CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed, if you have questions, lease contact Mar Simmons, City
P P Y q . P Y Y
Clerks Office.
Vendor Name:
Contract Number: I�kOS-�.35
This is assigned by Mary Simmons
Vendor Number: 39/,46.,
Project Name: &A/G`�?
S
Contract Effective Date: '7 1/5�aK-
Contract Termination Date: /1 4,,4 7
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager:
Department: �l/��� . /'�l /�i132
Abstract:
ADCL7832 07/02
�eo�a
KENT
W n S f I I N 4 T O N
CHANGE ORDER NO. 5
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR Staaleson Engineering, PC ("Contractor")
CONTRACT NAME & PROJECT NUMBER: Mill Creek Canyon Earthworks Park Short Stairs
ORIGINAL CONTRACT DATE: July 11, 2005
This Change Order amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual
consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work,"is hereby modified as follows-
Consultant to prepare an Engineer's Opinion of Probable Construction
Cost for the short stairs at Mill Creek Canyon Earthworks Park in Kent as
described in the Consultant's proposal dated 1/11/07 attached and
incorporated as Exhibit A.
2. The c ontract amount and time for p erfonnance p rovisions o f S ection II"Compensation,"and
Section 11I, "Time for Completion," are hereby modified as follows:
Original Contract Sum, $3,000.00
including applicable alternates and WSST.
Net Change by Previous Change Orders $8,895.00
Current Contract Amount $11,885.00
(incl Previous Change Orders)
Current Change Order $650.00
Applicable WSST Tax on this Change Order $0
Revised Contract Sum $121545.00
Original Time for Completion 60 days
Revised Time for Completion under 7/16/06
Prior Change Orders
Days Required ± for this Change Order + 180 calendar days
Revised Time for Completion 1/16/07
Pursuant to Section XIII, F, entitled "Miscellaneous Provisions," of the Contract executed by the parties,
the Contractor accepts all requirements of this Change Order by signing below Also, pursuant to the above-
referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and
acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature
arising from or connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, contract acceleration, onsrte or home office overhead, or lost profits.
The parties whose names appear below swear under penalty of perjury that they are authorized to enter
Into this contract tnodl ficatton, which Is binding on the parties of this contract.
3. The Contractorw ill adjust the a mount ofitsperfonnancebond (if any) for I his projecttobe
consistent with the revised contract sum shown u1 section 2, above.
IN WITNESS,the parties below have executed this Agreement, which will become effective on the
last date written below.
CONTRACTOR: CITY O KENT:
7
By:
(s aiwe) (signanoe)
Print Name: Darrell Staaleson Print Name: Jeff Watling
j Its Owner Its Director
(Title) 200C (Title)
DATE: yA 2 U DATE.
I APPROVED AS TO FORM:
Kent Law Department
Earthworks Short Stairs CO#5
CONTRACT MODIFICATION-2 01, 2
EXHIBIT A
Staaleson Engineering,P.C.
EXHIBIT A
CLIENT: Lori Hemet
PROTECT: Kent Earthworks Park Short Stairs
RE: Payments to ENGINEER for Services and
Reimbursable Expenses
SECTION A2—BASIC SERVICES OF ENGINEER
A2 0. General The Basic Services are premised on the following general scope of professional services:
A2 1. Refer to EXHIBIT A2 1—Work Break Down Structure None.
A22. General Project Description
1. Client has requested ENGINEERto perform additional services. ENGINEER shall provide Engineer's Opinion
of Probable Construction Costs
Original Agreement: $ 3,000.00
ADDITIONAL SERVICES for Al: $ 4,455.00
ADDITIONAL SERVICES for A2: $ 4,440.00
ADDITIONAL SERVICES for A3: $650.00
TOTAL PROJECT FEE: $12,545.00
A2.4. Project Description by Phase:
PHASE FEE
A3172-Final Design for Stair#1 —Short Stairs. COST PLUS to Maximum Fee $650.00
The ENGINEER shall prepare an Engineer's Opinion of Probable Construction Cost. $650 00
ENGINEER's opinions of probable Construction Cost are to be made on the basis of
ENGINEER's experience and qualifications and represent ENGINEER's bestjudgment as an
experienced and qualified professional engineer generally familiar with the construction industry.
However,since ENGINEER has no control over the cost of labor,materials,equipment or
services furnished by others,or over Contractor's methods of determining prices,or over
competitive bidding or market conditions,ENGINEER cannot and does not guarantee that
proposals,bids or actual Construction Cost will not vary from opinions of probable Construction
Cost prepared by ENGINEER. If OWNER wishes greater assurance as to probable Construction
Cost,OWNER shall employ an independent cost estimator.
Completion Schedule.On or about January 12,2007.
Outside Services:
None.
1. None $0.00
�b
hr�
EXHIBIT _._JQN 1 1 K17