HomeMy WebLinkAboutCAG2003-0529 - Original - WA State Department of Transportation - S 228th St Railroad Grade Separation - 09/17/2003 % cords M eme
KENT Document
WAsH,NoroN
CONTRACT COVER SHEET
This is to be completed by the Contract Manager prior to submission to City Clerks Office. All
portions are to be completed, If you have questions, please contact Mary Simmons, City
Clerks Office.
WSDOT
Vendor Name: Vendor Number:
JD Edwards Number
Contract Number:
This is assigned by Mary Simmons
South 228th St RR Grade Separation Fund Authorization
Description:
Project will grade separate the UP and BNSF RR tracks at 2281h ST Via two underground
crossings.
Detail:
South 2281h St RR Grade Separation
Project Name:
October 14, 2003
Contract Effective Date: Termination Date:
Contract Renewal Notice (Days):
Number of days required notice for termination or renewal or amendment
Don Wickstrom Public Works Engineering
Contract Manager: Department:
Abstract:
City Council authorized the Mayor to sign the Local Agency aareement with Washington
State Department of Transportation for the 228th ST. RR Grade Separations on September 16,
2003. The $1 million arant administered through FAST from FHWA will be used to beain
preliminary engineering on the project.
S Public\RecordsManagement\Forms\ContractCover\ADCL7832 07/02
Washington State Local Agency Agreement
AMk
GDepartment of Transportation
Agency City of Kent CFDA No. 20.205
(Catalog of Federal Domestic Assistance)
Address 220 4th Ave. S. Project No.
Kent, WA. 98032-5895 Agreement No.
For 0—SC WSDOT Use Only
The Local Agency having complied,or hereby agreeing to comply,with the terms and conditions set forth in(1)Title 23,U S Code Highways,(2)the regulations issued
pursuant thereto,(3)Office of Management and Budget Circulars A-102,A-87 and A-133,(4)the policies and procedures promulgated by the Washington State
Department of Transportation,and(5)the federal aid project agreement entered into between the State and Federal Government,relative to the above project,the
Washington State Department of Transportation will authorize the Local Agency to proceed on the project by a separate notification Federal funds which are to be
obligated for the project may not exceed the amount shown herein on line r,column 3,without written authority by the State,subject to the approval of the Federal
Highway Administration All project costs not reimbursed by the Federal Government shall be the responsibility of the Local Agency
Project Description
Name S.228th St. Railroad Grade Separations Length 0.5 mi
Termini 700 feet west of the Union Pacific 700 feet east of the Burlington Northern Santa Fe Railroad Tracks
Description of Work
The project will grade separate the Union Pacific and Burlington Northern Santa Fe railroad tracks at S. 228th Street via
two under-crossings. Both railroads will operate on bridge structures over the roadway. Associated improvements
include driveway improvements to accommodate the under-crossings as well as curbs, gutters, sidewalks, storm drainage,
pump stations,and lighting.
Estimate of Funding
Type of Work (t) (2) (3)
Estimated Total Estimated Agency Estimated
Project Funds Funds Federal Funds
PE a Agency 295,000.00 295,000 00
b.Other consultant 700,000.00 700,000 00
c. Other
Federal Aid Participationd.State 5,000 00 5,000.00
Ratio for PE a Total PE Cost Estimate a+b+c+d 1,000,000.00 1,000,000.00
Right of Way f.Agency
.Other
h.Other
Federal Aid i.State
Participation
Ratio for RW j.Total R/W Cost Estimate f+ +h+i
Construction k.Contract
I. Other
m.Other
n.Other
o.Agency
Federal Aid State
Participabon p.
