CHANGE ORDER NO, 46
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR: IV Constructors, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Town Square Plaza — IV Constructors
ORIGINAL CONTRACT DATE: May 21, 2007
This Change Order amends the above-referenced contract; all other provisions of the
contract that are not inconsistent with this Change Order shall remain in effect. For valuable
consideration and by mutual consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified as
follows:
Provide all labor, materials, and equipment necessary to:
Deletion of Change Order #35 and addition of Change Proposal #39
Rev 1; Revise fountain can PVC conduit male adapter to include
sealing lock nuts per electrical inspector direction at the Town Square
Plaza project in Kent, Washington as shown in the contractor's
proposal dated April 2, 2008 attached and incorporated as Exhibit A.
2. The contract amount and time for performance provisions of Section II
"Compensation," and Section III, "Time for Completion," are hereby modified as
follows:
Original Contract Sum, $3,737,448.00
including applicable alternates and
W SST.
Net Change by Previous Change Orders $ 830,329.69
(Incl. applicable WSST)
Current Contract Amount $4,941,501.80
(incL Previous Change Orders)
Current Change Order $ 4,155.00
Applicable WSST Tax on this
PP Change $ 373.95 9
Order
Revised Contract Sum $4,946,030.75
Original Time for Completion 1/31/08
(insert date)
Revised Time for Completion under +120 calendar days
prior Change Orders
(insert date)
Days Required f for this Change Order +0 calendar days
Revised Time for Completion 6/1/08
r
. t
Pursuant to Section 1 of the Contract executed by the parties, the Contractor accepts all
requirements of this Change Order by signing below. Also, pursuant to the above-referenced
contract, Contractor agrees to waive any protest it may have regarding this Change Order and
acknowledges and accepts that this Change Order constitutes final settlement of all claims of
any kind or nature arising from or connected with any work either covered or affected by this
Change Order, including, without limitation, claims related to contract time, contract
acceleration, onsite or home office overhead, or lost profits.
The parties whose names appear below swear under penalty of perjury that they are
authorized to enter into this contract modification, which is binding on the parties of this
contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this
project to be consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will
become effective on the last date written below.
CONTRACTOR: CITY OF KENT:
By: By:
(signature) % (signature)
Print Name: Gary Johnson P int d e: Suzette Cooke
Its Protect Manager It Mayor
Title) 029i�lee)
DATE: 466 DATE:
APPROVED AS TO FORM:
Ke t L D partment
Town Square Plaza #46 - JV Constructors
CONTRACT MODIFICATION-2 OF 2
ez Wk-`+ P Pg1of1
JV CONSTRUCTORS - CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE
ISSUING OFFICE CONTRACT NO. CHANGE PROPOSAL
CITY OF KENT PR 2007-03 NO.39 Rev 1
DEPT OF PARKS TOWN SQUARE PLAZA REVISE FOUNTAIN CAN
& RECREATION PVC CONDUIT MALE
ADAPTER TO INCLUDE
SEALING LOCK NUTS PER
ELECTRICAL INSPECTOR
DIRECTION
CONTRACTOR'S PROPOSAL-CHANGE IN CONTRACT PRICE
Net Increase Net Decrease Calendar Days Increase
4,155 Concurrent
COST PROPOSAL
Item Quanti Unit Description Unit Price Labor U/P Total
Revise Fountain Can PVC conduit male
1. 40 EA adapter to include 1" steel nipple and two
sealing lock nuts
1 Lot Fox Electric 4/2/08 cost proposal 3,61300 3,613
Sub-Total 3,613
JV Constructors Markup 15% 542
Grand Total 4,155
i
I
Date Typed Name and Title Signature
4/2/08 Gary A.Johnson,Project Manager
Page 1 of 1
Gary Johnson
From: "Al Glenewinkel" <AI@foxelectric net>
To: "Gary Johnson" <gary@lvconstructors com>
Cc: 'Brian Levenhagen" <BJ Leven hagen @ci.kent.wa.us>
Sent: Wednesday, Apri( 02, 2008 2.11 PM
Attach: CopSummary No16 Sealing Locknuts Revised.xls
Subject: Sealing Locknuts
Gary,
Since Alan Berg won't allow sealing locknuts on the PVC fittings I have
revised my Change Order.We will now connect a short piece of rigid conduit
to the PVC,a sealing lockout on the outside and a regular locknut on the
inside.
Al
4/2/2008
Fox Electric Company
Change Order Proposal
Sub Contractor Breakdown Summary
Project Name: Town Square plaza COP No. 16 Revised
Project Number: 75042 Date: 4/2/2008
Description: Install 2 sealing locknuts at each of 40 FIC
1. CRAFT LABOR COSTS
a craft labor costs from breakdown $ 58.48 40 Hrs.
b. foreman (Includes supervision) $ 62.40 1 Hrs.
c. lead foreman (Includes supervision) $ 63.17 0 Hrs.
