CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed, if you have questions, please contact Mary Simmons, City
Clerks Office.
Vendor Name: Transportation Improvement Board
Contract Number: Nov- qlq
This is assigned by Mary Simmons
Vendor Number:
Project Name: S. 228th St. - 54th Ave. S. to SR-516
Contract Effective Date: January 18, 2006
Contract Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: Chad Bieren
Department: Engineering
Abstract:
Fuel Tax Grant Distribution Agreement for one of the phases of the proiect.
ADCL7832 07/02
Washington State
' V Transportation Improvement Board
CITY OF KE
�NM ImVr^AF
Transmittal Letter ,11- 2 7 2005
TO Members
December 20, 2005 ENGINEERING DEPT
Comnssioner Leo Bowman
Chair Benton County
Counonmember Jeanne Burodge Mr. Larry Blanchard, P. E.
Vice Chair City of Federal Way Acting Public Works Director
Mr John Akers P E City of Kent
City of Ellensburg
Mr George Cress 220 - 4th Avenue South
Port of Longview Kent, WA 98032-5838
Ms Kathleen Davis
WSDOT
Councllmil Wir a,Ganley Transportation Improvement Program
City of Battle Ground TO Project Number 9-P-106(008)-6
Councnmemoer Calvin Goings South 228th St
PieiCe County
Ms Paula Hammond PE 54th Ave S to SR 516 (Kent-Des Moines Rd)
WSDOT Construction Phase Approval
Councnmember Neil McClure
City of Yakima
Mr DickMCKnley This is to confirm that the TIB has authorized the construction phase of this
City of Bellingham
project effective December 20, 2005. Please sign the enclosed Fuel Tax Grant
Mr Dave Nelson
Grant County Distribution Agreement and return the original to the TIB. Construction phase
Commissioner Greg Parton payments will be processed after an executed Fuel Tax Grant Distribution
Whitman County
Agreement is received by the TIB. You may request reimbursement from TIB
Mr DaveO Connell
Mason County beginning December 20, 2006.
Mrs Robin Retlew
Office of Financial Maragement Submit a TIB Reimbursement Form to request payment for eligible project costs.
Mr David Wenatchee a
nlelm
City of Wenhee Failure to submit timely progress billings may result in delayed payments or the
Ms iStamm establishment of a payment schedule. Reimbursements are processed
HS Public Affairs
electronically at
Mr Harold Taniguchi
King County Metro Transit www.tib.wa.gov/services/reimbursements/reimbursements.htm.
Mr Steve Tnomsen
Snohomish County For assistance with our project, contact Greg Armstrong, TO Project Engineer,
Y P 1 9 9 1 9
M of mold omac
Bicycle Alliancee of Wasni at (360) 586-1142 or via e-mail at GregA@TIB.wa gov.
Mr Jay Weber
County Road Admrmstration Board
Mr Slevan Gorcester
Executive Director
P 0 Box 40901
Olympia WA 98504 0901
Phone 360-5661140
Fax 360-586-1165
wvrw tib via gov
Investing in your local community
Attachment 1
Urban Programs
Project Description
and
List of Documents to be Attached to this Agreement for each
Phase of the Project
Project Information
Lead Agency- City of Kent
Project Number 9-P-106(008)-6
Project Title: South 228th St
Project Termini: 54th Ave S to SR 516 (Kent-Des Moines Rd)
TIB funds for the project are as follows:
Phase TO Funds
Design 0
Construction 278,508
Total Grant 278,508
Documents Required at Bid Award Phase
O Bid Award Updated Cost Estimate Form
O Bid Tabulations
O Cost Change Justification
Documents Required at Contract Completion Phase
O Contract Completion Updated Cost Estimate Form
O Final Summary of Quantities
O Cost Change Justification
O Project Accounting History
Amendments to Agreement (if any)
TIB Forth 190-600 Rev 2/14/2003
WWWashington State Transportation Improvement Board
Fuel Tax Grant Distribution Agreement
LEAD AGENCY: City of Kent
PROJECT NUMBER: 9-P-106(008)-6
PROJECT TITLE: South 228th St
PROJECT TERMINI: 54th Ave S to SR 516 (Kent-Des Moines Rd)
1 0 PURPOSE
The Washington State Transportation Improvement Board (hereinafter referred to as
"TIB") hereby grants funds for the project specified in the attached documents, and as
may be subsequently amended, subject to the terms contained herein. It is the intent of
the parties, TIB and the grant recipient, that this Agreement shall govern the use and
distribution of the grant funds through all phases of the project. Accordingly, the project
specific information shall be contained in the attachments hereto and incorporated
herein, as the project progresses through each phase.
