HomeMy WebLinkAboutPK07-078 - Change Order - #15 - JV Constructors - Town Square Plaza - 01/31/2008 r t
40
Records Manag e' ment .
�,KENT\1147
W�SMINGTON Document
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed, if you have questions, please contact Mary Simmons, City
Clerks Office.
Vendor Name: J\/ C(")�s- -v-Uti C- c S
Contract Number: ipIL-C)7- O79
Thic ie nceir ncA Mr AAr rx, fimmnne
Vendor Number.
Project Name: �OLV� �� 1,c G��� I a c1 CC) --H�"i
Contract Effective Date:
Contract Termination Date: l d O
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager:
Department:
Abstract:
ADCL7832 07102
4000
KENT
W/.5 H1NGTON
CHANGE ORDER NO. 15
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR. JV Constructors, Inc. ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Town Square Plaza—JV Constructors
ORIGINAL CONTRACT DATE: Mav 21, 2007
This Change Order amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual
consent of the parties,the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work,"is hereby modified as follows:
Provide all labor, materials,and equipment necessary to:
Install concrete blockouts for seat wall lights and grout perimeter reveal after light
installation at the Town Square Plaza project in Kent, Washington as shown in the
Contractor's Proposal dated November 8, 2007 attached and incorporated as
Exhibit A.
2. The contract amount and time for performance provisions of Section I1 "Compensation," and
Section 111, "Time for Completion,"are hereby modified as follows:
Original Contract Sum, $3,7379448.00
including applicable alternates and WSST.
Net Change by Previous Change Orders $ 297,616.95
(incl applicable WSST)
Current Contract Amount $4,035,064.95
(incl Previous Change Orders)
Current Change Order $ 87622.00
Applicable WSST Tax on this Change Order $ 767.36
Revised Contract Sum $4,044,454.31
Original Time for Completion 1/31/08
(insert date)
Revised Time for Completion under N/A
prior Change Orders
(insert date)
Days Required ± for this Change Order 0 calendar days
Revised Time for Completion 1/31/08
Pursuant to Section I of the Contract executed by the parties, the Contractor accepts all requirements of
this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to
r
waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change
Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work
either covered or affected by this Change Order, including, without limitation, claims related to contract time,
contract acceleration, onslte or home office overhead, or lost profits.
The parties whose names appear below swear under penalty of perjury that they are authorized to enter
into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project to be
consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement,which will become effective on the
last date written below.
CONTRACTOR: CITY OF KENT:
By: By:
(signature) A,,nature)
Print Name: Gary Johnson Pri t am _5 i� -t
Its Project Manager Its Wye,, e�
(TItie) (Title)
DATE: t Z'T DATE:
APPROVED AS TO FORM:
44U�144��
en Law e artment
Town Square Plaza#15—JV Constructors
CONTRACT MODIFICATION-2 OF 2
t
Pg 1 of 1
JV CONSTRUCTORS - CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE
ISSUING OFFICE CONTRACT NO. CHANGE PROPOSAL
CITY OF KENT PR 2007-03 No.20
DEPT OF PARKS TOWN SQUARE PLAZA Install Concrete Blockouts for
& RECREATION Seat Wall Lights and Grout
Perimeter reveal after light
Installation
CONTRACTOR'S PROPOSAL- CHANGE IN CONTRACT PRICE
Net Increase Net Decrease Calendar Days Increase
8,622 Concurrent
COST PROPOSAL
Item Quantity Unit ' Description Unit Price Labor U/P Other/Total
1. 47 EA Install foam blockouts for Bega Lights in curved
----------.concrete seat walls
Fox Electric 10/24/07 proposal 5,402
2. 47 EA Grout perimeter reveal between curved concrete
_ seat walls and the Bega light fixture
1-6 � MH ICarpe_nter 6000 _ 960
16 MH Laborer 6000 960
;Grout& application tools 175
Sub-Total 7 497
------ _ — — JV Constructors Markup _ _ 15%' 1,125
_-- — - I---
Gr id Total 8,622
1
Date Typed Name and Title nature
11/8/07 Gary .Johnson,Project Manager
Page 1 of 1
t
Gary Johnson
From: "Al Glenewinkel" <al@foxelectric.net>
To: "Gary Johnson"<garyQvconstructors.com>
Sent: Wednesday, October 24, 2007 4:13 PM
Attach: CopSummary Not City of Kent Conduits xls; CopSummary No2 Foam Blocks at Seat Walls.xls; CopSummary
No3 PSE Conduit xls, CopSummary No4 Wire Size.xls;CopSummary Nos Hydrel Lights xls; CopSummary No6
New Budding.xls; CopSummary No8 Additional Circuits to Street Bollards xls; CopSummary No9 Carosel xls,
CopSummary Nol0 Additional Conduits to Fountain.xls; CopSummary Nol1 RevisePoleLights As, change order
log Update 10-24-07.xls
Subject: Change Orders
Gary,
My change orders were getting out of sequence since I hadn't made a log of what I gave you.I am attaching a submittal log that
reflects all the changes I have processed to date.I will also include a copy of every change order with it's new number.I am sorry
for the confusion but this is what I had to do to straighten things out.If you don't want to re-number what I have already
submitted,send me a copy and I will correct the others.
