <o odo 04 1 K
V , D
m
1 1 H
N n?
1 1 �
� 13
m
z
D o �
� < N
m N
t
Z
�E e
m
®®®
m o Om®® y
v �
F p Z
z •• �
yz N
m
.. r
Exhibit 4
The City agrees, at its expense to provide labor and materials to install the
following additional items at locations No. 1 and No. 3.
Location No. 1
The City will construct and install the new sign according to the plans
submitted by Lance Mueller architects at the new driveway location on 83rd
Ave. S., the exact location will be agreed upon mutually by the City and
RREEF management.
Location No. 3
1. The City will remove and dispose of the existing monument sign.
2. The City will remove the existing asphalt and concrete pavement and C-
curbing at the existing driveway to be closed and install approximately
60 cubic yards of fill to level out the area. The fill material will be in the
form of imported clean gravel borrow.
3. The City will construct new C-curbing as necessary to delineate the
parking area.