Loading...
HomeMy WebLinkAboutPW06-088 - Supplement - #2 - Jones & Stokes Associates - S 228th Street BNSF Grade Separation - 09/07/2006 Records Ma...---n: ,,a.. ,g5ernetiL KENT Document N.S HI NGTON CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: Jones & Stokes Contract Number: 12U)06 -enge This is assigned by Mary Simmons Vendor Number: Project Name: S. 228th Street Grade Separation Contract Effective Date: Date of the Mayor's signature Contract Termination Date: March 31, 2007 Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Mark Madfai Department: Engineering Abstract: Continue to provide assistance to finalize the revised NEPA Categorical Exclusion application. N ADCL7832 07/02 Adft Washington State Department of Transportation Organization and Address Supplemental Agreement Jones & stokes 11820 Northup Way, Suite E300 Agreement Number Bellevue,WA 98005-1946 Contact Jennifer Barnes LA 5632 Project Number Phone DEMO - 1216 (001) (425) 893-6423 Project Title New Maximum Amount Payable S 228th Street Grade Separation $ 27,990.10 Description of Work Revised NEPA Categorical Exclusion and Environmental Documentation. The Local Agency of City of Kent desires to supplement the agreement entered into with Jones& Stokes and executed on 2/8/2006 and identified as Agreement No LA 5632 All provisions in the basic agreement remain in effect except as expressly modified by this supplement The changes to the agreement are described as follows- Section 1, SCOPE OF WORK, is hereby changed to read: Assist the .rty with finalization of a revised NEPA Categorical Exclusion applicatioii associated_field work, and tochuical_do 1c_i_m_entatlon forth-prgject_ For a_detai_led description, see the-Scope of Work which is attached as Eslubrt A and incorporated-by this reference II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read MarjcE 31,2007 III Section V, PAYMENT, shall be amended as follows Payment shall be amended to add an additional `F9,486 98 for an amended total atuount of 407,990.10. as set forth in the attached Exhibit A, and by this reference made a part of this supplement If you concur with this supplement and agree to the changes as stated above, please sign in the appropriate spaces below and return to this office for final action ByAlil�ABY Cooke,Mayor Consultant Signature ppr i g Authority Signature DOT Form 140-063 EF Revised 10/97 Jones&Stokes EXHIBIT A Scope of Work - AMENDMENT City of Kent Revised NEPA Categorical Exclusion and Environmental Documentation South 2281h Street Railroad Grade Separation Project INTRODUCTION The purpose of tlus supplemental Scope of Work and budget are for Jones & Stokes to assist the City of Kent with finalization of a revised NEPA Categorical Exclusion (CatEx) Application, associated field work, and technical documentation for the proposed grade separation of the Burlington Northern Santa Fe railroad crossing at South 228`h Street. SUPPLEMENTAL SCOPE OF WORK Task 1 — Wetland and Stream Delineation and Report Subtasks 1.1 —Wetland Delineation Supplemental work under this sub-task consists of additional wetland delineation for the existing wetland, denoted in the 2281h Grade Separation wetland report as Wetland F, located to the east of Miles Sand and Gravel. This scope assumes that: • The City will be responsible for surveying the boundaries of the delineated wetlands, as marked by the flags hung by Jones & Stokes biologists. • The City will provide any needed update of the calculation of the area of wetland, stream, and/or buffer impacted by any project elements Subtask 1.2 — Preparation of Wetland Report Jones & Stokes will prepare a stand-alone report (separate from the report prepared for the S 228th Grade Separation environmental documentation) for this wetland, utilizing the Ecology system for wetland rating, recently adopted by the City. Deliverables: Wetland rating field data forms, and data forms for routine wetland determination, and stand-alone wetland report to include this full area. 1 City of Kent South 22e Street Revised Grade Separation NEPA Scope of Work Categorical Exclusion Task 2 —Additional Revisions to Environmental Documentation Subtasls 2.1 —Additional Revision to Administrative Draft Technical Documents This