HomeMy WebLinkAboutPK05-340 - Change Order - #3 - L.W. Sundstrom - Three Friends Fishing Hole - Additional Work, Extended Time, Increased Contract Amount - 12/28/2005 Records M ___ - gle KENT °¢T_= Document WASHINGTOM � e CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: L le Contract Number: This is assigned by Mary Simmons Vendor Number: Project Name: Contract Effective Date: Contract Termination Date: Contract Renewal Notice (Days): + Number of days required• notice for termination or renewal or amendment Contract Manager: t/ M407l Department: �� Abstract: ADCL7832 07/02 KENT W P 5 H I N G T O N CHANGE ORDER NO. 3 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR: LW Sundstrom, Inc. ("Contractor") CONTRACT NAME &PROJECT NUMBER: Three Friends Fishing Hole, PR 05 02 ORIGINAL CONTRACT DATE: 9/12/05 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with tlus Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows. 1. Section I of the Agreement, entitled"Description of Work," is hereby modified as follows: Provide all labor, materials, and equipment necessary to: Add changes to the restroom/picnic shelter building as required from the City of Kent Building Department review and described in the Contractor's quote dated 12/1/05 attached and incorporated as Exhibit A Add an additional 106 calendar days to complete work, extending the contract date from 12/15/05 to 3/31/06 per verbal direction from Contractor 12/6/05 2. The c ontract amount and t ime for p erformance p rovisions o f S ection I I "Compensation," and Section III, "Time for Completion," are hereby modified as follows- Original Contract Sum, $5149691.46 including applicable alternates and WSST. Net Change by Previous Change Orders - $50,592.00 Current Contract Amount $464,099.46 (incl. Previous Change Orders) Current Change Order $229478.85 Applicable WSST Tax on this Change Order $1,978.14 Revised Change Order including WSST $249456.99 Revised Contract Sum $4889556.45 Original Time for Completion 12/15/05 Revised Time for Completion under 0 prior Change Orders Days Required ± for this Change Order +106 calendar days Revised Time for Completion 3/31/06 Pursuant to Section 1 of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by s igmng below Also, pursuant to the above-referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The C ontractor w ill adjust the amount o f its performance b and(if any) f or this project to b e consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement,which will become effective on the last date written below. CONT CTOR: CITY O NT: By: I JkAA, By: (signature) (signature) Print N e: Jim White Print Name: Lennart W. Sundstrom Its Mayor Its President (r,tie) (Titre) DATE. _ DATE: 1 Z - ! Z 06 AP FftpVED AS T FORM: en Law Dop Iment Three Friends Fishing Hole#3 CONTRACT MODIFICATION-2 OF 2 EXHIBIT A @2a42 ■ e# ` © 9 B ; a 2 00filaa2 ) § a _ ■ [ - � $) @@ § § {° 2 | � . k 2 a i \ k § § / ) \ ¥ \ 2 - 3 ! ƒ !a f � § | � $ • - ! \ 9 /c_ k - � \ � k\\ \ ; Q ; 2 4b2 5! «2Mp: « ] AR4 22 i s( + -- V/./_J LJJ JYy yQO f HEM)ERSW I'll soNRY PACE a al �a MER AND "Quality is o"r Altitude" DATE; 11-22-05 TO: LW Sundstram ATTENTION: Lon RE:CMU costs per revised drawings PROJECT: 3 Friends Fishing Hale *(44 2011Ieea CMU veneer at picnic shelter columns ......................$3,565,00 *CMU split farce . replaces smooth CMU at exterior elevations.... ......, .$1,570.00 ;CMU ground face-replaces smooth CMU at exterior elovationa..........$ 1,110.00 Total costs incurred due to revised drawings. .,..................................$6,246.00 From, Tom Hendarson President CR M BENAEIY11091115 4` 2701.3 lSO&Righway South,0313 Du Moim,WA 9819W250 Phan« (253)830MM VANON (253)9 MN- EMAIL.,; tiE!YDEki301YMA,50h11t7�'1KC(;eh1SN-COi►t 'ba+ox 'd llSO c� �NI PJ08i�CP�S M NJdL_ 'ti y0��z U