Ratio for CN q Total CN Cost Estimate k+l+m+n+o+
r.Total Project Cost Estimate e+ 1000 000.00 1000 000.00
Agency fficia Washington State Department of Transportation
By 6 By
Title 0 Mayor Assistant Secretary for Highways and Local Programs
Date Executed
DOT Form 140-039 EF .�
Revised 10102
Construction Method of Financing (Check Method selected)
State Ad and Award
❑Method A-Advance Payment-Agency Share of total construction cost(based on contract award)
❑Method B-Withhold from gas tax the Agency's share of total construction cost(line 4,column 2)In the amount of
$ at$ per month for months.
Local Force or Local Ad and Award
®Method C-Agency cost incurred with partial reimbursement
The Local Agency further stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a
condition to payment of the federal funds obligated,It accepts and will comply with the applicable provisions set forth
below.Adopted by official action on
Resolution/Ordinance No
Provisions
I. Scope of Work I Preliminary engineering
The Agency shall provide all the work,labor,materials,and services necessary 2 Right of way acquisition
to perform the project which is described and set forth in detail in the"Project 3 Project construction
Descnption"and"Type of Work"
In the event that right of way acquisition,or actual construction of the road,for
When the State acts for and on behalf of the Agency,the State shall be deemed which preliminary engineering is undertaken is not started by the closing of the tenth
an agent of the Agency and shall perform the services described and indicated in fiscal year following the fiscal year in which the agreement is executed,the Agency
"Type of Work"on the face of this agreement,in accordance with plans and will repay to the State the sum or sums of federal funds paid to the Agency under the
specifications as proposed by the Agency and approved by the State and the terms of this agreement(see Section IX)
Federal Highway Administration
When the State acts for the Agency but is not subject to the right of control by The Agency agrees that all stages of construction necessary to provide the initially
the Agency,the State shall have the right to perform the work subject to the planned complete facility within the limits of this project will conform to at least the
ordinary procedures of the State and fightFed to Highway a work subjecttration mimmum values set by approved statewide design standards applicable to this class
of highways,even though such additional work is financed without federal aid
II. Delegation of Authority participation
The State is willing to fulfill the responsibilities to the Federal Government by The Agency agrees that on federal aid highway construction projects,the current
the administration of this project.The Agency agrees that the State shall have the federal aid regulations which apply to liquidated damages relative to the basis of
full authority to carry out this administration The State shall review,process,and federal participation in the project cost shall be applicable in the event the contractor
approve documents required for federal aid reimbursement in accordance with fails to complete the contract within the contract time
federal requirements If the State advertises and awards the contract,the State VI. Payment and Partial Reimbursement
will further act for the Agency in all matters concerning the project as requested
by the Agency If the Local Agency advertises and awards the project,the State The total cost of the project,including all review and engineering costs and
shall review the work to ensure conformity with the approved plans and other expenses of the State,is to be paid by the Agency and by the Federal
specifications Government Federal funding shall be in accordance with the Transportation
Equity Act for the 21st Century(TEA 21),as amended,and Office of
III. Project Administration Management and Budget circulars A-102,A-87 and A-133 The State shall not
Certain types of work and services shall be provided by the State on this be ultimately responsible for any of the costs of the project The Agency shall be
project as requested by the Agency and described in the Type of Work above In ultimately responsible for all costs associated with the project which are not
addition,the State will famish qualified personnel for the supervision and reimbursed by the Federal Government Nothing in this agreement shall be
inspection of the work in progress On Local Agency advertised and awarded construed as a promise by the State as to the amount or nature of federal
projects,the supervision and inspection shall be limited to ensuring all work is in participation in this project
conformance with approved plans,specifications,and federal aid requirements The Agency shall bill the state for federal aid project costs incurred in conformity
The salary of such engineer or other supervisor and all other salaries and costs with applicable federal and state laws The agency shall rmrmtmze the time elapsed
incurred by State forces upon the project will be considered a cost thereof All between receipt of federal aid funds and subsequent payment of incurred costs
