Loading...
HomeMy WebLinkAboutPK07-280 - Change Order - #1 - Quality Fence Builders - Fire Station 76 Chain Link Fence & Motor Gate - 11/02/2007 i*01t l 440 Records Ma, semeNZ: n- r. KENT Document Wp$HINGTON _ _v W (t t t r This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact City Clerks Office. Vendor Name: I�kyaeehld o rs Vendor Number: rJ JD Edwards Number Contract Number: l lC 7- 940 This is assigned by Deputy City Clerk � � n Description: .�it, ,I 7� Project Nam - Contract Effective Date: ! c8 ? Termination Date: / 4 00 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment c Contract Manager: Department: Abstract: S Public\RecordsManagement\Forms\ContracfCover\ADCL7832 07/02 1 � KENT Wh5HINGTON CHANGE ORDER NO. 1 NAME OF CONTRACTOR: Quality Fence Builders ("Contractor") CONTRACT NAME & PROJECT NUMBER:City of Kent Fire 76 Chain Link Fence and Motor Operated Gate ORIGINAL CONTRACT DATE- October 1, 2007 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified to add additional work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Excavate for Mow Strip and Ground Restoration $3,500.00 Click 2 Enter System (Automated) $1,927.20 Concrete Mow Strip (DG Construction) $8,250.00 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows. Original Contract Sum, $51,183.00 (including applicable alternates and WSST) Net Change by Previous Change Orders $0 (incl applicable WSST) Current Contract Amount $51,183.00 (incl Previous Change Orders) Current Change Order $13,677.20 Applicable WSST Tax on this Change Order $ 1,217.27 Revised Contract Sum $66,077.47 CHANGE ORDER- 1 OF 3 Original Time for Completion 12/10/2007 (insert date) Revised Time for Completion under N/A prior Change Orders (insert date) Days Required (±) for this Change Order 0 calendar days Revised Time for Completion N/A (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms t of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement,which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: - Q By: (sr atur I ,gy to Print ame�:�t;��'A 7n--_j` / •LS�(zl�C� P nt N h Its U 1(P it<. o t is _ ('Cale) V (Title)/ DATE: lDla3�v� DATE: !!�2 /D 7 CHANGE ORDER-2 OF 3 f ` APPROVED AS TO FORM: (applicable tf change order requires mayor's signature) r e t Lain Drment QuahtyFenceSt 76 chg] CHANGE ORDER-3 OF 3 QU, ALITY October 15, 2007 �f o t Email, mhattrupfti,kent we tr; City of Kent Fax No; 253-8%-6080 400 W Gowe St Rhone No 253-856-5082 Kent, WA 98032-5895 Page 1 of 1 Attention: Mike Reference Proied FIRE STATION#76 CHANGE ORDER#1 Quality Fence Builders proposes the followr rig for the above referenced pro9ect • Excavate for Mow Strip and Ground Restoration (QFB) $ 3,500,00 • Click to Enter(Automated) $1,752 00+ 10% _$ 1,927 20 • Concrete Mow Strip (t3G Construction) $7.500 00 + 10% =1 8,250,00 TOTAL $13,677.20 We have excluded: EI Clearing B Staking the Fence Line El Temporary Fence 0 Grading 0 Fence Grounding E1 Set or Supplying Stee-aes © Core Drilling 0 Hazardous Waste Training 0 Hazardous Waste • Pwrit'ng or Equipment Treatment or Removal H Permits El Underground Utility Location 0 Sales and Use Tax • Fence Removal 0 Excess babilAy&USL&H Ins 0 Bond • Surveying 0 Traffic Control'Flagging 0 Concrete Mowing Strip • Federal Wages 0 Locks Passage Hardware& Installation 0 Union Wages "`" General Liability and Auto Coverage is $1,000,000 00 Each *"* Prices are good for 30 days. Past due charges are sub)ect to a service-large cf 1.6% per month If you have any questions, please contact me at your convenience Sincerely QUALITY FENCE BUILDERS,INC Mick Kimmerle VP 1 CAM MKdtm c wxt xudm sba,xAaYc�nt firestn coal din Co:n"ctor's Lic No CUAL(F8107t)F A,,hhum Q53)939-8?33 l AX q,'.5�143i•Rzw A P 0 Wx< 14 . AuNn,WWungtcmi 99071-0954 5psrratrzing to Uas end Access ConrMSystems ADDENDUM since 1980 Automated Equipment Company Prepared By: 9084fi E Marginal Way& Ken Rice Seattle,WA 98168 771 (206)767.90W Proposal Data. i3ast:Q star d FAX 1206)767-9077 Oclober 15.2007 wwwa¢gates com 71,tocafiton: r - IR Name: Quality Fence Station 76 Address: PC)Box 854 ft721 `'Avenue South .Nahum, WA.98071 .CAA. 98032Contact: 'Mick e Phone- 253-939-8533 Phone: Fax: 253-931-8604 Fax: E-'Bail. Cell: FURNISH NND INSTALL: 1 - -Click'-"Enter'system, to allow emergency vehicle access. Project Total 1,752,00 Plus"A ashington Mate Sales Tot Pricing based oa work being performed with installation of original systetit. N1 e i),op>se hereby to tbrnush materl.11 Xird tabor m a(xordance%sjib atiuched specoicaorms. Contract Firer 5 Terms of Pa►men t- Progressive billing CI;wTiJ StElt AUFPTANCF.The above prates.specllical)om.and condztmm An.s3tist'aciory°and are hereby accepted ai set with the terms end ran Hems included with original proposal. You are authorized To do the %mmr9-as Specified_ Pay meat a ill he aude As outlined abot ,,c- Ker��C'cc.�i "Uth.,t:e i signature r&atomer.Signature Auloovted Lquipment Co-Inc Date PAGE 1 Of I e D.G. CONSTRUCTION P J. 80X 64175 UNIVERSITY PLACE, WA 98464 ('253; -27<9--�024 ',. CTOBER 11, 2€ 07 CITY OF K NT FIRE -SE TATION BID THIS BID IS FOR CONCRETE MOW STRIA' 2- X 55�' Tj HIS 810 3=I_S0 tN'U-U0ES ALL LABOR AND IvI "c.RIA.S SET PLACE PoNg CONCRETE WITH SROC�Vl F EX-'ANSK)N J00N 1,S AT FENCE POST". =i.%'E .3RhD II'.G INCLUDED. DIRT MUST BE WITS- IN 1110TH OF „ . ,"� it H 'NOT Rr'z=IONSiBLE FOR SPRiNKLEPS AND PAYMEIVI DUE UPON COMPLETION OF J03. D G. .--O `?RUCTION