Loading...
HomeMy WebLinkAboutPK08-209 - Change Order - #1 - Transtech Electric, Inc. - Arbor Heights 360 Park - 05/07/2008 & Records Mla eme t ,. KENT WASHINGTON Document -f 777, 00 - CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: EA 4e C Contract Number: Tkie Ic rice; ..... I. assigned by Mary Simmons Y Vendor Number: Project Name: A Contract Effective Date: LA ! E�V ll Contract Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Department: Fy-S Abstract: ADCL7832 07/02 • KENT W A S H I N O T O N CHANGE ORDER NO. 1 NAME OF CONTRACTOR: Transtech Electric Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Arbor Heights 360 - Transtech Electric ORIGINAL CONTRACT DATE: April 7, 2008 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Remove and replace 6 1/2' by 11 1/2' sidewalk/ramp at Arbor Heights 360 Skate Park in Kent, Washington as described in the contractor's proposal dated April 21, 2008 attached and incorporated as Exhibit A. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $ 8,500.91 (including applicable alternates and WSST) Net Change by Previous Change Orders $ 0.00 (incl. applicable WSST) Current Contract Amount $ 8,500.91 (incl. Previous Change Orders) Current Change Order $ 2,488.00 Applicable WSST Tax on this Change $ 223.92 Order Revised Contract Sum $11,212.83 CHANGE ORDER - 1 OF 3 Original Time for Completion 5/8/08 (insert date) Revised Time for Completion under na prior Change Orders (insert date) Days Required (f) for this Change +5 calendar days Order Revised Time for Completion 5/13/08 (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: (signature) (signature) Print Name: T. w.:tw Prin e: Jeff Watling Its 11��w .� Its Parks Director I ' (title) (title) DATE: �� ' U DATE: CHANGE ORDER - 2 OF 3 1 � APPROVED AS TO FORM: (applicable if Mayors signature required) Kent Law Department Arbor Heights 360-Transtech#1 CHANGE ORDER - 3 OF 3 APr • 21 . 2008 12:41PM No • 14H r • Trans� 471-p r *n"' E.ler tric Inc,, April 21, 2008 Shane M. Gilbertson Kent Parks and Rec 220 Fourth Ave S Kent WA 98032 Subject: Sidewalk/Ramp at Kent Skate Park Our price to remove and replace the sidewalk/ramp on the southwest corner of 166th and 240th will be $2488, Work to be done in conjunction with other skate park work for traffic control purposes. • Includes: Removal and Replacement of 6 1/2' by 11 1/2' sidewalk/ramp. Excludes: Bond, Survey, Asphalt Patching, and Permits (Other than electrical), If you have any questions please call me at 253-872-5346, otherwise please sign to approve and fax back to 253-872-5346 to schedule the work. Sincerely, Ken McEntyre Estimator x Signed x 212aq b 0, Print Name X. -n b Date Transtech Electric,Inc 9012 5.208`h St Kent, WA 99031 Phone 253.372.5343 Fax 253.872.5346 General Contractor ID*TRANSEI05409 - Electrical Contractor iD#TRANSEZ055DT