CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed,if you have questions, please contact City Clerks Office.
44
Vendor Name: �//� Vendor Number:
JD Edwards Number
Contract Number. Pkoq ' xis
This is assigned by Deputy City Clerk
Description: C--V"e eill-
Detail:
Project Name: by /v ®�`� 03 ��6`� ✓�
p e3
� T 0 3
Contract EffectiveVDe: 0 Termination Date: S�
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Contract Manager: ,1*1512:�d7Av Department: Xd41Y
Abstract: /
Z�K/ ��/01::7
S•Pubbc\RecordsManagement\Farms\ContraclCover\ADCL7832 07/02
s
YAF Project Agreement
Youth Athletic Facility Grant Account
Project Sponsor: Kent Parks, Rec&Comm Sery Project Number: 03-1264D
Project Title: Glenn Nelson Park Improvements Approval Date: 4/2/2004
A. PARTIES QF THE AGREEMENT
This Project Grant Agreement(Agreement)is entered into between the Interagency Committee for Outdoor Recreation
(IAC),P.O.Box 40917,Olympia,Washington 98504-0917 and Kent Parks, Rec&Comm Serv,220 4th Ave S, Kent,
WA 98032-5895(Sponsor)and shall be binding upon the agents and all persons acting by or through the parties
S. PURPOSE OF AGREEMENT
This Agreement sets out the terms and conditions by which a grant is made from the Youth Athletic Facility Grant
Account of the State of Washington's General Fund. The grant is administered by the IAC to the Sponsor for the
project named above.
C. DESCRIPTION OF PROJECT
The subject Project is described on the attached Project Summary.
D. TERM OF AGREEMENT
The Project Sponsor must insure that the facility developed,improved,and/or maintained through the Youth Athletic
Facilities Account funding identified in the Project Agreement is made available for public youth and/or community
athletics for a minimum of twenty(20)years from the date of project completion.
E. PERIOD OF PERFORMANCE
The Project reimbursement period shall begin on April 2,2004 and end on March 31,2005. No expenditure made
before or after this period is eligible for reimbursement unless incorporated by written amendment into this
Agreement.
F. PROJECT FUNDING
The total grant award provided by the IAC for this project shall not exceed$56,624.00. The IAC shall not pay any
amount beyond that approved for funding of the project. The Sponsor shall be responsible for all total project costs
that exceed this amount. The contribution by the Sponsor toward work on this project at a minimum shall be as
indicated below:
Percentage Dollar Amount
IAC-YAF Improving 20.47% $56,624.00
Project Sponsor 79.53% $220,000.00
Total Project Cost 100.00% $276,624.00
G. RIGHTS AND OBLIGATIQNS
All rights and obligations of the parties to this Agreement are subject to this Agreement and its attachments,including
the Sponsor's Application,Project Summary,Eligible Reimbursement Activities Report,Project Milestones, and the
General Provisions,all of which are attached hereto and incorporated herein.
Except as provided herein,no alteration of any of the terms or conditions of this Agreement will be effective unless
provided in writing. All such alterations,except those concerning the period of performance, must be signed by both
parties. Period of performance extensions need only be signed by IAC's Director.
The Sponsor has read,fully understands and agrees to be bound by all terms and conditions as set forth in these
documents.
YAF Project Agreement Youth Athletic Facility Grant Account
Chapter 79A.25 RCW,Chapter 286 WAC Page 1 of 2
PROJAGRI.RPT
H. COMPLIANCE WITH APPLICABLE 31TATUTES.RULES.AND IAC POLICIES
' This Agreement is governed by,and the Sponsor shall comply with,all applicable state and federal laws and
regulations,including Chapter 79A.25 RCW,Chapter 28e WAC and published agency policies,which are incorporated
herein by this reference as if fully set forth.
I. ADDITIONAL PROVISIONS OR dfQQT CAT/ONS OF THE GENERAL PROVISIONS
The Project Sponsor must ensure that the facility acquired,developed, improved, and/or maintained through
the Youth Athletic Facilities Account funding identified in this Project Agreement is made available for public
youth and/or community athletics for a minimum of twenty(20)years from the date of project completion.
Project Completion begins at IACs issuance of final reimbursement.
Should the facility become unavailable for public youth and/or community athletic use during this 20 year
period, except as provided for in Section 25(b), IAC requires the project sponsor to replace all entirely or
partially funded project elements within this agreement.
J. FEDERAL FUND INFORMATION
(none)
K. PROJECT GRANT AGREEMENT REPRESENTATII/E
All written communications sent to the Sponsor under this Agreement will be addressed and delivered to:
Prolect Contact IAC
Name: Shane Gilbertson Interagency Committee for Outdoor Recreation
Title: Project Manager Natural Resources Building
Address: 220 4th Ave S PO Box 40917
Kent,WA 98032-5895 Olympia,Washington 98504-0917
www.isc.wa.gov/iact
These addresses shall be effective until receipt by one party from the other of a written notice of any change.
