HomeMy WebLinkAboutPW06-320 - Original - U.S. Dept of the Interior - Water Resources Investigations - 10/01/2006 Form 9-1366 U.S Department of the Interior Customer#: WA098
(Oct. 2005) U.S. Geological Survey Agreement#: 07W4WA09800
Joint Funding Agreement Project#: 97229EU
TIN #. 916001254
Fixed Cost r r
Agreement Yes No
FOR
WATER RESOURCES INVESTIGATIONS
THIS AGREEMENT is entered into as of the 1 STday of OCTOBER, 2006, by the U S GEOLOGICAL SURVEY,
UNITED STATES DEPARTMENT OF THE INTERIOR, party of the first part, and the City of Kent,
party of the second part
1. The parties hereto agree that subject to availability of appropriations and in accordance with their
respective authorities there shall be maintained in cooperation a fixed-price agreement for operation,
maintenance, and data collection at the Sprmgbrook, Mill Creek, and Rock Creek stream gaging
stations, herein called the program.The USGS legal authority is 43 USC 36C, 43 USC 50, and 43 USC
50b
2 The following amounts shall be contributed to cover all of the cost of the necessary field and analytical
work directly related to this program 2(b) includes In-Kind Services in the amount of$ N/A
by the party of the first part during the period
(a) $39,675 OCTOBER 1, 2006 to SEPTEMBER 30, 2007
by the party of the second part during the period
(b) $41,565 OCTOBER 1, 2006 to SEPTEMBER 30, 2007
(c) Additional or reduced amounts by each party during the above period or succeeding periods as may be
determined by mutual agreement and set forth in an exchange of letters between the parties
(d) The performance period may be changed by mutual agreement and set forth in an exchange of letters
between the parties
3. The costs of this program may be paid by either party in conformity with the laws and regulations respectively
governing each party
4 The field and analytical work pertaining to this program shall be under the direction of or subject to periodic
review by an authorized representative of the party of the first part
5 The areas to be included in the program shall be determined by mutual agreement between the parties
hereto or their authorized representatives The methods employed in the field and office shall be those
adopted by the party of the first part to insure the required standards of accuracy subject to modification by
mutual agreement
6 During the course of this program, all field and analytical work of either party pertaining to this program shall
be open to the inspection of the other party, and if the work is not being carried on in a mutually satisfactory
manner, either party may terminate this agreement upon 60 days written notice to the other party
7 The original records resulting from this program will be deposited in the office of origin of those records Upon
request, copies of the original records will be provided to the office of the other party
8 The maps, records, or reports resulting from this program shall be made available to the public as promptly
as possible The maps, records, or reports normally will be published by the party of the first part However,
the party of the second part reserves the right to publish the results of this program and, if already published
by the party of the first part shall, upon request, be furnished by the party of the first part, at costs,
impressions suitable for purposes of reproduction similar to that for which the original copy was prepared
The maps, records, or reports published by either party shall contain a statement of the cooperative relations
between the parties
9 USGS will issue billings utilizing Department of the Interior Bill for Collection (form DI-1040) Billing
documents are to be rendered QUARTERLY Payments of bills are due within 60 days after the billing date If
not paid by the due date, interest will be charged at the current Treasury rate for each 30 day period, or
portion thereof, that the payment is delayed beyond the due date (31 USC 3717, Comptroller General File B-
212222, August 23, 1983)
U.S. Geological Survey City of Kent
United States
Department of the Interior
- — ---- - USGS-Point of-CContact-- — ---- -- - - -Customer Point of Contact- - - -
Name- Bob Kimbrough Name jWjjW rAfthtiS
Address- USGS/WWSC Address � ( p� �( ��,�(, V)DUS
934 Broadway, Suite 300 a.-DLO ��{ IQ,
Tacoma, WA 98402 Wit, L,1* 4 032-
Telephone• 253-552-1608 Telephone 0 j)%-Ip- %M
Email rakimbroanusgsgov Email k ft,lac.( L*,U
Signatures Signatures • -.
By 7"tiwr.. �-+ fi$-L Date V Ob By
Date
Name Cynthia Barton, Ph.D., L G., L.H.G. Name-
Title Director, USGS Washington Water Title
Science Center
By (Date By
Date
Na 9107r`v Name
Title Title
By Date By
Date
Name- Name
Title Title
U.S. Geological Survey/City of Kent
Cooperative Stream-Monitoring Program
October 1, 2006 through September 30, 2007
CCU USGS Total
USGS Station No 12113346
Springbrook Creek at Orilla
Streamflow data $6,510 $6,210 $12,720 (a)
Precipitation data(not published) $980 $930 $1,910
Real-time satellite telemetry $1,165 $1,115 $2,280
Telephone telemetry 290 280 570
Subtotal $8,945 $8,535 $17,480
(a) USGS previously removed an acoustic velocity meter that used outdated technology and was no longer
operable USGS proposes the purchase(or rental)of a Son-Tek AVM to replace it in order to obtain more
accurate discharge data during times of variable backwater if agreeable,costs could be provided and upgrade
handled in a separate agreement
USGS Station No 12113347
Mill Creek at Earthworks Park
Streamflow data $6,510 $6,210 $12,720 (b)
Real-time satellite telemetry $1,165 $1,115 $2,280
Telephone telemetry 290 280 570
Subtotal $7,965 $7,605 $15,570
(b) USGS operates peak-stage crest-stage gages upstream and downstream from street culvert downstream from gage
During flood events,the peak stage measurements in the gage well may be affected by backwater from plugged outlet
gates on structures
USGS Station No 12113349
Mill Creek at Orilla
Streamflow data $6,510 $6.210 $12,720
Real-time satellite telemetry $1,165 $1,115 2 280
Subtotal $7,675 $7,325 $15,000
USGS Station No.12118400
Rock Creek below Divdrsion near Ravensdale
Streamflow data $6,510 $6,210 $12,720
Real-time satellite telemetry $1,165 $1,115 $2,280
Precipitation(published) JI&N 1 560 $3,190
Subtotal $9,305 $8,885 $18,190
USGS Station No.12118500
Rock Creek near Maple Valley
Streamflow data $6,510 $6,210 $12,720
Real-time satellite telemetry $1,165 $1,115 $2,280
Subtotal $7,675 $7,325 $15,000
TOTAL $41,565 $39,675 $81,240