costs related to this project incurred by employees of the State m the customary Expenditures by the Local Agency for maintenance,general administration,
manner on highway payrolls and vouchers shall be charged as costs of the supervision,and other overhead shall not be eligible for federal participation unless
project an indirect cost plan has been approved by W SDOT
IV. Availability of Records The State will pay for State incurred costs on the project Following
All project records in support of all costs incurred and actual expenditures payment,the State shall bill the Federal Government for reimbursement of
kept by the Agency are to be maintained in accordance with local government those costs eligible for federal participation to the extent that such costs are
accounting procedures prescribed by the Washington State Auditor's Office, attributable and properly allocable to this project The State shall bill the
the U S Department of Transportation,slid the Washington State Department Agency for that portion of State costs which were not reimbursed by the
of Transportation The records shall be open to inspection by the State and Federal Government(see Section IX)
Federal Government at all reasonable times and shall be retamed and made 1. Project Construction Costs
available for such inspection for a period of not less than three years from the
final payment of any federal aid funds to the Agency Copies of said records Project construction financing will be accomplished by one of the three
shall be furnished to the State and/or Federal Government upon request methods as indicated in this agreement
V. Compliance with Provisions
The Agency shall not incur any federal aid participation costs on any
classification of work on this project until authorized in writing by the State for
each classification The classifications of work for projects are
DOT Form 140-039 EF 2
Revised 10/02
Method A—The Agency will place with the State,within(20)days slier the X. Traffic Control,Signing,Marking,and Roadway
execution of the construction contract,an advance in the amount of the Maintenance
Agency's share of the total construction cost based on the contract award The
State will notify the Agency of the exact amount to be deposited with the State The Agency will not permit any changes to be made in the provisions for parking
The State will pay all costs incurred under the contract upon presentation of regulations and traffic control on this project without prior approval of the State and
progress billings from the contractor Following such payments,the State will Federal Highway Administration The Agency will not install or permit to be
submit a billing to the Federal Government for the federal aid participation installed any signs,signals,or markings not in conformance with the standards
share of the cost.When the project is substantially completed and final actual approved by the Federal Highway Administration and MUTCD The Agency will,
costs of the project can be determined,the State will present the Agency with a at its own expense,maintain the improvement covered by this agreement.
final billing showing the amount due the State or the amount due the Agency
This billing will be cleared by either a payment from the Agency to the State or XI. Indemnity
by a refund from the State to the Agency
The Agency shall hold the Federal Government and the State harmless from and
shall process and defend at its own expense all claims,demands,or suits,whether at
Method B— The Agency's share of the total construction cost as shown on law or equity brought against the Agency,State,or Federal Government,ansmg
the face of this agreement shall be withheld from its monthly fuel tax from the Agency's execution,performance,or failure to perform any of the
allotments The face of this agreement establishes the months in which the provisions of this agreement,or of any other agreement or contract connected with
withholding shall take place and the exact amount to be withheld each month this agreement,or ansmg by reason of the participation of the State or Federal
The extent of withholding will be confirmed by letter from the State at the time Government in the project,PROVIDED,nothing herein shall require the Agency to
of contract award Upon receipt of progress billings from the contractor,the reimburse the State or the Federal Government for damages ansmg out of bodily
State will submmt such billings to the Federal Government for payment of its injury to persons or damage to property caused by or resulting from the sole
participating portion of such billings negligence of the Federal Government or the State
Method C—The Agency may submit vouchers to the State in the format No liability shall attach to the State or Federal Government except as expressly
prescribed by the State,in duplicate,not more than once per month for those provided herein
costs eligible for Federal participation to the extent that such costs are directly XII. Nondiscrimination Provision
attributable and properly allocable to this project Expenditures by the Local The Agency shall not discriminate on the basis of race,color,national origin,or
