HomeMy WebLinkAboutPK07-078 - Change Order - #22 - JV Constructors - Town Square Plaza - 01/30/2008 Records Management
KENT Document
WAS N I NOTON
'.Jn xrM
xU:S���':l1yylna,
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed, if you have questions, please contact Mary Simmons, City
Clerks Office.
Vendor Name:
Contract Number: 67 -0 /0
T{iie ie n+eei'+n enf tiv AAnri Cimmnne
Vendor Number.
Project Name: Alit/ lz CO ZZ
Contract Effective Date:
t- fit -
Contract Termination Date: 0 �
Contract Renewal Notice (Days): N
Number of days required notice for termination or renewal or amendment
Contract Manager:
Department:
Abstract:
ADCL7832 07/02
KENT
WPS NINGTGN
CHANGE ORDER NO. 22
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR: JV Constructors, Inc. ("Contractor")
CONTRACT NAME&PROJECT NUMBER: Town Square Plaza—JV Constructors
ORIGINAL CONTRACT DATE• May 21, 2007
This Change Order amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual
consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled *'Description of Work," is hereby modified as follows:
Provide all labor, materials, and equipment necessary to:
Revise light poles and lamps at the Town Square Plaza project in Kent,
Washington as shown in the Contractor's Proposal dated December 21, 2007
attached and incorporated as Exhibit A.
2. The contract amount and time for performance provisions of Section II "Compensation," and
Section III, "Time for Completion," are hereby modified as follows.
Original Contract Sum, $3,737,448.00
including applicable alternates and WSST.
Net Change by Previous Change Orders $ 623,715.64
(zncl applicable WSST)
Current Contract Amount $41361,163.64
(incl. Previous Change Orders)
Current Change Order ($ 24,360.00) Credit
Applicable WSST Tax on this Change Order ($ 2,168.04) Credit
Revised Contract Sum $ 493349635.60
Original Time for Completion 1/31/08
(insert date)
Revised Time for Completion under N/A
prior Change Orders
(insert date)
Days Required ± for this Change Order 0 calendar days
Revised Time for Completion 1/31/08
Pursuant to Section I of the Contract executed by the parties, the Contractor accepts all requirements of
this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to
waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change
r �
Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work
either covered or affected by this Change Order, including, without limitation, claims related to contract time,
contract acceleration, onsite or home office overhead, or lost profits
The parties whose names appear below swear under penalty of perjury that they are authorized to enter
into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project to be
consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement,which will become effective on the
last date written below.
CONTRACTOR: CITY OF KENT:
By: By:
(s ignature) (signature)
Print Name- Gary Johnson Print N m : Suzette Cooke
Its Project Manager Its Mayor
/,-(Title)
DATE: t�l/G 'i✓ DATE:
APPROVED AS TO FORM:
KeiJ Law Depar6ent
Town Square Plaza#22—J V Constructors
CONTRACT MODIFICATION-2 OF 2
Pg1of1
JV CONSTRUCTORS - CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE
ISSUING OFFICE CONTRACT NO. CHANGE PROPOSAL
CITY OF KENT PR 2007-03 No,27
DEPT OF PARKS TOWN SQUARE PLAZA Revise Light Poles and Lamps
& RECREATION
CONTRACTOR'S PROPOSAL- CHANGE IN CONTRACT PRICE
Net Increase Net Decrease Calendar Days Increase
(24,360) Concurrent
COST PROPOSAL
Item Quanti Unit Description Unit Price Labor U/P Other/Total
I 'Revise Light Poles and lamps
Fox Electric 10/24/07 proposal - - (21,183)
I
- rt -
II' I - - ------ - -
i i I
i
------- --- - - -
I
Sub-Total (21,183)
JV Constructors Mar ku 15% ,
- P 3177- -- - — -- - - ( )
Grand Total (24,360)
Date Typed Name and Title Si nature
12/21/07 Gary A.Johnson,Project Manager
Fox Electric Company
Change Order Proposal
Sub Contractor Breakdown Summary
Project Name: Town Square plaza COP No. 11
Project Number. 75042 Date: 10%24107
Description: Eliminate 11 LUMEC poles and provide 2 Valmont poles
1. CRAFT LABOR COSTS
a. craft labor costs from breakdown $ 5803 -41.0 Hrs.
b.foreman(includes supervision) $ 62.40 0 Hrs.
c. lead foreman (includes supervision) $ 63.17 0 Hrs.
