Loading...
HomeMy WebLinkAboutPK06-026 - Change Order - #1 - Berger/Abam Engineers, Inc. - Lake Meridian Boat Launch Construction Documents - 02/22/2006 , Records Manlagernent% KEN W.s„,„GTO• - Document CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: 8n �����[�J Contract Number: �� This is assigned by Mary Simmons Vendor Number: 33/0e Project Name: L.,Ike, Contract Effective Date: 130`Oly / Contract Termination Date: Contract Renewal Notice (Days): �J Number of days required notice for termination or renewal or amendment Contract Manager: �� '612Co';', Department: Abstract: ADCL7832 07/02 KENT WA SHINGTON CHANGE ORDER NO. 1 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR. Berger/Abaco Engineers, Inc. ("Contractor") CONTRACT NAME &PROJECT NUMBER: Lake Meridian Boat Launch Construction Documents ORIGINAL CONTRACT DATE. January 30, 2006 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work," is hereby modified as follows: Provide all labor, materials, and equipment necessary to: Provide technical support and drawings required for permit applications for the Lake Meridian Boat Launch project as described in the Consultant's Fee Estimate datedl/25/06 attached and incorporated as Exhibit A. 2. The c ontract amount and t line f or p erformance provisions o f S ection 11"Compensation,"and Section III, "Time for Completion," are hereby modified as follows: Original Contract Sum, $24,773.00 including applicable alternates and WSST. Net Change by Previous Change Orders $0 (incl applicable 1FSST) Current Contract Amount $249773.00 (Mcl. Previous Change Orders) Current Change Order $90 53.00 Applicable WSST Tax on this Change Order $0 Revised Contract Sum $339926.00 Original Time for Completion 9130/06 (insert date) Revised Time for Completion under N/A prior Change Orders (insert date) Days Required ± for this Change Order +5 calendar days Revised Time for Completion 1016/06 (insert date) Pursuant to Section XIII, entitled "Miscellaneous Provisions," of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below Also, pursuant to the above- referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsrte or home office overhead, or lost profits. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The C ontractor w ill adjust the amount of i is p erfonnance b and(if any) f or this project to be consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: By: lkYLc, 6�L (sign tt re) (sign ureJ Print Name: Elmer W. Ozolin Print Name: Lon Ho Its Senior Project Manager Its Acting Director le DATE: 8 Cep 06 le) DATE: 2Z�0j APPROVED AS TO FORM: Kent Law Department Lake Mendtan Boat Launch Construction Documents CO#1 CONTRACT MODIFICATION-2 OF 2 EXHIBIT A 1 KENT PARKS,RECREATION&COMMUNITY SERVICES Lake Meridian Boat Launch Boarding Float •• Fee Estimate for Professional Services BERGER/ARAM E N,G I N E E RS INC 13ERGERI ABAM-STAFF HOUR SUMMARY Revision Date 25 January 2006 Principal Project Senior Techru- CADD Manager Engineer Engineer clan Drafter Admtn - Rem 771 $175 00 $139 00 $120 00 $90 00 $77 00 $75 00 $60 00 Totals Permit Support Permit Drawings(8 1Y2 X 11) (Assumes 3 drawings) 1 4 16 $1,699 00 - Provide technical Input for Perrrut Applications 2 4 $638 OD Meet with City/Agencies 4 $556 00 Coordination Meetings 8 $1,112 00 Total Hours 0 15 0 =$720 $0 16 0 59 Labor cost $0 $2,085 $0 $1,200 $0 $4,005 (Note Labor rates Include overhead+profit) Subtotal Labor $0 $2,085 $0 $1,200 $0 $4,005 Expenses Sub-Consullants 8athymstnc S,nvey by INCA Engineers $4,476 Subnolal $4,476 el Markup' $448 Yotal Sub-Consultants $4,923 Other Expenses' CADD Computer Ttme 16 $1000 1Hour $160 Travel 132 $0 445 1 Mile $59 Reproduction and Snapping $50 /Each $0 Boat Rental /Day so Experse Subtotal wlthoul Cadd $59 10%Markup S6 Totaf Other Expenses $225 Subtotal Expenses and marlai I $5,148 TOTAL COST $9,153 Page 1 Kent_Parks_Lake Merldian_01-25-06 As Lam- g alb o