HomeMy WebLinkAboutPK07-078 - Change Order - #7 - JV Constructors - Town Square Plaza - 10/12/2007 Records M.anagement
KENT
W,=,,,NGT,N Document
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed, if you have questions, please contact Mary Simmons, City
Clerks Office.
Vendor Name: J y L) lti�i 11c0
Contract Number:
Thre ie neeinnvA by AA nry Cimmnnc
Vendor Number:
Project Name:
Contract Effective Date:
Contract Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: 7[2� �)�q4�
Department: �� l
Abstract:
ADCL7832 07102
KENT
WAS.INGTON
CHANGE ORDER NO. 7
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR- JV Constructors, Inc ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Town Square Plaza—JV Constructors
ORIGINAL CONTRACT DATE Mav 21, 2007
This Change Order amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual
4 consent of the parties, the project contract is modified as follows:
I
1. Section I of the Agreement, entitled"Description of Work," is hereby modified as follows:
Provide all labor, materials, and equipment necessary to:
Reimbursement of 16 CB-F Permanent Embedded Aluminum Bollards and 16
Sandblast and Powdercoat Bollard "Forrest Green" from JV Constructors for the
Town Square Plaza project in Kent, Washington as shown in the Contractor's
Proposal dated September 6, 2007 attached and incorporated as Exhibit A.
2. The contract amount and time for performance provisions of Section II "Compensation," and
Section III, "Time for Completion,"are hereby modified as follows:
Original Contract Sum, $3,737,448.00
including applicable alternates and WSST.
Net Change by Previous Change Orders $ 1799347.61
(incl applicable WSST)
Current Contract Amount $3,9165795.61
(incl Previous Change Orders)
Current Change Order ($ 13,638.40) Credit
Applicable WSST Tax on this Change Order ($ 1,213.82) Credit
Revised Contract Sum $399011943.39
Original Time for Completion 1/31/08
(insert date)
Revised Time for Completion under N/A
prior Change Orders
(insert date)
Days Required ± for this Change Order 0 calendar days
Revised Time for Completion 1/31/08
(insert date)
a
Pursuant to Section 1 of the Contract executed by the parties, the Contractor accepts all requirements of
this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to
waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change
Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work
either covered or affected by this Change Order, including, without limitation, claims related to contract time,
contract acceleration, onsite or home office overhead, or lost profits.
The parties whose names appear below swear under penalty of perjury that they are authorized to enter
into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project to be
consistent with the revised contract sum shown in section 2, above
IN WITNESS, the parties below have executed this Agreement,which will become effective on the
last date written below.
CONTRACTOR: CITY OF I ENT:
By:4e By: —
(signature) �^ (signature)
Print Name: Gary Johnson Print Nam : zette Cooke
Its Project Manager Its f a or
(rrtle
DATE: mil°%�� DATE: /%3/0 7
APPROVED AS TO FORM:
Kent Law Department
Town Square Plaza#7—JV Constructors
CONTRACT MODIFICATION-2 OF 2
W vu
Olympic Foundry Inc.
5200 Airport Way South
S"Wa,WA 98106 (206)7644200 FAX(206)7a1701
,Ypa 'Y Casters of Carbon,Ahoy, Stainless,and Manganaso Steels.and Grey,Duct le,M-
Hard,Ni-Resist,2$0A Cr,and Heat Resistant Irons. Machinists and Pattem Makera.
ISO 9001:2000 CERTIFIED
REC�iVED
QUOTE
s�� 0 7 2od�
Hate: slB/z0o7 N CO>l�S' UCTORS lob 07- 5L9-0666
PR01Fcts CITY019ENT
Purchaser: JV CONSTRUCTQRS,INC. Bid Data-
Aftn: GM Johnson
Phone: 206/762-4219
Fax: 208/76MO69
EST.WTI LUT
ITEM p Q 1 Y. DESCRIPTION EACH PRICE TOTAL
84-4355 16 each CB-F Permanent.Embedded # go lbs S 851.00 $ 10,416#00
Aluminum Solfards 1 each
00-84 16 each(Sandblast and Powdercoat Soffard $ 201.40 S 3.222.40
t"Forast-Grata-" ,
80-2270 4 sets 48"Square"KENr Tree Grata 313 lbs S 494.64 S 1,973.56
gpismsvt Set
82-2000 4 each 480 Square"CI"Tree Grate Frame 26lbs S 118.57 4028
( each
t
4
i
Total K/e OI: 2,796 lbs
FOB: JOSSRE; Kent, WA
DELIVERY: GRATES&FRAMES:3. 4Days ARO. 13OLLARDS: 12-14 Weeks ARO.
TERMS: 1%10 NET 30,NO DEPOT REQUIRED - SUB TOTAL $ 16,083.24
(0)7 apPaval of credit for new ouston»ra)
REIGH
.e> v4� xary GRAM) TOTAL $ 16,0W.H4
SAL" Tax Not Indudw
i
14/Ytt i