Vendor Name: c 1 V Cm S+Y ,C.'t'
Contract Number: Pro
Thic is r.cc;r mn -1 . AAnr 4Z; r. nne
...... ... .......y....., h , v Y ......II� ...............
Vendor Number:
Project Name: �C�Luv� �q I�_Gt I a �` co iP b
Contract Effective Date: y �
rM\ opQ�
Contract Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contra t Mana
c ger:
ZD S
Department:
p 1
Abstract:
ADCL7832 07/02
L"
1 .
KENT
Wq- iry GTON
CHANGE ORDER NO. 18
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR- JV Constructors, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Town Square Plaza—JV Constructors
ORIGINAL CONTRACT DATE- May 21, 2007
This Change Order amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual
consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified as follows:
Provide all labor, materials, and equipment necessary to:
Add isolated reinforcing steel to lithocrete trench drain structure at the Town
Square Plaza project in Kent, Washington as shown in the Contractor's Proposal
dated December 11, 2007 attached and incorporated as Exhibit A.
2. The contract amount and time for performance provisions of Section II "Compensation," and
Section III, "Time for Completion," are hereby modified as follows:
Original Contract Sum, $3,737,448.00
including applicable alternates and WSST.
Net Change by Previous Change Orders $ 5729440.26
(incl applicable WSST)
Current Contract Amount $4,309,888.26
(incl Previous Change Orders)
Current Change Order $ 6,090.00
Applicable WSST Tax on this Change Order $ 542.01
Revised Contract Sum $41316,520.27
Original Time for Completion 1/31/08
(insert date)
Revised Time for Completion under N/A
prior Change Orders
(insert date)
Days Required ± for this Change Order 0 calendar days
Revised Time for Completion 1/31/08
Pursuant to Section 1 of the Contract executed by the parties, the Contractor accepts all requirements of
this Change Order by signing below Also, pursuant to the above-referenced contract, Contractor agrees to
waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change
Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work
either covered or affected by this Change Order, including, without limitation, claims related to contract time,
contract acceleration, onsite or home office overhead, or lost profits.
The parties whose names appear below swear under penalty of perjury that they are authorized to enter
into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project to be
consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will become effective on the
last date written below.
CONTRACTOR: CITY OF KENT:
By: A41By:
(signature) (s+gnahrre)
Print Name: Gary Johnson Print m Suzette Cooke
Its Project Manayer Its Mayor
tile) (T le)
DATE: �z DATE:
APPROVED AS TO FORM:
Ke t Law Department
Town Square Plaza#18—JV Constructors
