Loading...
HomeMy WebLinkAboutPK05-224 - Change Order - #1 - David A. Clark Architects, PLLC - West Fenwick Park Restroom Building Design - 06/08/2007 Records Management, KENO TlDocument WA9NINOTON CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: U� A , C In y-- rin I Je Contract Number: This is assigned by Mary Simons Vendor Number: 3 5-2 Project Name: VVe5+ F-en w(c�- Falk �,s4 c r, Contract Effective Date: 16 +1 - C)S Contract Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager. I Department: � Abstract: ADCL7832 07/02 KENT WwS HINGTON CHANGE ORDER NO. 1 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR: David A Clark Architects ("Contractor") CONTRACT NAME&PROJECT NUMBER: West Fenwick Park Restroom Building Design ORIGINAL CONTRACT DATE: July 7, 2005 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified as follows: Provide all labor, materials, and equipment necessary to: Consultant to provide review and recommendations of restroom/picnic shelter from structural engineer at West Fenwick Park in Kent, WA as described in the consultants proposal dated May 1, 2007 attached and incorporated as Exhibit A. 2. The contract amount and time for performance provisions of Section II "Compensation," and Section III, "Time for Completion," are hereby modified as follows: Original Contract Sum, $309388.45 including applicable alternates and WSST. Net Change by Previous Change Orders $0.00 (incl applicable WSST) Current Contract Amount $30,388.45 (incl Previous Change Orders) Current Change Order $5,290.00 Applicable WSST Tax on this Change Order $0.00 Revised Contract Sum $35,678.45 Original Time for Completion 10-07-05 Revised Time for Completion under NA prior Change Orders Days Required ± for this Change Order +730 calendar days Revised Time for Completion 10-07-07 Pursuant to Section XIII, entitled "Miscellaneous Provisions," of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above- referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount of its performance bond (if any) for this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement,which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: a4wL." By. (signature) nature) Print Name: David A Clark Prm e: Jeff Watlme Its Principal p9ri✓ w, 1'Nay,2 ,� Its Director Title) �� /Title) J DATE Vk%C. 0 DATE: APPROVED AS TO FORM: Kent Law Department West Fenwick Park CO#1 CONTRACT MODIFICATION-2 OF 2 DAVID A. , . May 01, 2007 Mr. Shane Gilbertson Project Manager Parks, Recreation & Community Services City of Kent 220 Fourth Ave. S. Kent, WA 99032-5895 0 V RE: New Structural Engineer proposal, West Fenwick Park x V Dear Shane, x This letter of proposal is in response to your request for obtaining a new structural engineer for the new restroom/picnic shelter building at the West Fenwick Park. As requested. our scope of work will be to have MLA Engineering to become the engineer of record and to revise the drawings in accordance with the current codes and create new detailing as required for bidding and construction. a a Our fee to complete the work is a fixed amount of$5,290. This does not include any changes to the mechanical, electrical or architectural portions of the building I understand the terms and conditions of the original contract will apply, and I look forward to continuing our relationship with you and the City of Kent. Sincerely, .a w m David A. Clark, AIA Principal d Z� w� m d W W d M_ r O M M A Washington Professional Linnled Liability Company Licensed and Registered Architects in Ancona, Cahfornia, Colorado,Hawaii, Texas and Washinglon