HomeMy WebLinkAboutPK06-253 - Change Order - #1 - Engineering Economics, Inc. - City Hall 4th Floor Law Remodel - 11/17/2006 Ea< r
Records MaIn,,a" gernlbIh ','
KENT Document
WASHINGTON sf
u yixi ii .�4
l
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed, if you have questions, please contact City Clerks Office.
Vendor Name: all Vendor Number:
JD Edwards Number
Contract Number: Pr-O6- 02J-3
This is assigned by Deputy City Clerk
Description: 0-e-L l
Detail: 40
Project Name:
Contract Effective Date: �l �� C Termination Date: IL3 0 Co
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: a:LA� Department: S
Abstract:
S Pubhc\RecordsManagement\Forms\ContractCover\ADCL7832 07/02
KENT
WASHI.0T0.
CHANGE ORDER NO. 1
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR: Engineering Economics, Inc. ("Contractor")
CONTRACT NAME &PROJECT NUMBER:Law Department Remodel HVAC
ORIGINAL CONTRACT DATE-October 10, 2006
This Change Order amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual
consent of the parties, the project contract is modified as follows:
1. Section I of the Agreement, entitled "Description of Work," is hereby modified as follows:
Provide all labor, materials, and equipment necessary to:
add additional services not included within the original Contract including
services related to the electrical rough-in for the HVAC system and project
management including mechanical and electrical coordination and instruction in
accordance with Contractor's November 3, 2006, Authorization for Engineering
Services, attached and incorporated as Exhibit A.
2. The contract amount and time for performance provisions of Section 1I "Compensation," and
Section 1II, "Time for Completion," are hereby modified as follows.
Original Contract Sum, $7,500
including applicable alternates and WSST.
Net Change by Previous Change Orders $0
(incl applicable WSST)
Current Contract Amount $7,500
(rncl. Previous Change Orders)
Current Change Order $8,120
Applicable WSST Tax on this Change Order $0
Revised Contrdl.t Sum $15,620
Original Time for Completion 12/4/06
(insert date)
Revised Time for Completion under N/A
prior Change Orders
(insert date)
Days Required ± for this Change Order 30 calendar days
Revised Time for Completion 1/3/06
(insert date)
Pursuant to Section XIII (F), entitled "Changes," of the Contract executed by the parties,the Contractor
accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced
contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges
and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from
or connected with any work either covered or affected by this Change Order, including, without limitation,
claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits.
The parties whose names appear below swear under penalty of perjury that they are authorized to enter
into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount of its performance bond (if any) for this project to be
consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement,which will become effective on the
last date written below.
CONTRACTOR: CITY OF KENT:
By: By:
(sig It re) (signature)
Print Name: 3- t�� BLS Print ame: J e F F Gf-�- 1 vja
Its f rAlnC_ Mczvlc.��r- Its JD)),ez)r `
title) (Title)
DATE: t��� b CP DATE:
APPROVED AS TO FORM:
Kent Law Department
EEIChange 1 Law remodel
CONTRACT MODIFICATION-2 OF 2
t
A
E �tl�
Engineming Economics Inc
1201 Western Avenue, Suite 325
Seattle, Washington 98101
telephone 206 6221001
facsimile 2D66225747
Authorization of Engineering Services
Date: November 3, 2006
Project: Kent City Hall 4th Floor Remodel
Project No: 03-06280
Client: City of Kent From: Byron Holmstead
Contact: David Gilmore Engineering Economics Inc
Telephone: (253) 856-5085 (206)622-1001
Subject: Change Order for Additional Design Services
Estimate/Price:
$8,120
Description of Additional Services:
1. Hire an electrical sub-consultant for construction drawings for L&I review for the
design of the electrical rough-ins for the HVAC system.
2. There are additional services to this project of adding an electrical sub-consultant.
We will add a mark-up of 10% ($5,200 x 10% =$520.00)plus associated project
management including mechanical and electrical coordination and instruction,
which will be T&E not to exceed $2,400. Total NTE$8,120.
Summary
Electrical HVAC Design Change Order = $5,720
Additional Mech.Services for elec.Coordination,T&E Not to Exceed = $2 400
Change Order total = $8,120
Approvals
Engineering Economics Inc