Loading...
HomeMy WebLinkAboutPK05-340 - Change Order - #2 - L.W. Sundstrom - Three Friends Fishing Hole - Additional Work, Extended Time, Increased Contract Amount - 02/22/2006 asx� fl Records Man" gemer -KEN• T .r Document WA9HINGTON - Ts'_ CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: Contract Number: This is assigned by Mary Simmons Vendor Number: r/ /` �i�i Project Name: ��/'.22 �`�9�rY�S ,>�I.��//�' f'���� ' [ �l y�/C' 7� Contract Effective Date: �1/2� -15 Contract Termination Date: /-2//SI�� S� � Contract Renewal Notice (Days): Number of days required notice for termination or renewal or amendment Contract Manager: Department: Abstract: ADCL7832 07/02 KENT Wns Hirucrory CHANGE ORDER NO. 2 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR. LW Sundstrom, Inc. ("Contractor") CONTRACT NAME & PROJECT NUMBER: Three Friends Fishing Hole, PR 05 02 ORIGINAL CONTRACT DATE: 9/12/05 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled"Description of Work,"is hereby modified as follows: Provide all labor, materials, and equipment necessary to: Delete one of two specified concrete barbecues for the Three Friends Fishing Hole restroom/picmc shelter building as described in the Cost Savings Proposal dated 9/15/05 attached and incorporated as Exhibit A. 2. The c ontract amount and time for p erformance p rovisions o f S ection 11 "Compensation," and Section I11, "Time for Completion," are hereby modified as follows. Onginal Contract Sum, $517,691.46 including applicable alternates and WSST. Net Change by Previous Change Orders - $48,960.00 Current Contract Amount $465,731.46 (incl Previous Change Orders) Current Change Order- CREDIT - $1,500.00 Applicable WSST Tax on this Change Order - $132.00 Revised Change Order including WSST - $1,631.00 Revised Contract Sum $4649100.46 Original Time for Completion 12/15/05 Revised Time for Completion under 0 prior Change Orders Days Required ± for this Change Order 0 calendar days Revised Time for Completion 12/15/05 Pursuant to Section 1 of the Contract executed by the parties, the Contractor accepts all requirements of this C hange O rdcr b y s igmng b elow. A lso,p ursuant t o t he a bove-referenced c ontract, C ontractor a grees t o waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The Contractor will adjust the amount o f its p erformance b and (if any) for this project to b e consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONT CTOR: CITY OF. John 7 Lkk-�' By: 0 By: (signature) ignat ) Print Na M. Hodgson Print Name: Lennart W Sandstrom Its Director Its President (Title) DATE: lb DATE: f © 4- o S APPROVED AS TO FORM: Kent Law Department t Three Fnends Fishing Hole#2 CONTRACT MODIFICATION-2 OF 2 EXHIBIT A Cost Savings Proposal Three Friends Fishing Hole project was advertised for public bid. Two bids were received June 21, 2005, both over the Engineer's estimate of $225,000 In an effort to bring construction costs to within the City's allocated budget, and still completing the project, Lori Flemm (City of Kent Parks & Open Space Superintendent) and Len Sundstrom (LW Sundstrom, Inc.) met on Wednesday, July 27, 2005 to review the project. It was agreed that the following items would be deleted from the base bid: 1. Delete metal wall panels in the restroom/picnic shelter building - $45,000 2. Delete one of two specified concrete barbecues - $1,500 CONTRACTOR: CITY OF KENT: C* � By- Lennart W Sundstrom By- Lori M. Flemm LW Sundstrom, Inc. City of Kent Parks and Open Space Date 1 d , 4- 0 Date. ;ept 15, 00�j