Loading...
HomeMy WebLinkAboutPK05-338 - Change Order - #5 - L.W. Sundstrom - City Hall Campus Improvements - Additional Work, Extended Time, Increased Contract Amount - 10/15/2007 Records M emerytq �IKCENZ4T � Document WABNINOION This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact City Clerks Office. Vendor Name: Vendor Number: JD Edwards Number Contract Number. IDKo S+ 3.3 This is assigned by Clerk's Office Description: Detail: (Jit It— (10 � -�tA� Project Name - Contract Effective Date: Termination Date: �t r-7 t 0 7 ---�-Contract Renewal Notice (Days): ,p Number of days required notice for termination or renewal Br amendment Contract Manager: �!Department: Ira,, Abstract: S:Pubhc\RecordsManogement\Forms\ContractCover\ADCL7832 07102 e KENVT WASHINGTON CHANGE ORDER NO. 5 NAME OF CONTRACTOR: [LW Sundstrom, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: City Hall Campus Improvements ORIGINAL CONTRACT DATE: November 10, 2005 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: „ • Section I of the Agreement, entitled "Description of Work �s hereby modified to add additional 1. Sep y work or revise existing work as follows: In addition to work required under the original Agreement and any prior Amendments, Contractor shall provide all labor, materials, and equipment necessary to: Previously unknown substrate layer caused cracking which forced repair of concrete walkway between Police and bull pen. Following corrective action notice, parts and labor to install a RP device and hot rock insulated decorative cover per City direction. Scope of work is attached. 2. The contract amount and time for performance provisions of Section II "Time of Completion," and Section III, "Compensation," are hereby modified as follows: Original Contract Sum, $4249267.78 (including applicable alternates and WSST) Net Change by Previous Change Orders $108,045.43 (incl applicable WSST) Current Contract Amount $532,313.21 (incl Previous Change Orders) Current Change Order $12,186.90 Applicable WSST Tax on this Change Order $1084.64 Revised Contract Sum $5459584.75 CHANGE ORDER- 1 OF 3 f Original Time for Completion 4/5/06 (insert date) Revised Time for Completion under 8/7/06 prior Change Orders (insert date) Days Required (±) for this Change Order 442 calendar days Revised Time for Completion 10/17/07 (insert date) In accordance with Sections 1-04.4 and 1-04.5 of the Kent and WSDOT Standard Specifications, and Section VII of the Agreement, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract,Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsrte or home office overhead, or lost profits. This Change Order, unless otherwise provided, does not relieve the Contractor from strict compliance with the guarantee and warranty provisions of the original contract, particularly those pertaining to substantial completion date. All acts consistent with the authority of the Agreement, previous Change Orders (if any), and this Change Order, prior to the effective date of this Change Order, are hereby ratified and affirmed, and the terms of the Agreement, previous Change Orders (if any), and this Change Order shall be deemed to have applied. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above IN WITNESS, the parties below have executed this Agreement,which will become effective on the last date written below, CONTRACTOR: CITY OF KENT: 7 By: By: (sign atur (signature) Print Name: ry f Pririt N 2 Its Vi (,Q ofc Its (TuleJ � r{yjg! DATE:_ DATE: CHANGE ORDER-2 OF 3 APP OVED AS TO FORM: ent Law epa ment Changeorder5simdstrom CHANGE ORDER-3 OF 3 Cr Hall campus 1 rmments L W Sundstrom, Inc. Reinstall Concrete Walkway between Police Station s Bullpen unit LABOR Oty unit cost labor ca7t 0 Labor ID Form L Finish Conorew 64 MH 55 3520 Credit to leave Slab @ bullpen -20 MH 55 -11 D0 0 0 Subtotal Labor coat $2420 00 Z42000 unit MATERIALSIEOUIPMENT qty unit cost Purchase Concrete 14 Cy 150 210D Purchase Rock 2 bads 125 250 Rent Concrete Buggy 1 day 200 200 Small Tools 1 allow 150 150 Welded wire Fabric 1 roll 165 165 Credo to leave slab @ bullpen -3 CY 150 -450 0 Subtotal Matenalkquipment 2,41500 2,415 DO SUBCONTRACTS 0 0 0 0 Subtotal Subcontractors 0 coo Total dlrectcosts 4,635 DD 26%mark up General's Labor 621120 21%mark up meterlall equipment 59715 10%mark on SUDCOMradV3 000 Subtotal 5,97136 TOTAL COST OF CHANGE S 5,971 F2c- I t'7`L „ �17•L rAA7 •n7 -don Nv 5U,6`1U $403-iy Ci Hall Cam us Im rovements L W Sundstrom, Inc Install a RP device g Not Box/Rock per City Duechm unit LABOR ptp unit Cott labor Coat 0 Labor t0 modify piping 38 MH 55 1980 MH 0 0 0 Subtotal Labor coat 91,980 00 11080,05 unit MATERIALSIEQUIPMENT qty unit Cost Piping&HOT 8M r Rock Malsnalt 1 Quole 2750 2750 Concrete Pad 1 min 325 325 0 0 0 0 0 Subtotal Matenallaqunpment 3,07500 3,075.00 SUBCONTRACTS 0 D 0 0 Subtotal Subcontractors 0 0.00 Total direct Cats 5,056.00 26%mark up Ganeral's Labor 61480 21%mark up material/equipment 1145 75 10%,mark on Subcontractors 000 Subtotal 6,11535 TOTAL COST OF CHANGE S s 275.55 4t / u� � J 7J L-Z r