L. ENTIRE AGREEMENT
This agreement,along with all attachments;constitutes the entire agreement of the parties. No other understandings,oral or
otherwise,regarding this Agreement shall exist or bind any of the parties.
M. EFFECTIVE DATE
This agreement, for project#03-1264D, shall be effective upon signing by all parties.
STATE OF WASHINGTON
INTERAGENCY
COMMITTEE FOR OUTDOOR RECREATION
J
BY: - ^�- CE. � DATE:
Laura Johnson,Director
PROJECT SP SO
BY DATE:
TITLE:
Pre-approved as to form:
BY: /S/
Assistant Attorney General
YAF Proiect Aareement Youth Athletic Facility Grant Account
Chapter 79A.25 RCW,Chapter 286 WAC Pace 2 of 2
PROJAGR2.RPT
Youth Athletic Facilities
RECRERTM Improvinq Category
Post-Evaluation Project Summary
TITLE: Glenn Nelson Park Improvements NUMBER: 03-1264D (Development)
STATUS: Board Funded
SPONSOR: Kent Parks, Rec&Comm Sery EVALUATION SCORE: 42.0000
BOARD RANKING: 10 of 24
COSTS: SPONSOR MATCH:
YAF Improving $56,624 20% Appropriation\Cash
Local $220,000 80%
Total $276,024 100%
DESCRIPTION:
This project in Kent in King County redevelops a soccer field and improves a baseball field. New drainage and an
automatic irrigation system will be installed and the cintrex material on the soccer field will be replaced with natural
grass.The south end of the field is adjacent to S. 268th Street, so plans include replacing a section of the old
outdated perimeter fencing with new 10'tall chaindink fence,with 20'of netting on top. This will go behind the south
soccer goal to contain errant shots on goal.
Presently there is not an accessible route from the parking lot to the soccer field, baseball field, or restroom. Grant
funds will be used to pave an ADA access from the parking lot to the fields and eligible support facilities.
LOCATION INFORMATION:
West side of Kent about a 1/2 mile southwest of Lake Fenwick.
YAF GROUP: Statewide
COUNTY: King
SCOPE(ELEMENTS):
Architectural & Engineering Park Furniture Trails
Athletic Fields Permits Utilities
Fencing&Gates Sales Tax
Landscaping Site Preparation
FISCAL YEAR: 2004 DATE PRINTED: April 25, 2004
1PAPSUM2 RPT Glenn Nelson Park Improvements
t,
Eligible Reimbursement Activities Report
r REC�RERTO
Project Sponsor: Kent Parks, Rec&Comm Sery Project Number: 03-1264 D
Project Tltle: Glenn Nelson Park Improvements IAC Approval: 4/2/2004
Development Items:
Items Elements Unit Quantity Description
Architectural&Engineering A&E development Lump Sum 100
Athletic Fields Baseball infield Each 100 65'and 60'
Athletic Fields Irrigation-automatic for turf/playfield Acres 300 Main line,laterals,and
heads
Athletic Fields Safety netting SQ Ft 4,00000 Safety netting 20'high for
soccer and baseball
Athletic Fields Soccer field-natural turf Each 100 300'X 165'
Athletic Fields Soccer goals Pair 100 permanent soccer goals
Fencing&Gates Fencing-chain link Linear Ft 77000 10'high,9 gauge
Landscaping Drainage system Lump sum 1.00 corrugated,perforated
pipe sub drainage
Landscaping Grass-hydro seed Acres 300
Park Furniture Drinking fountain Each 100 Frost Free,ADA
compliant
Park Furniture Picnic pads-concrete Each 4.00 14'X16'
Park Furniture Tables Each 400 4'X 8'Aluminum ADA
' accessible
Park Furniture Trash receptacles Each 400 Metal Self dosing
Permits Permits Lump sum 100
Sales Tax Sales Tax Lump Sum 1.00
Site Preparation Grading Acres 300
Trails Paths-access routes Linear Ft 1,000.00 6'side,concrete
Utilities Catch basins Each 400
ELIGREIM RPT April 25,2004 Page: 1
am W1072
�.
MW Milestone Report By Project
r RECRM
Project Number: 03-1264 D
Project Name: Glenn Nelson Park Improvements
Sponsor: Kent Parks, Rec& Comm Sery
IAC Project Manager: Darrell Jennings
Comnients/Description Project Start 04/02/2004
I A&E Complete/Permits Submitted 04/30/2004
Plans& Specs Reviewed by IAC 05/14/2004
Bid Awarded 05/31/2004
I Construction Started 06/01/2004
Annual Project Billing 06/30/2004
I Project Complete 03/31/2005
Final Docs&Billing to IAC 06/30/2005
X=Milestone Complete
I=Critical Milestone
1MILESTO.RPT April 25,2004 Page: 1