CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed, if you have questions, please contact Mary Simmons, City
Clerks Office.
Vendor Name: !� /r- S Al e-,
Contract Number:
This is assigned by Mary Simmons
Vendor Number: 7d6 2-6
Project Name: 'Sf /,(J/
Contract Effective Date:
Contract Termination Date:
-f
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager:
Department:
Abstract:
ADCL7832 07/02
� KENiT
W..S...GT01
CHANGE ORDER NO. 1
NAME OF CONTRACTOR, CONSULTANT, OR VENDOR S B &Associates, Inc. ("Contractor")
CONTRACT NAME &PROJECT NUMBER: West Fenwick Park Design
ORIGINAL CONTRACT DATE- December 29, 2005
This Change Order amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual
consent of the parties, the project contract is modified as follows.
1. Section I of the Agreement, entitled"Description of Work," is hereby modified as follows:
Provide all labor, materials, and equipment necessary to.
Provide additional work items to the original scope of work and new work for the
ballfield underdrain as described on the Consultant's proposal dated March 31,
2006 attached and incorporated as Exhibit A.
2. The c ontract amount and t ime for p erfonnance p rovisions o f S ection II "Compensation," and
Section III, "Time for Completion," are hereby modified as follows:
Original Contract Sum, $219750.00
including applicable alternates and WSST
Net Change by Previous Change Orders $0
Current Contract Amount $219750.00
Current Change Order $6,900.00
Applicable WSST Tax on this Change Order $0
Revised Contract Sum $285650.00
Original Time for Completion 2/28/06
Revised Time for Completion under N/A
prior Change Orders
Days Required ± for this Change Order + 60 calendar days
Revised Time for Completion 4/28/06
Pursuant to Section X1II, entitled "Modifications," of the Contract executed by the parties, the
Contractor accepts all requirements of this Change Order by signing below Also, pursuant to the above-
referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and
acknowledges and accepts that this Change Order constitutes final settlement of all claims of any land or nature
arising from or connected with any work either covered or affected by this Change Order, including, without
limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits.
L The parties whose names appear below swear under penalty of perjury that they are authorized to enter
into this contract modification, which is binding on the parties of this contract.
3. The Contractor will adjust the amount o f its p erformance b and (if any) for this project to b e
consistent with the revised contract sum shown in section 2, above.
IN WITNESS, the parties below have executed this Agreement, which will become effective on the
last date written below.
CONTRAC CITY OF KENT:
By: By:
(s�grinture) (Srgil ur
Print Name Michael R Lamb Print Name: Lori Hog
Its Principal Its Acting Director
(Tale) (Title)
DATE: 1AA Co DATE. �Z
APPROVED AS TO FORM:
Kent Law Department
West Fenwick Paik Design#]
CONTRACT MODIFICATION-2 OF 2
EXHIBIT A
1, A N [7 ,; CA 1'
RC, HITEC TS
5B & AS. I%TLC, )NC
114b NW IEARY WAY
SEATTLE, WA 9a107
{d;6)?59 T13i I ax(20e)73�2t3fi
March 31,2006
Perry Brooks, Project Manager
City of Kent
220—4`h Avenue South
Kent, Washington 98032-5895
Re- West Fenwick Park
Landscape Architectural Services
Amendment#E 1
Dear Perry,
Per your request we have prepared the following contract amendment proposal for the West Fenwick Park
project Listed below are the additional tasks and associated fees with review continents by the City from
the 100% submittal set The tasks and fees are separated into two categories The first category is for
revisions and additions to elements contained within the current scope of work The second category is
for new work associated with the ballfield underdram system
Additional Work Items
Scope of additional improvements associated with original scope items to include:
1- New 4' high colored chain link fence along south edge of play equipment area The fence to
include an expanded maze similar to sketch piovided by the City Colors to be blue,yellow and
red A 4'high galvanized chainlmk fence to continue from the play area east to the path leading
to the basketball court Both fences to include a concrete mow strip
2- Revised asphalt path to cement concrete from the parking lot to the new basketball courts
3- Shift ADA stalls to the west and provide a maintenance vehicle access from parking lot
4- Add sidewalk to the east side of the parking lot Connect to the plaza area
5- Revise paving and planting plan for new plaza layout
6- Show location of new waterline, meter and deduct meter to restroom location
7- Revise asphalt basketball court, move bench locations,add grass between walk and court
8- Relocate drinking fountain along path to the new basketball court
9- Add concrete band around outside edge of basketball court
Page 2 of 2
Scope of new work associated with ballfield underdratn-
I- Review soils report provided by City
2- Determine limit of new underdram system for the ballfield area For this proposal it is assumed
that the size of the underdramed field will be approximately 450' X 250'
3- Develop construction drawings showing new underdram system and 9"deep sand/organic/
topsoil mix For this proposal it is assumed that the underdram system outfall will be connected to
a sump dram or existing CB and that no downstream design or reports will be required If
additional stormwater system design is required, a civil engineer/fee will need to be added to the
contract
4- This scope does not include the design of new backstops or infield mixes
5- The construction drawings for the ballfield area will be developed as a separate package for later
use by the Ctty.
Bidding: Scope and fee to be determined at a later date if requested.
Construction Services: Scope and fee to be determined at a later date if requested
The following represents our fee proposal for the project
Summary of Fees
Work Phase Base Fee
Additional work items to current scope $2,100
Ballfield Underdram System $4,500
Expenses $300
Total $6,900
All work would be invoiced monthly based upon the percentage of work completed during the billing
period.
SBA is prepared to continue work immediately,and pioceed through the design phases.
I am available at your convenience to meet and review the specific items included,and on behalf of
SB&A team, I look forward to a successful completion of this project
Sincerely,
Michael R Lamb,Principal
SB and Associates, Inc