RE: Completing the Final Voucher and Closeout Report for
Public Works Trust Fund Construction Loan
• Loan Number: PW-01-691-032
• Project Name: Tacoma's Second Supply Pipeline 5 Project
Dear Mr. Wickstrom:
Enclosed please find the Final Voucher and Close-Out Report for Public Works Trust Fund
Construction Loan. These forms should be completed and sent to the Public Works Board as
soon as possible after the project is finished. The forms should be sent to:
Isaac Huang
Public Works Board
210 11`"Avenue
PO Box 48319
Olympia, WA 98504-8319
You will note that our office has completed the estimated expenditures by cost category. We
have also identified the eligibility date, the total project allocation, and the amount drawn to date.
The information was taken from the project loan file. Please review these items to ensure that
they agree with your figures.
If you have any questions, please contact me at 360-725-5009.
Sincerely,
Isaac Huang
Client Services Representative
Enclosures
A\Cent PW-01-032 doc
Public Works Board
Public Works Trust Fund
( Construction Loan Program
Project Close-Out Report
Loan Agreement Number: PW-01-691-032
NOTE: This report shall serve as a contract AMENDMENT for determining the final loan amount,
interest rate,and local share and shall be attached and incorporated into the loan agreement. The
report accounts for funds associated with the Public Works Trust Fund Loan Agreement's Scope
of Work. Costs outside of the Scope of Work are not accounted for by this report.
City of Kent Jim White
220 Fourth Ave S Name of Chief Executive Officer:
Kent, WA 98032 Mayor
Title:
NOTE: This document is to certify that the project,as described in the Public Works Trust Fund Loan
Agreement's Scope of Work, is complete and has been designed and constructed to current
standards.
SECTION 1: Estimated and Actual Project Expenditures by Cost Cate or .
COST CATEGORY ESTIMATED ACTUAL
Preliminary Engineering A. $ 430,000.00 N. $ in design
Environmental Review B. 500,000.00 O. In design
Design Engineering C. 1,800,000.00 P. 1,428,000
Land/ROW Acquisition D. 240,000.00 Q. 4,000
Sales or Use Taxes E. 1,500,000.00 R. 1343,000
Other Fees F. 180,000 00 S. 208,000
Construction Inspection G. 1,500 000.00 T. 808,000
Start-Up Costs H. U. -
Relocation Costs I. V. -
Financmg Costs J. 750,000.00 W. -
Contingency K 2,700,000.00 X. -
Construction L. 18,400,000.00 Y. 15,992,000
TOTAL PROJECT COST M $ 28,000,000.00 Z. $ 19,783,000
SECTION 2: Attachments
• If applicable,a signed A-19 voucher for the final loan draw.
Please note:copies of clearance documents from the Department of Revenue and the Department
of Labor and Industries are no longer required for close out. However, borrowers are still required
to comply with all state regulations regarding public works contracts.
SECTION 3: Certification
The chief executive officer of the jurisdiction certifies that:
• To the best of his/her knowledge,the data provided in this report is true and correct as of the date
indicated below;
• Records supporting the information provided in this report are on file and will be made available by
the jurisdiction upon request; and
• There are no outstanding liens against this project
Sign of Pro,ect Engineer or C uktant Date
Sign re of Chia f N%@..ww,P Q ffie.._ `,t Dn Date
'•` f�•. Xb : 1
State o �
County o
On this day of ,20 0-1 J&4-OL�Q�� /Z)A�
personally appeared before me,
i
whoGare]mown to me,
whose identity I verified on the bases of
whose identity I verified on the oath/affirmation of a credible witness,
to be the signer/s of the foregoing document,and h�e she/they acknowledged that he/she/they signed it.
a� 9. 94 .1
Notary Public
(Sea] or Stamp)nf My Commission Expires:Or
F ''••.......••��. �r
A\Cent PW-01-032 doc
Return this worksheet with Close-Out Report
WORKSHEET FOR CALCULATING THE FINAL DRAW& LOCAL MATCH
Unlike the first two vouchers, the Public Works Board staff is unable to calculate the amount of the final draw. Two
variables essential to the calculation are known only by the jurisdiction, i.e.,the actual total eligible project cost and the
interest earned on the PWTF funds. The worksheet provided here is designed to assist the jurisdiction in calculating the
amount of the final draw.