CONTRACT MODIFICATION-2 OF 2
Pg 1 of 1
JV CONSTRUCTORS - CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE
ISSUING OFFICE CONTRACT NO. CHANGE PROPOSAL
CITY OF KENT PR 2007-03 No.23
DEPT OF PARKS TOWN SQUARE PLAZA Add Isolated Reinforcing
& RECREATION Steel to Lithocrete Trench
Drain Structure
CONTRACTOR'S PROPOSAL- CHANGE IN CONTRACT PRICE
Net Increase Net Decrease Calendar Days Increase
6,090 Concurrent
--- 1 --J- - - - COST PROPOSAL
Item Quanti _, Unit Description Unit Price ' Labor U/P Other/Total
` Install izolated reinforcement in Lithocrete trench
1 I
drain structure
27 MH Belarde Company 12/5/07 proposal 2,974_
_ 3 MH Belarde Company 12/6/07 proposal 2,08_8
1— Lot Puget Sound Steel 12/4/07 Fabrication invoice 234
Reverse Lithocrete form work at fountain heads to
2. allow completion of remaining Lithocrete
pavement around the fountain
16 MH Belarde Company 12/6/07 proposal Incl Above
- I I
Sub-Total 5,296
_ JV Constructors Markup 15%
Grand Total 6,090
E
Typed Name and Title r mature Gary A.Johnson,Project Manager ��_�
TIMEAND NrArERrAIs woRuslrEEr
EWo
Project Kent Town Plaza _ PROJ.NO. 727_ DATE: 12/5/2007
Cintomer J V Comm ictols COR 4 4 �LWO# 727_
WORK DESCRIPTION: _ CYCLE
Tie rebar at trench dram
HOURS RA rF TOT•V
CLASSIFICATION REGULAR I OVI RTIMA RRGUUR UVYRTTMB COST
LABORER-FOREMAN } 5229 6737
LABORER-JOURNEYMAN — — _ --- — 5047 64.75
CEMENT MASON- FOREMAN 62 15 I 80,00
CEMENT MASON-JOURI%TYMAN 27 00 58 74 _ 75,09 t,585 98
LABOR INEFFICIENCIES _ -
TOTAL LABOR
: :� :;4`r'•?�y;"5;xn" >""".:`F. .{ i"� 0,im,77 vx;t IIOURS RATE rO rAL
n CLASSn%MATTON MODttL u+YJ r NO RXr UTAR STAADRV ARGUCnR STAM)RY cost
Equipment Inefficiencies V—
TOTAL E UPMENT
••arfA'sa"S y;",�.z'3 �Z; "�vckT ;.a�y.v-zest " ,7F�fiff7."/+�ii3""^.% a`i..s, `x„Y, i�r3. 4EK<"e,`>. .s.}r'taso�"r'„d:<d TOTAL
DZSCRIPTION QUANTITY U s VNITPRICE COBS
600'#4lebm 1 DO LS 1,00000 1,00000
TOTAL MATERIAL AND RENTALS „or"t
TOTAL
DRSCRIPIION QUANTITY mIs urnTPRIG@ COST
I -
TOTALSUBCONTRACTOR
TOTAL LABOR 585 98
LABOR MARKUP 15.0% 237 94
TOTAL EQUIPMENT
EQUIPMENT MARKUP 15.0%
TOTAL MATERIALS AND RENTALS 1,00000
SALES TAX ON PERMANENT MATERIALS AND SUPPLIES 0.00%
MATERIALS AND RENTALS MARKUP 15.0% 150 00
TOTAL SUBCONTRACTOR
SUBCONTRACTOR MARKUP 5.0%
EXTENDED SITE OVERHEAD(YES/NO) no 100%
UNABSORBED HOME OFFICE OVERHEAD(YES/NO) no 5.000%
GRANDTOTAL 2; , :0 x
C 10ocumenta and Settingsl}ohnnewy OocumentatPr*ctsWent Town PlazaTAra Work4COR 4A
TSM COR 44-not final Page I
UBELARDE COMPANY, INC.
P.O.Box 684
Woodinville,Washington 98072
(425) 376-2500 Fax(425)376-0332
EXTRA, WORK ORDER Sheet--Lot J
Customer Date Job# ri6
#
o 1 -5-� 0334
Project I
d
�' JI i 0C4,,PJ
Employees on Project Class Hours Bate Description of Work
r iM
Abdi
i
Equipment No. THours Rate
F= Comments
I
