Loading...
HomeMy WebLinkAboutPK07-078 - Change Order - #7 - JV Constructors - Town Square Plaza - 10/12/2007 Records M.anagement KENT W,=,,,NGT,N Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: J y L) lti�i 11c0 Contract Number: Thre ie neeinnvA by AA nry Cimmnnc Vendor Number: Project Name: Contract Effective Date: Contract Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: 7[2� �)�q4� Department: �� l Abstract: ADCL7832 07102 KENT WAS.INGTON CHANGE ORDER NO. 7 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR- JV Constructors, Inc ("Contractor") CONTRACT NAME & PROJECT NUMBER: Town Square Plaza—JV Constructors ORIGINAL CONTRACT DATE Mav 21, 2007 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual 4 consent of the parties, the project contract is modified as follows: I 1. Section I of the Agreement, entitled"Description of Work," is hereby modified as follows: Provide all labor, materials, and equipment necessary to: Reimbursement of 16 CB-F Permanent Embedded Aluminum Bollards and 16 Sandblast and Powdercoat Bollard "Forrest Green" from JV Constructors for the Town Square Plaza project in Kent, Washington as shown in the Contractor's Proposal dated September 6, 2007 attached and incorporated as Exhibit A. 2. The contract amount and time for performance provisions of Section II "Compensation," and Section III, "Time for Completion,"are hereby modified as follows: Original Contract Sum, $3,737,448.00 including applicable alternates and WSST. Net Change by Previous Change Orders $ 1799347.61 (incl applicable WSST) Current Contract Amount $3,9165795.61 (incl Previous Change Orders) Current Change Order ($ 13,638.40) Credit Applicable WSST Tax on this Change Order ($ 1,213.82) Credit Revised Contract Sum $399011943.39 Original Time for Completion 1/31/08 (insert date) Revised Time for Completion under N/A prior Change Orders (insert date) Days Required ± for this Change Order 0 calendar days Revised Time for Completion 1/31/08 (insert date) a Pursuant to Section 1 of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above IN WITNESS, the parties below have executed this Agreement,which will become effective on the last date written below. CONTRACTOR: CITY OF I ENT: By:4e By: — (signature) �^ (signature) Print Name: Gary Johnson Print Nam : zette Cooke Its Project Manager Its f a or (rrtle DATE: mil°%�� DATE: /%3/0 7 APPROVED AS TO FORM: Kent Law Department Town Square Plaza#7—JV Constructors CONTRACT MODIFICATION-2 OF 2 W vu Olympic Foundry Inc. 5200 Airport Way South S"Wa,WA 98106 (206)7644200 FAX(206)7a1701 ,Ypa 'Y Casters of Carbon,Ahoy, Stainless,and Manganaso Steels.and Grey,Duct le,M- Hard,Ni-Resist,2$0A Cr,and Heat Resistant Irons. Machinists and Pattem Makera. ISO 9001:2000 CERTIFIED REC�iVED QUOTE s�� 0 7 2od� Hate: slB/z0o7 N CO>l�S' UCTORS lob 07- 5L9-0666 PR01Fcts CITY019ENT Purchaser: JV CONSTRUCTQRS,INC. Bid Data- Aftn: GM Johnson Phone: 206/762-4219 Fax: 208/76MO69 EST.WTI LUT ITEM p Q 1 Y. DESCRIPTION EACH PRICE TOTAL 84-4355 16 each CB-F Permanent.Embedded # go lbs S 851.00 $ 10,416#00 Aluminum Solfards 1 each 00-84 16 each(Sandblast and Powdercoat Soffard $ 201.40 S 3.222.40 t"Forast-Grata-" , 80-2270 4 sets 48"Square"KENr Tree Grata 313 lbs S 494.64 S 1,973.56 gpismsvt Set 82-2000 4 each 480 Square"CI"Tree Grate Frame 26lbs S 118.57 4028 ( each t 4 i Total K/e OI: 2,796 lbs FOB: JOSSRE; Kent, WA DELIVERY: GRATES&FRAMES:3. 4Days ARO. 13OLLARDS: 12-14 Weeks ARO. TERMS: 1%10 NET 30,NO DEPOT REQUIRED - SUB TOTAL $ 16,083.24 (0)7 apPaval of credit for new ouston»ra) REIGH .e> v4� xary GRAM) TOTAL $ 16,0W.H4 SAL" Tax Not Indudw i 14/Ytt i