HomeMy WebLinkAboutPK06-252 - Change Order - #1 - Engineered Control Systems, Inc. - Replace Security Control & Monitoring System - 12/15/2006 Records Ma,rfagernen't,, OT WASHINp TON Document I` Yy This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact City Clerks Office. Vendor Name:CCS Vendor Number: JD Edwards Number Contract Number: L-4�f)(o -253 This is assigned by Deputy City Clerk Description: LA-z;- — Detail: Project Name: Contract Effective Date: A// 5/aOO(o Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Department: t2k '" Abstract: Y 1 5 Pubhc\RecordsManagement\Forms\ContractCover\ADCL7832 07/02 KENT WASHINGTON CHANGE ORDER NO. 1 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR- Engineered Control Systems, Inc("Contractor") CONTRACT NAME &PROJECT NUMBER:Kent Corrections Facility Control System Replacement ORIGINAL CONTRACT DATE:December 15, 2006 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled"Description of Work," is hereby modified as follows: Provide all labor,materials, and equipment necessary to: Change orders#1, 2, and 3 was addressed in the revised proposal dated November 28, 2006, that was attached to the This Change Order is including Proposed changes #4 through#9 from Contractor. #4 Add a Audio alarm monitor to the exam room, door 155 $11220.31 #5 Delete touch screen at work station#2 -$3,486.93 #6 Add(1) 17 inch desk top monitor to the adminstration/clerk $1,588.02 #7 Modification to CAB-02 control panel 24 vac instead of 120vac $ 1,403.50 #8 Modifying existing control stations intercoms $1,471.21 #9 Relocate call button in one cell in POD E, to be at ADA height $1,970.40 Also an extention of time to order materials and receive them. The Proposed change orders are attached with in depth details. 2. The contract amount and time for performance provisions of Section II "Compensation," and Section II1, "Time for Completion," are hereby modified as follows• Original Contract Sum, $293,199.10 including applicable alternates and WSST. Net Change by Previous Change Orders $0 (incl. applicable WSST) Current Contract Amount $2935199.10 (incl. Previous Change Orders) Current Change Order $ 45166.51 Applicable WSST Tax on this Change Order $ 370.82 Revised Contract Sum $2975736.43 Original Time for Completion March 15, 2007 (insert date) Revised Time for Completion under N/A prior Change Orders (insert date) Days Required ± for this Change Order 161 calendar days Revised Time for Completion August 24,2007 (insert date) Pursuant to Section VIII, entitled "Changes," of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement,which will become effective on the last date w ritten below. CONTRACTOR: CITY OF KENT: By: ' (signature) R (signature Print ame: `\ (2— ��o.�c Pri N z7aze God Its ('�,�5. S�. �'1�r Its NJ yob DATE:ttle) (Tetle ,`7 DATE: ��7 APPROVED AS TO FORM: K nt aw Depart en CorrecttonsControlChg order l CONTRACT MODIFICATION-2 OF 2 • i"fd0Vf> (tVL :.ULU t 1004*.4 To City of Kent Facilities and Mamrenance Department Atm Mike Hattrup Date December 15,2006 PROJECT City of Kent corrections Facility Control Systems Replacement DESCRIPTION OF PROPOSAL COP#004 per owner request Item Descriptions 1)This change adds an audio alarm monitor to the exam room, door 155 Inputs and outputs will be used from existing points the were abandon due to the intercom speaker being maccessable (men's locker room) Modification of CAB-3 panel will be accomplished An existing Dukane audio monitor circuit board will be re- used for this addition tuning will involve audio level balancing as required for daytime and nighttime alarming conditions Testing will validate operation the PLC and touchscreen programs will be changed and drawings will be updated ECS Added Cost: qty ECS'Nlaterial Description Unit Price Extension 20 West Penn 225 75 16 AWG, 2 onductor $0 250 $5 00 Total $5 