Loading...
HomeMy WebLinkAboutPK05-335 - Change Order - #2 - Staaleson Engineering, PC - Earthworks Park Short Stair Design - 10/28/2005 -c D1f kE. Records Manag- ernentr, W.SHINGro. - Document f CONTRACT COVER SHEET This is to be completed by the Contract Manager prior to submission to City Clerks Office. All portions are to be completed, if you have questions, please contact Mary Simmons, City Clerks Office. Vendor Name: Contract Number: This is assigned by Mary Simmons Vendor Number: 3 00e-71-16 Project Name: /w/ /fry- a— Contract Effective Date: `7////S-- T Contract Termination Date: Contract Renewal Notice (Days): Number of days required notice for termination or re ewal or amendment Contract Manager: Department: Abstract: ADCL7832 07/02 KENT WA5 HI..TON CHANGE ORDER NO. 2 NAME OF CONTRACTOR, CONSULTANT, OR VENDOR. Staaleson Engineering, PC. ("Contractor") CONTRACT NAME &PROJECT NUMBER: Mill Creek Canyon Earthworks Park Short Stairs ORIGINAL CONTRACT DATE: July 11, 2005 This Change Order amends the above-referenced contract; all other provisions of the contract that are not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual consent of the parties, the project contract is modified as follows: 1. Section I of the Agreement, entitled "Description of Work,"is hereby modified as follows. Provide all labor, materials, and equipment necessary to: Due to the Consultant's work load on other projects, the contracted work on Mill Creek Canyon Earthworks Park Short Stairs is behind schedule The Consultant has requested an extension to Wednesday, November 30, 2005 as described in his memo dated October 14, 2005 attached and incorporated as Exhibit A. 2. The c ontract amount and time for p erformance provisions o f S ection I I "Compensation," and Section III, "Time for Completion," are hereby modified as follows: Original Contract Sum, $39000.00 including applicable alternates and WSST. Net Change by Previous Change Orders $0 Current Contract Amount $3,000.00 (incl Previous Change Orders) Current Change Order SO Applicable WSST Tax on this Change Order $0 Revised Contract Sum $39000.00 Original Time for Completion 60 days Revised Time for Completion under 10/12/05 prior Change Orders Days Required ± for this Change Order + 49 calendar days Revised Time for Completion 11/30/05 Pursuant to Section XIII, F, entitled"Miscellaneous Provisions," of the Contract executed by the parties, the Contractor accepts all requirements of this Change Order by signing below. Also, pursuant to the above- referenced contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from or connected with any work either covered or affected by this Change Order, including, without limitation, claims related to contract time, contract acceleration, onsite or home office overhead, or lost profits. The parties whose names appear below swear under penalty of perjury that they are authorized to enter into this contract modification, which is binding on the parties of this contract. 3. The C ontractor w ill adjust the amount o f its p erformance b and (if any) f or this project to b e consistent with the revised contract sum shown in section 2, above. IN WITNESS, the parties below have executed this Agreement, which will become effective on the last date written below. CONTRACTOR: CITY OF KENT: By: / By: i 4w" ;prLa;- (stgnat re) (stgr lure) Print Name. Darrell Staaleson Print Name: John M. on Its Owner Its Director Title) (Title DATE-_ OC 2 4 2005 DATE: APPROVED AS TO FORM: Kent Law Department Earthworks Short Stairs CO#2 RECEIVED OCT 21 2005 Staaleson Engineering CONTRACT MODIFICATION-2 OF 2 EXHIBIT A taaleson �ng+neering, P.C. 5truct,irel Design * Investigations • Seismic Retrofits 10024 SE 240" St , Suite 230 Kent, Ws, 98031-SIZ4 Ph, (253) 520-0388; Fax. (253) 520-0387 Email; dstaal(Pstaaleng Cum Web. www.stealeng com C.LIEN'I Quienttn Po[t Kent Parks Dept. RE, Request Extension 220 Forth Ave S LEADLR Staaleson Ergineering, PC Kent,WA 98032 DATE Pnda) Octobet 14 2005 PRQJECT 04-014 Kent Earthworks Park Stairs PAGE Page I of I -- MEMO Quienttn, The Architectural design for the Short Stairs is at about 80"%o complete and I am working on the Construction drag ags Unfortunately, 1 am behind schedule on completing your nro;ect due to our workload Se I need to rgtiest an extension of our completion date by,45 days Extension of Completion Dale W ED NOV 30,2005. I trust that this +s acceptable I apprec+ate your p4Rence +� SINCERELY, STAALFSON ENGINEERING,PC ;!�I�z-,, OCT 14 2005 Der ell Staaleson, P F EthUTP+tG, Sent Via rt) r+lc 1 Uwentm foil Fax 253-856.6120 c ' Mail- G l i MW3lanrd dnc%�Prnj Nipma(sc nlrg)doC Z0 39vd 33Nb'N31NIVW 5MVal OET999EE97 ZZ LL SaOZ/6Z/6L