Loading...
HomeMy WebLinkAboutPK07-078 - Change Order - #5 - JV Constructors - Town Square Plaza - 10/12/2007 Records M,ana' gernent KENTDocument WASHINGTON i 1,4 CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: Contract Number: f��7 -0 7 b Thee is r.ccinnor7 by AAnry Cimmnnc ur e ..ray ..v v� •rw � vuuwr Vendor Number: I 2- 5 I Project Name: TO(A)in �� 14iaLe / l a -7A GDP S- Contract Effective Date: Contract Termination Date: tv " Contract Renewal Notice (Days): IV/4- Number of days required notice for termination or renewal or amendment Contract Manager: V DA a- ` Department: V-- S Abstract: ADCL7832 07/02 KE;4T WAS HI HOTO. CHANGE ORDER NO. 5 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR JV Constructors, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Town Square Plaza—JV Constructors ORIGINAL CONTRACT DATE: May21, 2007 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified as follows: Provide all labor, materials, and equipment necessary to: Substitute full width 8" Mesa Beige colored concrete for existing and new 5" asphalt paving on 2nd Ave between 6+40 & 8+42 at Town Square PIaza in Kent, Washington as shown in the Contractor's Proposal dated August 8, 2007 attached and incorporated as Exhibit A. 2. The cost of this Change Order #5 reflects added work at a cost of$173,495 and deducted work at a cost credit of$62,582, and subject to applicable WSST. 3. The contract amount and time for performance provisions of Section II "Compensation," and Section III, "Time for Completion," are hereby modified as follows: Original Contract Sum, $3,737,448.00 including applicable alternates and WSST. Net Change by Previous Change Orders $249067.99 (incl applicable WSST) Current Contract Amount $3,7619515.99 (inel Previous Change Orders) Current Change Order $ 1109913.00 Applicable WSST Tax on this Change Order $ 9,871.26 Revised Contract Sum $398829300.25 Original Time for Completion 1/31/08 (insert date) Revised Time for Completion under N/A prior Change Orders (insert date) Days Required ± for this Change Order 0 calendar days Revised Time for Completion 1/31/08 (insert date) i Pursuant to Section 1 of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract 4. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: G P. (signature) (signature) Print Name: Gary Johnson Print N 2 Suzette Cooke Its Proiect Manager Its Mayorr DATE: Akoy DATE. APPROVED AS TO FORM: AWN FAA Kent Law Department Town Square Plaza#5a—N Constructors CONTRACT MODIFICATION-2 OF 2 i �1 Pg 1 of 3 JV CONSTRUCTORS -CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE ISSUING OFFICE CONTRACT NO. CHANGE PROPOSAL CITY OF KENT PR 2007-03 No.5 Revision 1 DEPT OF PARKS TOWN SQUARE PLAZA Revise Roadway Fill Section &RECREATION and Provide Colored Concrete at 2nd Ave Between Intersections CONTRACTOR`S PROPOSAL-CHANGE IN CONTRACT PRICE Net Increase Net Decrease Calendar Days Increase 110,913 N/A COST PROPOSAL Item Quantity Unit Description Unit Price ) Labor Other/Total � I I 1. 1 LS Added Work Per Following Summary 173,495 2. 