00 ECS Labor Descriptions(Additive Cost): Hours Description Cost per Hour Extension 1 Project Mana er $50 00 $50 00 2 Shop Project Engineer $47 00 $94 00 2 Field Project Engineer S75 41 $150 82 0 UL 508 Shop Fabrication $41 00 $0 00 6 Installation Technician $71 19 $427 14 Total $721.96 • Enginneered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 1 • RECAP FOR COST OF WORK ITEMS: SELF PERFORM WORK Labor $721 96 Supervision(15%of labor cost) $108 29 Material $5 00 Equipment Additional Warranty(6%of material costs) $0 30 Small Tools(5%of labor) $36 10 Total for self perform work: $871.65 OVERHEAD AND PROFIT Total Cost $871 65 Overhead on self perform work 20% $174 33 Profit on self perform work @ 20% $174 33 Total for overhead and profit $348 66 TOTAL FOR CHANGE ORDER $1,220.31 CLARIFICATIONS AND EXCEPTIONS- This change order requires 0 calendar days extension to the project schedule ECS reserves the right to ask for a future schedule extension depending on job conditions All inclusions, exclusions and associated language on Subcontractors attached back up are considered official language for this COP Jim Blair Chief Estimator ECS • Engmneered Control Systems 2702 N Perry Spokane,Wa 99207 Ph 509-483-6215 Fax 509483-5102 2 • T 3rar1j0V/v1 #vc si�r_t� r�rYr To City of Kent Facilities and Mainrenance Department Attn Mike Hattrup Date January 18,2007 PROJECT City of Kent corrections Facility Control Systems Replacement DESCRIPTION OF PROPOSAL COP 4005 per owner request Item Descriptions 1) Delete the Touch Screen at work station#2 2) 3) ECS Added Cost: qty ECS Material Description Unit Price Extension -1 DCC 100 intercom amplifier $425 00 -$425 00 • -1 ECS TSC Touch Screen Controller $1,085 00 -$1,085 00 -1 E995475 1947L 19" LCD Touch Screen Monitor $782 00 -$782 00 -1 PRO-49QL Audio Technica Gooseneck Microphone $89 95 -$89 95 -1 AT8646QM Audio Technica Base Mount $35 00 -$35 00 -1 Siemens 6AV66131 BA011 CAO PC Runtime Software $320 00 -$320 00 $0 00 $0 00 $0 00 $0 00 $0 00 $0 00 $0 00 $0 00 Total -$2,736.95 ECS Labor Descriptions(Additive Cost): Hours Description Cost per Hour Extension -1 Project Manager $50 00 -$50 00 0 Shop Pro ect Engineer $47 00 $0 00 0 Field Pro ect Engineer $75 41 $0 00 0 UL 508 Shop Fabrication $41 00 $0 00 -1 Installation Technician $71 19 -$71 19 0 Filed Superintendent $75 46 $0 OO • Total I -$121.19 Enginneered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 1 • RECAP FOR COST OF WORK ITEMS: SELF PERFORM WORK Labor -$121 19 Supervision(15%of labor cost) $0 00 Material -$2,736 95 Equipment $0 00 Additional Warranty(6%of material costs) $0 00 Small Tools(5%of labor) $0 00 Total for self perform work: -$2,858.14 OVERHEAD AND PROFIT Total Cost -$2,858 14 Overhead on self perform work($0 to S50,000 a 12%) -$342 98 Profit on self perform work 10% -$285 81 Total for overhead and profit -$628 79 TOTAL FOR CHANGE ORDER -$3,486.93 CLARIFICATIONS AND EXCEPTIONS. This change order requires 0 calendar days extension to the project schedule ECS reserves the right to ask for a future schedule extension depending on lob conditions All inclusions, exclusions and associated language on Subcontractors attached back up are considered official language for this COP Jim Blair Chief Estimator ECS Enginneered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 2 INN0 N/A I IVE 10"S To City of Kent Facilities and Mainrenance Department Attn Mike Hattrup/Curtis lutz Date February 16,2007 PROJECT City of Kent corrections Facility Control Systems Replacement DESCRIPTION OF PROPOSAL COP#006 per owner request Item Descriptions 1)Add (1) 17" desk top monitor to the admistration/clerk desk Camera call ups will be accomplished form the 6" siemans touch panel in that area for door controlled and monitored on that panel ECS Added Cost: qty ECS Material Description Unit Price Extension 1 