Agency for maintenance,general administration,supervision,and other sex in the award and performance of any USDOT-assisted contract and/or
overhead shall not be eligible for Federal participation unless claimed under a agreement or in the administration of its DBE program or the requirements of 49
previously approved indirect cost plan CFR Part 26 The Agency shall take all necessary and reasonable steps under 49
The State shall reimburse the Agency for the Federal share of eligible project CFR Part 26 to ensure nondiscrimination in the award and administration of
costs up to the amount shown on the face of this agreement At the time of USDOT-assisted contracts and agreements The WSDOT's DBE program,as
audit,the Agency will provide documentation of all costs incurred on the required by 49 CFR Part 26 and as approved by USDOT,is incorporated by
project reference in this agreement Implementation of this program is a legal obligation
and failure to carry out its terms shall be treated as a violation of this agreement
The State shall bill the Agency for all costs incurred by the State relative to Upon notification to the Agency of its failure to carry out its approved program,the
the project The State shall also bill the Agency for the federal funds paid by Department may impose sanctions as provided for under Part 26 and may,in
the State to the Agency for project costs which are subsequently determined to appropriate cases,refer the matter for enforcement under 18 U S C 1001 and/or the
be ineligible for federal participation(see Section IX) Program Fraud Civil Remedies Act of 1986(31 U S C 3801 et seq)
VII. Audit of Federal Consultant Contracts
The Agency,if services of a consultant are required,shall be responsible for The Agency hereby agrees that it will incorporate or cause to be incorporated into
audit of the consultant's records to determine eligible federal aid costs on the any contract for construction work,or modification thereof,as defined in the rules
project The report of said audit shall be in the Agency's files and made and regulations of the Secretary of Labor in 41 CFR Chapter 60,which is paid for in
available to the State and the Federal Government whole or in part with funds obtained from the Federal Government or borrowed on
the credit of the Federal Government pursuant to a grant,contract,loan,insurance,
An audit shall be conducted by the WSDOT Internal Audit Office in or guarantee or understanding pursuant to any federal program involving such grant,
accordance with generally accepted governmental auditing standards as contract,loan,insurance,or guarantee,the required contract provisions for
issued by the United States General Accounting Office by the Comptroller Federal-Aid Contracts(FHWA 1273),located in Chapter 44 of the Local Agency
General of the United States,WSDOT Manual M 27-50,Consultant Guidelines
Authorization,Selection,and Agreement Administration,memoranda of The Agency further agrees that it will be bound by the above equal opportunity
understanding between WSDOT and FHWA,and Office of Management and Budget Circular A-133 clause with respect to its own employment practices when it participates in
federally assisted construction work Provided,that if the applicant so
If upon audit it is found that overpayment or participation of federal participating is a State or Local Government,the above equal opportunity clause
money in ineligible items of cost has occurred,the Agency shall reimburse is not applicable to any agency,instrumentality,or subdivision of such
the State for the amount of such overpayment or excess participation(see government which does not participate in work on or under the contract
Section IX)
Vill. Single Audit Act The Agency also agrees
The Agency,as a subrecipient of federal funds,shall adhere to the federal (1) To assist and cooperate actively with the State in obtaining the compliance of
Office of Management and Budget(OMB)Circular A-133 as well as all contractors and subcontractors with the equal opportunity clause and rules,
applicable federal and state statutes and regulations A subrecipient who regulations,and relevant orders of the Secretary of Labor
expends$300,000 or more in federal awards from all sources during a given (2) To furnish the State such information as it may require for the supervision of
fiscal year shall have a single or program-specificionsofOMBC audit performed for that such compliance and that rt will otherwise assist the State in the discharge of its
year lu accordance with the provisions of OMB Circular A-133 Upon
conclusion of the A-133 audit,the Agency shall be responsible for ensuring primary responsibility for securing compliance
that a copy of the report is transmitted promptly to the State (3) To refrain from entering into any contract or contract modification subj ect to
IX. Payment Of Billing Executive Order 11246 of September 24,1965,with a contractor debarred from,or
y g who has not demonstrated eligibility for,government contracts and federally
The Agency agrees that if payment or arrangement for payment of any of assisted construction contracts pursuant to the Executive Order
the State's billing relative to the project(e g,State force work,project
