CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed, If you have questions, please contact City Clerks Office.
Vendor Name: �r � Vendor Number:
JD Edwards Number
Contract Number: dc("36.3
This is assigned by Deputy City Clerk
C
� r
Description:
Detail:
Project Name:
Contract Effective Date: 0 Termination Date 0 S
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: 0,AA6L&.4 t epartment:
0
Abstract:
5 Public\RecordsManagement\Forms\ConiroctCover\ADCL7832 07/02
KENT
WASHINGTON
CHANGE ORDER NO, 1
NAME OF CONTRACTOR,CONSULTANT, OR VENDOR: Summit Central Construction.Inc ("Contractor's
CONTRACT NAME&PROTECT NUMBER-Kent Centennial Parking Garage Seismic
ORIGINAL CONTRACT DATE:October 25. 2004
This Change Order amends the above-referenced contract; all other provisions of the contract that are
not inconsistent with this Change Order shall remain in effect. For valuable consideration and by mutual
consent of the parties,the project contract is modified as follows:
1. Section I of the Agreement, entitled"Description of Work,"is hereby modified as follows:
Provide all labor,materials, and equipment necessary to:
Per A rchitect D rill h ole from o utside o f b uilding t hrough s pandrell p anel i nto
column, i nstall a nchor u sing H ilti H Y 150 with n ew 12" x 12" p late. P aint a 11
exposed steel. @55 locations, $12,799
Per ArchitectC!hip and grind embeds. Repair with Epoxy Gel@ 77 locations
$2,050
2. The c ontract a mount a nd t ime for p erformance p rovisions o f S ection I I"Compensation,"a nd
Section 111,"Time for Completion,"are hereby modified as follows:
Original Contract Sum, $3519315.20
including applicable alternates and WSST.
Net Change by, revious Change Orders $0
(incl. applicable WSST)
Current Contrast Amount $3519315.20
(incl. Previous Change Orders)
Current Change Order $141,849.00
Applicable WSST Tax on this Change Order $1,306.71
Revised Contract Sum $3679470.91
Original Time for Completion June 24,2005
(insert date)
Revised Time for Completion under N/A
prior Change Orders
(insert date)
Days Required t for this Change Order +21 calendar days
Revised Time for Completion July 15,2005
(insert date)
Pursuant to Section 41, entitled "Changes," of the Contract executed by the parties, the Contractor
accepts all requirements of this Change Order by signing below. Also, pursuant to the above-referenced
contract, Contractor agrees to waive any protest it may have regarding this Change Order and acknowledges
and accepts that this Change Order constitutes final settlement of all claims of any kind or nature arising from
or c onnected w ith any work a ither c overed o r affected b y t his C hange O rder, i ncluding,w ithout 1 imitation,
claims related to contract time,contract acceleration, onsite or home office overhead, or lost profits.
The parties whose names appear below swear under penalty of perjury that they are authorized to enter
into this contract modification,which is binding on the parties of this contract.
3. The C ontractor w ill adjust the amount o f i is p erformance b and(if any) f or t his p roj ect t o b e
consistent with the revised contract sum shown in section 2, above.
IN WITNESS,the parties below have executed this Agreement, which will become effective on the
last date written below,
CONTRACTOR: CITY OF NT:
By: By:
(signora sign re)
Print Name: Kee" br— Print N
Its P*%5r-e* Oi46Aa t r Its
(Title) 1J Title)
DATE: �� O( — DATE: Xr—e" —0 5
APPROVED AS TO FORM:
e Law ent
Owgemder t garageseismc
CONTRACT MODIFICATION-2 OF 2
Summit Central Construction, Inc. PROPOSED CHANGE ORDER
44110 196th Avenue SE No. 0000#1
Fax: 360-825-3797 Phone: 360-825-5600
Enumclaw,Wa 98022 Fax: 360-825-3797
TITLE: Spandrell repair DATE:2/17/2005
PROJECT:Kent Centennial Parking Garage Seis JOB: 02-034
TO: Attn: Rosalie Givens CONTRACT NO: 1
City of Kent
Parks Facilities
220 4th Avenue South
Kent, WA 98032-5895
Phone: 253-856-5083 Fax: 253-856-6080
IRE: ' ' : From: Number:
1D11 SCRIPM14 OF PROPOSAL
Per engineer direction-Drill hole from outside building through spandrell pannel into column,istall anchor using I-filti ffY150 with
new 12"x 12"plate, Paint all exposed steel. @ 55 locations
Item bescrioa Ste" Quadity UJAU thdtPrice Tax RateTzx Amount Net Aunt
00001 Spandreu Repay 1000 $12,799 00 0.000/0 $0 00 $12,799 00
Unit Cost: $129799.00
Unit Tax: $0.00
Lump Sum: $0.00
Lump Tax: $0.00
Total: $12,799.00
RECEIVED
FEB 18 2005
Staaleson Engineering
QfZOOL, MAR 17 2005
APPROVAL:
By: By:
Rosalie Givens Keith Hickle
Date: Date:
E, „®
s
S C C l Swmntt Central Constr ctkm,Mc. SHEET 1 OF 1
COST ESTIMATE DETAIL SHEET
PROJ:NAME: Kent Centenlal
Co Q` PROJECT# 04.10
\ REFERENCE: SCCI PCO#
DESCRIPMN QUANTITY UNIT UNIT EXTENSION
COST TOTALS
Subcontractors
SUB TOTALS: $
SCCI MATERIAL&EQUIPMENT $
pift anchor.