Al Glenewinkel RECOVED
Fox Electric OCT 2 5 20�7
Mobile: 2o6-963-7245
Office: 253-852-0540
FAX: 253-854-6139 JV CONSTRUCTORS
10/25/07
Fox Electric Company
Change Order Proposal
Sub Contractor Breakdown Summary
Project Name: Town Square Plaza COP No. 2
Project Number: 75042 Date: 9/10/07
Description: Provide and install foam blocks and sleeves for pre rough in of seating
walls for light fixtures and outlet boxes.
1. CRAFT LABOR COSTS
a.craft labor costs from breakdown $ 58.03 68.75 Hrs.
b. foreman (Includes supervision) $ 6240 2 Hrs.
c. lead foreman(Includes supervision) $ 6317 0 Hrs
DIRECT LABOR SUBTOTAL $ 4,11436
1.CRAFT LABOR COSTS $ 4,114.36
2. MATERIAL COSTS
a. material costs from breakdown $ 155.67
b, freight costs (itemize) $ —
2 MATERIAL COSTS $ 15567
3. OVERHEAD
a NTE 15% portion of 1 $ 617.15
b. NTE 15% portion of 2 $ 23.35
3 OVERHEAD $ 64050
4. EQUIPMENT COSTS
a. owned equipment(per spec approved source) $
b. rental equipment(1 day additional snorkel lift) $
4 EQUIPMENT COSTS $ -
5. SUBCONTRACTORS
a. $
5 SUBCONTRACTORS $
6. PROFIT
a Labor NTE 10% $ 473.15
b Material NTE 10% $ 17.90
c. Equipment NTE 10% $ -
d Sub Contractors NTE 10% $ -
6. PROFIT $ 49105
TOTAL COST 1 THRU 6 $ 5,401.59
FOX ELECTRIC - PO BOX 630 - KENT, WA - 98035-0630
COP 2
Change Order Proposal Estimate
PROJECT: Kent Town Square Plaza
WORK: Install Rigid Foam Blocks and sleeves in seating walls for
fixture block outs.
LOCATION: 2nd St. and W Harrison
U UNIT MATERIAL LABOR LABOR
MATERIAL QUAN PRICE COST UNIT HOURS
1 1/4" Schedule 40 PVC C 190 44.52 84.59 0.00 0.00
Cut Rigid Foam Blocks E 47 1.00 47.00 0.15 7.05
Cut pvc to length E 98 0.00 0 00 0.15 14.70
3" PVC C 10 123.32 12.33 0.00 0.00
Install Foam Blocks and Sleeves E 47 0.25 11.75 1.00 47.00
------------------------------------- ------- ------ ---------- ---------- ------------
E 0 57.98 0.00 2.00 0.00
---------------------------------------- ------- ------------------------------------------
---------------------------------------- ------- ------------------------------------------
MATERIAL LABOR
MATERIAL COST HOURS
TAKEOFF TOTALS 155.67 68.75
LAYOUT AND CONDUIT TRACING 0
DEMO LABOR 0
EQUIP RENTAL 0 0
MISC HARDWARE 0
---- ---------- ------------
TOTAL MATERIALS/HOURS 155.67 68.75
FOX ELECTRIC - PO BOX 630 - KENT, WA - 98035-0630