This Agreement, together with the attachments hereto, the provisions of chapter 47.26
Revised Code of Washington, the provisions of title 479 Washington Administrative
Code, and TIB Policies, constitutes the entire agreement between the parties and
supercedes all previous written or oral agreements between the parties.
2.0 PARTIES TO AGREEMENT
The parties to this Agreement are TIB, or its successor, and the grant recipient, or its
successor, as specified In the attachments
3 0 TERM OF AGREEMENT
This Agreement shall be effective upon execution by TIB and shall continue through
completion of each phase of the project, unless terminated sooner as provided herein.
40 AMENDMENTS
This Agreement may be amended by mutual agreement of the parties Such
amendments shall not be binding unless they are in writing and signed by personnel
authorized to bind each of the parties.
5.0 ASSIGNMENT
The grant recipient shall not assign or transfer its rights, benefits, or obligations under
this Agreement without the prior written consent of TIB The grant recipient is deemed
to consent to assignment of this Agreement by TIB to a successor entity. Such consent
shall not constitute a waiver of the grant recipient's other rights under this Agreement.
6 0 GOVERNANCE & VENUE
This Agreement shall be construed and interpreted in accordance with the laws of the
state of Washington and venue of any action brought hereunder shall be in the Superior
Court for Thurston County.
TIB Forth 190-500 Page 1 of 3 Rev 2/14/2003
Washington State Transportation Improvement Board
Fuel Tax Grant Distribution Agreement
7.0 TERMINATION
7.1 UNILATERAL TERMINATION
Either party may terminate this Agreement upon 30 days' prior written notice to
the other party. If this Agreement is so terminated, the parties shall be liable only
for performance rendered or costs incurred in accordance with the terms of this
Agreement prior to the effective date of termination.
7.2 TERMINATION BY MUTUAL AGREEMENT
Either party may terminate this contract in whole or in part, at any time, by mutual
agreement with a 30 calendar day written notice from one party to the other
7 3 TERMINATION FOR CAUSE
In the event TIB determines the grant recipient has failed to comply with the
conditions of this Agreement in a timely manner, TIB has the right to suspend or
terminate this Agreement. TIB shall notify the grant recipient in writing of the
need to take corrective action If corrective action is not taken within 30 days, the
Agreement may be terminated. TIB reserves the right to suspend all or part of
the Agreement, withhold further payments, or prohibit the grant recipient from
incurring additional obligations of funds during the investigation of the alleged
compliance breach and pending corrective action by the grant recipient or a
decision by TIB to terminate the Agreement The grant recipient shall be liable
for damages as authorized by law including, but not limited to, repayment of
misused grant funds. The termination shall be deemed to be a Termination for
Convenience if it is determined that the grant recipient (1) was not at fault, or (2)
failure to perform was outside of the grant recipient's control, fault or negligence.
The rights and remedies of TO provided in this Agreement are not exclusive and
are in addition to any other rights and remedies provided by law
7.4 TERMINATION FOR CONVENIENCE
TIB may, by ten (10) days written notice, beginning on the second day after the
mailing, terminate this Agreement, in whole or in part, because federal or state
funds are no longer available for the purpose of meeting TIB's obligations, or for
any reason. If this Agreement is so terminated, TO shall be liable only for
payment required under this Agreement for performance rendered or costs
incurred prior to the effective date of termination.
7.5 TERMINATION PROCEDURE
Upon receipt of notice of termination, the grant recipient shall stop work and/or
take such action as may be directed by TIB.
TO Form 190-500 Page 2 of 3 Rev 2/14/2003
Washington State Transportation Improvement Board
Fuel Tax Grant Distribution Agreement
8.0 AVAILABILITY OF TO FUNDS
The availability of Transportation Improvement Board funds is a function of Motor
Vehicle Fuel Tax collections and existing contractual obligations. The local agency shall
submit timely progress billings as project costs are incurred to enable accurate
budgeting and fund management Failure to submit timely progress billings may result in
delayed payments or the establishment of a payment schedule
9.0 ATTACHMENTS
Attachment 1 specifies the grant program applicable to this project, identifies the grant
recipient, and contains the list of additional documents specific to the project which will
be attached and Incorporated into this Agreement, together with subsequent
amendments, as the project progresses through each phase of design and construction.
