Loading...
HomeMy WebLinkAboutPK06-247 - Change Order - #2 - Duchess Construction, Inc - Service Club Ballfields Scoreboards Install - 02/02/2007 Records M ,a;nagem - " n't KENT = Document WA.SHINGTON - -- � - xn CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: ��' 5� ��?��T'%��' �'� Ale Contract Number: K 7 This is assigned by Mary Simmons Vendor Number: Project Name:, 13i`E'�' Contract Effective Date: Ira Contract Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: '�G'Vzo Department: Abstract: ADCL7832 07/02 000 KENT WASHINGTON CHANGE ORDER NO. 2 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR. Duchess Construction, Inc ("Contractor") CONTRACT NAME & PROJECT NUMBER: Service Club Ballfields Scoreboards Installation ORIGINAL CONTRACT DATE 11/13/06 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled"Description of Work," is hereby modified as follows: Provide all labor, materials, and equipment necessary to: Replace wire stolen from the parking lot and pathway lighting as described in the Contractor's COP dated 119/07 attached and incorporated as Exhibit A. 2. The contract amount and time f or p erformance provisions o f S ection 11 "Compensation,"and Section III, "Time for Completion," are hereby modified as follows- Original Contract Sum, $209427.20 including applicable alternates and WSST Net Change by Previous Change Orders $89644.16 Current Contract Amount $29,071.36 (incl Previous Change Orders) Current Change Order $39500.00 Applicable WSST Tax on this Change Order $308.00 Revised Contract Sum $32,879.36 Original Time for Completion 12/4/06 Revised Time for Completion under +27 nor Change Orders Days Required ± for this Change Order +30 calendar days Revised Time for Completion 1/31/07 Pursuant to Section XV, entitled "Miscellaneous Provisions," of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below Also, pursuant to the above- referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract 3. The C ontractor will adjust the amount o f i is p erformance b and (if any) for this project to b e consistent with the revised contract sum shown in section 2, above. I IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: /`�5/ By: (signature) (signature) Print Name. Brook Boone Il A#k4l S7-9 a Print Name: Jeff Watling Its President V, C-c- 'PRE5. Its Director ( ule) (Title) DATE. ll 41 er? DATE: Yz<07 APPROVED AS TO FORM: Kent Law Department Service Club Ball6eld Scoreboards Installation—CO#2 CONTRACT MODIFICATION-2 OF 2 01/03/2007 08: 49 2538639155 DUCI£SS CONSTRUCTION PAGE 01 • EXHIBIT A QCi9�E DUCHESS CONSTRUCTION INC. A ELECTRIC P O BOX 19i5—NALTON,WA OM Phaaw 2531g1-2016—Fad 253 R"106 January 09,2007 C.O.P. CITY Of KENT PARKS 220 4TH AVE. S. KENT,WA_92032-5895 RE: WIRE REPLACEMENT AT SERVICE CLUB BALLFIELDS ATTN:SHANE GILBERTSON REPLACE WIRE STOLEN FROM PARKING LOT AND PATHWAY LIGHTING,REPLACE WIRE CUT IN GROUND BOXES TO POLES C-7,C-9,C-1,C-6,THAT WERE CUT TO SHORT TO SPLIC>;. INSTALL TANIPERPROOF BOLTS IN GROUND BOXES OUT SIDE OF FENCE AREAS AS PER YOUR REQUEST. FOR THE SUM OF S3,500.00 2 EA TAMPER PROOF TIPS FOR INSTALL WERE GIVEN TO ANDY IF YOU HAVE ANY QUESTIONS PLEASE CALL ME AT(253)261 5766 01 THANK YOU, 10' HANK LEENSTRA VICE PRES. b