cancellation,overpayment,cost ineligible for federal participation,etc)is not (4) To carry out such sanctions and penalties for violation of the equal
made to the State within 45 days after the Agency has been billed,the State opportunity clause as may be imposed upon contractors and subcontractors by the
shall effect reimbursement of the total sum due from the regular monthly fuel State,Federal Highway Administration,or the Secretary of Labor pursuant to Part
tax allotments to the Agency from the Motor Vehicle Fund No additional II,subpart D of the Executive Order
Federal project funding will be approved until full payment is received unless
otherwise directed the Assistant Secretary for Highways and Local Programs
DOT Fonn 14D-039 EF 3
Revised 10/02
In addition,the Agency agrees that if it fails or refuses to comply with these XV. Venue for Claims and/or Causes of Action
undertakings,the State may take any or all of the following actions For the convenience of the parties to this contract,it is agreed that any claims
(a) Cancel,terminate,or suspend this agreement in whole or in part, and/or causes of action which the Local Agency has against the State of
Washington,growing out of this contract or the project with which it is
(b) Refram from extending any further assistance to the Agency under the concerned,shall be brought only in the Superior Court for Thurston County
program with respect to which the failure or refusal occurred until satisfactory
assurance of future compliance has been received from the Agency,and XVI. Certification Regarding the Restrictions of the Use
(c) Refer the case to the Department of Justice for appropriate legal proceedings of Federal Funds for Lobbying
The approving authority certifies,to the best of his or her knowledge and belief,
that
XIII. Liquidated Damages (1) No federal appropriated funds have been paid or will be paid,by or on behalf
The Agency hereby agrees that the liquidated damages provisions of 23 CFR of the undersigned,to any person for influencing or attempting to influence an
Part 635,Subpart 127,as supplemented,relative to the amount of Federal officer or employee of any federal agency,a member of Congress,an officer or
participation in the project cost,shall be applicable in the event the contractor employee of Congress,or an employee of a member of Congress in connection with
fails to complete the contract within the contract time Failure to include the awarding of any federal contract,the making of any federal grant,the making of
liquidated damages provision will not relieve the Agency from reduction of any federal loan,the entering into of any cooperative agreement,and the extension,
federal participation in accordance with this paragraph continuation,renewal,amendment,or modification of any federal contract,grant,
XIV. Termination for Public Convenience loan,or cooperative agreement
The Secretary of the Washington State Department of Transportation may (2) If any funds other than federal appropriated funds have been paid or will be
tertmnate the contract in whole,or from time to time in part,whenever paid to any person for influencing or attempting to influence an officer or employee
of any federal agency,a member of Congress,an officer or employee of Congress,
(1) The requisite federal funding becomes unavailable through failure of or an employee of a member of Congress in connection with this federal contract,
appropriation or otherwise grant,loan,or cooperative agreement,the undersigned shall complete and submit
(2) The contractor is prevented from proceeding with the work as a direct the Standard Form-LLL,"Disclosure Form to Report Lobbying,"in accordance
result of an Executive Order of the President with respect to the prosecution of with its instructions
war or in the interest of national defense,or an Executive Order of the (3) The undersigned shall require that the language of this certification be
President or Governor of the State with respect to the preservation of energy included in the award documents for all subawards at all tiers(including subgrants,
resources and contracts and subcontracts under grants,subgrants,loans,and cooperative
(3) The contractor is prevented fromproceedmg with the work by reason of
agreements)which exceed$100,000,and that all such subrecipients shall certify
and disclose accordingly
a preliminary,special,or permanent restraining order of a court of competent
jurisdiction where the issuance of such order is primarily caused by the acts or This certification is a material representation of fact upon which reliance was
omissions of persons or agencies other than the contractor placed when this transaction was made or entered into Submission of this
certification as a prerequisite for making or entering into this transaction imposed
by Section 1352,Title 31,U S Code Any person who fails to file the required
(4) The Secretary determines that such termination is in the best interests of certification shall be subject to a civil penalty of not less than$10,000 and not more
the State than$100,000 for each such failure
Additional Provisions
DOT Form 140-039 EF 4
Revised 10102
rt - -^ -- - - - - - - �
i
in
N
1
f
W
C
L
c n
00
N --
N
17,NM4 (TYP.)