DIRECT LABOR SUBTOTAL $ 2,40160
1 CRAFT LABOR COSTS $ 2,40160
2. MATERIAL COSTS
a material costs from breakdown $ 454.40
b. freight costs (Itemize) $ -
2.MATERIAL COSTS $ 454.40
3 OVERHEAD
a NTE 15% portion of 1 $ 360.24
b. NTE 15% portion of 2 $ 68.16
3 OVERHEAD $ 428.40
4. EQUIPMENT COSTS
a. owned equipment(per spec approved source) $ -
b. rental equipment(1 day additional snorkel lift) $ -
4 EQUIPMENT COSTS $
5 SUBCONTRACTORS
a. $
$
5.SUBCONTRACTORS $
6. PROFIT
a Labor NTE 10% $ 276.18
b Material NTE 10% $ 5226
c. Equipment NTE 10% $ -
d. Sub Contractors NTE 10% $ -
6. PROFIT $ 32844
TOTAL COST 1 THRU 6 $ 3,612.84
FOX ELECTRIC - PO BOX 630 - KENT, WA - 98035-0630
COP 15
Change Order Proposal Estimate
PROJECT: Kent Town Square Plaza
Description: Install 2 sealing locknuts at each of 40 FIC
LOCATION:
------------------ -------- _--------------
U UNIT MATERIAL LABOR LABOR
MATERIAL QUAN PRICE COST UNIT HOURS
Sealing Locknuts E 80 1.93 154.40 0.15 12.00
1" RIGID NIPPLE E 80 2.93 234.40 0.25 20.00
Standard locknuts E 80 0.34 27.20 0.10 8.00
1" PVC Female Adapters E 80 0.48 38.40 0.10 8.00
------------------------------- -------- -------- ----------- ------------ -----------
--------- ---------- -------------
MATERIAL LABOR
MATERIAL COST HOURS
--------- ----------------
TAKEOFF TOTALS 454.4 48
LAYOUT AND CONDUIT TRACING 0
DEMO LABOR 0
EQUIP RENTAL 0 0
MISC HARDWARE 0
----------- -----------
TOTAL MATERIALS/HOURS 454.4 40
FOX ELECTRIC - PO BOX 630 - KENT, WA - 98035-0630
Y ,
Page 1 of 2
Gary Johnson
From: "Al Glenewmkel" <Al@foxelectric net>
To: <BERA235@LNI WA GOV>
Cc: "Gary Johnson" <garyQvconstructors.com>; 'Brian Levenhagen"
<BJLevenhagen@ci kentwa.us>, <LEIS235@LNI WA.GOV>
Sent: Wednesday, March 26, 2008 10 20 AM
Attach: JboxEntrySeal doc
Subject: FW Junction Box Seal
Al,
My sketch showed a sealing locknut on the outside of the can Are you requiring a sealing locknut inside as well?Also,why do
you want a bonding bushing in the junction box?The conduit has a direct connection to the can
Al Glenewmkel
Fox Electric
206-963-7245
--Original Message----
From: Levenhagen, Brian [maiito:B]Levenhagen@ci.kent.wa.us]
Sent:Tuesday,March 25, 2008 8:41 AM
To: al@foxelectric.net
Cc: Gary Johnson; Michael Lamb
Subject: FW: Junction Box Seal
Al,
Are you fine with what he has requested?
Brian
From: Berg,Allan O (LNI) [mailto:BERA235@LNI.WA.GOV]
Sent:Tuesday,March 25,2008 8:19 AM
To: Levenhagen,Brian
Cc: Leighton,Steven (LNI)
Subject: RE:Junction Box Seal
Good Morning Brian, The only problem I see with this application is we will need to install bonded bushings and make sure
we install sealing locknuts, otherwise the installation looks ok Have a great day, Al
From: Levenhagen, Brian [mailto:BJLevenhagen@ci.kent.wa.us]
Sent:Monday, March 24, 2008 1:06 PM
To: Berg,Allan O (LNI)
Subject: FW:Junction Box Seal
Allen,
At our meeting a couple weeks ago for Kent Town Square Plaza we discussed how to get the
conduit the feeds into the fountain compliant with the electrical code. Attached you will find
a sketch that details how our electrician plans on solving that problem. Could you please
look it over and let me know if the design will work and let me know of any additional
comments, questions, or concerns you have regarding this issue.
Thanks,
Brian Levenhagen
Kent Parks & Open Spaces
253-856-5116
3/26/2008
Page 2 of 2
From:AI Glenewnkel[maiito:Al@foxelectric.net]
Sent Monday, March 24, 2008 12:20 PM
To: Gary Johnson; Levenhagen, Brian; Michael Lamb
Subject:)unction Box Seal
Bnan,
Attached please find a sketch showing our plan to provide a waterproof seal at the conduit entry to the FIC junction
box.
Al
3/26/2008
� s
t
In order to provide a seal at the Fountain In A Can
junction box, we propose to cut back the existing 1"
PVC conduit, install a 1"PVC female adapter and
install a 1"rigid nipple with a sealing locknut.
I"PVC FA
I"sealin lockout
1"Plastic Bushing
1 1"standard lockout
I" Rigid Steel Nipple
Fountain Junction Box
pt-07_ a77
REQUEST FOR MAYOR'S SIGNATURE
KENT Please Fill in All Applicable Boxes
WASHINGTON
Routing Information (ALL REQUESTS MUST FIRST BE ROUTED THROUGH THE LAW DEPARTMENT)
Originator: r��'� 1 � �� �% Phone (Originator):
Date Sent: U Date Required.
Return Signed Document to:`- /,g h7j-Ufi CONTRACT TERMINATION DATE:
VENDOR NAME:J�/ L����l �l DATE OF COUNCIL APPROVAL:
Brief Explanation of Document:
All Contracts Must Be Routed Through the Law Department
(This Area to be Completed 13y the Law Department)
Received-
Approval of Law (Dept.: �
Law Dept. Comments: t4
Date Forwarded to Mayor-
Shaded Areas to Be Completed by Administration Staff
Received:
Recommendations & Comments:
Disposition: 6 Z orA �v.
71
2
(J � � s1i 10 a
Date Returned.
Iane581-0 3/05