Rental Equipment No. Hours Rate
Materials oty unit Cost
j M
{
I
i
I
Fore pate
_-
i
Dade a re:
Owner esentati e$ag to n�
TIME AND MATERIALS WORKSILEET
F.WO
Project Kent Town Plaza PROJ.A'O. 727_L_DATE: 12/6/2007
Customer J V Constructors COR# 4 EWO H 335
WORK DE_SC_R_IPUON: _ _ CYCLE_
2 ma days to reverse forms at fountain heads to Rorui lithocrete fields due to/tie iebar at each wench dram
HOL.T2S RATE TOTAL
CLASb1FICATION RRGULM I OVERTIAm REGUAR OVRRTIME COSt
LABORER-FOREMAN �_- 52 29 — 6737
LABORER-JOURNEYMAN s0 a7 6a 75
CENgNT MASON- FOREMAN ___ 62 15 _ 8000
CEM)NT MASON-JOURNEYMAN _ 19 00 _ 53 74 75 09 1,11606
LABOR INEFFICIENCIES -- --- -
TOTAL.IAB,O,„�R�
'c'L'.e°`F-,- 7%M �7iA`.�"."7-3,7 7 77',--''s,c ^a ;'w"f•e:""��� HOURS RATE rO r•AL
CLASSIFICATION MODU Gorr NO REGULAR SrAmD REGULAR SrANDRY COST
Equipment Inefficiencies
TOTAL UIPMENT �',I' TOTAL
DESCRIPTION QVANITTY p) UNITS WTPEICE COST
400'#4 rebar 100 'LS 70000 70000
— I -
i
TOTAL MATERIALS AND RENTAL$ q Fla tr7�i1<0 '
:1' dw'Y,>`ACF L' �ge�/n.x'ro� Tm%� f h 'n 7 �'da., . , .,u t s•aZ $z'sh'.'�' -T!"�tP't' TOTAL
UESCRIPI'IONa QUANTRY UNITS f UN❑PRICE COST
I "
TOTAL SUBCONTRACTOR
TOTAL LABOR 1,11606
LABOR MARKUP 15.0% 16741
,TOTAL EQUIPMENT
(EQUIPMENT MARKUP 15.0% _
TOTAL MATERIALS AND RENTALS 700 00
SALES TAX ON PERMANENT MATERIALS AND SUPPLIFS 0.00%
MATERIALS AND RENTALS MARKUP 15.0% !DS 00
TOTAL SUBCONTRACTOR _
SUBCONTRACTOR MARKUP 5.0%
EXTENDED SITE OVERHEAD M.S/NO) no 10.0%
UNABSORBED ROM?OFFICE OVERHEAD(YES/NO) no 5.000%
GRAND TOTAL Vim,-2 0$)S
C 1Documents and Settingsl;ohnnaWy DocumentslProtects%Kent Town PlazalExtra WorMCOR#41
n 7/1017M•I TO I(M10 N�_nn,final Paoe 1
EELARDE COMPANY, INC.
R O Box 684
Woodinville,Washington 98072
(425) 376-2500 Fax (425) 376-0332
EXTRA WORK ORDER Sheet/ of—L
Customer Date Job# °W O#
,�.V ���7 /e,7OA� 12--( -,p 2 0335
Project
Employees on Project Class Hours Rate Description of Work
g V
W InO . C4!/ZM /
ec"&qt
er
Equipment No. I Hours Rate
Comments
I
1
I '
Rental Equipment No. Hours Rate Materials aty Unit Cost
i 0 --
I
i I
I
Owner resenta ive Ss a re: Date Foreman's Signature: Date
!2-fo-®
` �
� o �
N N T lco
Y
CY
U 0 r C3 r � — ; t co t0. 4D
1 V j l
� I
i
o � L � N mca eta
mm aCLQ If7� N $ 40 {3
o � d
O l
U CA' O
I
I >A
U
N
co0
d r jy
r C1
CA I � ! {'�
p ti I io la
.c
to lu co
m
z >
mQ, Ip�C061009
S $
o ._ ,- c
15
'm 0 IL 43 O F I I
'o caLLJ
n0. � m 3cU �
U d i LAJ N
LL J co
1 } a I
� O �f a { , i
< i Q
oo
r� 4m I Z ) 'co CD C::) LLJ
m} � 1 J ,
CJ
_ 03 0 l L
(O rn p ai t j I fA 3k
"uj
¢ no O (!�
CD
ix LO i p d
M �C�ll 0 ~
n. m CO M Li.
PU ET SOUND STEEL CO .M , INC 01
906
T ' _d Avenue South Kent, VA 98032 �253 85_4_-3600 Fax �3 852-885 I
Fax to _--�� ------ Date _
To fax#
From _ = Total pqs
Comments
w
R •
n •
RECEIVED
IDEC 0 6 20
JV CONSTRUCTORS
4