N
Q
f7
m
DD
p f)
N_
N_
w
Sn Q
LU
F
Z
y O
m
m
F
Q
3
ENGINEERING DEPARTMENT SHEET
CITY OF KENT cn
TYPICAL BRIDGE N
KENT DRAWN Rw SCALE NONE SECTIONor
g
w•••�••.e• APPROVED DATE 7-17-03 to
N
i
fq
;UTTCLIE,
0
BELLEVUE
0 1 2NT
SCALE IN MILES
-- SlamesST( rO SCALE
S_196TH.
i� SpDil{
— -
—SEATAC
F�--�
"
I_! _-� 4� —t -- B _SE 20M ST �
7J f
1 r �1?II'I�j —6r-�5 2127N ST I , � 4 /i-J' — ' �2 ��!_� :r c
1 _! �1 •� • �. ` :UNINCORPORATED: I;iiGRADE ", '-�Jai .na.a �! r ICING COUNTY.,I
'SEPARATIONS _
ST. , 171
MOINES
' _'_ --a (KENT
--_ --� ii _ R- - '" ;1--;•1.—.—_ 1: -- -- :�_ SE 240TH ST
ST
us
�� i..�� i Q
�. .�
fV
I ci
3 1 i
,k i r'. _ -- ' ,�• co
cri
It
in
` - kt --! •- `•! S 2MH ST
FEDERAL { AUBURN , m
WAY;
co
ENGINEERING DEPARTMENT SHEET
CITY OF KENT
N
KENT DRAWN Rw SCALE SHOWN VICINTY MAP o
7-17-03 Q
w..x...,e• APPROVED DATE V1
N
Washington State Local Agency enc Federal Aid
�
fI/ Department of Transportation Project Prospectus
Prefix Route
Federal Aid Date 7/30/2003
Project Number
Local Agency 02 WSDOT Federal Employer
-3013
Project Number Use Only Tax ID Number 91-6001254
Agency Federal Program Title
City of Kent ® 20.205 ❑ 20 209 ❑ Other
Project Title Start Latitude N47,231,51" Start Longitude W 122,14',34"
S 228th St.Railroad Grade Separations
End Latitude N47,23',51" End Longitude W122,13',58"
Project Termini From To
700 feet west of the Union Pacific Railroad Tracks 700 feet east of the Burlington Northern Santa Fe Railroad
From To Length of Project Award Type
0.5 im I ® Local ❑ Local Forces ❑ State ® Railroad
Federal Agency City Number County Number I County Name WSDOT Region
® FHWA ❑ Others 0615 17 1 King I NW
Congressional District Legislative Districts Urban Area Number TMA/MPO/RTPO
8,9 5,31,33,47 1 MPO/PSRC
t LooslAwney Phisse Start
Phase Esttr6atediCost; OundlIV Federal Funds {fatal
Nearest Hundred 3Doliar Nearest KundradDollar east Hundred Dollw Month Year
P E. $1,000,000 $1,000,000 Sept. 2003
R/W
FT
onstotal $1,000,000 $1,000,000
i s ri i�rr>> 0
0 �f ttili ow tLmg Design and Present nd_JtIgn)
Roadway Width Number of Lanes
46 feet 1 4
Currently,S.228th St.is 4-lanes wide, approximately 46 feet in width with separate left turn pockets at the intersections.The
Union Pacific and Burlington Northern Santa Fe railroad tracks cross the road at grade. The UP has one mainline track crossing
the road and the BNSF has two mainline tracks and one spur track crossing the road.Sidewalks exist in some locations
predominantly on the south side of the road.No bike lanes exist in the vicinity.Driveways to businesses connect to the roadway
in several locations.
