HomeMy WebLinkAboutPK06-247 - Change Order - #1 - Duchess Construction, Inc - Service Club Ballfields Scoreboards Install - 01/08/2007 Records MaaMO r� �=e �-y� en KENT Document WPSHINGTON CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: Contract Number: Peo6 a / This is assigned by Mary Simmons Vendor Number: Project Name: 66 &fs -Le.6 /tJ_S Arlo t Contract Effective Date: �a Contract Termination Date: Contract Renewal Notice (Days): 7' —e7 Number of days required notice for termination or renewal or amendment Contract Manager: A,,lC�� � l� Department: Abstract: ADCL7932 07/02 t • KENT WAS MINGTON CHANGE ORDER NO. 1 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR. Duchess Construction, Inc ("Contractor") CONTRACT NAME & PROJECT NUMBER: Service Club Ballfields Scoreboards Installation ORIGINAL CONTRACT DATE:11/13/06 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled"Description of Work," is hereby modified as follows: Provide all labor, materials, and equipment necessary to: Provide additional workers to complete scoreboard, flagpole and art lighting as described in the Contractor's COP dated 12/11/06 attached and incorporated as Exhibit A 2. The c ontract a mount and t ime for p erformance p rovisions o f S ection I I "Compensation," and Section III, "Time for Completion," are hereby modified as follows: Original Contract Sum, $20,427.20 including applicable alternates and WSST Net Change by Previous Change Orders $0 Current Contract Amount $20,427.20 (incl Previous Change Orders) Current Change Order $79945.00 Applicable WSST Tax on this Change Order $699.16 Revised Contract Sum $29,071.36 Original Time for Completion 12/4/06 (insert date) Revised Time for Completion under N/A prior Change Orders Days Required ± for this Change Order +27 calendar days Revised Time for Completion 12/31/06 (insert date) Pursuant to Section XV, entitled "Miscellaneous Provisions," of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below Also, pursuant to the above- referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The C ontractor will adjust the amount o f its p erformance b and(if any) for this project to b e consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: ae. B ,�CX�/C --� (signature) (signature) Prat Name: Brook Boone Wathng Its President Its Director (Tale) (Title) DATE: /�Z ��3 DATE. APPROVED AS TO FORM: Kent Law Department Service Club Ballfield Scoreboards Installation—CO#1 CONTRACT MODIFICATION-2 OF 2 V 33 EXHIBIT A DUCHESS CONSTRUCTION INC. PO Box 1985- Milton,Way 98354 (253)891-2016 Fax(253)8639165 City of Kent Parks & Recreation 220 4th Ave. South Kent,WA 98032 Attn Shane Gilbertson 12/11/2003 COP Service Ball fields Scoreboards Provide 75 KVA 277/480 Generator for temp power $580 00 2 workers 8 hrs ea for setup @ $70 00 hr $1,120 00 1 worker 8 hrs on Saturday @ $70 00 hr $560 00 2 workers 8 hrs ea For tear down of system @ $70 00 hr $1,120 00 2 workers 24 hrs ea Working on Flagpole and Art lighting @ $70 00 hr $3,360 00 Provide and install one 480 volt 100 amp nema 3R $365 00 fussed disconnect 2 workers 6 hrs ea @ 70 00 hr $840 00 Subtotal $7,945 00 Tax $69916 Total $8,64416 Sincerely, Brook Boone President If you have any questions please call me at(253)261-5768 ell lti