1 LS 'Deleted Work Per Following Summary (62,582) i 4 i I I I � ) Grand Total 110,913 I I I 1 Date Typed Name and Title Signature 8/8/07 Gary A.Johnson,Project". Pg2of3 JV CONSTRUCTORS - CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE ISSUING OFFICE CONTRACT NO. CHANGE PROPOSAL CITY OF KENT PR 2007-03 No.5 Revision 1 DEPT OF PARKS TOWN SQUARE PLAZA Substitute Full Width 8" Mesa &RECREATION Beige Colored Concrete for Existing&New 5" Asphalt Paving on 2nd Ave Between 6+40 &8+42 CONTRACTOR'S PROPOSAL-CHANGE IN CONTRACT PRICE Net Increase Net Decrease Calendar Days Increase 173,495 N/A COST PROPOSAL Item Quantity Unit Description Unit Price Labor Other/Total 1. 1 Lot 'Extend 2nd Ave St Closure with existing signs N.C. Saw cut 2nd Ave/Smith St intersection j omt- 2. 26 LF 1 N.C. Existing reported to be butt joint 3. 5,252 j SF 'Demo 26 x 202 existing 8"AC pavement 32 HR GP Earthworks operator&backhoe 138.00 4,416 D Leonard's Trucking 2 Truck at 7/10cy loads j 64 HR 85.00 5,440 per day per truck- (4 Days) 560 CY Renton Concrete Recyclers 7.50 ! 4,200 4. 5,252 SF Excavate existing 5" road base&dispose offsite 8 HR GP Earthworks operator&backhoe 138.00 1,104 110 CY Tranklm Ridge S&G 13.50 1,485 5 5,252 SF 'Compact&Test Subgrade 3 HR GP Earthworks operator&compactor 149 50 449 1 Lot Otto Rosenau Inc. By City 6 6,868 SF Place Geotextile Fabric on Subgrade 6,868 i SF NW Geotextile-Permea Tex 2315 0.06 412 16 j MH Carperter 2/5 60.00 ! 960 7. 1 5,252 SF Haul Place Compact 5" of crush basecourse 4 HR GP Earthworks operator& backhoe 138.00 j 552 4 HR GP Earthworks operator&compactor 149.50 598 82 CY Miles S&G 1-1/4" crush basecourse 2552 i 2,093 Place 202LF concrete curb at east side of 2nd 8. ! 7,272 SF Ave&202LF x 36 of 8" unreinforced Mesa Beige I 1 colored concrete between intersections 1 LS lBelarde Concrete proposal j 126,656 9. 1 Lot Survey&Layout concrete pavement 2,500 Sub-Total 150,865 JV Constructors Markup 15% 22,630 Grand Total 173,495 d Signature Date Type Name and Title g 8/8/07 Gary A.Johnson,Project Manager JV CONSTRUCTORS - CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE Pg3of3 JV CONSTRUCTORS-CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE ISSUING OFFICE CONTRACT NO. CHANGE PROPOSAL CITY OF KENT PR 2007-03 No. 5 Revision 1 DEPT OF PARKS TOWN SQUARE PLAZA Delete 5" Asphalt Pavement at &RECREATION 2nd Ave&Revise 12"ATB to 3" ATB at 2nd Ave&Harrison Designated AC Paved Areas& Reduce Harrison AC Pavement from 5" to 4"Asphalt Pavement CONTRACTOR'S PROPOSAL-CHANGE IN CONTRACT PRICE Net Increase Net Decrease Calendar Days Increase (62,582) N/A COST PROPOSAL Item Quantity Unit Description Unit Price Labor Other/Total 1. 2,493 SF Delete 5"Asphalt pavement& 12" Asphalt Treated Base @ 2nd Ave-West Lane 2,493 SF Unit Price Work (12 00) (29,916) Reduce 5" Asphalt pavement to 4" @ Harrison& 2, 4,958 SF 2nd Ave Library intersection 4,598 SF Northwest Asphalt (1.00) (4,958) I Reduce 12" Asphalt pavement to 3" @ Harrison 3. 4,958 SF i&2nd Ave Library intersection 4,598 SF ,Northwest Asphalt (3 72) (18,444) 4. 7,451 SF Reduce road bed excavation depth from 14"to 5" at 2nd Ave 10'lane and Harrison 12'lane 16 HR �GP Earthworks operator&backhoe (138 00) (2,208) 207 CY Franklin Ridge S&G (13 50) (21795) Sub-Total (58,321) (29,916) JV Constructors Markup-Unit Price Work 0% 0 (28,405) I JV Constructors Markup-NonUnit Price Work 15% (4,261) Grand Total 1 (62,582) Date Typed Name and Title Signature 8/8107 Gary A.Johnson,Project Manager