HomeMy WebLinkAboutPK05-335 - Change Order - #4 - Staaleson Engineering, PC - Earthworks Park Short Stair Design - 06/12/2006 i Records M-a,:n:""'-g" ernen- a T W.=H,„Gro„ Document Awl CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: Contract Number: This is assigned by Mary Simmons Vendor Number: Project Name:^�/r/� �il/!/�C� I�LG✓?G/G �tJ//. e��i�5 �l1"� �l�O/ 7� Contract Effective Date: `7&1 L r Contract Termination Date: -7 Contract Renewal Notice (Days): -)-135- �� 5 Number of days required notice for termination or re ewal or amendment Contract Manager: Department: j 9/ "M/Wd"y-�� Abstract: ADCL7832 07/02 KENT WTS HINGTOH CHANGE ORDER NO. 4 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR Staaleson Engineering, PC. ("Contractor") CONTRACT NAME &PROJECT NUMBER: Mill Creek Canyon Earthworks Park Short Stairs ORIGINAL CONTRACT DATE- July 11, 2005 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work,"is hereby modified as follows: Provide all labor, materials, and equipment necessary to: Coordinate work with Architect to prepare specifications and architectural plan for the short stairs at Mill Creek Canyon Earthworks Park in Kent as described in the Consultant's proposal dated June 1, 2006 attached and incorporated as Exhibit A 2. The c ontract amount and t ime for p erfonnance p rovisions o f S ection 11 "Compensation," and Section III, "Time for Completion," are hereby modified as follows: Original Contract Sum, $39000.00 including applicable alternates and WSST Net Change by Previous Change Orders $0 Current Contract Amount $7,40.00 (incl Previous Change Orders) Current Change Order $4,440.00 Applicable WSST Tax on this Change Order $0 Revised Contract Sum $11,8 5.00 . Original Time for Completion 60 days Revised Time for Completion under 2/28/06 prior Change Orders Days Required ± for this Change Order + 135 calendar days Revised Time for Completion 7/16/06 Pursuant to Section XIII, F, entitled "Miscellaneous Provisions,"of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below Also, pursuant to the above- referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all clam-is of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The C ontractor will a dj ust the amount o f its p erfonnance b and (if any) f or t his p roj ect to b e consistent with the revised contract sum shown in section 2, above IN WITNESS,the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: ._ _ By: (signallae) (sign ire) Print Name: Darrell Staaleson Print Name: Lori Hog Its Owner Its Acting Director (Title (Tul DATE: SUN 2006 DATE: APPROVED AS TO FORM: Kent Law Department Earthworks Short Stairs CO#4 CONTRACT MODIFICATION-2 OF 2 f � � Staatcstrin Er: ineerin P.C.-- -- EXHIBIT A CLIENT. Lori Plemm Kent Earthworks Park S1,orr Stairs r e RF Paymentsto FNGINLERfor Servicesand ktimbursahle Expenses SEC7�ION AZ--BASK SE�ViCES OF ENGII'VEM A'_'0 CaLneral The Bzmic. rvices are premised cm the Ibtlowine genera!SCopz fit PrAess!O�Jah SUVICCS' A2 I Refer to LX [IBIT A2 t—Vfm BreaK Doi+n Str.!ctui� iNOPW A22„t;cp<rai Pio;ecr bcec iprinlr I, N has become necessary fur LNG NFER to peifotm additionai servic;s, waich were not previously expectz-A,in undci to w±npiete the priject ENGINEER shall provide an ArchitcLtural Plan, whicli shows the Arc dlecmral �quiremem separate fmm the structuisl framing. F*jNLER sha IKEEVISE framing per discustirc,,i with Client r [britainai Agreement. --- S 3,000.00 k AE) ITIONAL rERVlt S for A1: 4 4,455.00i :.i ADDITIONALSERVIC SWA2 11 S y440.0Q 'TOTAL PROJECT FEE Sl1,895.00 is AI Prol L'1£)eicr'i trap Phrase y PHASEgor, AM-Fittat T) i,n e+ for 5tgr d 1 --Sho't StaraCOST Pi US to Maximum Fe Tta ENGINEER shall RE. !SE fratnms and foundation des!grt per d scus5!on with C .er±t. I.500.10 Sehiertuic'On or before.I44, 16, :006. OudsrdeServiees: Faye Clark. Architect, i ! AdditRtinal Fee for Ar hitect to prepare Spec!ticauoits tar relevant aspect,of this p-olect in 5 1,02700 r ,Iccord;lncc�teeth AIA Standards This tee is i t addmoa to the f_c previously appioved in Al " � f'nn Fu.,ivn iesu ird t, m Airhitc,U s d!rect dracussiens with C'+ty of!tent n_r;3r�ing s.ope cif' se!V,ces. i 2 A rcliacct Shall prep 'Architectural Plan for the Short Stairs based on 1 opographic Map S 1 050A0 a lircvided by thQ CaN ,f Kent Th,:Design shall include details tur guarttails hurdrails, and other life safetytI ns�nll cracria prevlouriv developed AddiT!oltal Fee for Architect was omitted 5ori±pAddenduni in error _ 3 FEVISF Foundatiapton Architecrurah Plan I'Mri Concletc walls to stee'i Post:and S8b3,00 beam=.on concrete x a,» FILE COPY l i d; ' • FXHIBiT A Pane I of I 8•uzao6 C�,df i-JUN " 12006 . i TOTAL P.O7