Loading...
HomeMy WebLinkAboutPK05-335 - Change Order - #5 - Staaleson Engineering, PC - Earthworks Park Short Stair Design - 01/25/2006 Records Mana"'g-erne'n KENT -= Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, lease contact Mar Simmons, City P P Y q . P Y Y Clerks Office. Vendor Name: Contract Number: I�kOS-�.35 This is assigned by Mary Simmons Vendor Number: 39/,46., Project Name: &A/G`�? S Contract Effective Date: '7 1/5�aK- Contract Termination Date: /1 4,,4 7 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Department: �l/��� . /'�l /�i132 Abstract: ADCL7832 07/02 �eo�a KENT W n S f I I N 4 T O N CHANGE ORDER NO. 5 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR Staaleson Engineering, PC ("Contractor") CONTRACT NAME & PROJECT NUMBER: Mill Creek Canyon Earthworks Park Short Stairs ORIGINAL CONTRACT DATE: July 11, 2005 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work,"is hereby modified as follows- Consultant to prepare an Engineer's Opinion of Probable Construction Cost for the short stairs at Mill Creek Canyon Earthworks Park in Kent as described in the Consultant's proposal dated 1/11/07 attached and incorporated as Exhibit A. 2. The c ontract amount and time for p erfonnance p rovisions o f S ection II"Compensation,"and Section 11I, "Time for Completion," are hereby modified as follows: Original Contract Sum, $3,000.00 including applicable alternates and WSST. Net Change by Previous Change Orders $8,895.00 Current Contract Amount $11,885.00 (incl Previous Change Orders) Current Change Order $650.00 Applicable WSST Tax on this Change Order $0 Revised Contract Sum $121545.00 Original Time for Completion 60 days Revised Time for Completion under 7/16/06 Prior Change Orders Days Required ± for this Change Order + 180 calendar days Revised Time for Completion 1/16/07 Pursuant to Section XIII, F, entitled "Miscellaneous Provisions," of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below Also, pursuant to the above- referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsrte or home office overhead, or lost profits. The parties whose names appear below swear under penalty of perjury that they are authorized to enter Into this contract tnodl ficatton, which Is binding on the parties of this contract. 3. The Contractorw ill adjust the a mount ofitsperfonnancebond (if any) for I his projecttobe consistent with the revised contract sum shown u1 section 2, above. IN WITNESS,the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY O KENT: 7 By: (s aiwe) (signanoe) Print Name: Darrell Staaleson Print Name: Jeff Watling j Its Owner Its Director (Title) 200C (Title) DATE: yA 2 U DATE. I APPROVED AS TO FORM: Kent Law Department Earthworks Short Stairs CO#5 CONTRACT MODIFICATION-2 01, 2 EXHIBIT A Staaleson Engineering,P.C. EXHIBIT A CLIENT: Lori Hemet PROTECT: Kent Earthworks Park Short Stairs RE: Payments to ENGINEER for Services and Reimbursable Expenses SECTION A2—BASIC SERVICES OF ENGINEER A2 0. General The Basic Services are premised on the following general scope of professional services: A2 1. Refer to EXHIBIT A2 1—Work Break Down Structure None. A22. General Project Description 1. Client has requested ENGINEERto perform additional services. ENGINEER shall provide Engineer's Opinion of Probable Construction Costs Original Agreement: $ 3,000.00 ADDITIONAL SERVICES for Al: $ 4,455.00 ADDITIONAL SERVICES for A2: $ 4,440.00 ADDITIONAL SERVICES for A3: $650.00 TOTAL PROJECT FEE: $12,545.00 A2.4. Project Description by Phase: PHASE FEE A3172-Final Design for Stair#1 —Short Stairs. COST PLUS to Maximum Fee $650.00 The ENGINEER shall prepare an Engineer's Opinion of Probable Construction Cost. $650 00 ENGINEER's opinions of probable Construction Cost are to be made on the basis of ENGINEER's experience and qualifications and represent ENGINEER's bestjudgment as an experienced and qualified professional engineer generally familiar with the construction industry. However,since ENGINEER has no control over the cost of labor,materials,equipment or services furnished by others,or over Contractor's methods of determining prices,or over competitive bidding or market conditions,ENGINEER cannot and does not guarantee that proposals,bids or actual Construction Cost will not vary from opinions of probable Construction Cost prepared by ENGINEER. If OWNER wishes greater assurance as to probable Construction Cost,OWNER shall employ an independent cost estimator. Completion Schedule.On or about January 12,2007. Outside Services: None. 1. None $0.00 �b hr� EXHIBIT _._JQN 1 1 K17 Page t of I 1/11/2007