Loading...
HomeMy WebLinkAboutPK07-078 - Change Order - #6 - JV Constructors - Town Square Plaza - 10/12/2007 Records Management KENT Document WASH,NGTON t A• K a CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: J V Cow UY vvc4z Y,- Contract Number: TWe ie r ecinmcA by AAnn, Qrmmnne Vendor Number: 5"1 2 J I Project Name: -TaW'v-� &I Vl a ✓e a :�-a Contract Effective Date: Contract Termination Date: Contract Renewal Notice (Days): N� Number of days required notice for termination or renewal or amendment Contract Manager: 1 6r4 Doyiodr Department: CiS — 1 Abstract: ADCL7832 07/02 KENT WA5HfNGTON CHANGE ORDER NO. 6 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR. JV Constructors, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER- Town Square Plaza—JV Constructors ORIGINAL CONTRACT DATE May 21, 2007 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work,"is hereby modified as follows: Provide all labor, materials, and equipment necessary to: Extend asphalt transition pavement at Harrison Street from Station 15+70 to 15+10 at the Town Square Plaza in Kent, Washington as shown in the Contractor's Proposal dated August 23, 2007 attached and incorporated as Exhibit A. 2. The contract amount and time for performance provisions of Section II "Compensation," and Section III, "Time for Completion," are hereby modified as follows: Original Contract Sum, $397379448.00 including applicable alternates and WSST. Net Change by Previous Change Orders $ 144,852.25 (incl applicable WSST) Current Contract Amount $398829300.25 (incl Previous Change Orders) Current Change Order $ 319677.00 Applicable WSST Tax on this Change Order $ 2,818.36 Revised Contract Sum $3,9169795.61 Original Time for Completion 1/31/08 (insert date) Revised Time for Completion under N/A prior Change Orders (insert date) Days Required ± for this Change Order 0 calendar days Revised Time for Completion 1/31/08 (insert date) K Pursuant to Section 1 of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above IN WITNESS, the parties below have executed this Agreement,which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: (signature) (signature) Print Name: Gary Johnson Print Nate Suzette Cooke Its Project Manager Its . -'il Mayor ale) (Tatle � DATE:/ DATE: APPROVED AS TO FORM: Kent Law Department Town Square Plaza#6—JV Constructors CONTRACT MODIFICATION-2 OF 2 JV CONSTRUCTORS— CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE P9 1 of 1 ISSUING OFFICE i CONTRACT NO. CHANGE PROPOSAL CITY OF KENT PR 2007-03 No.6 DEPT OF PARKS TOWN SQUARE PLAZA Extend Asphalt Transition & RECREATION Pavement at Harrison Street From Station 15+70 to 15+10 CONTRACTOR'S PROPOSAL-CHANGE IN CONTRACT PRICE Net Increase Net Decrease Calendar Days Increase 31,677 N/A COSTPROPOSAL Item I Quantity; Unit ; Description Unit Price Labor 'Other/Total 1. !Extend 2nd Ave St Closure with existing signs j N.C. -2. 1 30__ LF ;Saw cut Harrison @ station 15+10 Evergreen Concrete Minimum Charge 1 300 — 3. —�1,800 SF 'Demo 30 x 60 existing 8" AC Pavement j 11 ! HR GP Earthwork operator&backhoe j 13800 1,518 22 HR '',D Leonards Trucking 85.00 11870 192 CY !Renton Concrete Recycleers 7 50 I ! 1,440 4 Days ;Extend Hitachi 2X200 lease 47500 j 1,900 I ` ;Excavate existing 5" road base and 0 to 12" ( � 0 4. 1,800 ! SF insiture subgrade material to provide revised I aransition grade —_ 3 HR 'GP Earthwork operator& backhoe 138.00 414 61 CY 'Franklin Ridge S&G disposal site 13.50 1 824 5. j 1,800 SF Compact&Test Subgrade 0 1 �HR GP Earthwork operator& compactor 149.50 150 T ( LS 'Otto Rosenau Inc By Cary 6. 1,800 1 SF Haul Place Compact 5" Crush Base Course 0 LS HR jGP Earthwork operator&backhoe 138.00 j 207 i I.5 i HR iGP Earthwork operator&compactor 149.50 224 28 j CY Miles S&G 1-1/4" crush base course 1 25 52 ; 715 7. + 1 ( EA ;Remove,Raise, Replace Storm Inlet with Catch f 0 Basin Grate 2.0 1 HR jGP Earthwork operator&backhoe 138.00 276 2 HR 'Laborer 6000 120 j i -Lot (Catch Basin Ring 50.00 I SO 1 Ea ;Catch Basin Grate & Frame j 20000 200 _ 8. 1 1 Lo_t_Survey&Layout Asphalt Pavement 850.00 850 __ -- Sub-Total Non Unit Price Items 11,058 —� TJV Constructors Markup Non Unit Price Item 15%: 1,659 9. _ 60_� LF__Extend Concrete Curb &Gutter(Unit Price) 28.00 j 1,680 j ^ 14" Asphalt Pavement prorate 5" AC Pavement 9.60 17,280 10. 1,800 ll SF I(UnitPrice) jSub-Total Unit Price Items — 18,960 -JV Constructors Markup Unit Price Items 0%, 0 Grand Total 31,677 Date Typed Name and Title S' nature 8/23/07 Gary A.Johnson, Project Manager