Vendor Name: JV
�
Contract Number:
Vendor Number: 1 S——1 2
Project Name: TM-y-\- 5q["Ou'-9
Contract Effective Date: f r L
Contract Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager:
Department:
Abstract:
ADCL7832 07/02
KENT
WASHINGTON
CHANGE ORDER NO. 21
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR: JV Constructors, Inc ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Town Square Plaza—JV Constructors
ORIGINAL CONTRACT DATE: May 21, 2007
This Change Order amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual
consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled"Description of Work," is hereby modified as follows:
Provide all labor, materials, and equipment necessary to:
Revise irrigation controller per submittal review comment at the Town Square
Plaza project in Kent, Washington as shown in the Contractor's Proposal dated
December 21, 2007 attached and incorporated as Exhibit A.
2. The contract amount and time for performance provisions of Section 1I "Compensation," and
Section 1I1, "Time for Completion,"are hereby modified as follows:
Original Contract Sum, $3,737,448.00
including applicable alternates and WSST.
Net Change by Previous Change Orders $ 616,392.11
(incl applicable WSST)
Current Contract Amount $41353,840.11
(incl Previous Change Orders)
Current Change Order $ 69725.00
Applicable WSST Tax on this Change Order $ 598.53
Revised Contract Sum $4,361,163.64
Original Time for Completion 1/31/08
(insert date)
Revised Time for Completion under N/A
prior Change Orders
(insert dale)
Days Required ± for this Change Order 0 calendar days
Revised Time for Completion 1/31/08
Pursuant to Section 1 of the Contract executed by the parties, the Contractor accepts all requirements of
this Change Order by signing below Also, pursuant to the above-referenced contract, Contractor agrees to
waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change
T _
Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work
either covered or affected by this Change Order, including, without limitation, claims related to contract time,
contract acceleration, onsite or home office overhead, or lost profits.
The parties whose names appear below swear under penalty of perjury that they are authorized to enter
into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project to be
consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement,which will become effective on the
last date written below.
CONTRACTOR: CITY OF KENT:
By: By. —
(signature) (signature)
Print Name- Gary Johnson Print N Suzette Cooke
Its Project Manager Its Ma or
C/ Z���rle) (Tit�)
DATE:- DATE: /
� —
APPROVED AS TO FORM:
Kent aw DepJrtment
Town Square Plaza#21—JV Constructors
CONTRACT MODIFICATION-2 OF 2
Pg1of1
JV CONSTRUCTORS - CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE
ISSUING OFFICE CONTRACT NO. CHANGE PROPOSAL
CITY OF KENT PR 2007-03 No.26
DEPT OF PARKS TOWN SQUARE PLAZA Revise Irrigation Controller
& RECREA fION Per Submittal Review
Comment
CONTRACTOR'S PROPOSAL- CHANGE IN CONTRACT PRICE
Net Increase Net Decrease Calendar Days Increase
6,725 Concurrent
I
COST PROPOSAL �-
Item Quantity Unit Description - — Unit Price Labor U/P Other/Total
I
Substitute Toro Controller for the specified
1. 1 Ea IRambird Controller
�— Garrison Creek 12/17/07 proposal 5,598
2 1 Lot Provide conduit to building exterior for 250
continuation by others _
I
i I
I
Sub-Total 5,848
i --- - JV Constructors Markup__ - 15% - - — _ - 877
Grand Total 6,725
i
Date Typed Name and Title i 7 ture
12/21/07 Gary A. Johnson,Project Manager 3 '—--
Garrison Creek Landscaping, Inc.
Change Order
PO Box I511 -
Kent WA 98035-1511 Date #
253-373-9438 fax 253-458-0864 IV17/2007 4305
brett@garrisoncrk.com
Customer Name � Job Location
JV Constructors Inc Town Square Plaza
PO Box 80346 Toro Controller
Seattle, WA 98108-0346
206-762-4219 fax 206-768-6969
Project
Description Quantity Total
Credit for Rainbird ESP LX Controller installed 1 -289.00
Requested Toro SSAK-12WS 36NS3 installed 1 5,88650
All material is guaranteed to be as specified All work to be in a workmanlike manner to
the best of our ability and experience. Subtotal SS 597.50
Any alteration or deviation from the above specifications involving extra costs will be done
only upon a written change order.The cost will become an extra charge over and above the Sales Tax
estimate S0 00
All elements of this agreement are contingent upon accidents or delays beyond our control.
This estimate does not include material price increases,or additional labor&materials Total S5,597 50
which may be required should unforeseen problems arse after the work has started
Phone# Fax# E-mail
253-373-9438 253-458-0864 gwrisoncrk@yahoo corn