17' dessk top ICD monitor $638 00 $638 00 • 1 misc cable for new monitor $50 00 $50 00 Total $888.00 ECS Labor Descriptions(Additive Cost): Hours Description Cost per Hour Extension 0 Project Manager $50 00 $0 00 4 Shop Project Engineer $47 00 $188 00 1 Field Project Engineer $75 41 $75 41 0 UL 508 Shop Fabrication $41 00 $0 00 3 Installation Technician $71 19 $213 57 0 Filed Superintendent $75 46 $0 00 Total $478.98 v • Enginneered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 1 . t • RECAP FOR COST OF WORK ITEMS: SELF PERFORM WORK Labor $476 98 Supervision(15%of labor cost) $71 55 Material $688 00 Equipment $0 00 Additional Warranty (6%of material costs) $41 28 Small Tools(5%of labor) $23 85 Total for self perform work: $1,301.66 OVERHEAD AND PROFIT Total Cost $1,301 66 Overhead on self perform work(SO to$50,000 na 12%) $156 20 Profit on self perform work(y) 10% $130 17 Total for overhead and profit $286 36 TOTAL FOR CHANGE ORDER $1,588.02 CLARIFICATIONS AND EXCEPTIONS • This change order requires 0 calendar days extension to the project schedule ECS reserves the right to ask for a future schedule extension depending on job conditions Jim Blair Chief Estimator ECS • Enginneered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 2 t p� x N, To- City of Kent Facilities and Mamrenance Department Attn Mike Hattrup/Curtis Lutz Date April 20.2007 PROJECT City of Kent corrections Facility Control Systems Replacement DESCRIPTION OF PROPOSAL COP ft007 per owner request Item Descriptions 1) this change covers the modification to CAB-02 door control panel for controlling the 24VAC doors in lieu of the planned 120VAC doors The change modifies the panel, removing the 12 HC relays and installing 24 SPDT relays, adding a multiconductor cable between CAB-03 and CAB-02 for the added controls, a DC power supply, wiring, PLC programming, testing and drawing changes ECS Added Cost: qty ECS Material Description Unit Price Extension 6 2966171, PLC-RSC-24DC/21, relay 1PDT $1350 $81 00 • -12 2967620, PL-RSC-24DC/21 HC, relay, 1 PDT $12 90 -$154 80 2 2770024, D-UKK3/5, terminal, 2Tier bridge end pc $1 50 $3 00 30 2220PRPP Lake Cable 40 conductor, 22AWG $3 50 $105 00 1 SDN4-22-100LP Sola 4 amp, 24VDC power supply $210 00 $210 00 2 3004100, Phoneix contact, fuse block, UK5-HESI $9 50 $19 00 Total $263.201 ECS Labor Descriptions(Additive Cost): Hours Description Cost per Hour Extension 1 Project Manager $50 00 $50 00 2 Shop Project Engineer S47 00 $94 00 3 Field Protect Engineer S75 41 $226 23 0 UL 508 Shop Fabrication $41 00 $0 00 5 Installation Technician S71 19 $355 95 0 Filed Superintendent S75 46 $0 00 Total $726.18 • Engineered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 1 x • RECAP FOR COST OF WORK ITEMS: SELF PERFORM WORK Labor $72618 Supervision 15%of labor cost) $108 93 Material $263 20 Equipment $0 00 Additional Warranty(6%of material costs) $15 79 Small Tools(5%of labor) $36 31 Total for self perform work: $1,150.41 OVERHEAD AND PROFIT Total Cost $1,150 41 Overhead on self perform work($0 to$50,000 12%) $138 05 Profit on self perform work @ 10% $115 04 Total for overhead and profit $253 09 TOTAL FOR CHANGE ORDER $11403.50 CLARIFICATIONS AND EXCEPTIONS• • This change order requires 0 calendar days extension to the project schedule ECS reserves the right to ask for a future schedule extension depending on lob conditions Jim Blair Chief Estimator ECS Engineered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 2 • inararavraiEVE SOLUIil "f ; To:City of Kent Facilities and Mamrenance Department Atm Mike Hattrup/Curtis Lutz Date April 20, 2007 PROJECT City of Kent corrections Facility Control Systems Replacement DESCRIPTION OF PROPOSAL COP#008 per* owner request Item Descriptions 1) This change covers modifying existing control stations Several intercom stations have a circuit board connected