Approved as to Form
This 14th Day of February, 2003
Rob McKenna
Attorney General
By:
Signature on file
Elizabeth Lagerberg
Assistant Attorney General
Lead Agency 7 Transportation Improvement Board
12, ex
i at of Chairman/Mayor at Executive Director ate
uzette Cooke Stevan Gorcester
Print Name Print Name
TIB Form 190-500 Page 3 of 3 Rev 2/14/2003
Attachment 1
Urban Programs
Project Description
and
List of Documents to be Attached to this Agreement for each
Phase of the Project
Project Information
Lead Agency: City of Kent
Project Number: 9-P-106(008)-6
Project Title: South 228th St
Project Termini: 54th Ave S to SR 516 (Kent-Des Moines Rd)
TIB funds for the project are as follows:
Phase TIB Funds
Design 0
Construction 278,508
Total Grant 278,508
Documents Required at Bid Award Phase
O Bid Award Updated Cost Estimate Form
O Bid Tabulations
O Cost Change Justification
Documents Required at Contract Completion Phase
O Contract Completion Updated Cost Estimate Form
O Final Summary of Quantities
O Cost Change Justification
O Project Accounting History
Amendments to Agreement (if any)
T18 Form 190-600 Rev 2/14/2003
����—\ Washington State Transportation Improvement Board
A " 'l Fuel Tax Grant Distribution Agreement
7.0 TERMINATION
7.1 UNILATERAL TERMINATION
Either party may terminate this Agreement upon 30 days' prior written notice to
the other party If this Agreement is so terminated, the parties shall be liable only
for performance rendered or costs incurred in accordance with the terms of this
Agreement prior to the effective date of termination.
7.2 TERMINATION BY MUTUAL AGREEMENT
Either party may terminate this contract in whole or in part, at any time, by mutual
agreement with a 30 calendar day written notice from one party to the other.
7.3 TERMINATION FOR CAUSE
In the event TIB determines the grant recipient has failed to comply with the
conditions of this Agreement in a timely manner, TO has the right to suspend or
terminate this Agreement. TIB shall notify the grant recipient in writing of the
need to take corrective action. If corrective action is not taken within 30 days, the
Agreement may be terminated TIB reserves the right to suspend all or part of
the Agreement, withhold further payments, or prohibit the grant recipient from
incurring additional obligations of funds during the investigation of the alleged
compliance breach and pending corrective action by the grant recipient or a
decision by TIB to terminate the Agreement The grant recipient shall be liable
for damages as authorized by law including, but not limited to, repayment of
misused grant funds The termination shall be deemed to be a Termination for
Convenience if it is determined that the grant recipient: (1) was not at fault, or (2)
failure to perform was outside of the grant recipient's control, fault or negligence
The rights and remedies of TO provided in this Agreement are not exclusive and
are in addition to any other rights and remedies provided by law.
7.4 TERMINATION FOR CONVENIENCE
TO may, by ten (10) days written notice, beginning on the second day after the
mailing, terminate this Agreement, in whole or in part, because federal or state
funds are no longer available for the purpose of meeting TIB's obligations, or for
any reason If this Agreement is so terminated, TIB shall be liable only for
payment required under this Agreement for performance rendered or costs
incurred prior to the effective date of termination.
7 5 TERMINATION PROCEDURE
Upon receipt of notice of termination, the grant recipient shall stop work and/or
take such action as may be directed by TIB.
TIB Form 190-500 Page 2 of 3 Rev 2/14/2003
Washington State Transportation Improvement Board
Fuel Tax Grant Distribution Agreement
10 AVAILABILITY OF TIB FUNDS
The availability of Transportation Improvement Board funds is a function of Motor
Vehicle Fuel Tax collections and existing contractual obligations. The local agency shall
submit timely progress billings as project costs are incurred to enable accurate
budgeting and fund management Failure to submit timely progress billings may result in
delayed payments or the establishment of a payment schedule
9.0 ATTACHMENTS
Attachment 1 specifies the grant program applicable to this project, identifies the grant
recipient, and contains the list of additional documents specific to the project which will
be attached and incorporated into this Agreement, together with subsequent
amendments, as the project progresses through each phase of design and construction.
Approved as to Form
This 14th Day of February, 2003
Rob McKenna
Attorney General
By:
Signature on file
Elizabeth Lagerberg
Assistant Attorney General
Lead Agency Transportation Improvement Board
S!zette
n a of Chairman/Mayor D e Executive Director to
Cooke
Stevan Gorcester
Print Name Print Name