Misc materials eParr,Paint. 5200 Isom $ 7500 $ 3,90000
Mtsc Equipment 100 Isum $ 50 00 $ 5000
SCCI MATERIAL&EQUIPMENT TOTAL $ 3,950.00
SCCI LABOR
Carpenter 86.00 hour $ 34.50 $ 2,96700
Carpenter 3600 how $ 2840 $ 1,02240
0.00 how $ - $ -
0 00 how $ $
000 hour $ - $
- - - --- — - - — - - -0E16- - - how $ _ $000 hair $ $
0.00 hour $ -
SCCI LABOR TOTAL 122.00 hour $ 3,989.40
TIME EXTENSION 000 days $ - $ -
UNION BENEFITS 122.00 hour $ 1050 $ 1,28100
PAYROLL BURDEN 2100 % $ 3,98940 $ 83777
DIRECT SUP/Managernent 1500 % $ 91623
SCCISUB MARKUP 1000 % $ -
SCCI 0 H &PROFIT 1500 % $ 1,64616
SUBTOTAL $ 12,621
INSURANCE 040 % $ 50
BOND PREMIUM 250 % $ 127
TOTAL $ 12,799
Summit Central Construction, Inc. PROPOSED CHANGE ORDER
-44110 196th Avenue SE No. 00002
Fax:360-825-3797 Phone: 360-825-5600
Enumclaw,Wa 98022 Fax: 360-825-3797
TITLE: Spandrell Patch DATE:2/17/2005
PROJECT:Kent Centennial Parking Garage Seis JOB: 02-034
TO: Attn. Rosalie Givens CONTRACT NO: 1
City of Kent
Parks Facilities
220 4th Avenue South
Kent, WA 98032-5895
Phone: 253-856-5083 Fax: 253-856-6080
RE: From: Number:
HllSCRMI()N OF PROPOSAL.
Per architects direction,chip and grind embeds. repair with Epoxy Gel A approx 77 locations
Btart Dewrip " Sloew Quo* umb gilt P Tnx Rate Tax Amount Net Amount
00001 sou patch 1000 $2,050 00 0 00% $0 00 $2,050 00
Unit Cost: $29050.00
Unit Tax: $0000
Lump Sum: $0.00
Lump Tax: $0.00
Total: $29050.00
RECEIVED
FEB 18 2005
Staaleson Engineering
`Q[ vi ,t,- MAR 17 2005
APPROVAL:
By: By:
Rosalie Givens Keith Hickle
Date: Date:
Exped&mg
F
SCC l Summit Cent d Cowftuafim%Inc. SHEET 1 OF 1
COST ESTIMATE DETAIL SHEET
PROJ: NAME: Kent Centenlal
PROJECT#: 04.10
REFERENCE: SCCI PCO#
DESCRIPTION QUANTITY UNIT UNIT EXTENSION
COST TOTALS
Subcontractors
SUB TOTALS: $
SCCI MATERIAL 3 EQUIPMENT $
C?orcmwe patch,
Misc material Paart 1.00 Isum $ 14500 $ 14500
5 -
SCCI MATERIAL&EQUIPMENT TOTAL $ 145.00
SCCILABOR
Carpenter 19.00 haw $ 3475 $ 66025
Carpenter 9.00 hour $ 2840 $ 25560
0.00 haw $ - $ -
0.00 haw $ - $ -
000 haw $ - $ -
0 00 haw $ - $ -
- — - — -- - -- — ------ 0-00--------hwr— - -r --- _ - $ _ --- -
0.00 haw $ -
SCCI LABOR TOTAL 28.00 hour $ 915.85
TIME EXTENSION 0.00 days $ - $ -
UNION BENEFITS 2800 haw $ 1050 $ 29400
PAYROLL BURDEN 21.00 % $ 91585 $ 19233
DIRECT SUP/Menegernent 1500 % $ 21033
SCCI SUB MARKUP 10.00 % $ -
SCCI O H.&PROFIT 15.00 % $ 26363
SUBTOTAL $ 2,021
INSURANCE 0.40 % $ 8
BOND PREMIUM 2.50 % $ 20
TOTAL $ 2,050