to the call in button that causes phantom calls and calls that cannot be reset The removal of the circuit board is necessary in order for the call-in button to work properly This change was conducted on a time a and material basis ECS Added Cost: qty ECS Material Description Unit Price Extension 1 085-302-1 security screw, 18-8X1 (1 box) $60 73 $60 73 i Total $60.73 ECS Labor Descriptions(Additive Cost): Hours Description Cost per Hour Extension 1 Project Manager $50 00 $50 00 1 Shop Project Engineer $47 00 $47 00 0 Field Project Engineer $75 41 $0 00 0 UL 508 Shop Fabrication $41 00 $0 00 12 Installation Technician $71 19 $854 28 0 Filed Superintendent $75 46 $0 00 Total $951.28 • Engineered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 1 RECAP FOR COST OF WORK ITEMS: SELF PERFORM WORK Labor $951 28 Supervision(15%of labor cost) $142 69 Material $60 73 Equipment $0 00 Additional Warranty(6%of material costs) $3 64 Small Tools(5%of labor) $47 56 Total for self perform work: $1,205.91 OVERHEAD AND PROFIT Total Cost $1,205 91 Overhead on self perform work($0 to$50,000 @ 12%) $144 71 Profit on self perform work a 10% $120 59 Total for overhead and profit $265 30 TOTAL FOR CHANGE ORDER $1,471.21 CLARIFICATIONS AND EXCEPTIONS: This change order requires 0 calendar days extension to the project schedule ECS reserves the right to ask for a future schedule extension depending on job conditions Jim Blair Chief Estimator ECS Engineered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 2 r � cz�o' INNOVA-tIVi- SOIL- JIIONS ` To- City of Kent Facilities and Maintenance Department Attn Mike Hattrup Date July 10,2007 PROJECT City of Kent corrections Facility Control Systems Replacement DESCRIPTION OF PROPOSAL COP#009 per owner request Item Descriptions To relocate call button in one cell in POD "E" Relocation will be to remove call station from light fixture, run conduit upward toward the ceiling, run conduit along ceiling to cahse location Drill thru wall into chase and run conduit down to ADA height, drill thru wall again into the cell and mount new call button at ADA height Call button is already programmed into the system and has been verified to be in working order ECS Added Cost: qty ECS Material Description Unit Price Extension 1 Mullion Mounted Call Station $18 00 $18 00 25 Feet of 1/2' or 3/4' surface conduit $2 00 $50 00 1 Fire Stopping/Sealant $5 00 $5 00 $0 00 $0 00 $0,00 $0 00 $0 00 $0 00 $0 00 $0 00 $0 00 $0 00 $0 00 Total $73.00 ECS Labor Descriptions(Additive Cost): Hours Description Cost per Hour Extension Pro ect Manager $50 00 $0 00 0 Shop Project Engineer $47 00 $0 00 0 Field Project Engineer $75 41 $0 00 0 UL 508 Shop Fabrication $41 00 $0 00 18 Installation Technician $71 19 $1,281 42 0 Filed Superintendent S75 46 $0 00 Engmneered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 1 r ' Total $1,281.42 I RECAP FOR COST OF WORK ITEMS: SELF PERFORM WORK- Labor $1,281 42 Supervision(15%of labor cost) $192 21 Material $73 00 Equipment Additional Warranty (6%of material costs) $4 38 Small Fools(5%of labor) $64 07 Total for self perform work: $1,615.08 OVERHEAD AND PROFIT Total Cost $1,615 08 Overhead on self perform work(SO to $50,000 12%) $193 81 Profit on self perform work 10% $161 51 Total for overhead and profit $355 32 TOTAL FOR CHANGE ORDER $1,970.40 CLARIFICATIONS AND EXCEPTIONS, Quote does not include engineering time or programming This change order requires 161 calendar days extension to the project schedule ECS reserves the right to ask for a future schedule extension depending on job conditions All inclusions, exclusions and associated language on Subcontractors attached back up are considered official language for this COP Art Krumm Operations Manager 509-483-6215 ext 5 ECS Engmneered Control Systems 2702 N Perry Spokane, Wa 99207 Ph 509-483-6215 Fax 509-483-5102 2