DIRECT LABOR SUBTOTAL $ (2,379 23)
1.CRAFT LABOR COSTS $ (2,379.23)
2. MATERIAL COSTS
a. material costs from breakdown (20,453.74)
b.freight costs (itemize) $
2.MATERIAL COSTS $ (20,453.74)
3. OVERHEAD
a. NTE 15% portion of 1 $ -
b. NTE 15% portion of 2 $
&OVERHEAD $
4. EQUIPMENT COSTS
a. owned equipment(per spec approved source) $
b. rental equipment(1 day additional snorkel lift) $ -
4.EQUIPMENT COSTS $
& SUBCONTRACTORS
a. CRANE SERVICE $ 1,500.00
&SUBCONTRACTORS $ 1,500.00
6. PROFIT
a. Labor NTE 10% $
b. Material NTE 10% $ -
c. Equipment NTE 10% $ -
d. Sub Contractors NTE 10% $ 150.00
6. PROFIT $ 150.00
TOTAL COST 1 THRU 6 $ (21,182.97)
FOX ELECTRIC - PO BOX 630 - KENT,WA - 98035-0630
COP 6
Change Order Proposal Estimate
PROJECT: Kent Town Square Plaza
WORK:
LOCATION:
--------- --- ------------ ------------
U UNIT MATERIAL LABOR LABOR
MATERIAL QUAN PRICE COST UNIT HOURS
------- ----- ---------
ELIMINATE LUMEC POLES E 11 -2,060.00 -22660.00 -3.00 -33.00
PROVIDE VALMONT POLES E 2 2,228.13 4456.26 5.00 10.00
POLE BASES E 9 -250.00 -2250.00 -2.00 -18.00
E 0 0.00 0.00 0.00 0.00
9 0 0.00 0.00 0.00 0.00
E 0 0.00 0.00 0.00 0.00
------------------------------- -------- ---------- ----------- ------------ -----------
------- ------ --------- ----
MATERIAL LABOR
MATERIAL COST HOURS
TAKEOFF TOTALS -20453.74 -41.00
LAYOUT AND CONDUIT TRACING 0
DEMO LABOR 0
EQUIP RENTAL TRUCK MOUNTED CRANE 0
MISC HARDWARE 0
---- ----------- -----------
TOTAL MATERIALS/HOURS -20453.74 -41
FOX ELECTRIC - PO BOX 630 - KENT, WA - 98035-0630
Page 1 cf
Gary Johnson
From: 'Al Glenewinkel"<al@foxelectric net>
To: "Gary Johnson"<gary@jvconstructors.com>
Sent: Wednesday,October 24, 2007 4:13 PM
Attach: CopSummary Not City of Kent Conduits.xis; CopSummary No2 Foam Blocks at Seat Wails x1s; CopSummary
No3 PSE Conduit x1s;CopSummary No4 Wire Size.xls; CopSummary Nos Hydrel Lights.xls; CopSummary No6
New 30ding.x1s; CopSummary Nob Additional Circuits to Street Soliardsxls;CopSummary No9 Carosel.xls;
CopSummary Nol0 Additional Conduits to Fountain.xls; CopSummary No11 RevisePolel-ights.xls;change order
log Update 10-24-07.xls
Subject: Change Orders
Gary,
My change orders were getting out of sequence since I hadn't made a log of what I gave you.I am attaching a submittal log that
reflects all the changes I have processed to date.I will also include a copy of every change order with it's new number.I am sorry
for the confusion but this is what I had to do to straighten things out.If you don't want to re-number what I have already
submitted,send me a copy and I will correct the others.
Al Glenewinkel RECEIVED
Fox Electric
Mobile: 2o6-963-7245 OCT 2 5 2007
Office: 253-852-0540
FAX:283-854-613g ,N CONSTRUCTORS
s
a
r
10/25/07