Worksheet:
Step 1. Identify the Actual total eligible project cost. 1. 18,614,321.51
Step 2. PWTF contract's face amount. 2. 10,000,000 00
Step 3. Identify the Actual local funds used as match* Eligible costs may be considered local 3. 8,918,832.63
share from: <<12 months prior to Loan Agreement Execution Date>>
Step 4. Identify other federal or state grants used for project costs. 4. 0
Step 5. Balance of eligible project cost(subtract line 4 from line 1). 5. 18,614,121.51
Step 6 Multiply Line 5 by 85%, 90%,or 95%,as defined in the "Disbursement of Loan Proceeds" �85%
section of the loan agreement. 6. 15,822,173.28
Step 7. Identify interest earned on PWTF funds. 7. 279,983 13
Step 8. Subtract line from line 7 from line 6. 8. 15,542,190 15
Step 9. Enter the lesser of line 2 or line 8 (or a local option of an elective amount less than both line
2 and line 8). 9 10,000,000 00
Step 10. Amount drawn from the project's PWTF allocation to date. 10. 9,500,000.00
Step 11. To calculate the final draw amount for the project, subtract line 10 from line 9
(If this is a negative amount,this is the amount needed to refund to the Public Works Board 11. 500,000.00
within 30 days)
Step 12. Percent of local share (divide line 3 by the sum of lines 3 &9). 12. 47.14%
* Eligible Costs for LOCAL MATCH
Local Funds Included: * Loans (state,federal,and local)
* Locally generated revenue
Local Funds Excluded: • Interest earned on PWTFfunds
* All grants
* PWTF Pre-Construction loan
A Xent PW-01-032 doc
FORM STATE OF WASHINGTON AGENCY USE ONLY
A19-1 A AGENCY NO I CONTRACT NO OR GA AUTH NO
INVOICE VOUCHER 103 1 PW-01-691-032
AGENCY NAME INSTRUCTIONS TO VENDOR OR CLAIMANT.
Public Works Board In the absence of a detailed invoice,submit this form to claim payment
210 11'"Street or materials,merchandise or services Show complete detail for each item
Post Office Box 48319
Olympia,Washington 98504-8319 Vendor's Certificate:
I hereby certify under penalty of penury that the items and totals listed
ierein are proper charges for materials,merchandise or services furnished
VENDOR OR CLAIMANT(warrant is to be payable to) to the State of Washington,and that all goods fumished and/or services
rendered have been provided without discrimination because of age,sex,
naMal status,race,creed,color,national origin,handicap,religion,or
City of Kent /ietnam era or disabled veteran statu
220 Fourth Ave S
Kent, WA 98032 By
ISRSign in ro131o3
(Title) (Date)
FFEJDERAL I D NO OR SOCIAL SECURITY NO RECEIVED BY DATE RECEIVED
6001254
DATE DESCRIPTION QUANTITY UNIT PRICE AMOUNT
PW-01-691-032
Final Voucher
Loan Amount 10,000,000.00
Previous Draws 9,500,000.00
Balance 500,000.00
Total Final Voucher $ 500,000.00
PREPARED BY(Fiscal) DATE SERVICE AREA APPROVAL DATE
DOC DATE CURRENT DOC NO REF DOC NO VENDOR NUMBER VENDOR MESSAGE
M SUB
TRANS O APPN PROGRAM SUB SUB INVOICE GENERAL
SUF CODE D FUND INDEX INDEX OBJ OBJ CNTY CITY PROJECT AMOUNT NUMBER LEDGER
APPROVED FOR PAYMENT BY FISCAL DATE WARRANT TOTAL
A Xent PW-01-032 doc