HomeMy WebLinkAboutPK07-078 - Change Order - #1 - JV Constructors - Town Square Plaza - 06/24/2007 Records Management,
KENT I
WASHINGTON Document
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed, if you have questions, please contact Mary Simmons, City
Clerks Office.
Vendor Name: J V C av� S-ty LA.-C r S Vk C-
Contract Number. �0��7 g -a"
r
This is assinned ki, &Aar%, 4imm^nss
r�y • vJ • �
Vendor Number: -7 2 15'-�
Project Name: / b UO'VA E6? IA/.i 1/e i (Gt -2a — v( v� ��57b,�L`c
G hWYI�C O YCl G v
Contract Effective Date:
Contract Termination Date: I 1 O
Contract Renewal Notice (Days): 0
Number of days required notice for termination or renewal or amendment
Contract Manager: 1
Department:
Abstract:
ADCL7832 07/02
111�
KENT
Wws HiNGTOw
CHANGE ORDER NO. 1
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR: JV Constructors, Inc. ("Contractor")
CONTRACT NAME &PROJECT NUMBER: Town Square Plaza—JV Constructors
ORIGINAL CONTRACT DATE: May 21, 2007
This Change Order'amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual
consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled"Description of Work," is hereby modified as follows:
Provide all labor, materials, and enijipment Accessary to:
Excavate, place backfrll manhole and 8" PVC side sewer stub before street
overlay work installed at the Town Square Plaza in Kent, Washington as shown in
the Contractor's Proposal dated June 15, 2007 attached and incorporated as
Exhibit A.
2. The contract amount and time for performance provisions of Section II "Compensation," and
Section III, "Time for Completion," are hereby modified as follows.
Original Contract Sum, $39737,448.00
including applicable alternates and WSST.
Net Change by Previous Change Orders $0.00
(incl applicable WSST)
Current Contract Amount $3,7379448.00
(incl Previous Change Orders)
Current Change Order $15,864.00
Applicable WSST Tax on this Change Order $1,411.90
Revised Contract Sum $39754,723.90
Original Time for Completion 1/31/08
(insert date)
Revised Time for Completion under N/A
prior Change Orders
(insert date)
Days Required ± for this Change Order 0 calendar days
Revised Time for Completion 1/31/08
(insert date)
Pursuant to Section 1 of the Contract executed by the parties, the Contractor accepts all requirements of
this Change Order by signing below. Also, pursuant to the above-referenced contract, Contractor agrees to
waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change
Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work
either covered or affected by this Change Order, including, without limitation, claims related to contract time,
contract acceleration, onsite or home office overhead, or lost profits.
The parties whose names appear below swear under penalty of perjury that they are authorized to enter
into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project to be
consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will become effective on the
last date written below.
CONTRACTOR: CITY OF KENT:
By: By: E�
(signature) (signature)
Print Name: Gary Johnson Print/N e Suzette Cooke
Its Project Manager Its � Mayor
DATE:�� DATE: (T IeJ
APPROVED AS TO FORM:
en Law 17
ment
Town Square Plaza#1—JV Constructors
CONTRACT MODIFICATION-2 OF 2
Y
au..
Pg1of1
JV CONSTRUCTORS- CONTRACT MODIFICATION PROPOSAL AND ACCEPTANCE
ISSUING OFFICE CONTRACT NO. CHANGE PROPOSAL
CITY OF KENT PR 2007-03 No. 1
DEPT OF PARKS TOWN SQUARE PLAZA Install set over type manhole at
& RECREATION 3rd & Harrison station 15+50-
for future development
CONTRACTOR'S PROPOSAL- CHANGE IN CONTRACT PRICE
Net Increase Net Decrease Calendar Days Increase
15,864 Concurrent
COST PROPOSAL
Item TQuantity Unit j Description Unit Price Labor ,Other/Total
1. 1 Lot ISurvey/Layout By City
Excavate rnlarr barkf ill manhole and 8" PVC 7
2. l 1 Lot (side sewer stub before street overlay work i
jintalled
IGP Earthworks 6/14/07 proposal j 14,422
i
i
i
I
Sub-Total 14,422
T Sub-Total JV Directs --- 14,422
� I
JV Constructors; Markup - 10%1 — 1,442
I Grand Total 15,864
Date Typed Name and Title Signature
6/15/07 Gary A. Johnson,Project Manager
'%CAN
k I
OP Earthwor sl ✓U
ncljkvc�voild 541�01
PMB 4322 15127 Main St E STE 104
S
Sumner, WA 98390
Phone 253-863-0163,Fax 253-826-2799
June 14, 2007
JV Constructors,Inc.
PO Box 80346
Seattle, WA 98108
Phone 206-762-4219, Fax 206-768-6969
Attention: John
Reference: PR2007-03, Kent Town Square Plaza
Request for Quotation
GP Earthworks, Inc. herby proposes to furnish the necessary labor, equipment and
materials to complete the following work per your direction:
Install Set Over Manhole at 3rd Harrison for future development
Total Price to Complete $14,422.20
IV Constructors, Inc.Authorized Signature GP Earthworks,Inc.Authonzed Signature
Sincerely,
gamy d. Mich
GP Earthworks, Inc.
JV Constructors Install Set Over Manhole at
PR2007-03, Town Square Plaza 3rd Harrison
Kent,WA
Date Equipment Hrs/Qnty Rate Subtotal O&P Total
15%
ZX120 Excavator W/Operator 16.00 12000 1,920.00 288.00 2,208 00
310 Backhoe W/Operator 1600 11000 1,76000 264.00 2,02400
Pipelayer Labor 2000 71 00 1,42000 213.00 1,63300
Topman Labor 2000 71 00 1,42000 213.00 1,63300
Subcontractors Hrs/Qnty Rate Subtotal O&P Total
15%
60 LF of 8" PVC 6000 400 240.00 36.00 27600
100 ton 5/8 Crushed 10000 1259 1,25900 18885 1,44785
Export 72 TCY of Excess Material 7200 1207 86904 13036 99940
Manhole 1 00 63200 63200 9480 72680
Ring & Cover 1 00 18200 18200 2730 20930
New Channel 1.00 275.00 275.00 41.25 316.25
Paving-Temp 1 00 1,50000 1,50000 22500 1,72500
Steel Sheets (2) 8 x 20 sheets 2 days 200 9200 18400 27.60 211 60
Steel Sheets Delivery& Pick-up (2 hrs each) 400 9500 38000 57.00 43700
Shoring 1 00 50000 50000 75.00 57500
_Shoring Delivery& Pick-up(2 hrs each) 400 9500 38000 57.00 43700
Total Amount Due $14,422.20
RECEIVED
JON 1 2007
-V ColkjSTRUCTORS