CHANGE ORDER
Date: 9/11/00 Change Order No.: 1
City Project Name & Project Number- 2007 Asphalt Overlays 07-3001
Contractor: ICON MATERIALS
Contractor Firm Name
Original Contract Date- June 19,2007
This Change Order amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual
consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement which outlines the Description of Work, is hereby modified as
follows:
Provide all labor, materials, and equipment necessary to:
001• Schedule III 1000 — Planning Bituminous Pavement The cost for this work shall be a
quantity of 170 0 @ $4 375 sy for an actual total of$743.75
Reason: Omitted from plans in error.
Cost . ... . . .......................................... $743.75
002: Schedule V: Extra Patch removal and Replacement on N. End of 144Ih Avenue SE
Catch basin rehab on 144`h Avenue SE Cost for this work shall be 1 LS of$3822.39
Reason: Necessary as a result of project construction.
Cost . ................................................. $3822.39
003: Schedule VI: 1011 — Crushed surfacing top course, 5/8 inch minus. Cost for this work
shall be a quantity of 29 75 @ 28.25 per ton for an actual total of$840 44
Reason: Omitted from plans in error.
Cost ....................... ....... ... .............. $840.44
2. The contract amount and time for performance provisions of Section II "Compensation," and
Section III, "Time for Completion," are hereby modified as follows:
Original Contract Sum, $ 1,614,933.20
including applicable alternates and WSST.
Net Change by Previous Change Orders $ - 0 -
(incl applicable WSST)
Current Contract Amount $ 156149933.20
- 1 -
(incl Previous Change Orders)
Current Change Order $ 59406.58
Applicable WSST Tax on this Change Order $
Revised Contract Sum $ 1,620,339.78
Original Time for Completion 65 calendar days
Revised Time for Completion under - 0 -
prior Change Orders
Days Required ± for this Change Order - 0 - Calendar days
Revised Time for Completion 65 calendar days
In accordance with Sections 1-04.4 and 1-04 5 of the Kent and WSDOT Standard Specifications, the
Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-
referenced contract, Contractor agrees to waive any protest or claim it may have regarding this Change Order
and acknowledges and accepts that this Change Order constitutes full payment and final settlement of all claims
of any kind or nature arising from or connected with any work either covered or affected by this Change Order,
including, without limitation, claims related to contract time, contract acceleration, onsite or home office
overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from
strict compliance with the guarantee and warranty provisions of the original contract, particularly those
pertaining to substantial completion date.
The parties whose names appear below swear under penalty of perjury that they are authorized to enter
into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project to be
consistent with the revised contract sum shown in section 2, above.
IN WITNESS,the parties below have executed this Agreement,which will become effective on the
last date written below.
CONTRACTOR: C rY F ENT:
01
By: By:
(s/gnature) / i afore)
h-
Print Na e: �_ A t i 44 P Print Name a Q r
Its C h ' E-<hMA L Its
(Title) (T (e)
DATE: la— / 5-D DATE: /D
-2-