supplement provides for a second round of revision of the Administrative Draft to incorporate City comments into the draft technical documents, in addition to the one round defined in the original scope. Subtask 2.2—Preparation of Project Drawings Supplemental work under this sub-task consists of preparation of conceptual project drawings to support the project description, the cultural report, the noise assessment, and wetland report. Subtask 2.3—Preparation of Hard Copy Documents for Submittal Supplemental work under this sub-task consists of preparation of bound hard copy documents,. Jones & Stokes will provide seven (7) bound copies of the Draft ECS and supporting documentation, for submittal to the City, WSDOT and FHWA. Task 3 — Prepare Final Submittal of ECS for WSDOT and FHWAApproval Jones & Stokes will incorporate WSDOT comments on the ECS application to prepare a final draft to be submitted to WSDOT and FHWA for final approval. This scope assumes that: • WSDOT comments on draft ECS application will be editorial in nature, and will require no substantive change to the supporting analysis or documentation. Deliverable: One(1) electronic copy in pdf format of the final submittal of the ECS application and attachments Jones & Stokes will provide seven (7) bound copies of the Final ECS and supporting documentation, for submittal to the City, WSDOT and FHWA. 2 r w m c 0 x w srys o W 0 O O N O O O O � N 00 N O O O O O of 0 0 N (0 O 0 N N n 0 0 0 0 0 m O Q O O a Q O O N M V 0 O O O O O M "' � '� M fA Ol N Vi 69 l0 (O 1�11 fR O b9 M b9 fR f9 � O HO N N OI M O CCU J 0 0 0 0 0 0 0 0 N 0 0 0 0 0 0 0 O O O O O O O O N O 10 0 0 0 0 0 a o 0 0 0 0 0 0 0in � 0 O U) f H N ry 2 � C9 F N tm0 'B m a w A � N O m (L F a w w My c W E a O O N O O O O N O O N O O O O O l0 y O O O O O O Q_ O O V V O O N M O O O O O O O O n 0 O fA f9 W N bf M w w M b n b Y b 6 d U N 7 N 0 M 3 M N M1Y M M V) 9 V M 0 0 W a U N O N C E e 0 c i � a J A W W N R N C � � M tC•''11 n E0 VI of w n 0 0 > es w` a w ro o ry $ dc m o n w 5 m W N 4m c Uj ! T 6 _ � 0 C) N Ul N O N G C Q W ' r d 1 r I x a I x e N V u eN ems, N O N uNi d L d M l0 Oaa1 m U N t r S O N U C W V) M N c > I 'n •- n d m L m m I 1^E e O 0 0 y O 0 0 IL -i O O O M M > a m » w U u ' C7 m W a v m � � E Vl }3 N y y O 0 O a G M o U) (A W F C NIr ft E a t z NE u c u o 0 E 9 S U q y 0 m W u Ot c c m > a 0 m o E a S a m e }9 0 c - o d y A ° ¢ `m `o V) = g o a C W a C v N C ED O O W y N a W j ° N m t0 Ym�e C Od y lx > Q cc m �0 > y y LL O O N N % t d d d U v W vo N K d a M S al � N rn d a N 3 y ! ! H v y o O u N N M 0 H - F- N N N H F V) O N IN F- Message Page 1 of 1 Yoshitake, Nancy From: Langholz, Ken Sent. Wednesday, September 06, 2006 5 09 PM To: Yoshitake, Nancy Subject Scope and cost for 228th amendment Nancy, Please prepare a federal contract for the attached work. Use March 31, 2007 as project completion. Thanks, Ken -----Original Message----- From: Jennifer Barnes [mailto:]Barnes@jsanet com] Sent: Tuesday, September 05, 2006 1.55 PM To: Langholz, Ken Cc: Madfai, Mark; Deborah Munkberg Subject: Scope and cost for 228th amendment Hi Ken, I have attached a scope and cost estimate for a contract amendment for the 228th Grade Separation It is my understanding that you are covering this while Mark is on vacation, and that you are expecting this Turns out that starting today, I'm on vacation also So Deborah Munkberg (my supervisor) is covering this in my absence The amendment covers additional support for document production requested by the City that was not in the previous scope, additional wetlands work requested by the City, and additional hours to cover finalization of the ECS and technical documentation for submittal to FHWA Changes made since the earlier versions I sent to Mark are streamlining the text in the scope(taking out references to previous scope and tasks) as per his request-and we have also confirmed with your wetlands person (Erin)that we need to do a stand alone report for the wetland located east of Miles Sand & Gravel that reflects your newly adopted Ecology rating system -so the total cost for the wetland report went up by--$1,000 If you need any follow up, Deborah is cc'ed in this email, and her phone number is 425-893-6422 Thanks) Jennifer 9/7/2006