Description cf` r+ os Dark
Roadway Width Number of Lanes
®New Construction ❑3-R ❑2-R 48 feet 4
The project will grade separate the Burlington Northern Santa Fe and Union Pacific railroad tracks at S 228th Street via
under-crossings.The railroads will operate on bridge structures constructed at the existing track grade.Associated Improvements
include driveway improvements to accommodate the under-crossings as well as curbs,gutters,sidewalks,storm drainage,pump
stations,and lighting.
Local Agency Contact Person Title Phone
Mark Madfai Senior Project Engineer 253-856-5521
Mailing Address City State Zip Code
220 4th Ave. S. Kent WA 98032-5895
By
Design Approval �J haa11 Approving Professional Engineer 1 I
Title 1 4A u Wolc h�(�QGroW, J Date
DOT Form 140-101 EF Page 1 of 3 ■Supersedes Previous Editions■
Revised 1212002
Agency Project Title Date
City of Kent S.228th St.Railroad Grade Separations 7/30/2003
deometric;ttesign
Description Through Route Crossroad
❑Principal Arterial ❑Principal Arterial
Federal ®Urban ®Minor Arterial El Urban ❑Minor Arterial
❑Collector ❑Collector
Functional ❑Major Collector ❑Major Collector
Classification ❑Rural ❑Minor Collector [] Rural ❑Minor Collector
❑Access Street/Road ❑Access Street/Road
Terrain N Flat ❑ Roil ❑Mountain [] Flat ❑Roll []Mountain
Posted Speed 35 MPH
Design Speed 40MPH
Existing ADT 9000
Design Year ADT 14000
Design Year 2020
Design Hourly Volume(DHV) 1500
/4ciden#- 3 Year Fx erience
Property InjuryAccidents Fatal Accidents
Year Damage Number of Number of Number of Number of Total Number
of Accidents
Accidents Accidents Injuries Accidents Fatalities
1999 1 1
2000 1 1 1 2
2001 1 1
PWf9rrpanc;of'W,oF*
Preliminary Engineering Will Be Performed By Others Agency
Agency and consultants 70 % 30 %
Construction Will Be Performed By Contract Agency
100 % %
� I`t�ttlll€iefi#$1�lf��sti�r�
❑Final ®Preliminary
Cl Class I-Environmental Impact Statement(EIS) ® Class II-Categorically Excluded(CE)
❑ Project Involves NEPA/SEPA Section 404 to Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class III-Environmental Assessment(EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreement
Environmental Considerations
The undercrossing at the BNSF tracks are adjacent to a portion of Mill Creek. The project will require this to be
protected during construction.A box culvert at a driveway may need to be replaced.Wetlands exist in the roadway
ditches north and south of the roadway.No filling of wetlands is anticipated to occur as a result of this project.Noise
and air quality will be addressed in the BA and may be affected due to an increase in traffic, although the reduction
in traffic delays at the tracks and the associated tram noise may decrease the noise and air impacts.
DOT form 140-101 EF Page 2 of 3
Revised 1212002
Agency Project Title Date
City of Kent S.228th St.Railroad Grade Separations 7/30/2003
Right of Way
®No Right of Way Required ❑Right of Way Required
*All construction required by the
contract can be accomplished ElNo Relocation El Relocation Required
within the existing nght of way.
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
At the BNSF and UP crossings there are various underground utilities that will need to be relocated including fiber
optic lines for Qwest, Sprint,MCI, 360 Networks, Level 3, and Multimedia as well as the railroads' own
communication fiber.The Olympic Pipeline alongside the UP tracks will also need to be relocated.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles)of the proposed project? ❑ Yes ® No
Remarks
This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is
not Inconsistent with the agency's comprehensive plan for community develo ment.
Agency City of Kent
Date By
Mayor/Chairperson
DOT Forth 140-101 EF
Page 3 of 3
Revised 1212002